BILLING:

sorting billing
KITAYAMA MEATSHOP 1
SMIP BASKETBALL COVERED COURT
PBI 20K BAGHOUSE FOUNDATION
Artificial recharge tank

boq
Proposed fence for vacant lot along Roces in front of Ramar center
RAMCAR Steel Parking Repair & Maintenance
SMIP BASKETBALL COVERED COURT
OPEN WAREHOUSE PHASE 3: BUILDING
PBI 20K BAGHOUSE FOUNDATION
OPEN WAREHOUSE PHASE 3: BASECOARSE LAYING
PBI COVERED WALKWAY FROM MCB TO RTI CANTEEN
PBI DC MEZZANINE EXPANSION FOR SAN HUAN MIXER
PBI MCB MEZZANINE EXPANSION
KITAYAMA MEATSHOP
KFC Sta. Cruz 2nd Gen
KFC Concepcion
KFC MABALACAT
KFC CARMONA
KFC MC KINLEY
KFC Lemery
BROILER FARM-5 ADDITIONAL - Farm-5 House 3&4 Settlement
BROILER FARM-5 ADDITIONAL - Farm-5 Deep Well Access Gate
NEW WOOD WAREHOUSE BUILDING
New Wood Warehouse #2
RAMCAR STEEL PARKING 3RD LEVEL PAVILION AND STAGE
SMIP ROAD C EXTENSION
SMIPC OFFICE RENOVATION & TRAINING FACILITIES
SMIPC BALASING - BULAC BLOCK FENCE
SMIP MOTORPOOL TRAINING CV
PAIGKAS HOUSE RENOVATION
Creek Alignment Near WWTP #2
PBI underground cabling to PBI/PEZA guard house
PBI DC Forming Series Rehabilitation Works
PBI TRUCK PARKING
PBI SODIUM SULFATE BUNDWALL & ROOFING ON ACID FILLING
PBI BOILER ROOM
PBI DC Tunnel Dryer Overhead crane
PBI DRY CHARGE COLUMNS RELOCATION/REMOVAL
PBI underground cabling to PBI/PEZA guard house
PBI Acid Mixing Building Rehab
EG PORTABLE TOILET
eg bbs platform
eg heat recovery
EG VESTIBULE REFINING CONTROL ROOM
EG VESTIBULE ROTARY BAGHOUSE CONTROL ROOM
EG VESTIBULE ETP CONTROL ROOM
EG VESTIBULE PELLETIZING CONTROL ROOM
EG VESTIBULE RF1 CONTROL ROOM
EG VESTIBULE RF2 CONTROL ROOM
EG Heat Recovery Project
EG Materials Bunker Rehab
EG STORAGE FACILITIES CHAMBER 3 SLAG TRANSFER
RTI BUILDING EXPANSION
Mortality Pit
House Construction
EWT
Site Devt
QESI EXISTING BUILDING NEW 2ND FLOOR
PBI MCB EMPLOYEE LOUNGE
Broiler Farm Truck Scale
Broiler Farm-1 Slat Washer

boq checking:
EG sidewalk/walkway along EERI service roads
PBI PAINTING OF FLOORING
PBI Tunnel Dryer Additional Concrete Louvers
PBI MCB MEZZANINE EXPANSION
WWTP2
SMIP BALASING FENCE
SMIP LOCKER
SMIP road b
PBI WET FIN PROJECT
Broiler Farm-1 CV Warehouse Relocation
PBI LOCKER EXPANSION

OTHERS:
pending cost center & capex aiko
cut off per project integration
email ECR for billing
excess delivery of basecourse at farm6
boq for permit - qesi painting building
BOM of FG submission DEC 4
for progress bi 12-Apr
for 100% billi 24-Apr

costing

NOT CRITICAL
CRITICAL?
CRITICAL
CRITICAL
billing 2
billing - OK
CRITICAL
billing 3
billing 1
NOT CRITICAL
billing
billing
billing
billing
billing
billing
CRITICAL submitted to sir erymar
billing billing
billing
NOT CRITICAL
CRITICAL?
billing
billing
billing
billing
NOT CRITICAL
NOT CRITICAL
NOT CRITICAL
NOT CRITICAL
CRITICAL
PROGRESS BILLING
PROGRESS BILLING
PROGRESS BILLING
PROGRESS BILLING
PROGRESS BILLING
PROGRESS BILLING
CRITICAL
CRITICAL
CRITICAL
CRITICAL
CRITICAL
CRITICAL
NOT CRITICAL
NOT CRITICAL
NOT CRITICAL
NOT CRITICAL
NOT CRITICAL
NOT CRITICAL
CRITICAL PROGRESS BILLING
billing PROGRESS BILLING
billing PROGRESS BILLING
CRITICAL PROGRESS BILLING
CRITICAL
CRITICAL
CRITICAL
waiting for tank design
waiting for tank design

FOR CHECKING OF MTP


for add of grinding of flooring

for revision of quantity


FOR CHECKING OF MTP
CRITICAL

integration
DATE : January 6, 2017
PROJECT : Dorm 1 & 2 Plumbing Repainting
SUBJECT : PROJECT MONITORING
SCHEDULE
DESCRIPTION
Day Start

Dorm 1 & 2 Plumbing Repainting


Installation of Fabricated Stair
Installation of fabricated stair
Installation of Steel Columns
Installation of Steel Column
Installation of Perimter Beam
Installation of perimeter Beam
Installation of Roof Framing
Installation of Rafters
Installation of C-Purlins
Roofing installation
Roofing installation
Installation of Wire Mesh for Perimeter Fence
Installation of Wire mesh for perimeter fence
Fabrication & installation of Steel Door
Installation of steel door
bing Repainting

SCHEDULE STATUS
QTY. UNIT ACTUAL REMARK
Finish
% QTY. S

2 units 50% 1

7 units 100% 7

4 sides 100% 4

3 units 100% 3
3 spans 0% 0

3 spans 0% 0

4 sides 25% 1

1 unit 0% 0
DATE : January 6, 2017
PROJECT : PBI Floor Repainting of Plastic Departme
SUBJECT : PROJECT MONITORING
SCHEDULE
DESCRIPTION
Day Start Finish

PBI Floor Repainting of Plastic Department


PHASE 1: Along Bay -1 Model Flooring Area
Epoxy Painting Finish for whole area, Color: Apple Green
PHASE 2: Along Bay -1 Mold Shop Floor Area On going operation waiting
Epoxy Painting Finish for whole area, Color: Apple Green for advise
PHASE 3: Along Bay -2 Sealing Area On going operation waiting
Epoxy Painting Finish for whole area, Color: Apple Green for advise
PHASE 4: Along Bay -3 Sealing Area On going operation waiting
Epoxy Painting Finish for whole area, Color: Apple Green for advise
PHASE 5: Along Bay - 0 Moldel Flooring Area On going operation waiting
Epoxy Painting Finish for whole area, Color: Apple Green for advise
PHASE 6: Along Bay - 2 Mold Shop Floor Area On going operation waiting
Epoxy Painting Finish for whole area, Color: Apple Green for advise
PHASE 7: Along Bay - 3 Mold Shop Floor Area On going operation waiting
Epoxy Painting Finish for whole area, Color: Apple Green for advise
PHASE 8: Along Bay - 1, 2, 3 & 0 Walkway On going operation waiting
Epoxy Painting Finish for whole area, Color: Primer Gray for advise
ng of Plastic Department

STATUS
QTY. UNIT REMARKS
ACTUAL
% QTY.

