You are on page 1of 13
Reg No: [-T ] EET Question Paper:Code: 73106 ake B.Arch, DEGREE EXAMINANION, APRILIMAY 2017. ‘Ninth Semester ‘AR 2502/AR 1602/0166 AR 604 SPECIFICATIONS AND ESTIMATION yee (Regulations 2609/2010) “ite? Three hours u : <> Maximum’: 100'marks 127! AnowoP ALL questions, UPARTA ~< (10 x 2+ 20 marks) portance ‘of Specification. ne “Describe the Jala eae of desig of specification. detailed estifiate. 6. Mo finalize the rate of ai item, the’ analysis of rates, is. must” Justify the e |. statement. 7. What are the requirements for preparing estimation? 8. Give the details of estimation for lime concrets:-Assume necessary data... 9: Write short notsé on the role of Cost Plantier. ~~ tion andiwhat are its implications? PARTB— (6x 1680 maths)” (@) Blucidate: id detail the: prisidiples 6f specification’ writing /and classificatiol of specification. “ ~(16) 12: 13. 14. (b) @ (b) @ &) @) -) @ (b) illustrate the general specification with units for the following works @ Earth work excavation (4) (i) Painting the outer walls : © Gi) Wood works for fully paneled doors © Give a detailed specification’ for Reinforced Cement Concrete 4 u ‘5 Or { Chart out a detailed specification for Damp proof Course and dado work for marble flooring. 6) Elaborate in detail the types of estimate of buildings and requirement for preparing estimation. Or Describe the principles of measurement and billing contingencies. State the measurement of brick work. Explain.in detail the method of deriving detailed quantity of estimate for Cement Plastering and iron works. (16) Or Chait out the general guidelines for preparing detailed estimate by Using long wall and short wall method. (Assume necessary data) (6) Write notes on : @ Cost analysis. ; @) (i) Contingencies. ¢ ® Or 3 ‘Explain the methods of valuation of land. 2 73106 p | ¥ ITI OPP? PDPPDPP Pep pppoe ep Pepe pep Pf = Reg. No.: Question Paper Code : 60104 B.Arch. DEGREE EXAMINATION, NOVEMBER/DECEMBER 2016. Sixth/Nineth Semester AR 2502/AR 1502/10166 AR 604 — SPECIFICATIONS AND ESTIMATION. Z : (Regulations 2009/2010) ‘Time : Three hours Maximum : 100 marks “Support answers with sketches and assume necessary data wherever required. ~ Answer ALL questions. PART A— (10 x:2 = 20 marks) State the necessity of specification. What is the significance of specification? Write the specification for 1* class brick work. What is the specification for Damp proof course? " Write the significance of approximate estimation. State the. equitrement for preparing estimation. _ Brief the method of valpulation of materials required for brickwork for walls State the purpose if detail estimate, = Stat the function of cost planne®; What is the implication for depreciation? PART B— (6 x 16+ 80 marks) Give an acéount on types of specification and principles of specification writing. Or Discuss in detail the important aspects of the design of specification and sources of information. : 13. 14. 15. @) © @ () @ c) Chart out in detail the method of estimation for a framed RCC building. Or Discuss in detail elementary billing and measurement of wood and steel. Elucidate in detail the specification for earthwork and plain cement ‘concrete. Or JMlustrate the specification’ for coment plastering for brick’ walls and. weather proofing course in terrace.. Explain in detail the difference between center line method and long wall ‘and short wall method for estimation. 7 Or Make a detailed estimation for painting and flooring. Give an account on method of cost adjustment and cost analysis. Or ‘Déscribe in detail the role of various financial agenties for building and Tand development. +2 60104 woesel TTT TTT TTT Question Paper Code: 51104 B.Arch, DEGREE EXAMINATION, MAY/JUNE 2016 Ninth Semester AR 2502/AR 1502/10166 AR 604 ~ SPECIFICATIONS AND ESTIMATION Regulations 2009/2010) Time : Three Hours Maximum : 100 Marks Answer ALL questions. PART ~ A (10 x 2 = 20 Marks) ‘What is the purpose of specification ? How do you write Specification ? ‘Write the specification for earth work, ‘Write the specification for plastering. Briefly explain the various factors to be considered during preparation of a detailed estimate. “To finalize the rate of an item, the analysis of rates is must.” Justify the statement. ‘What are non-scheduled items 2 ‘What is a muster roll ? Differentiate between ‘scrape value’ and ‘salvage value’ Brief about imprest account. @ (b) (b) @ (b) PART-B (5x 16=80) Explain in detail the principles of estimation and different methods of estimation, OR Elaborate on the different types of specification. Write the detailed specification for (Earthwork evocations for foundation of a wall (ii) Manufacturing and fixing of glazed wooden windows OR Explain in detail th bret specification for I class and I lass building. Write notes on (Bill of quantity (ii) Contingencies Requirements for preparing an estimate oR ©) Co) © Calculate the quantities of the following items for platform having outer to outer dimensions of 4500 mm x 6000 mm. The toe walls are 200 mm thick. The depth of foundation is 700 mm, Assume the typical detail for the foundation. The height of the platform is 450 mm from ground. (i) First class brick work in foundation upto ground and upto floor level. Gi) 40 mm thick LPS. flooring, 51104 15. DDD hp PPP PPPDDDDD PIPPI DL LLDPE PLD DD nh 14. (a) Write down the units of measurements for the following items (a) Glazed tiles in dado Al- glazed partition 40 mm thick panelled doors Pressed steel hollow section frame Half brick thick brick wall MS. grill for windows 6mm thick 1: 4 cement plaster over ceiling Sanitary furnitures (100. mm dia Rain water pipe oR Explain Centre line and short wall-long wall method for detailed estimate with ‘your illustrative example. Write notes on (cost analysis (i) Functions ofa cost planner OR ‘What is valuation ? What is the purpose of valuation ? What are the methods of valuation of land ? xee.No.