You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12

what is meant by
the wall here??
there is no wall- if
you mean retaining
A wall- retaining wall A
will be extending
per site condition-
we can not use it
as a reference

KEY PLAN
NOTES:
B B

C LEGEND: C

possible conflict
with retaining wall was this distance
foundation provided based on
conflict avoidance
and type of arch?

D D

Rev Date Revision Details Drawn Chkd Appd

E E

we need to know the Project Management Consultant : Design & Build Contractor :
distance from end of
arch to the centreline of
the soakaway pit putting
into considideration:
a) type of arch
F b)the retaining wall F
foundation interference Supervision Consultant : Design Consultant :
with the precast slab
** i suggest that we put
the slab not to be
centric with the 3m AECOM Middle East Limited
access way to avoid the
conflict between
retaining wall foundation Project Name:
and precast slab NEW ORBITAL HIGHWAY & TRUCK ROUTE
CONTRACT 3
ORBITAL HIGHWAY: MESAIEED
G G
TO SALWA ROAD
Project Code:
IA 12/13 C 062 ST
Status:
DETAILED DESIGN
Drawing Title:

QP PROTECTION STRUCTURES
GATES AND FENCES
ELEMENTS AND DETAILS
SHEET 4 OF 5
H Drawn:
T.PACIK
Checked:
J.KRSICKA H

Designed: Approved:
J.LOSKO P.NEHASIL
Date: Scale:
JULY 2015 AS SHOWN
Drawing Number: Revision:

EXW-P023-0003-SE-LAJ-DG-51025-004 D01
1 2 3 4 5 6 7 8 9 10 11 12 V: D01 .01