953.7 sq. m. 100% 953.7

81.76 sq. m. 0% 0

121.27 sq. m. 0% 0

94.12 sq. m. 0% 0

11.85 sq. m. 0% 0

43.93 sq. m. 0% 0

43.93 sq. m. 0% 0

448 sq. m. 89% 400


DATE : January 6, 2017
PROJECT : PBI DC Column Removal
SUBJECT : PROJECT MONITORING
SCHEDULE
DESCRIPTION
Day

PBI DC Column Removal


Retrofitting & Removal of Columns
Manual Chipping works for water to be diverted on existing canal 2
Retrofitting of concrete pedestal & column along line GL - E/2 2
Removal of concrete pedestal & steel column along GL - F/2 2
Retrofitting of steel column along line GL - G/2
Fab. Of 16mm Plate welded to Wide Flange
Fabrication of 16mm additional Plate
Waiting for delivery of Wide
Installation of Wide Flange
Flange
Installation of Corbel
C Column Removal
ECT MONITORING
SCHEDULE STATUS
QTY. UNIT
ACTUAL REMARKS
Start Finish
% QTY.

08-Jan-18 09-Jan-18 1.5 L-M 0% 0 Completed


10-Jan-18 11-Jan-18 1 unit 0% 0
12-Jan-18 14-Jan-18 1 unit 100% 1
1 unit 100% 1

1 unit 0% 0
Waiting for delivery of Wide
1 unit 0% 0
Flange
done to
2 units 0% 0
fabrication
DATE : January 7, 2017
PROJECT : PBI WET FIN FLOOR REHABILITATION
SUBJECT : PROJECT MONITORING
SCHEDULE STATUS
DESCRIPTION QTY. UNIT ACTUAL REMARKS
Day Start Finish
% QTY.

PBI WET FIN FLOOR REHABILITATION 20 19-Dec-17 07-Jan-18


PHASE-1 20 19-Dec-17 07-Jan-18
Removal of FRP 3 19-Dec-17 21-Dec-17 200 sq.m. 100% 200 Completed
Demolition of slab 5 20-Dec-17 24-Dec-17 200 sq.m. 95% 190
Excavation works 4 23-Dec-17 06-Jan-18 200 sq.m. 90% 180
Concreting of slab 2 07-Jan-18 07-Jan-18 200 sq.m. 85% 170
PHASE-2 17 22-Dec-17 07-Jan-18
Removal of FRP 1 22-Dec-17 22-Dec-17 102 sq.m. 100% 102 Completed
Demolition of slab 5 02-Jan-18 06-Jan-18 102 sq.m. 100% 102 Completed
Excavation works 1 04-Jan-18 06-Jan-18 102 sq.m. 69% 70
Concreting of slab 1 07-Jan-18 07-Jan-18 102 sq.m. 0% 0

schedule status 11 of 46 Ramcar Steel Parking 3rd Level Management Forum Pavilion (24hours per day - 2shifts)
DATE : December 13, 2017 / 3:00PM
PROJECT : Ramcar Steel Parking 3rd Level Management Forum Pavilion & Stage (24 hours per day - 2shifts)
SUBJECT : Proposed Schedule
SCHEDULE STATUS
DESCRIPTION Start Finish QTY. UNIT PROJECTED ACTUAL VARIANCE (A-P) REMARKS
Hour
day time day time % QTY. % QTY. % QTY.
Ramcar Steel Parking 3rd Level Management Forum Pavilion &
300h 1-Dec 6:00 13-Dec 18:00
Stage (24 hours per day - 2shifts)
Preliminaries 252h 1-Dec 6:00 11-Dec 18:00 1318 sq.m. 100% 1318 100% 1318 0% 0 Completed
Delivery of fabricated item from SMIP to Roces 216h 3-Dec 6:00 12-Dec 6:00 1318 sq.m. 100% 1318 100% 1318 0% 0 Completed
Site Construction of Pavilion and Stage 252h 3-Dec 6:00 13-Dec 18:00
Manpower, equipment & tools mobilization 12h 3-Dec 6:00 3-Dec 18:00 1 unit 100% 1 100% 1 0% 0 Completed
Perimeter board-up 24h 3-Dec 18:00 4-Dec 18:00 1 unit 100% 1 100% 1 0% 0 Completed
Dismantling of existing tire guard 60h 4-Dec 18:00 7-Dec 6:00 64 units 100% 64 100% 64 0% 0 Completed
Welding blanket laying 12h 4-Dec 6:00 4-Dec 18:00 1 unit 100% 1 100% 1 0% 0 Completed
Higher/Upper Roof Area (Middle of Pavillion at Grid Line - 6 to 11 & C to F 132h 4-Dec 18:00 10-Dec 6:00
Columns 12h 4-Dec 18:00 5-Dec 6:00 16 units 100% 16 100% 16 0% 0 Completed
Beams for column to column connection 24h 5-Dec 18:00 6-Dec 18:00 32 units 100% 32 100% 32 0% 0 Completed
Beams for truss to truss connection 12h 6-Dec 18:00 7-Dec 6:00 15 units 100% 15 100% 15 0% 0 Completed
Roof framing system 84h 6-Dec 18:00 10-Dec 6:00 578 sq.m. 100% 578 100% 578 0% 0 Completed
Fullwelding & painting retouch works 108h 5-Dec 18:00 10-Dec 6:00 578 sq.m. 100% 578 100% 578 0% 0 Completed
Roof installation 48h 9-Dec 6:00 11-Dec 6:00 578 sq.m. 100% 578 100% 578 0% 0 Completed
Lower Roof Area (Sides of upper roof Between Grid Line - 5&6, 11&12, B&C,
F&G)
168h 5-Dec 6:00 12-Dec 6:00
Columns 12h 5-Dec 6:00 5-Dec 18:00 24 units 100% 24 100% 24 0% 0 Completed
Beams for column to column connection 24h 6-Dec 18:00 7-Dec 18:00 24 units 100% 24 100% 24 0% 0 Completed
Roof framing system 72h 9-Dec 6:00 12-Dec 6:00 740 sq.m. 100% 740 100% 740 0% 0 Completed
Fullwelding & painting retouch works 108h 7-Dec 18:00 12-Dec 6:00 740 sq.m. 100% 740 100% 740 0% 0 Completed
Roof installation 48h 11-Dec 6:00 13-Dec 6:00 740 sq.m. 100% 740 100% 740 0% 0 Completed
Panting of structural steel frame 216h 4-Dec 18:00 13-Dec 6:00 1318 sq.m. 100% 1318 100% 1318 0% 0 Completed
Installation of backing cover frame for squatter area 60h 9-Dec 18:00 12-Dec 6:00 188 sq.m. 100% 188 100% 188 0% 0 Completed
Additional works 60h 11-Dec 6:00 13-Dec 18:00
Replacement of existing expanded metal flooring to checkered plate 36h 12-Dec 6:00 13-Dec 18:00 28 panels 100% 28 100% 28 0% 0 Completed
Lattice beam & mounting plates prior to installation of 24” ceiling fan 36h 11-Dec 6:00 11-Dec 18:00 1 unit 100% 1 100% 1 0% 0 Completed
Sewer & water line piping works for Lavatory & Toilet 36h 12-Dec 6:00 13-Dec 18:00 1 unit 100% 1 100% 1 0% 0 Completed
Painting retouch of existing flooring 36h 12-Dec 6:00 13-Dec 18:00 597 sq.m. 100% 597 100% 597 0% 0 Completed
Installation of plywood at ramp area 36h 12-Dec 6:00 13-Dec 18:00 181 sq.m. 100% 181 100% 181 0% 0 Completed
Cutting opening at columns for electrical 24h 12-Dec 18:00 13-Dec 18:00 40 units 100% 40 100% 40 0% 0 Completed
Installation of mist barrier between upper roof & lower roof 12h 13-Dec 6:00 13-Dec 18:00 4 sides 100% 4 100% 4 0% 0 Completed

