Professional Documents
Culture Documents
On
OnScene
Scene Commander
Commander
(OSC)
(OSC)
Zulkarnain
Zulkarnain // Bayu
Bayu Haryanto
Haryanto
Site
Site Safety
Safety Officer
Officer
Dwi
Dwi Enggar
Enggar // Melvin
Melvin FF
No Name Position Schedule Location
: On Duty
: Off Duty
Coming BACK
Date
Extend
10/9/2015
10/9/2015
10/7/2015
Extend
10/9/2015
10/9/2015
10/9/2015
Extend
10/9/2015
No Nama Posisi
1 Bayu Haryanto Oyong Superintendent
2 Saiful Bahri Marine Supervisor
3 Erwin Saputra Production Operator
4 Nizwar Production Operator
5 Saiful Hadi Production Operator
6 Sujito Ahmad Santoso Production Operator
7 Suparyanto Production Operator
8 Ramli Manurung Mechanic Technician
9 Djoko Mahargio Mechanic Technician
10 Endang Sukandar Mechanic Technician
11 Almustakim Mechanic Technician
12 Zakaria Mechanic Technician
13 Ismanu Mechanic Technician
14 Rahdiyanto Marine Deck Crew
15 Murtala Marine Deck Crew
16 Wiwiek Wahyudi Marine Deck Crew
17 Wahyudi Marine Deck Crew
18 Alexander Fransisco Marine Deck Crew
19 Mangarandang Situmorang Oyong Wortel Production Technician
20 Arif R J Oyong Wortel Production Technician
Marine Supervisor
2 10/1/2015 Crew Arrangement & Team Structure plan Closed
Safety Officer
Marine Supervisor
4 10/6/2015 Oil Spill Drill Final Coordination Open
Oyong Supt
Marine Supervisor
1 10/7/2015 Equipment Preparation Open
Safety Officer
5 10/9/2015 Oil Spill team & observer aboard Marine Supervisor Open
Safety Officer
6 10/10/2015 Sosialization Risk Assessment Open
Team member
ARATION 2015
Remark
Z:\Safety\EHS OFFICER\SAFETY OFFICER OYONG\EMERGENCY\Drills\2015\10. Oct 15\Preparation Oil Spill Drill\02. 9800-
Santos Indonesia Operations
Oyong Field
Rev 00
Go NoGo Hydrotest of Export Hose Y DONE
Date 13-May-16
N NOT YET
Status Action
Element Component Remarks/Status / Consequence
By Date
Dwi Enggar/Annif
JHA Developed & Socialization to Work Party Y JHA reviewed by Safety Officer & socialization conducted on 12/05/16 on SPJ Daniar
12-May-16
Workpack for Inspection FSO Export Hose available as Pak Annif email on 04/05/16
Procedure Available Y Annif Daniar 13-May-16
Approved on 13/05/2016
Export hose dismantling & cleaning preparation Y Export hose dismantled & cleaned 6 of 23 string Saiful Bahri 13-May-16
PREPARATION PLAN
Ensure Equipment Gear inspected & marked with colour Special tool for hydrotest are certified Dwi Enggar/Annif
Y 11-May-16
coding. Common tools available & motor pump inspected by Safety Officer on 11/05/2016 Daniar
Air & water utilization on maindeck Y Compressed air line & fresh water line available on deck Saiful Bahri 09-May-16
SUPPORT
Hose transportation for spare & backload Y Vessel AHT Tegap Jaya available on site. Saiful Bahri 13-May-16
FSO Master:
Oil Spill prevention plan Y As per approved SOP Ihwan Asrul
13-May-16
BARRIERS
SAFETY SYSTEMS Safety Barrier Y Safety Barrier attached on surrounding hydrotest area. Saiful Bahri 13-May-16
RISK MANAGEMENT
FSO Master:
SOPEP Y Standart SOPEP and eco friendly oil dispersant available. Ihwan Asrul
06-May-16
LEARNING FROM Finger tip incident on Seagood 101 Lifting Lifesaver & finger tip incident shared on 07/05/2016 Annif Daniar/ Dwi
Y 07-May-16
INCIDENTS Wipcheck Safety Video Wipcheck Safety Video shared on 27/04/2016 Enggar
COMMENTS:
Except as specifically noted above, and within their individual areas of accountability, the following signatories confirm that all actions required by the Assurance Plan have been completed and that processes are in place for management of risks
due to simultaneous project and live plant operation or the requirement of higher start up assurance
APPROVAL
Head Of East Java Operation FIDELIS GULTOM