Natural Gas Industry B 3 (2016) 269e273
www.elsevier.com/locate/ngib
Research Article
Abstract
For safe and efficient development of the sour gas reservoirs of the Cambrian Longwangmiao Fm in the Anyue Gas Field, the Sichuan Basin,
and reduction of safety barrier failures and annulus abnormal pressure which are caused by erosion, corrosion, thread leakage and improper well
completion operations, a series of studies and field tests were mainly carried out, including optimization of well completion modes, experimental
evaluation and optimization of string materials, sealing performance evaluation of string threads, structural optimization design of downhole pipe
strings and erosion resistance evaluation of pipe strings, after the technical difficulties related with the well completion in this reservoir were
analyzed. And consequently, a set of complete well completion technologies suitable for HTHP (high temperature and high pressure) and high-
flowrate gas wells with acidic media was developed as follows. First, optimize well completion modes, pipe string materials and thread types.
Second, prepare optimized string structures for different production allocation conditions. And third, formulate well completion process and
quality control measures for vertical and inclined wells. Field application results show that the erosion of high-flowrate production on pipe
strings and downhole tools and the effect of perforation on the sealing performance of production packers were reduced effectively, well
completion quality was improved, and annulus abnormal pressure during the late production was reduced. This research provides a reference for
the development of similar gasfields.
© 2016 Sichuan Petroleum Administration. Production and hosting by Elsevier B.V. This is an open access article under the CC BY-NC-ND
license (http://creativecommons.org/licenses/by-nc-nd/4.0/).
Keywords: Sichuan Basin; Anyue Gas Field; Longwangmiao Fm gas reservoir; HTHP; Acidity; High flowrate; Gas well; Well completion; String structure;
Completion quality control
With the progress in the development of deep, HTHP sour safety of gas wells as leakages from screws of pipe strings,
gasfields in recent years, such severe threats to the production failures of packers and abnormal pressurization in annulus
have been presented. These problems may directly affect the
successful production of gas wells and the production safety in
* later stages [1e12]. With the Lower Cambrian Longwangmiao
Project supported by the National Manjor S&T Project “Development
Demonstration Project of Large Carbonate Gas Field in Longgang Area, the Fm in the Anyue Gas Field of the Sichuan Basin as an
Sichuan Basin” (No. 2011ZX05047-02) and Ph.D Station S&T Research example, this paper discusses the completion technologies for
Project of PetroChina Southwest Oil and Gas Field Company “Study on String high-productivity gas wells with HTHP sour gases. The
Mechanics concerning to the Integrity of HTHP High-yield Gas Wells in the research results are of great importance to ensuring the safe,
Longwangmiao Fm Reservoir” (No. 20140305-11).
economic and high-efficiency development of similar gas
* Corresponding author.
E-mail address: l_yf@petrochina.com.cn (Li YF.). reservoirs in the SichuaneChongqing area.
Peer review under responsibility of Sichuan Petroleum Administration.
http://dx.doi.org/10.1016/j.ngib.2016.05.012
2352-8540/© 2016 Sichuan Petroleum Administration. Production and hosting by Elsevier B.V. This is an open access article under the CC BY-NC-ND license
(http://creativecommons.org/licenses/by-nc-nd/4.0/).
270 Li YF. et al. / Natural Gas Industry B 3 (2016) 269e273
Table 2
Results of corrosion tests with formation water from Well MX11.
Material Position of the Corrosion Remarks
tested piece rate/(mm a1)
BG110SS Liquid 0.3221 Severe corrosion can be
observed regionally with an
approximate maximum pitting
area of 0.85 mm2
BG2532 Liquid 0.0020 Uniformed corrosion
BG2830 Liquid 0.0030 Uniformed corrosion
Test conditions: pH2 S ¼ 2.7 MPa, pCO2 ¼ 1.76 MPa, pH of formation
water ¼ 6.532, Cl content ¼ 28 378 mg/L, water type ¼ calcium chloride,
test temperature ¼ 140 C, test duration ¼ 72 h.
Table 3
SCC test results for domestically-produced alloy BG2830.
Test object BG2830 alloy tubing
Reference GB/T 15970.2e2000; ISO 7539-2: 1989;
standards NACE TM0177-2005
Test method Four-point bending
Test conditions Test solution: Simulated water
solution from the Well Longgang-6;
Temperature ¼ 150 ± 5 C; pH2 S ¼ 6 MPa;
pCO2 ¼ 5.4 MPa; Loading stress
(100% AYS) ¼ 850 MPa; Test duration: 720 h Fig. 1. Structure of completion string deployed in a vertical well.