schedule status 12 of 46 Ramcar Steel Parking 3rd Level Management Forum Pavilion (24hours per day - 2shifts)
LEGEND:
FABRICATION
DELIVERY
ONSITE WORKS
S M T

3-Dec 4-Dec 5-Dec


Backing cover for squater area Backing cover for squater area

Frame for lighting holders Frame for lighting holders


Columns & beams Columns & beams

Cutting & deliveries of steel Cutting & deliveries of steel Cutting & deliveries of steel
members of Trusses c/o RTI members of Trusses c/o RTI members of Trusses c/o RTI

Trusses Trusses Trusses


Columns & beams Columns & beams
Manpower, equipment &
tools mobilization
Perimeter board-up Perimeter board-up
Dismantling of existing tire Dismantling of existing tire
guard guard

Welding blanket laying

Columns & beams Columns & beams

10-Dec 11-Dec 12-Dec


Trusses
Purlins & accessories
Trusses Lighting holders frame
Purlins & accessories
Trusses Trusses
Purlins & accessories Purlins & accessories
Fullwelding & painting Fullwelding & painting Fullwelding & painting
retouch retouch retouch
Roof installation Roof installation
Installation of frames for
lighting holders
Stage expansion Stage expansion Stage expansion
Installation of plywood on
flooring
W T F

6-Dec 7-Dec 8-Dec


Backing cover for squater area

Trusses Trusses Trusses


Purlins & accessories Purlins & accessories

Trusses Trusses Trusses

Roof framing system Roof framing system

Backing cover for squater area


- Wooden frame with plywood

Columns & beams Columns & beams


Trusses Trusses Trusses
Purlins & accessories
Fullwelding & painting Fullwelding & painting Fullwelding & painting
retouch retouch retouch

Installation of backing cover Installation of backing cover


for squater area - Wooden for squater area - Wooden
frame with plywood frame with plywood

13-Dec
Roof installation
Installation of frames for
lighting holders
Stage expansion
Installation of plywood on
flooring
S
2-Dec
Construction drawing
preparations
Materials, manpower,
equipment & tools
preparations
Material procurements &
deliveryies
9-Dec

Trusses
Purlins & accessories

Trusses

Roof framing system

Trusses
Purlins & accessories
Fullwelding & painting
retouch

Installation of backing cover


for squater area - Wooden
frame with plywood
DATE : November 29, 2017
SCHEDULE WORK STATUS
DESCRIPTION
Day Start Finish % QTY.
RTI-SSD Mezzanine Area 50 27-Nov-17 27-Jan-18
Preliminaries 43 27-Nov-17 19-Jan-18
Notice to proceed 1 27-Nov-17 27-Nov-17 100%
Materials procurement & deliveries 15 29-Nov-17 16-Dec-17
Equipment mobilization 1 18-Dec-17 18-Dec-17 0% - / 1
Manpower mobilization 1 18-Dec-17 18-Dec-17 0% - / 1
Structural steel fabrication including painting 17 16-Dec-17 08-Jan-18
Mezzanine Steel Column 7 16-Dec-17 23-Dec-17 0% - / 17
Steel Beams & Flooring 7 23-Dec-17 03-Jan-18 0% - 872
Flooring & Floor sytem 10 18-Dec-17 29-Dec-17 0% - / 528
Stairway 4 03-Jan-18 08-Jan-18 0% - / 1
Metal works fabrication including painting 8 09-Jan-18 17-Jan-18
Mezzanine Handrail 4 09-Jan-18 12-Jan-18 0% - / 8
Stairway Handrail 5 12-Jan-18 17-Jan-18 0% - / 10
Delivery of Fabricated Materials 21 23-Dec-17 19-Jan-18 0%
Construction of additional SSD mezzanine floor
Site Works 6 18-Dec-17 23-Dec-17
Site Clearing works 3 18-Dec-17 20-Dec-17 0% - / 728
Safety & Board-up 3 18-Dec-17 20-Dec-17 0% - / 108
Drilling & Installation of expansion bolt 4 20-Dec-17 23-Dec-17 0% - / 84
Structural steel erection 22 23-Dec-17 20-Jan-18
Mezzanine Steel Column 2 23-Dec-17 26-Dec-17 0% - / 17
Steel Beams & Flooring 18 29-Dec-17 20-Jan-18 0% - / 872
Flooring & Floor sytem 10 10-Jan-18 20-Jan-18 0% - / 528
Stairway 4 09-Jan-18 12-Jan-18 0% - / 1
Metal works erection 3 11-Jan-18 13-Jan-18
Mezzanine Handrail 2 12-Jan-18 13-Jan-18 0% - / 8
Stairway Handrail 3 11-Jan-18 13-Jan-18 0% - / 10
Painting Works 6 20-Jan-18 26-Jan-18 0% - / 1,049
Good house keeping & backloading works 2 26-Jan-18 27-Jan-18 0% - / 1

schedule 18 of 46
WORK STATUS

QTY.

