You are on page 1of 1

0.350 MIN.

5.800 A 0.400 MAX. B


5.800 1.188 MIN.
0.080 2.900 2.900 0.660 0.170
EJE DE 1.399 MAX.
APOYO 1 PASADOR
0.400 0.660 1.190 0.660 1.190 0.660 0.400 0.559 9-B1N4
CLARO 3 EJE DE PILA B4N10 POR VIGA 5-B1N4

0.150 GRADA
1.700 0.037 0.387
0.450 0.350
0.350
0.750 2.050 2.050
1.800 0.450 0.700
0.575 0.037
P4 PEDESTAL 0.400
0.351 2-B2N6 MIN. 2-B3N6
1.400
1.500 0.450 0.200 NEOPRENO
0.750 R0.950
R0.300
0.500 A B
0.450
0.150

PILA 4 - 0+244.723 EJE DE


APOYO 1.100 0.650 1.700 2.050
0.616 0.403 0.664 1.188 0.664 1.188 0.664 0.432 0.300
CLARO 4

EJE DE PILA EJE DE PILA


5.800 1.800 1.800
5.800
0.084 BLOQUE 0.150 0.750 0.150 0.750
0.406 EJE DE 2.050 1.700 2.050 ANTISISMICO 0.750 0.150 0.750 0.150
0.400 0.664 1.284 0.664 1.284 0.664 0.350 APOYO 9-B1N4 5-B1N4
CLARO 4 ELEVACION GRADA 0.350 9-B1N4 5-B1N4
0.037 MIN. 0.350
0.150 0.350 0.350
0.450 MIN. 0.350 MIN. 0.350
10-C9N4 10-C6N8 MIN. MIN.
0.750
1.700
1.800 0.450 0.400 0.400
1.400 MIN. 0.400 MIN. 0.400
P5 MIN. MIN.
1.500 0.450 2-C4N5 2-C5N5
0.750
2x11-C7N4 @ 0.20
C8N4 @ 0.20 10-C3N6
0.450
0.150 2x5-B2N6 2x5-B2N6 5-B3N6 5-B3N6
2.050 1.700 2.050 POR BLOQUE POR BLOQUE POR BLOQUE POR BLOQUE
PILA 5 - 0+269.776 EJE DE 10-C1N6
APOYO 2-C2N5
0.400 0.664 1.399 0.664 1.399 0.664 0.350 CLARO 5 PILA ELEVACION
0.174 0.086
4 838.332

5 840.157

1.800
0.450 0.450 0.450 0.450 0.900 0.900
EJE DE APOYO 5-C11N6
GRADA AL 0.066 GRADA
0.500 EJE DE PILA GRADA AL
CENTRO 0.037 PILAS DE 4 Y 5
EJE DE PILA CENTRO 0.037
EJE DE APOYO
0.065 0.400 0.035 0.500
10-C6N8

0.065 0.400 0.035 C10N5


@ 0.20 2-C7N4
ELEVACION 2-C5N5 @ 0.20
0.065
0.035 MOSTRADA C8N4 @
EN TABLA 0.20
1.466

0.066 0.065 2-C4N5


0.050 0.035 1.400
REC. REC.
5-P1N3 0.050 0.070 0.070
0.50 4-P2N3
10-C3N6
0.40 5-P1N3 0.800
4-P2N3
0.30 0.50 2-C2N5 MIN.
0.30 0.30 0.40
0.30
0.30 0.30 0.30 10-C1N6
0.30

REFUERZO DE
COLUMNA

B
A A B
A A C C C
A A 4
B B A
3 A
1 2

PROYECTO: PRESENTA: PROFESIONAL RESPONSABLE: ESCALA:


GOBIERNO DE EL SALVADOR CONTENIDO: REPRESENTANTE LEGAL: CONTRATO:
FONDO DE CONSERVACION VIAL (FOVIAL) " ESTRUCTURAS Y OBRAS DE PROTECCION FOVIAL CO-131/2013 INDICADAS
ENTRE AVENIDA JERUSALEN - CALLE EL ESPINO PASO ESTE - OESTE ING. HANS ALEXIS TOVAR TOVAR FECHA: No. DE HOJA:
Y CALLE EL PEDREGAL" CABEZAL DE PILAS INTERMEDIAS P4 Y P5
ENERO /2014 ES-3-PEO.13

You might also like