Ma’aden Wa’ad Al Shamal Phosphate

JOB SAFETY ANALYSIS Company (MWSPC)

Location Ma’aden Wa’ad Al Shamal Phosphate Company(MWSPC) JSA# Page 1 of 4


Department(Prepared by) HSE Department
JSA Title or Job HYDROJETTING AND CLEANING OF CONDENSERS 31A50-HEX-005 AND 31A60-HEX-007
Description
Personal Protective Equipment Required Hard hat, Full Face Visor, Chemical- Gloves,Coverall, Mono Goggles,
Rubber Gum Boots with Steel Toe, Gas Mask(3M 6006, 6200)
Disposable Coverall

Revised JSA Review


Check One New JSA
Revision# Date

BASIC JOB STEPS POTENTIAL HAZARDS RECOMMENDATIONS


 Physical injury due to mishandling of materials  Ensure all materials shall be stored, handled and used in
back, muscle safe manner, by type, providing sufficient access/egress
 Strain, sprain.  Employee shall be trained for using safe methods in
 Pinch Points/ Hand Injury handling materials.
 Run over or struck by  Leather hand gloves to be worn.
 Equipment/Material falling during handling or  Ensure all the material fully secured by competent and
lifting certified rigger.
 Sling worn out and cut during handling  Physical barriers to be erected and warning signs to be
 Run over during crane or equipment movement displayed.
 Persons injury & nearby  Trained banks man with high visibility jacket & whistle.
 Pedestrians, Injury by falling materials.  Make sure that rigger is always present during off-loading
1.) Mobilization of Manpower & Equipment
 Finger injury. Body being caught in between or
materials or handling by crane
 Slings are checked for properness and certificates are
struck by materials.
available.
 Make sure that banks men are present with flags in hand.
 Competent Supervision.
 Workforce training in the selection & use of tools, material
& equipment.
 Inspection of all equipment prior to use (including crane &
lifting gear).
 All personnel to undergo TBT briefing, and PTW (where
required).
 Ensure that all materials are properly secured by means of
correct sling belt to prevent materials from falling during
transportation.
 No overloading of materials on the trucks.
 Follow general guidelines in method statement.
 Competent Rigger to handle the activity.
 Manual handling training.
 Keep all body parts out of the line of fire.
 Barricading & signage
 Narrow road/ collision or topple  Ensure valid vehicle driving license
 Insecure instrument on vehicle  Observe proper traffic control and speed limit
 Over speeding  Equipment or material should be properly secured
 Warning signs shall be erected as means of warning where
applicable.
2.) Lineup of Equipment & Manpower
 Properly secure the equipment and material
 Ensure right position of the equipment and material is
properly set on the vehicle
 No person allowed to sit/present on the back of truck lorry
 Vehicle maneuvering unaided shall never be allowed
 Poor handling of scaffolding material  All scaffolding material should be hoisted by manila rope
 Improper Fall Protection and pulley wheels.
 Inadequate Foundation  Loose scaffolding clamps shall be hoisted with the help of
 Structure Collapse tool bags.
 Falling / throwing of materials  Area survey to be conducted before scaffolding erection
 Poor Housekeeping / slip trip and fall  Ground to be compacted properly
 Incomplete bracing  Use proper base / sole plate.
 No guard rails and toe boards  ICOM scaffolding inspector should inspect and approve
 Substandard Scaffolding Material scaffolding and tagged near access point at eye level
 Incompetent workforce  Scaffolding will be inspected again in case of modification
 Unauthorized Alteration of Scaffolding
and every week.
 Maintain good housekeeping at all time to prevent slip, trip
and falls.
3.) Erection of Scaffolding to Access the Front and Rear  Scaffolding material should be certified.
Cover of Cooler  Only experienced, third party certified and competent
scaffolders and supervisors to be employed.
 Install complete guard rails
 Area to be barricaded, vehicle will only be allowed with
permit and their movement should have controlled by
trained banks man
 Necessary signboard to be arranged during the erection and
dismantling of scaffolding.
 All areas, which require scaffolding should be mapped and
numbered. Scaffolding tags to be numbered in accordance
with mapping
 No scaffolding platforms are to be modified by
unauthorized personnel, except a competent Scaffolder
 Ensure LOTO and LOTO Log Sheet is attached with the Work
 Improper Isolation of Equipment Permit
 Release of Trapped Energy  Chemical Gloves and Splash Goggles, Chemical Gas Mask
 Release of Hazardous Substance and Chemical Coverall to be used along with Basic PPE’s
4.) Blinding, Front & Rear Cover Opening Works  Mishandling of Front and Rear Cover can cause  Authorized person Entry only
Personal  Riggers to be used to handle Covers during Opening and
 Injury and Damage to Cover
moving it to secure place

