You are on page 1of 14

1) pile work

rcc ratio 1 1.5 3


item sub-title D (ft) H (ft) N L (rft) V (cft)
1.67 80 82 6560 14311.73
0
pile 0
0
0
total rcc volume (cft) 14311.7
total boring length (rft) 6560
length without
Re-bar 3.5 tie spacing (inch) 6.5
tie (ft)
L with
N
item sub-title dia (mm) lap U.W (ft) N (pile.) W (kg)
(bar)
(ft)

main
20 39.5 3 0.75 82 7265
bar-1
main
16 39.5 9 0.48 82 13949
pile bar-2
main
0 0.00 82 0
bar-3
tie 10 4.17 141 0.19 82 9016

material required & total costing for pile works

wastage
sl item unit qty. Q rate amount
(in %)

1 cement bag 3123 1 3154 400 1261514


2 sand cft 5855 5 6148 40 245902
stone
3 cft 11710 8 12646 180 2276346
chips
20 mm
4 kg 7265 1 7338
re bar
16 mm
5 kg 13949 2 14228
re bar
12 mm
6 kg 0 0
re bar
10 mm
7 kg 9016 4 9377
re bar
total re-
8 kg 30230 30942 60 1856547
bar
9 labour rft 6560 0 6560 160 1049600
total amount 6689909
cost per rft 1020
re bar (%) 0.95

2) pile-cap work
earth excavation
item sub-title L (ft) W (ft) H (ft) A(sft) N V (cft)
PC-1 11.00 7 5 3 1155
PC-2 11.00 7 5 6 2310
PC-2A 11.00 7 5 1 385
PC-3 11.00 10 5 8 4400
PC-3A 13.00 11 5 1 715
pile-cap PC-3B 13.00 11.5 5 1 747.5
PC-4 12.00 12 5 3 2160
PC-5 12.00 12 5 1 720
PC-6 14.00 14.00 5 1 980
PC-7 17.00 16 6 1 1632
PC-8 20.00 18 6 1 2160
total volume (cft) 17364.5

CC 2.5" ratio 1 3 6
item sub-title L (ft) W (ft) H (ft) A(sft) N V (cft)
PC-1 9.00 4 0.21 3 22.5
PC-2 9.00 4 0.21 6 45
PC-2A 9.00 4 0.21 1 7.5
PC-3 9.00 8 0.21 8 120
PC-3A 11.00 9 0.21 1 20.625
pile-cap PC-3B 11.00 9 0.21 1 20.625
PC-4 10.00 10 0.21 3 62.5
PC-5 10.00 10 0.21 1 20.83333
PC-6 12.00 12.00 0.21 1 30
PC-7 15.00 14 0.21 1 43.75
PC-8 18.00 16 0.21 1 60
total volume (cft) 453.333
material required & total costing for pile cap cc

wastage
sl item unit qty. Q rate amount
(in %)

1 cement bag 54 1 55 410 22527


2 sand cft 204 5 214 45 9639
brick
3 cft 408 6 432 46 19894
chips
total amount 52060

rcc ratio 1 1.5 3


item sub-title L (ft) W (ft) T (ft) A(sft) N V (cft)
PC-1 8.00 3.5 2.5 3 210
PC-2 8.00 3.5 2.5 6 420
PC-2A 8.00 3.5 2.5 1 70
PC-3 2.83 49 8 1111
PC-3A 3 65 1 195
pile-cap PC-3B 3 61 1 183
PC-4 3 49 3 441
PC-5 8.00 8 3.17 1 203
PC-6 9.83 9.83 3.5 1 338
PC-7 13.17 12.17 2.83 1 454
PC-8 16.50 13.75 2.67 1 605
total rcc volume (cft) 4229.66
Re-bar
L N U.W W
item sub-title dia (mm) N (cap.)
(ft) (bar) (ft) (kg)
20 9 10 0.75 202
PC-1 16 4 19 0.48 3 109
10 23 1 0.19 13
20 9 10 0.75 404
PC-2 16 4 19 0.48 6 218
10 23 1 0.19 26
20 9 10 0.75 67
PC-2A 16 4 19 0.48 1 36
10 23 1 0.19 4
20 8.25 20 0.75 987
PC-3 16 6.25 20 0.48 8 479
PC-3 8
10 30 1 0.19 45
20 19.3 25 0.75 361
PC-3A 16 19.3 25 0.48 1 231
10 35 1 0.19 7
20 9 26 0.75 175
20 6.5 20 0.75 97
PC-3B 1
pile-cap 16 9 47 0.48 202
10 32 1 0.19 6
20 8.25 20 0.75 370
PC-4 16 6.25 26 0.48 3 233
10 30 1 0.19 17
20 9 46 0.75 310
PC-5 16 0 0 0.48 1 0
10 32 1 0.19 6
25 10.83 48 1.17 607
PC-6 16 0 0 0.48 1 0
10 40 1 0.19 7
20 13.7 57 0.75 584
PC-7 16 13.7 58 0.48 1 380
10 40 1 0.19 7
20 16 92 0.75 1101
PC-8 16 16 74 0.48 1 567
10 66 1 0.19 12

material required & total costing for pile cap works

wastage
sl item unit qty. Q rate amount
(in %)

