You are on page 1of 2

Project : Doubling of Madar-Palanpur Section

Client : RVNL
Job : Design of substructure for BR.No 831

Subject : Contents Prepared : T.Bharathi Project Code 1057


Drg.No: RVNL/NWR/ABR-KRJD/BR/831/GAD Checked : V.V.Ramayya Job Code : -
Sheet Chainage : 627/753.092 Date : 24/05/12 Rev : 1

Ref Calculations Output

Pile Capacity Calculations


Type of Pile Bored Cast-in-sit u Pile
Diameter of Pile D = 1.2 m
Natural Ground level = 0.0 m
Cut-off level of pile = -2.20 m
Founding level of Pile = 22.80 m
Water Table level = 0.0 m
Length of Pile from Cutoff level to Founding level = 25.00 m

Maximum Pile reactions (No seismic codition)


From Normal Load Condition Jt. 607 LC 100 SLS = 152.79 t
STAAD Seismic Load condition Jt. 607 LC 103 SLS = 153.19 t
Wind Load condition Jt. 107 LC 101 SLS = 124.94 t
Seismic Load condition ( Applied Load reduced by 33%) = 115.18 t
Wind Load condition ( Applied Load reduced by 33%) = 93.94 t
Max Pile Load reaction = 152.79 t
Dead Load of the Pile Taking 60 % of Pile Wt. = 16.97 t
Total Axial Load = 169.8 t

Ultimate Bearing Capacity of the Pile

IS: 2911, Ultimate Bearing Capacity of the Pile Qu = Qu1 + Qu2


Part 1/Sec2
For Granular Soil
Qu1 = Q1 + Q2 n
Q1 = Ap(0.5 D γ Nγ +PD Nq) Q2 = Σ K Pdi Tanδ Asi
i=1
For Clayey soil
Qu2 = Q3 + Q4 n
Q3 = Ap Nc Cp Q4 = Σ α C Asi
i=1
Where
Ap = Cross Sectional Area of Pile = 1.13 m2
As = Surface Area of Pile = 3.77 m2/m
γ = Unit weight of the Soil (dry or submerged, based on water table)
K = Coefficient of Earth Pressure = 1 to 2 = 1.30
δ = Angle of Wall Friction b/w Pile and soil
Nc,Nq,Nγ = Bearing Capacity Factor
α = Reduction Factor for Cohesive Soil = 0.30
D = Diameter of the Pile = 1.20 m
Pdi = Effective overburden pressure in t/m2 for "i"th layer
PD = Effective overburden pressure in t/m2
Cp = Average cohesion at pile tip
C = Average cohesion throughout the length of the pile
Project : Doubling of Madar-Palanpur Section
Client : RVNL
Job : Design of substructure for BR.No 831

Subject : Contents Prepared : T.Bharathi Project Code 1057


Drg.No: RVNL/NWR/ABR-KRJD/BR/831/GAD Checked : V.V.Ramayya Job Code : -
Sheet Chainage : 627/753.092 Date : 24/05/12 Rev : 1

Ref Calculations Output

IS2911, Q1 = Ap(0.5 D γ Nγ +PD Nq) , for a φ = 0 the values of Nq and Nγ are


Fig.1
Nq = 64.2
Nγ = ### These values are taken from GT report for Bore hole 1 of 867 bridge

IS6403, End Bearing Capacity of pile = 1163.4 t


Table 1,
From GT
Report S. No. depth inter. γ γ sub C φ Pdi Av. Pdi Q2 Q4
based on φ
value at pile m m t/m3 t/m3 t/m2 deg t/m2 t/m2 t t
tip(end)
1 0.20 0.2 1.8 1.00 0 0 0 0 0 0
2 1.20 1.00 1.8 1.00 0 0 0.00 0 0.00 0.00
3 3.00 1.80 1.8 1.00 0 0 0.00 0 0.00 0.00
4 4.00 1.00 1.8 1.00 0 30 1.00 0.5 1.41 0.00
5 5.00 1.00 1.8 1.00 0 30 2.00 1.5 4.24 0.00
6 6.00 1.00 1.8 1.00 0 30 3.00 2.5 7.07 0.00
7 7.00 1.00 1.8 1.00 0 30 4.00 3.5 9.90 0.00
8 8.00 1.00 1.8 1.00 0 30 5.00 4.5 12.73 0.00
9 9.00 1.00 1.8 1.00 0 30 6.00 5.5 15.56 0.00
10 10.00 1.00 1.8 1.00 0 30 7.00 6.5 18.39 0.00
11 11.00 1.00 1.8 1.00 0 30 8.00 7.5 21.22 0.00
12 12.00 1.00 1.8 1.00 0 30 9.00 8.5 24.05 0.00
13 13.00 1.00 1.8 1.00 0 40 10.00 9.5 39.07 0.00
14 14.00 1.00 1.8 1.00 0 40 11.00 10.5 43.18 0.00
IS6403, Fig 15 15.00 1.00 1.8 1.00 0 40 12.00 11.5 47.29 0.00
1, From GT
Report φ 16 16.00 1.00 1.8 1.00 0 40 13.00 12.5 51.41 0.00
values
based on N 17 17.00 1.00 1.8 1.00 0 40 14.00 13.5 55.52 0.00
values 18 18.00 1.00 1.8 1.00 0 40 15.00 14.5 59.63 0.00
given in GT
report are 19 19.00 1.00 1.8 1.00 0 40 15.00 15 61.69 0.00
20 20.00 1.00 1.8 1.00 0 40 15.00 15 61.69 0.00
21 21.00 1.00 1.8 1.00 0 40 15.00 15 61.69 0.00
22 22.00 1.00 2.8 1.00 0 40 15.00 15 61.69 0.00
23 23.00 1.00 3.8 1.00 0 40 15.00 15 61.69 0.00
24 24.00 1.00 4.8 1.00 0 40 15.00 15 61.69 0.00
25 25.00 1.00 5.8 1.00 0 40 15.00 15 61.69 0.00
Total 25.00 842.50 0.00

Ultimate Bearing Capacity of the Pile Qu = 2005.9 t


Factor of safety for safe bearing capacity = 3.0
Safe Bearing Capacity of the Pile = 668.6 t
> 169.758
O.K