lot
lot

unit
unit
m2
lot

unit
unit

m2
m
pcs

unit
unit
m2
lot

unit
unit
m2
lot

schedule 19 of 46
DATE : November 22, 2017
PROJECT : Amadeo Farm Central CV Office - Locker, Laundry & Shower Area
SUBJECT : Proposed Schedule

SCHEDULE WORK STA


DESCRIPTION
Day Start Finish % Q
Amadeo Farm Central CV Office - Locker, Laundry & Shower Area 37 09-Nov-17 22-Dec-17
Preliminaries 16 09-Nov-17 25-Nov-17
Construction of Locker & Laundry Area 37 09-Nov-17 19-Dec-17
Civil & Earthworks 4 09-Nov-17 13-Nov-17 95% 0.95 /
Masonry Works 6 21-Nov-17 27-Nov-17 72% 0.72 /
PU wall panel installation 6 27-Nov-17 03-Dec-17 19% 30.00 /
Structural Steel Erection 7 25-Nov-17 04-Dec-17 100% 156 /
Roofing & Siding Works 4 04-Dec-17 07-Dec-17 0% - /
Doors & Windows 4 07-Dec-17 11-Dec-17 0% - /
Plumbing Works 8 18-Nov-17 27-Nov-17 33% 0.33 /
Storm Drainage System 7 12-Dec-17 19-Dec-17 0% - /
Construction of Male & Female Toilet Area 4 11-Dec-17 15-Dec-17 0% - /
Construction of Male & Female Shower Room, Clean Room,
8 13-Dec-17 21-Dec-17 10% 0.1 /
Shower Tunnel & Dirty Room
Good house keeping & backloading works 2 21-Dec-17 22-Dec-17 0% - /
Amadeo Farm Central CV Office - Kitchen & Pantry Area 36 03-Nov-17 08-Dec-17
Preliminaries 10 03-Nov-17 13-Nov-17
Construction of Kitchen & Pantry Area 22 03-Nov-17 28-Nov-17
Civil & Earthworks 7 03-Nov-17 10-Nov-17 100% 1 /
Masonry Works 3 11-Nov-17 14-Nov-17 100% 1 /
Structural Steel Erection 7 13-Nov-17 20-Nov-17 100% 97 /
Roofing & Siding Works 7 20-Nov-17 27-Nov-17 0% - /
Doors & Windows 2 27-Nov-17 28-Nov-17 0% - /
Construction of Kitchen counter top 9 28-Nov-17 07-Dec-17
Masonry Works 1 28-Nov-17 28-Nov-17 75% 0.75 /
Civil Works 2 29-Nov-17 01-Dec-17 100% 1 /
Tile Works 1 02-Dec-17 02-Dec-17 100% 4.69 /
Plumbing Works 1 04-Dec-17 04-Dec-17 0% - /
Painting Works 2 06-Dec-17 07-Dec-17 0% - /
Good house keeping & backloading works 2 07-Dec-17 08-Dec-17 0% - /

schedule 20 of 46
WORK STATUS

QTY.

1 lot
1 lot
156 m2
156 unit
1 lot
17 unit
1 lot
1 lot
1 lot
1 lot
1 lot

1 lot
1 lot
97 unit
1 lot
4 unit

1 lot
1 lot
4.69 m2
1 lot
7.45 m2
1 lot

schedule 21 of 46
DATE : November 22, 2017
PROJECT : Amadeo Farm Central CV Office - Kitchen & Pantry Area
SUBJECT : Proposed Schedule

SCHEDULE WORK STA


DESCRIPTION
Day Start Finish % Q
Amadeo Farm Central CV Office - Kitchen & Pantry Area 36 03-Nov-17 08-Dec-17
Preliminaries 10 03-Nov-17 13-Nov-17
Equipment mobilization 1 03-Nov-17 03-Nov-17 100% 1 /
Manpower mobilization 1 03-Nov-17 03-Nov-17 100% 1 /
Site Clearing works 1 03-Nov-17 03-Nov-17 100% 88.07 /
Materials procurement & deliveries 12 03-Nov-17 16-Nov-17 63%
Civil Materials 6 03-Nov-17 08-Nov-17 100%
Structural Steel Materials 14 03-Nov-17 16-Nov-17 25%
Fabrication of forms & rebars 2 03-Nov-17 04-Nov-17 100% 1 /
Footing 1 03-Nov-17 03-Nov-17 100% 10 /
Slab on Grade 2 03-Nov-17 04-Nov-17 100% 28.93 /
Structural steel fabrication including painting 6 06-Nov-17 11-Nov-17 23% 22 /
Steel Post 1 06-Nov-17 06-Nov-17 0% - /
Roof Framing System 5 07-Nov-17 11-Nov-17
Roof Steel Beam 1 07-Nov-17 07-Nov-17 0% - /
Trusses 1 08-Nov-17 08-Nov-17 0% - /
Rafters 1 08-Nov-17 08-Nov-17 0% - /
Horizontal strutt 1 08-Nov-17 08-Nov-17 0% - /
Purlins 2 09-Nov-17 10-Nov-17 0% - /
Cross Brace & Tie 1 11-Nov-17 11-Nov-17 0% - /
Sag rods 1 11-Nov-17 11-Nov-17 0% - /
Gutter hangers 1 11-Nov-17 11-Nov-17 100% 22 /
Delivery of Fabricated Steel Materials 1 13-Nov-17 13-Nov-17 0%
Construction of Kitchen & Pantry Area 22 03-Nov-17 28-Nov-17
Civil & Earthworks 7 03-Nov-17 10-Nov-17 100% 1 /
Batterboard, Staking & Lay-out 1 03-Nov-17 03-Nov-17 100% 54.50 /
Footing 2 03-Nov-17 04-Nov-17
Excavation 1 03-Nov-17 03-Nov-17 100% 2.67 /
Gravel Bedding, G-1 1 04-Nov-17 04-Nov-17 100% 0.25 /
Installation of forms & rebars 1 04-Nov-17 04-Nov-17 100% 10 /
Concreting 1 04-Nov-17 04-Nov-17 100% 1.14 /
Backfill & Compaction 2 06-Nov-17 07-Nov-17 100% 1.64 /
Slab on Grade 4 07-Nov-17 10-Nov-17
Slab on Grade Preparation 1 07-Nov-17 07-Nov-17 100% 28.93 /
Barrier Protection 1 08-Nov-17 08-Nov-17 100% 28.93 /

schedule 22 of 46
DATE : November 22, 2017
PROJECT : Amadeo Farm Central CV Office - Kitchen & Pantry Area
SUBJECT : Proposed Schedule