Test results No cracks observed
In accordance with the mechanical verification results for integrated casing string / installation of wellhead for gas
casing string under complicated conditions, and with production / displacement of protection fluids in annulus /
comprehensive consideration to the completion costs, releasing of perforation gun upon completion of pressurized
Ø88.9 mm, d6.45 mm tubing of Grade 110 steel is recom- perforation / setting of the packer / blow off /
mended for vertical wells or wells with relatively low pro- acidization / fluid discharging / testing / completion and
ductivity, whereas Ø114.3 mm, d6.88 mm tubing of Grade 125 production. For highly-deviated wells and horizontal wells, it is
steel for highly-deviated wells and horizontal wells with high not possible to release the perforation gun upon completion of
productivities. relevant operations. For minimizing the impacts of perforation
vibration on the sealing performance of the packer, the comple-
3.5. Erosion resistance of subsurface safety valves tion technique involving perforation and installation of integrated
casing string for acidizationetestingeproduction is used. Major
In horizontal wells or gas wells with high productivities, procedures include: installation of pipe string for perforation /
Ø114.3 mm subsurface safety valves may be deployed in perforation / retrieval of the perforation string / circulation of
combination with larger production casing and intermediate killing fluids and observation / installation of packer comple-
casing at 0e200 m. Under such circumstances, the wellbore tion string / installation of wellhead for gas production /
integrity of gas wells may be reduced. Accordingly, displacement of protection fluids in annulus / setting of the
Ø114.3 mm tubing, Ø88.9 mm subsurface safety valves and packer / blow off / acidization / fluid discharging /
Ø177.8 mm permanent packers should be deployed in hori- testing / completion and production.
zontal wells or gas wells with relatively high productivities.
According to the program, the minimum inner diameter (ID) 4.2. Quality control over completion operations
of the pipe string can be observed at 88.9 mm subsurface
safety valve (71.5 mm). Erosion resistance performances of According to the exploration experiences in the HTHP sour
subsurface safety valves under various conditions were gasfields in the SichuaneChongqing area, improper quality
analyzed. Calculation results related to erosion-resistance control over completion operations may induce leakage in
performances of subsurface safety valves (Table 4) show pipe screws and improper setting of packers. Subsequently,
that, under a wellhead tubing pressure of 15e60 MPa, re- abnormal pressures may be observed in annulus during pro-
quirements of erosion-resistance capacities for productivities duction in later stages. Under such circumstances, production
of 100 104e159 104 m3/d can be fully satisfied. safety of gas wells may be compromised severely [12e14]. To
eliminate the possibility of abnormal pressurization in annulus
4. Completion techniques and operation quality control between tubing and casing due to an improper quality control
over relevant operations, it is important to take the following
4.1. Completion techniques measures to control the quality of completion operations.
In accordance with the completion strings deployed, two 1) Standards for the quality of key parameters for tubing
packages of completion techniques have been developed for with air-tight screws should be clarified. All tubing
vertical wells and horizontal wells, respectively. For vertical should be checked one by one and only qualified tubing
wells, integral completion technique involving perfo- can be delivered to the site.
rationeacidizationetestingeproduction is used to minimize the 2) All operations should be performed strictly in accor-
operation time and operation risks and also to eliminate pollution dance with the deployment requirements for tubing with
and damages of reservoir formations during the killing operations air-tight screw made of corrosion-resistance alloy to
after acidization. Major procedures include: installation of the enhance operation quality.
3) Torque calibrators and hydraulic tongs should be deployed
on site to achieve optimal torques for gas-tight screws.
Table 4
Calculated erosion resistance of Ø88.9 mm subsurface safety valve (with ID of
4) Helium should be used to check the gas tightness of all
71.5 mm). screwed pipes to be deployed in the well [3]. Only
Standard Wellhead pressure/MPa Erosion resistance/(104 m3 d1)
qualified pipes can be deployed.
5) Tubing pressure and annular pressure should be strictly
API 14E-1991 7.8 78.1
10.0 90.1
controlled during acidization, packer setting and blow
20.0 112.4 off to ensure that safety factors of completion string,
25.0 129.2 differential pressures of the packer and axial stresses are
30.0 140.4 all within an allowable extent.
40.0 148.4
50.0 159.2
60.0 166.1
5. Field applications
Note: With subsurface safety valve made of material Grade 718, and with
protection of flow nipples in both upstream and downstream, C in erosion Well MX009-X1 is the first development well in the
flowrate calculation was determined to be 200 (C is a constant determined by Longwangmiao Fm gas reservoir in the Anyue Gas Field, with
compositions of a corrosion layer). casing program of Ø508 mm þ Ø339.7 mm þ Ø244.5
Li YF. et al. / Natural Gas Industry B 3 (2016) 269e273 273
mm þ Ø177.8 mm þ Ø127 mm. With production formation production. Compared with conditions in the Longgang
pressure coefficient of 1.68, temperature of 143.74 C and Gas field over the same time period, abnormal pressures
maximum well inclination of 86.21 , the well was completed in annulus of such producers can be reduced
through tailpipe perforation. significantly.
