You are on page 1of 7

Cost Albuq Bostin Cleveland Supply

Des Moines 5 4 3 100


Evan 8 4 3 300
Fort 9 7 5 300
Demand 300 200 200

Shipment Albuq Bostin Cleveland Supply


Des Moines
Evan
Fort
Demand
Transportation Problem

1/29/18

Program 9.1

Transportation
Enter
Enter the
the values
values in in the
the shaded
shaded area
area then
then use
use the
the Run
Run Excel's
Excel's Solve
Solv
button.
button.Alternatively,open
Alternatively,open Solver Solver by
by going
going to
to the
the Data
DataTab
Tab (Excel
(Excel 20
2
2010,
2010, 2013,
2013, 2016)2016) or or the
the Tools
Tools menu
menu (Excel
(Excel 2003,
2003, 2011).
2011). Use
Use the
the b
on
on the
the left
left to
to find
find aa starting
starting solution.
solution.

Data
COSTS Albuq Boston Cleveland Supply
Desmon 5 4 3 100
Evan 8 4 3 300
Ford L 9 7 5 300
Demand 300 200 200 700 \ 700

Shipments Albuq Boston Cleveland Row Total


Desmon 100 0 0 100
Evan 0 200 100 300
Ford L 200 0 100 300
Column Total 300 200 200 700 \ 700

Total Cost 3900

Page 2
Transportation Problem

hen use
then use the
the Run
Run Excel's
Excel's Solver
Solver
oing to
going to the
the Data
DataTab
Tab (Excel
(Excel 2007,
2007,
u (Excel
(Excel 2003,
2003, 2011).
2011). Use
Use the
the buttons
buttons

Page 3
The Assigment Problem

A B C D E F
1
2 1/29/18
3
4 The Assigment Problem
5
6 Assignment
7
Enter
Enter the
the values
values in
in the
the shaded
shaded area
area then
then use
use the
the Run
Run Excel's
Excel's Sol
So
8 Alternatively,open
Alternatively,open Solver
Solver byby going
going to
to the
the Data
Data Tab
Tab (Excel
(Excel 2007,
2007, 22
9 2016)
2016) oror the
the Tools
Tools menu
menu (Excel
(Excel 2003,
2003, 2011).
2011).
10
11 Data
12 COSTS Radio Toaster Coffe Table
13 Adams 11 14 6
14 Brown 8 10 11
15 Cooper 9 12 7
16
17
18 Assignments Radio Toaster Coffe Table Row Total
19 Adams 1 1
20 Brown 1 1
21 Cooper 1 1
22 Column Total 1 1 1 3
23
24 Total Cost 25
25
26 Assignment costs Radio Toaster Coffe Table
27 Adams 11 14 Assign 6
28 Brown 8 Assign 10 11
29 Cooper Assign 9 12 7
30

Page 4
The Assigment Problem

G H I J
1
2
3
4
5
6
7
n the
the shaded
shaded area
area8then
then use
use the
the Run
Run Excel's
Excel's Solver
Solver button.
button.
Solver
Solver byby going
going to
to the
the Data
Data Tab
Tab (Excel
(Excel 2007,
2007, 2010,
2010, 2013,
2013,
menu
menu (Excel 9 2011).
(Excel 2003,
2003, 2011).
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

Page 5
A B C D E F G H I
1
2 1/29/18
3
4 The Maximum Flo Net Problem
5
6 Maximal Flow
Enter
Enter the
the flow
flow capacities
capacities from
from node
nodetoto node
node in
in the
the shaded
shaded area.
area.The
The
7 capacity
capacity from
from thethe source
source toto the
the sink
sink must
must be
be set
set very
very high.Enter
high.Enter the
the
8 values
values in
in the
the shaded
shaded areaarea then
then use
use the
the Run
Run Excel's
Excel's Solver
Solver button.
button.
Alternatively,
Alternatively, oror to
to view
view the
the sensitivity
sensitivity results,
results, open
open Solver
Solver by
by going
going to
to the
the
9 Data
DataTab
Tab (Excel
(Excel 2007,
2007, 2010,
2010, 2013,
2013, 2016)
2016) or
or the
theTools
Tools menu
menu (Excel
(Excel 2003,
2003,
10 2011).
2011).
11 Data - Arc capacities
12 From\to Node 1 Node 2 Node 3 Node 4 Node 5 Node 6
13 Node 1 0 3 10 2 0 0
14 Node 2 1 0 0 1 0 2
15 Node 3 0 0 0 3 2 0
16 Node 4 0 1 1 0 0 1
17 Node 5 0 0 1 0 0 6
18 Node 6 999999 2 0 1 0 0
19
20
21
22 Flows
23 From\to Node 1 Node 2 Node 3 Node 4 Node 5 Node 6 Outflow
24 Node 1 2 2
25 Node 2 2 2
26 Node 3 2 2
27 Node 4 1 1
28 Node 5 2 2
29 Node 6 2 2 1 5
A B C D E F G H I
30 Inflow 2 2 2 1 2 5
31 Outflow 2 2 2 1 2 5
32
33
34 Max Flow 5

You might also like