SCHEDULE WORK STA


DESCRIPTION
Day Start Finish % Q
Gravel Bedding, G-1 1 08-Nov-17 08-Nov-17 100% 1.59 /
Installation of forms & rebars 1 08-Nov-17 08-Nov-17 100% 28.93 /
Concreting 2 09-Nov-17 10-Nov-17 100% 3.18 /
Masonry Works 3 11-Nov-17 14-Nov-17 25% 0.25 /
For Slab 2 11-Nov-17 13-Nov-17
Steel Trowelled Cement Slab Finish 2 11-Nov-17 13-Nov-17 100% 28.93 /
For 6" CHB Wall 1 14-Nov-17 14-Nov-17
Zocalo Wall 1 14-Nov-17 14-Nov-17 0% - /
Concrete Topping 1 14-Nov-17 14-Nov-17 0% - /
Plain Cement Plastered Wall Finish 1 14-Nov-17 14-Nov-17 0% - /
Structural Steel Erection 7 13-Nov-17 20-Nov-17 0% - /
Steel Post 1 13-Nov-17 13-Nov-17 0% - /
Roof Framing System
Roof Steel Beam 1 13-Nov-17 13-Nov-17 0% - /
Trusses 1 14-Nov-17 14-Nov-17 0% - /
Rafters 1 15-Nov-17 15-Nov-17 0% - /
Horizontal strutt 1 15-Nov-17 15-Nov-17 0% - /
Purlins 2 16-Nov-17 17-Nov-17 0% - /
Cross Brace & Tie 1 18-Nov-17 18-Nov-17 0% - /
Sag rods 1 18-Nov-17 18-Nov-17 0% - /
Gutter hangers 1 18-Nov-17 18-Nov-17 0% - /
Siding framing 4 15-Nov-17 20-Nov-17 0% - /
Roofing & Siding Works 7 20-Nov-17 27-Nov-17 0% - /
Valley Gutter 1 20-Nov-17 20-Nov-17 0% - /
Main Roof 2 20-Nov-17 21-Nov-17 0% - /
Roof Insulation 2 21-Nov-17 22-Nov-17 0% - /
Sidings
Exterior 3 22-Nov-17 25-Nov-17 0% - /
Interior 2 25-Nov-17 27-Nov-17 0% - /
Doors & Windows 2 27-Nov-17 28-Nov-17 0% - /
PVC Door installation 1 27-Nov-17 27-Nov-17 0% - /
Glass Door installation 1 27-Nov-17 27-Nov-17 0% - /
Window 1 28-Nov-17 28-Nov-17 0% - /
Construction of Kitchen counter top 9 28-Nov-17 07-Dec-17
Masonry Works 1 28-Nov-17 28-Nov-17 0% - /
For Support Wall

schedule 23 of 46
DATE : November 22, 2017
PROJECT : Amadeo Farm Central CV Office - Kitchen & Pantry Area
SUBJECT : Proposed Schedule

SCHEDULE WORK STA


DESCRIPTION
Day Start Finish % Q
Laying of 4" CHB 1 28-Nov-17 28-Nov-17 0% - /
Plain Cement Plastered Wall Finish 1 28-Nov-17 28-Nov-17 0% - /
Civil Works 2 29-Nov-17 01-Dec-17 0% - /
For Top Slab
Installation of forms & rebars 1 29-Nov-17 29-Nov-17 0% - /
Concreting 1 01-Dec-17 01-Dec-17 0% - /
Tile Works 1 02-Dec-17 02-Dec-17 0% - /
30 x 30 ceramic tile installation 1 02-Dec-17 02-Dec-17 0% - /
Plumbing Works 1 04-Dec-17 04-Dec-17 0% - /
Kitchen Sink & plumbing accessories 1 04-Dec-17 04-Dec-17 0% - /
Painting Works 2 06-Dec-17 07-Dec-17 0% - /
Painting for support wall 2 06-Dec-17 07-Dec-17 0% - /
Good house keeping & backloading works 2 07-Dec-17 08-Dec-17 0% - /

schedule 24 of 46
WORK STATUS

QTY.

1 lot
1 lot
88.07 m2

1 lot
10 m
28.93 m2
95 unit
3 unit

4 unit
2 unit
1 unit
3 unit
22 unit
4 unit
34 unit
22 unit

1 lot
54.50 m2

2.67 m3
0.25 m3
10 m
1.14 m3
1.64 m3

28.93 m2
28.93 m2

schedule 25 of 46
WORK STATUS

QTY.
1.59 m3
28.93 m2
3.18 m3
1 lot

28.93 m2

3.00 m2
0.12 m3
6.00 m2
95 unit
3 unit

4 unit
2 unit
1 unit
3 unit
22 unit
4 unit
34 unit
22 unit
2 side
1 lot
4.00 pcs
92.30 m2
92.30 m2

