AP ESWARAN M&E WORKS LIST FOR STP

TO: M&E CONSTRUCTOR

BQ FOR M&E WORK FOR SEWERAGE TREATMENT PLANT

(A) Emergency Overflow


1 FRP Coarse Screen
(B) Primary Screen Chamber
1 IWK approval SS Penstock c/w headstock and SS shaft
2 FRP Coarse Screen
3 FRP Dropboard
4 FRP Basket (if required)
5 1½" Hot dipped galvanized hand railing
6 1½" SS hand railing
( C) Pump Sump
1 A frame on top of pump sump and labeling
2 Trolley + Chain Block + SS Chain + SS Shackled D + SS Snap Hook
3 4" AB 3P Pipe c/w fitting and labeling
4 SS guard rail
5 Hot dipped galvanized grating
6 Aluminium ladder
7 Overflow pipe
8 IWK Approval float switch c/w wiring
9 Weatherproof spot light
10 Junction box + Isolator
11
12
(D) Grit & Grease Chamber & Secondary Screen Chamber
1 FRP Fine Screen
2 FRP Dropboard
3 Hot dipped galvanized grating
4 1½" Hot dipped galvanized hand railing (if required)
5 4" GI Piping + Gate Valve (if required)
6
(E) Aeration Tank (RC Tank)
1 Fine bubble tube/disc diffuser
2 MLSS piping + fitting to Anoxic (air lift)
3 Trolley + Chain Block + SS Chain + SS Shackled D + SS Snap Hook for MLSS pump
4 A frame / Lifting davit to list up pump
5 SS guard rail (RC tank)
6
(F) Anoxic & Balancing Tank
1
2
3
4
5
6
7
8
9
(G) Sedimentation Tank
1
2
3
4
5
6
(H) Sludge Holding Tank
1 Junction box + Isolator (if required) with labeling
2 SS Chain + SS Shackled D + SS Snap Hook for Sludge pump (if required)
3
(I) Sand Drying Bed
1
2
3
(J) Flow Measurement Chamebr
1 SS Ruler
2
3
4
5
(K) Blower
1 Air Header
2 Trolley + Chain Block
3 PVC danger + no admitting signboard
4 Fluorescent Lighting + power socket c/w wiring
5 Exhaust Fan c/w portable timer
6 Lightning Arresstor
7 Beacon Light c/w wiring
8 Emergency Stop Bottom with labeling
9
(L) Control Panel Room
1 12mm thickness Rubber mat
2 Fluorescent Lighting + power socket c/w wiring
3
(M) MISC
1 Lamp post
2 TNB meter board
3 Incoming cable from TNB meter board to control panel
4 All the GI piping c/w fitting for tank to tank connection to blower
5 All the cabling work for raw sewage pump, EQ pump, SHT pump, ST pump, mixer & blower
6 PVC danger + no admitting signboard
7 Petunjuk Pembuangan Kumbahan
8 Attend testing & commissioning (PDC7 inspection)
9 Attend final inspection
10
(N) Equipment
1 Air Blower
2 Raw Sewage Pump
3 Control Panel
4
5
6
7
8
9
10

1 TSURUMI submersible pump 2 units. 1.5kw 100DML RM 10,800.00


2 Fully auto-control panel RM 9,000.00
3 Air-spec Blower as per -drawing RM 10,200.00

EQUIPMENT ONLY RM 30,000.00