Personal Injury by high speed projectile materials Sufficient Barrication, Restrict entry for Unauthorized
persons in Jetting Area
Personal Injury by Pressurized Water Stream Mandatory PPE’s: Full Face Shield with Hard Hat, Chemical
Gloves, Splash Goggles, Chemical Gas Mask, Chemical
Damage to the H.E Tubes due to Hydro jetting Coverall, Rubber Boots with Steel Toe.
Only Authorized person to Operate equipment and perform
High Noise Hydro Jetting Operation
Strict No Entry Sign Board and Hard Barrication to Restrict
Slip Trip and fall Entry on the opposite site of the tube being Hydro jetted.
Job to be started only after prior instruction from site
5.) Hydro jetting Cleaning of Tube Side Whipping of Hoses and Lance Supervisor to Jetter regarding Max. Pressure, Safety
Requirements and Work Permit Information.
Mandatory Tarpaulin Barrication to prevent any projectile
materials to come out of Job site.
Compulsory Whip check on every Pressurized Hose
Connections
Either Parking brake or Mechanical Strain to be used to Park
Equipment
Fire Extinguisher to be placed near to the Equipment
Gas Test to be carried out by Client prior to Starting of the
I.C Engine Operated Equipment
Personal Injury by projectile materials Sufficient Barrication, Restrict entry for Unauthorized
persons in Job Site
Damage to the H.E Tubes due to High Pressure Mandatory PPE’s: Full Face Shield with Hard Hat, Chemical
Gloves, Splash Goggles, Chemical Gas Mask, Chemical
High Noise Coverall, Rubber Boots with Steel Toe.
Only Authorized person to Operate equipment and perform
Whipping of Hoses and Lance Operation
Strict No Entry Sign Board and Hard Barrication to Restrict
6.) Air Drying using Compressor Air Entry on the opposite site of the tube being Air Dried.
Job to be started only after prior instruction from site
Supervisor regarding Max. Pressure, Safety Requirements
and Work Permit Information.
Mandatory Tarpaulin Barrication to prevent any projectile
materials to come out of Job site
Compulsory Whip check on every Pressurized Hose
Connections
Written approved procedure prior to start of Job
Electrical Hazards Only Authorized person to Operate Equipment
7.) Eddy Current Testing Barrication of the Job Location
Slip Trips and Falls Proper Management of Electric Cables
Good Housekeeping
Written approved procedure prior to start of Job
Distance Barrication of the Location
Serious Fatal Injuries from Equipment Rupture Only Calibrated Test Gauges should be used, minimum 2
No Warning Signs No’s
8.) Hydrostatic Testing Improper Disposal of Test Fluids Relief Valve set at 1.3 Times test pressure shall used
No Barrication
No Close Visual Inspection Above the MAWP of the
Equipment
Warning signs shall be placed
Slip, Trip and Fall Injury
Sufficient Barrication, Restrict entry for Unauthorized
persons in Job Site
9.) Spool Box-up
Heavy Materials Handling to be carried by Riggers
Alteration of Equipment Written approved procedure prior to start of Job
Misuse of Equipment Only Authorized person to Operate equipment and perform
Whipping of Hoses Operation
10.) Bolt Torqueing
Sips Trips and Falls Sufficient Barrication, Restrict entry for Unauthorized
persons at Job Site
Inspection of Equipment for Safety, Integrity prior to use
Poor House Keeping On the job completion, proper cleanup of the area is to be
Slip, trip and falls ensured by the Area Supervisor.
ICOM HSE Officer to assure that adequate housekeeping
11.) Job Completion, clean up. Dust generation
done.
Ensure the permit is signed off and closed.
Dust masks to be used by housekeeping crew
Prepared By: - Abdul Date:11/09/2017
Gafoor(Safety
Employees
Engineer)
Participating
in the
Approved By:- Date:
Development
Of JSA
Reviewed By:- Date:
HSE Department
SHEM-P-08.10.09-A