1 cement bag 923 2 941 410 385929


2 sand cft 1730 8 1869 45 84093
stone
3 cft 3461 8 3737 180 672746
chips
25 mm
4 kg 607 5 638
re bar
20 mm
5 kg 4762 5 5000
re bar
16 mm
6 kg 2350 8 2538
re bar
12 mm
7 kg 0 0
re bar
10 mm
8 kg 150 10 166
re bar
total re-
9 kg 7870 8342 60 500492
bar
total amount 1643261
re bar (%) 0.84
rcc ratio 1 2 4
item sub-title L (ft) W (ft) H (ft) A(sft) N V (cft)
GB-1 64.00 1 1.5 1 96
GB-2 30.00 1 1.5 1 45
GB-3 7.33 1 1.5 1 11.00
GB-4 16.00 1 1.5 1 24
GB-5 41.00 1 1.5 1 61.5
GB-6 91.17 1 1.5 1 136.76
GB-7 15.18 1 1.5 1 22.77
GB-8 31.25 1 1.5 1 46.88
grade GB-9 38.50 1 1.5 1 57.75
beam
12"x18" GB-10 15.00 1 1.5 1 22.5
GB-11 19.83 1 1.5 1 29.75
GB-12 25.00 1 1.5 1 37.5
GB-13 43.00 1 1.5 1 64.5
GB-14 31.50 1 1.5 1 47.25
GB-15 16.42 1 1.5 1 24.63
GB-16 33.00 1 1.5 1 49.5
GB-17 19.50 1 1.5 1 29.25
GB-18 28.25 1 1.5 1 42.38
total rcc volume (cft) 848.895
Re-bar spacing(avg) 5.5
L with
N U.W W
item sub-title dia (mm) lap L N (seg.)
(bar) (ft) (kg)
(ft)
20 80.9 3 0.75 181
16 80.9 2 0.48 77
GB-1 1
16 59.5 1 0.48 28
10 3.92 140 0.19 102
20 37.8 3 0.75 85
16 37.8 2 0.48 36
GB-2 1
16 24 1 0.48 11
10 3.92 65 0.19 48
20 10 2 0.75 15
16 10 4 0.48 19
GB-3 1
0
10 3.92 16 0.19 12
20 18 3 0.75 40
16 18 2 0.48 17
GB-4 1
16 12.5 1 0.48 6
GB-4 1

10 3.92 35 0.19 26
20 55.6 3 0.75 125
16 55.6 2 0.48 53
GB-5 1
16 36 1 0.48 17
10 3.92 89 0.19 66
20 119.7 3 0.75 268
16 119.7 2 0.48 115
GB-6 1
16 75 1 0.48 36
10 3.92 199 0.19 146
20 19 3 0.75 43
16 19 2 0.48 18
GB-7 1
16 15 1 0.48 7
10 3.92 33 0.19 24
20 46.1 3 0.75 103
16 46.1 2 0.48 44
GB-8 1
16 28 1 0.48 13
10 3.92 68 0.19 50
20 50.6 3 0.75 113
16 50.6 2 0.48 48
GB-9 1
16 14 1 0.48 7
grade 10 3.92 84 0.19 62
beam
12"x18" 20 20 3 0.75 45
16 20 2 0.48 19
GB-10 1
16 16 1 0.48 8
10 3.92 33 0.19 24
20 23 3 0.75 52
16 23 2 0.48 22
GB-11 1
16 17 1 0.48 8
10 3.92 43 0.19 32
20 33.8 3 0.75 76
16 33.8 2 0.48 32
GB-12 1
16 22.5 1 0.48 11
10 3.92 55 0.19 40
20 57.6 3 0.75 129
16 57.6 2 0.48 55
GB-13 1
16 36 1 0.48 17
10 3.92 94 0.19 69
20 48.6 3 0.75 109
16 48.6 2 0.48 47
GB-14 1
16 22 1 0.48 11
10 3.92 69 0.19 50
20 53.1 3 0.75 119
16 53.1 2 0.48 51
GB-15 1
16 28 1 0.48 13
10 3.92 36 0.19 26
20 46.1 3 0.75 103
16 46.1 2 0.48 44
GB-16 1
16 27 1 0.48 13
10 3.92 72 0.19 53
20 29.8 3 0.75 67
16 29.8 2 0.48 29
GB-17 1
16 10.5 1 0.48 5
10 3.92 47 0.19 34
20 39.3 4 0.75 118
16 39.3 2 0.48 38
GB-18 1
16 39.3 2 0.48 38
10 3.92 85 0.19 62
material required & total costing for grade beam

wastage
sl item unit qty. Q rate amount
(in %)

