PROPERTY TO BE CONSTRUCTED:
Residential Building - First Floor (Full) & Ground Floor (Alterations only)
JOB DESCRIPTIONS:-
BRICK WORK:-
SILL LEVEL:-
1. All windows bottom providing 0’4” tk beam with RCC (1:3:4) window bottom level.
2. As per Plan & Elevation Design.
LINTEL LEVEL:-
1. Providing 0’6” tk beam with RCC (1:2:4) in lintel level for all walls.
2. Providing 0’6” tk concrete for loft and sunshade with RCC (1:2:4).
3. Providing running lintel concrete with RCC (1:2:4) using 20 mm coarse aggregate. (As per
plan)
4. Providing Roof Storage Loft above toilet area.
ROOF LEVEL:-
Providing roof slab with RCC (1:2:4) with 0’5” tk. (As per plan)
PARAPET WALL:-
Providing Parapet wall all around with 0’ 41/2” tk and 3 ½ feet height. (As per plan)
FLOORING:-
1. Providing vitrified tiles flooring 2 x 2 Size with 4 inch skirting work (per sq.ft Rs: 50/-)
2. Providing concept tiles for toilet (7’ ht) & Kitchen (4 ½ ht) - (per sq.ft Rs: 35/-)
3. Providing Stair case with Granite Slab with Rough grip finishing.
4. Providing Seal & Try water proofing methods in Toilet & Kitchen Area
PLASTERING:-
TERRACE LEVEL:-
1. Providing weather course Suruki concrete with slope calculated and provided with
minimum 0’4” tk.
2. Providing pressed tiles over the Suruki concrete with skirting.
3. Providing Sanitary Pipes for Rain Water Harvesting.
WOOD WORK:-
ELECTRICAL WORK:-
Living room: 2 tube lights, 1 Pulp Holder, 2 fans, 1 night lamp and 3 (5 Amp) Plug points, TV
Plug, Point for Dish TV, Internet, A/C, 2 way switch for sit out area.
Sit-Out Area: Washing Machine & Grinder/Mixi plug, 1 Fan, 1 Tube Light & 2 way Door bell
Toilet: One Light, Water Heater, one plug & Exhaust Fan.
Staircase area: Two way switch, 2 plug points.
Inverter line will be provide for required point.
Socket outlets points Amps will be as per specification of usage.
PLUMBING WORK:-
PAINTING WORK:-
1. Providing inner wall two coat of wall care putty, one coat primer and two coats of Asian
Premium Interior emulsion.
2. Providing outer wall one coat of primer and two coats of Asian exterior Apex emulsion.
3. Steel Grill, Window, Frame - Asian Premium Satin Enamel Paint
4. Colors will be confirmed by 1st Party based on Elevation design.
ELEVATION WORK:-
SPECIFICATIONS:-
AGREED COST:-
1 ST FLOOR AREA 327 Sq.ft (as per plan) x 1500 = Rs. 4, 90,500/-
PAYMENT TERMS:-
1. Request the second party to support the maximum cooperation to complete the project on
time (2 months) without any delay as agreed.
2. Request the First party to arrange payment as per above terms.
3. Also agreed to execute the works as per terms given above & refer drawing.
WITNESSES:
----------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------
Payment Table