Well MX009-X1 was completed through perforation and 3) Since the completion of high-productivity producers in
installation of integrated casing string for acid- HTHP formations may involve complicated working
izationetestingeperforation. The completion string is conditions, materials of the pipe string, sealing perfor-
composed of Ø114.3 mm tubing þ Ø88.9 mm subsurface mances of screws, strength and erosion resistance of
safety valve þ Ø114.3 mm tubing þ Ø177.8 mm permanent pipe string under complicated conditions, and other
packer assembly þ Ø88.9 mm tubing þ ball seat. All quality factors should be considered during the design of
control procedures were strictly followed during the installa- completion string and the selection of optimal downhole
tion of the completion string. Working pump pressure and tools for such gas producers to ensure pipe string safety
annular balance pressure were controlled carefully during and reliability during completion and production in later
packer setting, fluid discharging and acidization. To ensure stages.
even distribution of acid, diverting acid and plugging balls
were used. Gas productivity obtained during the test was References
263.47 104 m3/d. The well was completed in January 2014.
Since then, tubing pressure and annular pressure between [1] Xue Lina, Zhou Xiaohu, Yan Yancheng, Fan Xilian, Hu Daliang. Ma-
terial selection of the production casing in high-temperature sour gas
tubing and casing have been maintained steadily with no
reservoirs in the Changxing Formation, Yuanba Gas Field, northeastern
abnormal pressures observed (Fig. 3). It is implied that Sichuan Basin. Nat Gas Ind 2013;33(1):85e9.
downhole pipe string crews and packers have satisfactory [2] Jiang Fang. In-lab evaluation methods of metal materials for high sour
sealing performances. In addition, quality of completion op- gas fields. Nat Gas Ind 2004;24(10):105e7.
erations has been controlled properly. [3] Wang Jianjun. Seal test of the injectioneproduction string for under-
ground gas storage. China Pet Mach 2014;42(11):170e3.
[4] NACE Standard. TM0177e2005 laboratory testing of metals for resis-
tance to sulfide stress cracking and stress corrosion cracking in H2S
environments. Houston: NACE International; 2005.
[5] Zhang Zhi, Li Yanjun, Zhang Chao, Huang Yi, Guo Yongbin, Luo Limin,
et al. Wellbore integrity design of high-temperature gas wells containing
CO2. Nat Gas Ind 2013;33(9):79e86.
[6] Zhang Zhi, Huang Yi, Li Yanjun, Zhang Chao, Zeng Chunmin. Safety
evaluation of production casing considering corrosion in gas well with
sustained casing pressure. J Southwest Pet Univ Sci Technol Ed
2014;36(2):171e7.
[7] Guo Jianhua, Ma Faming. Air tightness performance assessment of screw
threads of oil tubings in high-sulfur gas wells in the Longgang Gas Field,
Sichuan Basin. Nat Gas Ind 2013;33(1):128e31.
[8] Shi Jiaoqi, Lin Kai, Xie Xuedong, Luo Weiguo, Yue Jing, Kong Hanbing.
Improvement of APl threaded tubing and casing scaling measures. China
Pet Mach 2002;30(3):47e9.
[9] He Yinda, Qin Deyou, Ling Tao, Li Xu, Yi Fei, He Jianfeng. Analysis of
tubing hermetic scaling in high pressure gas well of Tarim oil field. Drill
Fig. 3. Annular pressure in Well MX009-X1. Prod Technol 2010;33(3):36e9.
[10] Liu Yintao, Lei Youwei, Cao Yanguang, Chen Yongguang, Li Zonglin,
6. Conclusions Yu Dong. An optimal design of pipe strings for horizontal sour gas wells
at the Dawan Block, Puguang Gas Field. Nat Gas Ind 2012;32(12):71e4.
[11] Guo Jianhua, She Chaoyi, Tang Geng, Chen Yan, Shi Taihe. Optimal
1) In addition to high pressure, high temperature and pres-
design and application of completion strings in a HTHP sour gas well.
ence of sour media, the Cambrian Longwangmiao Fm Nat Gas Ind 2011;31(5):70e2.
gas reservoir in the Anyue Gas Field is characterized by [12] Liu Jie, He Ye, Yue Hong, Wang Ning, Zhang Ping, Deng Chunxiao,
high productivity of individual wells. During the design et al. Technology and practice of well completion and putting into pro-
of the completion string, requirements related to corro- duction for gas wells with high sulfur content in Sichuan and Chongqing
areas. Nat Gas Ind 2006;26(1):72e5.
sion and strength should be considered, together with
[13] Su Biao, Long Gang, Xu Xiaoqiang, Wu Qiang, Ding Dong, Wang Yi.
erosion prevention of pipe string and downhole tools Safe completion and production technologies of a gas well with ultra
under various conditions to protect them from damages. depth, high temperature, high pressure and high H2S content: a case from
2) To minimize the negative impacts of pipe string vibra- the Yuanba Gas Field in the Sichuan Basin. Nat Gas Ind
tion on the sealing performance of the permanent 2014;34(7):60e4.
[14] Su Biao, Zhao Zuopei, Yang Yonghua. Completion and well testing
packer during perforation, it is necessary to complete
technology in HTHP and high H2S gas wells of the eastern Sichuan
the production in the Longwangmiao Fm gas reservoir Basin. Nat Gas Ind 2010;30(12):53e6.
by perforation before packer setting, acidization and