You are on page 1of 1

Mass in kg including lifting tools Crane capacity in tons selected Crane Normal Crane MAN B&W Double-Jib Crane

in accordance with DIN and JIS operating width Height to crane hook in mm for: Building-in height in mm
standard capacities in mm Normal lifting Reduced height lifting
procedure procedure involving tilting
of main components
(option)
Engine Type
Cylinder cover Cylinder liner Piston with Normal crane MAN B&W A H1 H2 H3 D
complete with with cooling rod and Double-Jib Minimum Minimum height from Minimum height from Minimum height Additional height
exhaust valve jacket stuffing box Crane distance centre line crankshaft centre line crankshaft to from centre line required for removal of
to centre line crane centre line crane hook crankshaft to exhaust valve complete
hook underside deck without removing any
beam exhaust stud
S46ME-B8 1450 1575 800 2.0 2x1.0 2050 9000 8175 7900 325

The crane hook travelling area must cover at least the full length of the engine and a width in
accordance with dimension A given on the drawing (see cross-hatched area).

It is furthermore recommended that the engine room crane be used for transport of heavy
spare parts from the engine room hatch to the spare part stores and to the engine.
See example on this drawing.

The crane hook should at least be able to reach down to a level corresponding to the centre
line of the crankshaft.

For overhaul of the turbocharger(s), trolley mounted chain hoists must be installed on a
separate crane beam or, alternatively, in combination with the engine room crane structure,
see separate drawing with information about the required lifting capacity for overhaul of
turbochargers.

1) The lifting tools for the engine are


designed to fit together with a
standard crane hook with a lifting
capacity in accordance with the
figure stated in the table. If a larger
crane hook is used, it may not fit Date Des. Chk. A.C. Revision change Chg. Not. Rev.
directly to the overhaul tools, and 03
the use of an intermediate shackle 02
or similar between the lifting tool 01
and the crane hook will affect the 20100226 DFA OLS 00
requirements for the minimum lifting Basic Standards (MBD SB) Suppl. Drawing No.
height in the engine room EN21F-m Tolerances EN21C Surf. Roughness
(dimension B). Material / Blank: Final User Material: Mass (Kg)

2) The hatched area shows the height Scale: Size: Product Type: Page No.: Projection:
where an MAN B&W Double-Jib MAN Diesel
A3 S46ME-B8 1 (1)
Crane has to be used.
Info. No.: Item Name: Item Id.:

Copyright 2009 MAN Diesel


386617 Engine Room Crane 5199006-7
This drawing is the property of MAN Diesel and is to be treated as confidential by the party to whom it has been submitted by MAN Final User Info No.: Final User Description: Final User Ident. No.:
Diesel and is not to be disclosed to any third party without the specific prior written permission of MAN Diesel

You might also like