Professional Documents
Culture Documents
Strengthening the
value & credibility of
TS 16949
4TH., Edition
Rule to Recognition of
ISO/TS 16949:2009 – certification
And other related new issues
28 February 2014
Danang Widoyoko/5-ADP-12-07-2011
2
© DWI-2013 ALL RIGHTS RESERVED.
1
4/21/2014
(only countries listed with more than 500 ISO/TS16949 certified sites)
2
4/21/2014
Taken from :
IATF Auditor Guide for ISO/TS 16949 First Edition April 2009
All rights reserved © 2009 ANFIA, © 2009 IATF France, © 2009 IAOB, © 2009 SMMT, © 2009 VDA.
Taken from :
IATF Auditor Guide for ISO/TS 16949 First Edition April 2009
All rights reserved © 2009 ANFIA, © 2009 IATF France, © 2009 IAOB, © 2009 SMMT, © 2009 VDA.
3
4/21/2014
Waiver /kelonggaran
/kelonggaran
harus diajukan kepada
IATF untuk proses
yang hendak dirubah :
BUKAN UNTUK
KETERLAMBATAN
PELAKSANAAN
YANG TIDAK
SESUAI DGN TS
RULE
4
4/21/2014
Part/Komponen yang
Part/Komponen
diperbolehkan dalam
sertifikasi adalah yang
digunakan untuk kendaraan
kecuali :
1. Fire Extinguisher
2. Car Jacks
3. Floor Mats
4. Manual Books
Dari Wikipedia :
Fabless manufacturing is the
design and sale of hardware
devices and semiconductor
chips while outsourcing the
fabrication or "fab" of the devices
to a specialized manufacturer
called a semiconductor foundry
Industri mobil :
Assembly line dan
komponen miliki
OEM – serta jaringan
suplainya (supply
chain)
5
4/21/2014
12
6
4/21/2014
13
14
7
4/21/2014
From WIKIPEDIA :
Fabless manufacturing is the design and sale of hardware devices and semiconductor
chips while outsourcing the fabrication or "fab" of the devices to a specialized manufacturer
called a semiconductor foundry. Foundries are typically located in China[1] [2] [3] [4] because
of the generally low cost of labor, so fabless companies can benefit from lower capital costs
while concentrating their research and development resources on the end market
15
16
8
4/21/2014
17
9
4/21/2014
20
10
4/21/2014
21
Prior to next regularly scheduled audit of the main site, the audit days for
the main site and previous manufacturing site extension shall be
recalculated. The purpose of the recalculation of audit days is to separate
the previously included headcount of the manufacturing site extension
from the headcount of the main manufacturing site. Records of the audit
day calculation shall be retained as part
of the audit records. The scheduling of the audit for the previous
manufacturing site extension shall comply with the deadline in Rules 5.1.1 –
audit cycle and shall be an initial certification audit. No stage 1 readiness
review is required and the stage 2 days can be reduced equivalent to the
minimum number of audit days for recertification audits in Table 5.2.
22
11
4/21/2014
Perhitungan mandays
menggunakan table renewal dan
memiliki site cycle baru
23
12
4/21/2014
The Problem
Suppliers complain that there
are too many CSR’s
CB’s claim that it’s becoming
difficult to manage
13