27.26 m2
15.73 m2
4 unit
1 unit
1 unit
2 unit

1 lot

schedule 26 of 46
WORK STATUS

QTY.
3.03 m2
6.06 m2
1 lot

4.46 m2
0.55 m3
4.69 m2
4.69 m2
1 lot
1 lot
7.45 m2
7.45 m2
1 lot

schedule 27 of 46
DATE : December 22, 2017
PROJECT : QESI Fabrication Painting Building
SUBJECT : Proposed Schedule
SCHEDULE STATUS
DESCRIPTION
Day Start Finish % QTY.
QESI Fabrication Painting Building 71d 03-Nov-17 31-Jan-18
Preliminaries 40d 03-Nov-17 22-Dec-17
Materials procurement & deliveries 12d 10-Nov-17 23-Nov-17
Civil materials 6d 10-Nov-17 16-Nov-17 100% 1.00 /
Structural steel materials 12d 10-Nov-17 23-Nov-17 75% 0.75 /
Structural steel fabrication including painting 22d 24-Nov-17 22-Dec-17
Beams 4d 24-Nov-17 28-Nov-17 100% 19 /
Columns 3d 24-Nov-17 27-Nov-17 58% 7 /
Roof framing system 9d 28-Nov-17 09-Dec-17 5% 0.05 /
Siding framing 4d 09-Dec-17 13-Dec-17 46% 150 /
2nd floor framing 6d 11-Dec-17 16-Dec-17 75% 0.75 /
Sliding door 4d 18-Dec-17 22-Dec-17 0% - /
Steel cover for underground dust collector system 4d 18-Dec-17 22-Dec-17 0% - /
Forms & rebar fabrication 9d 10-Nov-17 20-Nov-17 100% 1 /
Site development works 29d 10-Nov-17 15-Dec-17 67%
Site clearing including transfer of Ilo-ilo steel 5d 11-Nov-17 16-Nov-17 100% 2,833 /
Cut, fill & compaction of soil 6d 13-Nov-17 18-Nov-17 100% 378 /
Laying & compaction of basecoarse outside building area 21d 20-Nov-17 15-Dec-17 0% - /
Building construction 57d 20-Nov-17 31-Jan-18
Civil & earthworks 33d 20-Nov-17 03-Jan-18
Building foundation 13d 20-Nov-17 06-Dec-17
Earthworks 12d 21-Nov-17 06-Dec-17 100% 12 /
Installation of forms & rebar 8d 23-Nov-17 04-Dec-17 100% 12 /
Concreting works 9d 23-Nov-17 05-Dec-17 100% 12 /
Building slab 6d 26-Dec-17 03-Jan-18 0%
Underground dust collector system 6d 19-Dec-17 27-Dec-17
Excavation works 1d 19-Dec-17 19-Dec-17 100% 13 /
Installation of forms & rebar for bottom slab 1d 20-Dec-17 20-Dec-17 100% 13 /
Concreting of bottom slab 1d 20-Dec-17 20-Dec-17 100% 13 /
CHB wall & plastering 4d 22-Dec-17 27-Dec-17 46% 6 /
Structural steel erection including painting 20d 27-Dec-17 20-Jan-18 0%
Roof, gutter & sidings installation 7d 05-Jan-18 12-Jan-18 0%
Masonry works for CHB walls 41d 29-Nov-17 22-Jan-18
Perimeter wall 6" CHB laying from FTB to slab level 3d 29-Nov-17 04-Dec-17 100% 43 /
Perimeter wall 6" CHB laying above slab level 6d 06-Jan-18 12-Jan-18 0% - /

schedule 28 of 46
DATE : December 22, 2017
PROJECT : QESI Fabrication Painting Building
SUBJECT : Proposed Schedule
SCHEDULE STATUS
DESCRIPTION
Day Start Finish % QTY.
Interior wall 4" CHB laying 6d 13-Jan-18 19-Jan-18 0% - /
Plastering of wall 12d 09-Jan-18 22-Jan-18 0% - /
Carpentry works for wall & ceiling 16d 11-Jan-18 29-Jan-18 0%
Painting works 15d 15-Jan-18 31-Jan-18 0%
Doors installation 5d 24-Jan-18 29-Jan-18 0%
Storm drainage system 15d 04-Jan-18 20-Jan-18 30% 0.30 /

schedule 29 of 46
STATUS

QTY.

1 lot
1 lot

19 units
12 units
1 lot
326 m2
1 lot
3 set
52 m2
1 lot

2,833 m2
378 m3
1,259 m2

12 units
12 units
12 units

13 Lin.m
13 Lin.m
13 Lin.m
13 Lin.m

43 m2
272 m2

schedule 30 of 46
STATUS

QTY.
249 m2
2,083 m2

1 lot

schedule 31 of 46
DATE : November 11, 2017
PROJECT : Waste Water Treatment Plant #2
SCHEDULE STATUS
DESCRIPTION
Day Start Finish % QTY.
Waste Water Treatment Plant #2 110 18-Oct-17 06-Mar-18
Preliminaries 19 18-Oct-17 11-Nov-17
Existing creek alignment 10 20-Oct-17 03-Nov-17 100%
Construction of Waste Water Treatment Plant #2 98 04-Nov-17 06-Mar-18
Clearing & grubbing works 1 04-Nov-17 04-Nov-17 100% 1 / 1
Lay-out works 1 06-Nov-17 06-Nov-17 100% 1 / 1
Temporary acces from slab to access road 3 06-Nov-17 08-Nov-17 82% 168 / 204
Additional pit to pump out the water for foundation works 1 09-Nov-17 09-Nov-17 100% 4 / 4
Wall from foundation to bottom slab level 31 09-Nov-17 16-Dec-17
Foundation 18 09-Nov-17 29-Nov-17 100% 152 / 152
Laying of blocks (6crews; 1mason & 2helper per crew) 21 18-Nov-17 14-Dec-17 15% 2,815 / 18,506
Backfilling & compaction of soil 21 21-Nov-17 16-Dec-17 0% - / 152
Slab 13 18-Dec-17 05-Jan-18
Excavation 9 18-Dec-17 29-Dec-17 0% - / 1,440
Laying of slag blocks for slab 9 20-Dec-17 03-Jan-18 0% - / 32,000
Concreting 9 23-Dec-17 05-Jan-18 0% - / 1,440
Wall from bottom slab level to finish top elevation 53 28-Dec-17 02-Mar-18
Laying of blocks 44 28-Dec-17 20-Feb-18 0% - / 39,546
Backfilling & compaction of soil 44 04-Jan-18 24-Feb-18 0% - / 146
Plastering of wall 15 13-Feb-18 02-Mar-18 0% - / 460
Perimeter Interceptor Canal 12 21-Feb-18 06-Mar-18 0% - / 152
New PVC Pipe Sewer Drainage Line from existing Settling
12 21-Feb-18 06-Mar-18 0%
Tank to New STAM WWTP Lagoon

schedule 32 of 46
STATUS

QTY.

lot
lot
m
units

m
pcs
m

sqm
pcs
sqm

pcs
m
sqm
m

schedule 33 of 46
DATE : September 08, 2017
PROJECT : SMIP Perimeter Block Fence at EG Balasing/Bulac Side (680 linear meter fen
SUBJECT : Proposed Schedule

