0.60mm thk.

pre-painted long span curved roofing


DN Hi-Rib 1030
0.60mm thk. pre-painted long span roofing
DN Twin Hi-Rib 950
1 2 3 4 5 6 7
D C B A 2'' X 4'' X 1.2mm thk.built-up tubular sun screen
2'' X 4'' X 1.2mm thk.built-up tubular sun screen louver, automotive paint fin.
louver, automotive paint fin. 0.60mm thk. pre-painted long span curved roofing
4'' thk. chb wall w/ cem. plaster fin.
4'' thk. chb wall w/ cem. plaster fin. painted w/ boysen pemacoat or approved equivalent DN Hi-Rib 1030
painted w/ boysen pemacoat or approved equivalent

ROOF LEVEL ROOF LEVEL

2.20
2.41
2.90
3.10

0.43
1.20
1.00

2.26

2210
9.20

9.20

9.20

9.20
5.10
5.19
3.20

6.79
3.60

3.80
STAGE LEVEL STAGE LEVEL
1.60

1.60
1.20
FIN. FLOOR LINE FIN. FLOOR LINE
0.30

0.30

0.30
0.30
NAT. GRADE LN. NAT. GRADE LN.

REAR ELEVATION LEFT


Scale
SIDE ELEVATION
1:100 mm
Scale 1:100 mm

7 6 5 4 3 2 1
A B C D 2'' X 4'' X 1.2mm thk.built-up tubular sun
screen louver, automotive paint fin.
0.60mm thk. pre-painted long span curved roofing 0.60mm thk. pre-painted long span curved roofing 4'' thk. chb wall w/ cem. plaster fin.
DN Hi-Rib 1030 DN Hi-Rib 1030 painted w/ boysen pemacoat or approved
equivalent
ROOF LEVEL ROOF LEVEL

2.20

2.41
2.90
3.10

0.43
1.20
1.00

2.26
9.20

9.20

9.20

9.20
5.10
5.19
3.20

6.79
3.60

3.80
STAGE LEVEL STAGE LEVEL
1.60

1.60
1.20

FIN. FLOOR LINE FIN. FLOOR LINE


0.30

0.30

0.30

0.30
NAT. GRADE LN. NAT. GRADE LN.

FRONT ELEVATION / SECTION RIGHTSIDE


Scale
ELEVATION
1:100 mm
Scale 1:100 mm

A B C D
1.20
0.60mm thk. pre-painted long span curved roofing
DN Hi-Rib 1030 0.90 0.90 0.80 0.60 0.60 0.80 1.20

ROOF LEVEL

0.20
0.40
0.60
2.90
3.10

2.10

2.10

2.10
1.20
1.00
9.20

9.20

5.19
3.20

3.60

MARK D1 D2 D3 MARK W1 W1 W1
MATERIALS STEEL PANEL DOOR STEEL PANEL DOOR FLUSH DOOR MATERIALS SLIDING WINDOW SLIDING WINDOW GLASS BLOCKS
LOCATION COMMON CR BACK STAGE DRESSING ROOM LOCATION DRESSING ROOM COMMON CR BACK STAGE
QUANTITY 2-SETS 1-SET 4-SETS QUANTITY 2-SETS 4-SETS 2-SETS

STAGE LEVEL
1.60

1.20

FIN. FLOOR LINE


0.30

0.30

NAT. GRADE LN.

RIGHT SIDE VIEW


SCHEDULE OF DOORS & WINDOWS
Scale 1:40 m
Scale 1:1000 mm

IAPOA NO.: TIN: RA 9266, Article IV section 33 ARCHITECT: PROJECT TITLE: RECOMMENDING APPROVAL: APPROVAL: SHEET CONTENTS: DESIGNED BY: SHEET NO.:

Drawings and Specifications and other Contract ( by the Authority of Chairman Michael G. Aguinaldo ) FRONT ELEVATION
DATE DESIGNED:
REPUBLIC OF THE PHILIPPINES Documents duly signed, stamped or sealed, as
instruments of Service, are the Intellectual Property and PROPOSED STANDARD MULTI-PURPOSE
RIGHT SIDE ELEVATION
REAR ELEVATION

COMMISSION ON AUDIT Documents of the Architect, wether the object for which
they are made is executed or not. It shall be unlawful
for any person to duplicate or to make copies of said
COVERED COURT BUILDING WITH STAGE ATTY. USMIN P. DIAMEL ENGR. LUIS S. MEJIA AsComm. DELFIN P. AGUILAR
LEFT SIDE ELEVATION
SECTION
DRAWN BY:

DATE DRAWN:
A 3
COA CENTRAL OFFICE, COMMONWEALTH AVE., Q.C.
PRC NO. : VALIDITY:
Documents for use in the repetition of and for other
projects or buildings, wether executed partly or in
whole, without the written consent of the Architect or
PRC NO. : VALIDITY:
DIRECTOR IV
REGIONAL DIRECTOR
DIRECTOR IV
GENERAL SERVICES OFFICE
ASSISTANT COMMISSIONER
ADMINISTRATION SECTOR
CHECKED BY:
3/10
Author of said Documents. LOCATION: COMMISSION ON AUDIT RO XIII COMPOUND, SOUTH MONTILLA BLVD.,BUTUAN CITY COMMISSION ON AUDIT - RO XIII COMMISSION ON AUDIT COMMISSION ON AUDIT DATE REVISED
PTR NO.: DATE: PLACE: PTR NO.: DATE: PLACE: