You are on page 1of 3

Review of Points observed during

Rounds of KMC on 19 Sep 16


Point Raised Action taken
1. Top and side of the Kitchen walls are to be cleaned & painted. Pending

2. Rain water harvesting channel pipelines behind Block A to be cleaned and Completed
re-laid.
3. Stand of Water tank behind the Block A is to be painted green. Completed

4. Backside of the Kitchen is to be painted with Distemper Pending

5. Tea Stand available in the Dining Hall – 2 is to be painted. Completed

6. 06 Nos. of broken tiles in the stairs of Dining Hall, 14 Nos. of broken tiles in Pending
the stairs of Block A and 02 Nos. of broken tiles in the stairs of Block B, 10
new tiles in wash basin area are to be replaced with new tiles.

7. Shoe racks in all the Blocks are to be cleaned. Unwanted items are to be Completed
removed

8. 05 Nos. of Shoe racks in stores are to be shifted to Block – A. Completed

9. 10 Nos. of 8- Locker Almirah are to be painted locally. In progress

10. Brown sheets are to be placed in all the Luggage racks for all the Blocks. Completed

11. Old torn door nets are to be removed from Block A. Completed

12. Dust cob webs found in the false ceiling of rooms in Block – A&B, TV Completed
Rooms, are to be cleaned.

13. Regular maintenance of Exhaust fans needs to be done. Completed

14. Tiles are to be fixed in the side walls of Water Tanks. Pending

15. The damaged pavement in front of the toilet room is to be repaired. Pending

16. 04 Nos. of damaged Toilet doors are to be repaired. Pending

17. 20 Nos. of plastic chairs are to provide in two TV rooms. In Progress

18. Old files found in the TV Room -02 are to be covered with polythene and Completed
stored properly.

19. Two damaged 8- Locker Almirah are to be sent to Expert Engineering for Completed
repairs.

20. Clothing lines are to be provided in front of MTLL Block Completed

Review of Points observed during Rounds of KMC New Camp on 03 Oct -16

Points Raised Action Taken


1. All Shoe racks to be painted with black colour. Completed

2. Room No 5 door to be changed. Not Completed


3. Notice board outside Room No 5 is to be cleaned.
Completed

4. Tube light located outside of the TV room to be fixed properly.


Completed

5. TV box to be made/ repaired for both TV rooms


Completed

6. Area behind stores container to be cleaned


Cleaned

7. Clothing line to be provided for Ranchi Security Guards. Completed

Following points observed during the rounds of KMC New Camp on 15 Oct
2016:
1. Water Pipe near the Toilet Block is to be painted.
2. Urinal Door is to be wielded.
3. Blue mooring of 3 feet in the outer wall of the Washerman, Barber & Cobbler shop.
4. Water Cooler in the TV Room No -02 is to be repaired.
5. Table cloth is to be provided for TV Room No-02.
6. TV Stand in Room No-02 is to be covered.
7. Wooden Cupboard in the storeroom is to be repaired.
8. Additional clothing line wires are to be fixed in the cloth dry shade.
9. Volleyball ground, referee stand and fencing are to be painted.
10. Shoe racks are to be cleaned.
11. STP tank side is to be filled with OB/BHQ for the movement of STP Tanker.
12. DG shade, Security point in the entrance gate and the Fire-wood shade are to be painted.
13. Electrical Pole is to be removed from the front of MTLL Block.
14. 03 Nos. of Ceiling fans are to be provided in conference hall.
15. Clothing line support is to be painted green.

Following points observed during the rounds of KMC Old Camp on 15 Oct
2016:
1. Camp building is to be distempered.
2. Doors and Windows are to be painted.
3. Fire Point is to be painted.
4. Bathrooms and Toilet walls are to be distempered.
5. Tiles are to be fixed in the Bathroom passage.
6. Unused items in the shoe racks are to be disposed of.
7. Rooms are to be painted and False Ceilings of all rooms are to be fixed.
8. Dining Hall is to be painted.
9. Flower Garden is to be produced in the centre of the block.
10. Clothing lines with T- structure is to be provided inside the blocks.
11. Outer wall of the Gym is to be painted.
12. Shoe racks are to be painted.
13. Old Tin Sheets for Room No 4, 5, 6, 7, 8 & Dining Hall are to be replaced with new one.
14. Stand is to be provided for carom board.
15. Wall Mounted fans are to be cleaned for every rooms.