ESTIMATE

beam 2 7.9 1.2 18.96


2 10.4 0.9 18.72
2 7.9 0.9 14.22
1 7 0.6 4.2
slab 1 8 11 88
484.16 m2 410 198,505.60

15 Solid block masonry(20cm thick)

in CM 1:5 .Using good quality Solid


block(30x20x15cm) .Including the

cost of all materials and labour etc.


out side 1 50 0.2 2.8 28
28

diduction
door d 1 1.2 0.2 2.1 0.504
d1 1 0.9 0.2 2.1 0.378
d2 1 0.8 0.2 2.1 0.336
w1 4 0.5 0.2 1.5 0.6
w2 1 1 0.2 1.5 0.3
w3 1 1.5 0.2 1.5 0.45
kw1 2 0.5 0.2 0.75 0.15
kw2 1 1 0.2 0.75 0.15
v 1 0.6 0.2 0.45 0.054
2.922
After diduction 25.078 m3 4100 102,819.80

16 Laying Floor Tiles using good quality


ceramic Tiles 60x60cm including
the cost of all materials and labour
etc.
floor 1 10.7 8.1 86.67
wall 1 6.1 3 18.3
104.97 m2 2155 226,210.35

FIRST FLOOR

17 Reinforced cement concrete 1:1.5:3 for

column .Using 20mm brockan stone .

Including the cost of all materials and

labour etc. complete. But excluding


the cost of reinforcement.
column 14 0.2 0.4 3 3.36
3.36 m3 9000 30,240.00