Introduction:

This method statement covers the earthworks excavation and backfilling operations to be
undertaken as a part of construction works involved in Yuhua Primary School’s Sports Hall. This
method statement details the procedures and safe practices that are to be undertaken during the
earthwork operations including top soil strip, excavation and marking of COL for pile-heads and
backfilling.

 The boundary of earthworks will be marked out.


 This boundary will be secured with the help of fence to avoid any safety incident.
 Proper and safe access to carry out the excavation operation is to be made and clear
demarcation is established to prevent any roll over incident.
 The soil will be stripped using the Caterpillar 320D for excavation to the depth of 2.0 metres
from the existing ground level.
 The protection works are to be done to avoid collapse of excavation faces with due care.
 The COL is marked on the pile heads with the help of survey team.
 The hacking of the pile heads are to be done until the COL mark with ________
 After hacking the concrete and rebar coming out of pileheads have to be in good condition.
 The ECC is to be done to check the alignment of the pile heads.
 Lean concreting will be done followed by rebar placement.
 The boundary of earthworks will be marked out.
 This boundary will be secured with the help of fence to avoid any safety incident.
 Proper and safe access to carry out the excavation operation is to be made and clear
demarcation is established to prevent any roll over incident.
 The soil will be stripped using the Caterpillar 320D for excavation to the depth of 2.0 metres
from the existing ground level.
 The protection works are to be done to avoid collapse of excavation faces with due care.
 The COL is marked on the pile heads with the help of survey team.
 The hacking of the pile heads are to be done until the COL mark with ________
 After hacking the concrete and rebar coming out of pileheads have to be in good condition.
 The ECC is to be done to check the alignment of the pile heads.
 Lean concreting will be done followed by rebar placement.

 The boundary of earthworks will be marked out.


 This boundary will be secured with the help of fence to avoid any safety incident.
 Proper and safe access to carry out the excavation operation is to be made and clear
demarcation is established to prevent any roll over incident.
 The soil will be stripped using the Caterpillar 320D for excavation to the depth of 2.0 metres
from the existing ground level.
 The protection works are to be done to avoid collapse of excavation faces with due care.
 The COL is marked on the pile heads with the help of survey team.
 The hacking of the pile heads are to be done until the COL mark with ________
 After hacking the concrete and rebar coming out of pileheads have to be in good condition.
 The ECC is to be done to check the alignment of the pile heads.
 Lean concreting will be done followed by rebar placement.

 The boundary of earthworks will be marked out.


 This boundary will be secured with the help of fence to avoid any safety incident.
 Proper and safe access to carry out the excavation operation is to be made and clear
demarcation is established to prevent any roll over incident.
 The soil will be stripped using the Caterpillar 320D for excavation to the depth of 2.0 metres
from the existing ground level.
 The protection works are to be done to avoid collapse of excavation faces with due care.
 The COL is marked on the pile heads with the help of survey team.
 The hacking of the pile heads are to be done until the COL mark with ________
 After hacking the concrete and rebar coming out of pileheads have to be in good condition.
 The ECC is to be done to check the alignment of the pile heads.
 Lean concreting will be done followed by rebar placement.

 The boundary of earthworks will be marked out.


 This boundary will be secured with the help of fence to avoid any safety incident.
 Proper and safe access to carry out the excavation operation is to be made and clear
demarcation is established to prevent any roll over incident.
 The soil will be stripped using the Caterpillar 320D for excavation to the depth of 2.0 metres
from the existing ground level.
 The protection works are to be done to avoid collapse of excavation faces with due care.
 The COL is marked on the pile heads with the help of survey team.
 The hacking of the pile heads are to be done until the COL mark with ________
 After hacking the concrete and rebar coming out of pileheads have to be in good condition.
 The ECC is to be done to check the alignment of the pile heads.
 Lean concreting will be done followed by rebar placement.

 The boundary of earthworks will be marked out.


 This boundary will be secured with the help of fence to avoid any safety incident.
 Proper and safe access to carry out the excavation operation is to be made and clear
demarcation is established to prevent any roll over incident.
 The soil will be stripped using the Caterpillar 320D for excavation to the depth of 2.0 metres
from the existing ground level.
 The protection works are to be done to avoid collapse of excavation faces with due care.
 The COL is marked on the pile heads with the help of survey team.
 The hacking of the pile heads are to be done until the COL mark with ________
 After hacking the concrete and rebar coming out of pileheads have to be in good condition.
 The ECC is to be done to check the alignment of the pile heads.
 Lean concreting will be done followed by rebar placement.