SCHEDULE
DESCRIPTION
Day Start Finish
SMIP Perimeter Block Fence at EG
128 04-Sep-17 10-Feb-18
Balasing/Bulac Side (680 linear meter fence)
Preliminaries 119 04-Sep-17 31-Jan-18
Equipment mobilization 1 04-Sep-17 04-Sep-17
Site Clearing works 3 05-Sep-17 07-Sep-17
Manpower mobilization 1 05-Sep-17 05-Sep-17
Temporary facilities works 4 06-Sep-17 09-Sep-17
Temporary access road 3 05-Sep-17 07-Sep-17
Delivery of materials 115 08-Sep-17 31-Jan-18
Materials for concrete works 114 08-Sep-17 30-Jan-18
Slag blocks materials 114 09-Sep-17 31-Jan-18
Fabrication of forms & rebars 114 08-Sep-17 30-Jan-18
Lay-out works 3 05-Sep-17 07-Sep-17
Construction of Block Fence 123 08-Sep-17 09-Feb-18
Footing 115 08-Sep-17 31-Jan-18
Excavation 114 08-Sep-17 30-Jan-18
Installation of forms & rebars 114 09-Sep-17 31-Jan-18
Concreting 114 09-Sep-17 31-Jan-18
Laying of blocks 114 12-Sep-17 02-Feb-18
Plastering of exterior wall 100 06-Oct-17 09-Feb-18
Backfilling & compaction of soil 114 14-Sep-17 05-Feb-18
Good house keeping & backloading works 2 09-Feb-18 10-Feb-18

schedule 34 of 46 pbi pasting line-5 mezzanine


DATE : September 14, 2017
PROJECT : PBI BOILER ROOM
SUBJECT : Proposed Schedule

SCHEDULE
DESCRIPTION
Day Start Finish
PBI BOILER ROOM 70d 25-Oct-17 24-Jan-18
Preliminaries 30d 25-Oct-17 04-Dec-17
Drawings & plans work 1d 25-Oct-17 25-Oct-17
Notice to proceed 1d 25-Oct-17 25-Oct-17
Structual steel materials procurement and deliveries c/o Client 18d 26-Oct-17 18-Nov-17
Structural steel fabrication & painting 9d 20-Nov-17 29-Nov-17
Steel columns 2d 20-Nov-17 21-Nov-17
Steel beams & girders 2d 22-Nov-17 23-Nov-17
Steel trusses 3d 20-Nov-17 22-Nov-17
Roof framing accessories 2d 23-Nov-17 24-Nov-17
Gutter hanger 1d 25-Nov-17 25-Nov-17
Wall framing 5d 24-Nov-17 29-Nov-17
Fabrication of forms & rebar 2d 26-Oct-17 27-Oct-17
Transfer of existing cooling tower to new location & clearing
30d 25-Oct-17 04-Dec-17
of working area c/o Client
Construction of PBI DC Cooling Tower 40d 05-Dec-17 24-Jan-18
Site works 8d 05-Dec-17 13-Dec-17
Building Foundation 7d 14-Dec-17 22-Dec-17
Machine pad foundation 3d 22-Dec-17 26-Dec-17
Slab 3d 27-Dec-17 29-Dec-17
Structural steel erection 7d 02-Jan-18 09-Jan-18
Roof, gutter & sidings installation 2d 10-Jan-18 11-Jan-18
Wall 10d 06-Jan-18 17-Jan-18
Storm drainage system 5d 18-Jan-18 23-Jan-18
Good house keeping & backloading works 1d 24-Jan-18 24-Jan-18

schedule 35 of 46 pbi pasting line-5 mezzanine


DATE : September 14, 2017
PROJECT : New Wood Warehouse Building
SUBJECT : Proposed Schedule
SCHEDULE
DESCRIPTION
Start Finish
New Wood Warehouse Original schedule 01-Feb-17 31-Oct-17