-(slalalelalalel lala lyl ] Question Paper Code : 51961 B.Arch. DEGREE EXAMINATION, MAYJUNE 2014. Ninth Semester (AR 2502/AR 1502 — SPECIFICATIONS AND ESTIMATION (Regulation 2009) Time : Three hours Maximum : 100 marks Answer ALL questions. PART A — (10 « 2 = 20 marks) - Discuss the significance of Specification writing? ‘Wht in thi sumpace aticaing iol apesificatin? ° ‘What sources are considered as guidelines for writing specifications in India? Write the unit of measurement of one brick wall and P.C.C. in flooring? What are contingency charges? " What do you understand by optimization of resources? Outline any two methods for quantity estimation. Outline the furictions of a cost planner. ry , ry a ny 74 ry z i rs = = = 5 | ‘What is the necessity of valuation of property? What is depreciation of a property? PART B — (5 x 16 = 80 marks) Discuss in detail the principles of good specification writing. Or What are the’ types of specifications? Highlight their significance and illustrate with an example, the significance aspects to be covered while writing specification. 12. (a) Write detailed specification for first class brick work in 1:6 cement mortar, Or (6) Write detailed specification for reinforced cement concrete slab. 13. (a) Discuss in detail the various types of estimate. Or (b) _ Disciiss the various factors responsible for determining the rate of an item of work? : 14. (a) From the given fig 1 below calculate the details and abstract estimate for the double roomed building (Loadbearing structure) (2x8= 16) () Barthwork in excavation. : Gi)’ P.C.C. in foundation. Or (») ‘From the given figure below calculate'the details and abstract estimate for the double roomed building (Loadbearing structure) (2x8= 16) (Brick work upto plinth level (i), Brick masonry in superstructure. (Load Bearing type structure) Devel Wed? All Dimensions of Section in CMS 2 51961 ) af a a a a af a (Dimensions in meters) Discuss in detail the various role players in financing for building and land. Or Discuss the various methods for determining the “depreciation of a property. ‘Time : Three hours i. Reg.No.:[_ | LI I | LE Question Paper Code: 21104 BiArch. DEGREE EXAMINATION, NOVEMBER/DECEMBER 2015 Ninth Semester 'AR 2502/AR 1502/ 10166 AR 604 — SPECIFICATIONS AND ESTIMATION (Regulations 2009/2010) : ‘Maximum : 100 marks Answer ALL questions. “PART A— (10 x 2= 20 marks) ‘State why specification is essential in construction. State the significance of specification. Brief the difference between carpet and plinth area of a building. Chart out the specification for 1* class brick work. Write a short account on necessity of estimation. State the significance of principles of measurement and billing. ‘What are the requirements for preparing estimation? Give the details of estimation for lime concrete, Assume necessary data. ‘Mention the role of a cost planner. State the purpose of cost analysis. : PART B— (6 x 16= 80 marks) (@) Blucidate in detail “the principles of specification writing and * classification of specification. (6) Or : XO) miustrate the generar specication With units for the following Works @ earth work excavation (4) Gi) ___ painting the outer walls © (iii) Wood works for fully paneled-doors © Discuss the sequence of finding the quantities for-the following items of works — assume necessary data. () Random rubble masonry in CM-1:6 for foundation, basement and superstructure a0) (i) Water proofing course over roof concrete @) Steel for windows and doors @ Or Elucidate a detailed specification for marble flooring and dadooing. 8) Chart out a detailed specification for painting and Damp proofing course in flooring. ® Discuss in detail the factors considered for e&timation. (a6) Or Explain in detail the elementary billing and measurement of basic materials like, wood, brick, and conerete. (16) Find the rate analysis for the following works: @) Plastering in CM 1:4 C.C in 1:2:4 Cement rate: Rs, 275/- per bag/at shop. Sand rate: Rs. 320/- per M3.at site Coarse aggregate: Rs. 750/- per M? at site Mason: Rs: 280/- per day. Mesthri : Re. 300/- per day. ‘Mazdoor : Re. 200/- per day. Female mazdoor : Rs. 190/- per day Assume Yelevant data for.other necessary requirements, Or 15. (®) Explain with an example how you would estimate the detailed quantity for the following works. @ Wood work o (i) Painting ) (ii) Flooring “ (iv) Weathering course @ (2) @ Highlight the different points to be considered cost budgeting for a project. ®) (i) Discuss different factors that affect estimate with the final cost of the building? ® Or (b) Explain about detailed estimate and abstract estimate. (6) All the vey Bet f 3 21104

You might also like