ANNEX C
[Clause 4.2.4(b)]
AREA REQUIRED FOR TRANSFORMER ROOM AND SUBSTATION
FOR DIFFERENT CAPACITIES
C-1 The requirement for area for transformer room and substation for different capacities of transformers is
given below for guidance:
Sl Capacity of Total Transformer Total Substation Area (In Coming, Suggested Minimum
No. Transformers) Room Area, HV, MV Panels, Transformer Roof but" Face Width
KVA Minimum, m Without Generators), Minimum m
@ @) (Oy )
1x 160 140 90 90
2x 160 280 118 135
1250 150 1 90
2% 250 300 121 13S
1x 400 165 93 90
2400 33.0 125 135
3400 495 167 180
2500 360 130 145
3x50 540 m 19.0
2630 360 132 145
3x630 540 176 19.0
2x 800 390 135 45
3x 800 580 181 140
2 1000 390 149 145
3x 1000 580 197 199
NoTEs
|The above dimensions are overall area requised for substation excluding generating Set.
2 The clear height required for substation equipment shal be misimum of 3.0 m below the soffit ofthe bear.
ANNEX D
[Clause 4.2.4G)]
ADDITIONAL AREA REQUIRED FOR GENERATOR IN ELECTRIC SUBSTATION
Del The requirement of additional area for generator in electric substation for different capacities of generators
is given below for guidance:
SINo, Capacity Area Clear Height below the Soffit of the Beam
KW a m
@ 2) @ o
a 25 56 36
ii) 48 36 36
iit) 100 65 36
iv) 150 n 46
vy) 248, 100 46
vi) 350 100 46
vii) 480 100 46
vit) 600 10 46
ix) 300 120 46
x) 1.000 120 46
xi) 1250 120 46
xii) 1600 150 46
NOTE — "The area ad height rice for generating set room given in the above table are for geeral guidance only and may be
finally fixed accondng to actual requirement
PART 8 BUILDING SERVICES — SECTION 2 ELECTRICAL AND ALLIED INSTALLATIONS 6