schedule 36 of 46 pbi pasting line-5 mezzanine


DATE : September 21, 2017
PROJECT : Proposed Schedule for the Balance of Works - RTI Expansion
SUBJECT : Proposed Schedule
SCHEDULE WORK STATUS
DESCRIPTION
Start Finish % QTY.
RTI Expansion - Original Schedule 01-Feb-17 21-Oct-17
Balance of Works: Building Construction 24-Oct-17 15-Dec-17
Building sidings 24-Oct-17 24-Nov-17 100% 32 / 32 spans
Electrical building power & lighting 24-Oct-17 15-Dec-17 75% 0.75 / 1 lot
Water line 24-Oct-17 09-Dec-17 85% 0.85 / 1 lot
Steel louvers installation - - 0% - / 1 lot
Fence steel grills installation - - 0% - / 1 lot
Building doors & windows installation - - 0% - / 1 lot
Toilet, EF Room & Power Room doors 21-Oct-17 26-Oct-17
Walls 23-Sep-17 27-Sep-17 100% 1 / 1 lot
Ceiling 21-Oct-17 25-Oct-17 100% 1 / 1 lot
Tiles 23-Oct-17 26-Oct-17 95% 0.95 / 1 lot
Plumbing pipe fixtures & accessories 21-Oct-17 22-Oct-17 50% 0.5 / 1 lot
Doors & windows 25-Oct-17 26-Oct-17 0% - / 1 lot
DATE : November 23, 2016
ACCOMPLISHMENT Target Schedule
DESCRIPTION
% QTY Hours Start Finish
OUTSIDE HOUSE & FACILITIES WORKS 820h 03-Nov-17 09-Mar-18
Road works 312h 03-Nov-17 20-Dec-17
Site Grading 100% 1.00 / 1 lot 168h 03-Nov-17 27-Nov-17
Subgrade preparation 100% 1.00 / 1 lot 168h 18-Nov-17 15-Dec-17
Basecoarse preparation 25% 0.25 / 1 lot 168h 24-Nov-17 20-Dec-17
Feedbin silo foundation 0% 0 / 1 unit 32h 20-Dec-17 26-Dec-17
Storm drainage system 356h 18-Nov-17 16-Jan-18
RCP drainage line 0% 0.00 / 1 lot 156h 15-Dec-17 11-Jan-18
PVC pipe drainage line 25% 0.25 / 1 lot 276h 02-Dec-17 16-Jan-18
Slag block lining open canal 264h 18-Nov-17 02-Jan-18
Excavation 17% 100 / 600 lot 240h 18-Nov-17 27-Dec-17
Slag block lining open canal 10% 60 / 600 m 240h 22-Nov-17 02-Jan-18
Mortality Pit 156h 28-Nov-17 23-Dec-17
Excavation works 100% 1 / 1 unit 12h 28-Nov-17 29-Nov-17
Forms & rebar installation 100% 1 / 1 unit 108h 29-Nov-17 16-Dec-17
Concreting 108h 04-Dec-17 19-Dec-17
Bottom slab 100% 1 / 1 unit 12h 04-Dec-17 05-Dec-17
Stiffiner columns 100% 1 / 1 unit 48h 08-Dec-17 15-Dec-17
Top Slab 0% 0 / 1 unit 12h 18-Dec-17 19-Dec-17
Blocks laying for walls 50% 1 / 1 unit 60h 05-Dec-17 13-Dec-17
Manhole cover 0% 0 / 1 unit 12h 19-Dec-17 20-Dec-17
Air vent 0% 0 / 1 unit 24h 19-Dec-17 23-Dec-17
Elevated Water Tank 572h 11-Nov-17 09-Feb-18
Earthworks 100% 4 / 4 unit 12h 13-Nov-17 14-Nov-17
Civil works 100% 4 / 4 unit 104h 13-Nov-17 28-Nov-17
Structural Steel works 512h 11-Nov-17 31-Jan-18
Fabrication 50% 0.50 / 1 unit 192h 11-Nov-17 11-Dec-17
Erection 50% 0.50 / 1 unit 360h 06-Dec-17 31-Jan-18
Painting works 25% 0.25 / 1 unit 228h 08-Jan-18 09-Feb-18
Piping works 0% 0 / 1 unit 108h 09-Jan-18 24-Jan-18
Main water line from elevated water tank to house 0% 180h 25-Jan-18 20-Feb-18
Deep Well Construction 37% 67 / 180 m 720h 13-Nov-17 03-Mar-18
DATE : November 23, 2016
ACCOMPLISHMENT Target Schedule
DESCRIPTION
% QTY Hours Start Finish
Pipe line from Deep Well to Elevated Water Tank 0% 60h 01-Mar-18 09-Mar-18
DATE : November 23, 2016
PROJECT : BROILER FARM-6 HOUSE 5&6 (SCHEDULE)
House-6 House-5 House-5
DESCRIPTION ACCOMPLISHMENT Target Schedule ACCOMPLISHMENT Target Schedule ACCOMPLISHMENT
% QTY Hours Start Finish % QTY Hours Start Finish %
Notice to proceed from Client (Assumed date) 0 hrs 8/1/2017 6:00 8/1/2017 6:00 0 hrs 8/1/2017 6:00 8/1/2017 6:00 ###
Building construction 70d
Foundation works 100% 54 / 54 units 100% 54 / 54 units ###
Slab works 100% 26 / 26 spans 216h 8/25/2017 6:00 9/18/2017 19:00 100% 26 / 26 spans 276h 8/2/2017 6:00 9/1/2017 19:00 ###
CHB zocalo works 50% 13 / 26 spans - - - 100% 26 / 26 spans 120h 8/19/2017 6:00 9/4/2017 19:00 14d
Repainting of columns, beams & trusses 100% 54 / 54 units 144h 8/2/2017 6:00 8/16/2017 19:00 100% 54 / 54 units 144h 8/17/2017 6:00 9/4/2017 19:00 ###
Structural Steel Erection 100% 26 / 26 spans 240h 8/2/2017 6:00 8/26/2017 19:00 100% 26 / 26 spans 240h 8/26/2017 6:00 9/21/2017 19:00 ###
Wall framing & wall insulation 0% 0 / 26 spans - - - 96% 23 / 24 spans - - -
Installation of metal furring for ceiling 100% 26 / 26 spans 120h 8/19/2017 6:00 9/4/2017 19:00 100% 26 / 26 spans 120h 9/15/2017 6:00 9/27/2017 19:00
Roof, sidings and ceiling works 600h 8/14/2017 6:00 10/17/2017 19:00 264h 9/15/2017 6:00 10/11/2017 19:00
Installation of roof 100% 26 / 26 spans 120h 8/14/2017 6:00 8/26/2017 19:00 100% 26 / 26 spans 72h 9/15/2017 6:00 9/21/2017 19:00
Installation of exterior wall 0% 0 / 54 spans - - - 85% 46 / 54 spans - - -
Installation of interior wall 0% 0 / 54 spans - - - 85% 46 / 54 spans - - -
Installation of ceiling 88% 23 / 26 spans 96h 10/3/2017 6:00 10/11/2017 19:00 100% 26 / 26 spans 96h 9/23/2017 6:00 10/2/2017 19:00
Blown-in Ceiling insulation 0% 0 / 27 spans - - - 0% 0 / 27 spans - - -
Gas Room 100% 1 / 1 unit 14h 10/9/2017 6:00 10/10/2017 8:00 100% 1 / 1 unit 14h 10/3/2017 6:00 10/4/2017 8:00
Building waterline 90% 0.9 / 1 lot 132h 10/12/2017 6:00 10/24/2017 19:00 85% 0.9 / 1 lot 132h 10/6/2017 6:00 10/18/2017 19:00
Sewer System, from house to swale 100% 1 / 1 lot 144h 9/20/2017 6:00 10/4/2017 19:00 100% 1 / 1 lot 144h 9/5/2017 6:00 9/18/2017 19:00
Downspout installation - - - - - -
Gutter procurement & deliveries - - - - - -
Gutter installation - - - - - -
DATE : 'October 23, 2016
* PROJECT : PAIGKAS MANURE FACILITY (Option 1)
* SUBJECT : Proposed Schedule
* SCHEDULE
DESCRIPTION
* Day Start
PAIGKAS MANURE FACILITY (Option 1) 29d 24-Oct-17
Preliminaries 16d 24-Oct-17
Drawings & plans work 1d 24-Oct-17
Notice to proceed 1d 24-Oct-17
Manpower mobilization 1d 24-Oct-17
Equipment mobilization 1d 24-Oct-17
Structual steel materials procurement and deliveries 12d 25-Oct-17
Site Clearing works 1d 24-Oct-17
Lay-out works 2d 24-Oct-17
Structural steel fabrication & painting 14d 26-Oct-17
Fabrication of forms & rebars 6d 26-Oct-17
Construction of Litter Shed Building 23d 25-Oct-17
Siteworks 6d 25-Oct-17
Earthworks 13d 25-Oct-17
Installation of formworks & rebars 9d 27-Oct-17
Concreting 6d 31-Oct-17
Structural steel erection 10d 09-Nov-17
Roof framing 9d 10-Nov-17
Roof & gutter installation 5d 17-Nov-17
Wall 6d 04-Nov-17
Storm drainage system 6d 21-Nov-17
Electrical works 6d 23-Nov-17
Site Development Works 9d 23-Nov-17
Storm drainage system from building to existing outflow 8d 23-Nov-17
Roadworks 6d 27-Nov-17
Good house keeping & backloading works 1d 06-Dec-17
*
SCHEDULE
REMARKS
Finish
06-Dec-17
13-Nov-17
24-Oct-17
24-Oct-17
24-Oct-17
24-Oct-17
06-Nov-17
24-Oct-17
25-Oct-17
13-Nov-17
04-Nov-17
29-Nov-17
31-Oct-17
10-Nov-17
08-Nov-17
08-Nov-17
20-Nov-17
20-Nov-17 6.00
22-Nov-17
10-Nov-17
27-Nov-17
29-Nov-17
05-Dec-17
02-Dec-17
05-Dec-17
06-Dec-17

9,287,923,386.00
-
-
-
-
0

#NAME?

13.42
50.00

3.142857 360 7200

###
###
51 days 7/23/2015 8:00 ###