 Personal Injury by high speed projectile materials  Sufficient Barrication, Restrict entry for Unauthorized
persons in Jetting Area
 Personal Injury by Pressurized Water Stream  Mandatory PPE’s: Full Face Shield with Hard Hat, Chemical
Gloves, Splash Goggles, Chemical Gas Mask, Chemical
 Damage to the H.E Tubes due to Hydro jetting Coverall, Rubber Boots with Steel Toe.
 Only Authorized person to Operate equipment and perform
 High Noise Hydro Jetting Operation
 Strict No Entry Sign Board and Hard Barrication to Restrict
 Slip Trip and fall Entry on the opposite site of the tube being Hydro jetted.
 Job to be started only after prior instruction from site
5.) Hydro jetting Cleaning of Tube Side  Whipping of Hoses and Lance Supervisor to Jetter regarding Max. Pressure, Safety
Requirements and Work Permit Information.
 Mandatory Tarpaulin Barrication to prevent any projectile
materials to come out of Job site.
 Compulsory Whip check on every Pressurized Hose
Connections
 Either Parking brake or Mechanical Strain to be used to Park
Equipment
 Fire Extinguisher to be placed near to the Equipment
 Gas Test to be carried out by Client prior to Starting of the
I.C Engine Operated Equipment
 Personal Injury by projectile materials  Sufficient Barrication, Restrict entry for Unauthorized
persons in Job Site
 Damage to the H.E Tubes due to High Pressure  Mandatory PPE’s: Full Face Shield with Hard Hat, Chemical
Gloves, Splash Goggles, Chemical Gas Mask, Chemical
 High Noise Coverall, Rubber Boots with Steel Toe.
 Only Authorized person to Operate equipment and perform
 Whipping of Hoses and Lance Operation
 Strict No Entry Sign Board and Hard Barrication to Restrict
6.) Air Drying using Compressor Air Entry on the opposite site of the tube being Air Dried.
 Job to be started only after prior instruction from site
Supervisor regarding Max. Pressure, Safety Requirements
and Work Permit Information.
 Mandatory Tarpaulin Barrication to prevent any projectile
materials to come out of Job site
 Compulsory Whip check on every Pressurized Hose
Connections
 Written approved procedure prior to start of Job
 Electrical Hazards  Only Authorized person to Operate Equipment
7.) Eddy Current Testing  Barrication of the Job Location
 Slip Trips and Falls  Proper Management of Electric Cables
 Good Housekeeping
 Written approved procedure prior to start of Job
 Distance Barrication of the Location
 Serious Fatal Injuries from Equipment Rupture  Only Calibrated Test Gauges should be used, minimum 2
 No Warning Signs No’s
8.) Hydrostatic Testing  Improper Disposal of Test Fluids  Relief Valve set at 1.3 Times test pressure shall used
 No Barrication
 No Close Visual Inspection Above the MAWP of the
Equipment
 Warning signs shall be placed
 Slip, Trip and Fall Injury
 Sufficient Barrication, Restrict entry for Unauthorized
persons in Job Site
9.) Spool Box-up
 Heavy Materials Handling to be carried by Riggers
 Alteration of Equipment  Written approved procedure prior to start of Job
 Misuse of Equipment  Only Authorized person to Operate equipment and perform
 Whipping of Hoses Operation
10.) Bolt Torqueing
 Sips Trips and Falls  Sufficient Barrication, Restrict entry for Unauthorized
persons at Job Site
 Inspection of Equipment for Safety, Integrity prior to use
 Poor House Keeping  On the job completion, proper cleanup of the area is to be
 Slip, trip and falls ensured by the Area Supervisor.
 ICOM HSE Officer to assure that adequate housekeeping
11.) Job Completion, clean up.  Dust generation
done.
 Ensure the permit is signed off and closed.
 Dust masks to be used by housekeeping crew
Prepared By: - Abdul Date:11/09/2017
Gafoor(Safety
Employees
Engineer)
Participating
in the
Approved By:- Date:
Development
Of JSA
Reviewed By:- Date:
HSE Department