1 cement bag 146 2 148 410 60858


2 sand cft 364 8 393 45 17681
3 brick chip cft 728 8 786 145 113946
25 mm
4 kg 0 0
re bar
20 mm
5 kg 1792 1 1810
re bar
6 16 mm re kg 1014 2 1035
12 mm
7 kg 2 0
re bar
8 10 mm re kg 925 4 962
9 total re-b kg 3731 3806 60 228350
total amount 420835
re bar (%) #DIV/0!
rcc ratio 1 1.5 3
item sub-title L (ft) W (ft) H (ft) A(sft) N V (cft)
B-13 78.58 0.83 1.360833 1 88.76
B-14 66.00 0.83 1.360833 2 149.09
B-15 13.50 0.83 1.3 2 28.01
B-16 25.67 0.83 1.6 1 33.73
B-17 26.50 0.83 1.25 1 27.49
B-18 49.33 0.83 1.25 1 51.18
floor
B-19 49.33 0.83 1.25 1 51.18
beam
B-20 41.00 0.83 1.25 2 85.08
B-21 49.33 0.83 1.25 1 51.18
B-22 49.33 0.83 1.58 1 64.83
B-23 18.75 0.83 1.58 1 24.64
B-24 22.00 0.83 1.58 1 28.91
L.B 0.00
total rcc volume (cft) 684.08402
Re-bar spacing(avg) 5.5
L with
N U.W W
item sub-title dia (mm) lap L N (seg.)
(bar) (ft) (kg)
(ft)
20 90.9 2 0.75 136
20 216.646 1 0.75 162
B-13 16 90.9 2 0.48 1 87
16 131 1 0.48 63
10 4.42 171 0.19 142
20 72.6 2 0.75 217
20 385 1 0.75 576
B-14 2
16 51.66 2 0.48 99
10 4.42 144 0.19 238
20 15 2 0.75 45
16 15 2 0.48 29
B-15 2
0
10 4.25 29 0.19 47
20 29.33 9 0.75 197
B-16 20 9 6 0.75 1 40
10 4.91 56 0.19 51
20 29 4 0.75 87
B-17 20 10.5 1 0.75 1 8
10 4.25 58 0.19 46
20 60.9 5 0.75 228
20 68 1 0.75 51
B-18 1
16 50 1 0.48 24
10 4.25 108 0.19 85
FB
FB
20 60.99 5 0.75 228
B-19 20 45 1 0.75 1 34
10 4.25 108 0.19 85
20 60.99 5 0.75 456
20 42 1 0.75 63
B-20 2
16 56 1 0.48 54
10 4.25 89 0.19 142
20 60.99 5 0.75 228
20 72 1 0.75 54
B-21 1
16 50 1 0.48 24
10 4.25 108 0.19 85
20 60.99 6 0.75 274
20 67 1 0.75 50
B-22 16 61.99 1 0.48 1 30
25 220 1 1.17 257
10 4.91 108 0.19 99
20 23.33 6 0.75 105
B-23 20 58 1 0.75 1 43
10 4.91 41 0.19 38
20 26.3 6 0.75 118
20 35 1 0.75 26
B-24 1
25 40 1 1.17 47
10 4.91 48 0.19 44
material required & total costing for floor beam

wastage
sl item unit qty. Q rate amount
(in %)

1 cement bag 149 5 157 400 62687


2 sand cft 280 8 302 45 13601
3 brick chips cft 560 8 604 115 69515
4 25 mm re bar kg 304 0 304
5 20 mm re bar kg 3425 5 3596
6 16 mm re bar kg 408 8 441
7 12 mm re bar kg 2 0
8 10 mm re bar kg 1103 10 1213
9 total re-bar kg 5239 5554 60 333212
total amount 479015
rcc ratio 1 1.5 3
item sub-title L (ft) W (ft) H (ft) A(sft) N V (cft)
floor
0.42 3812 1 1601.04
beam
total rcc volume (cft) 1601.04

Re-bar spacing(avg)
L with
N U.W W
item sub-title dia (mm) lap L N (seg.)
(bar) (ft) (kg)
(ft)
st. main 10 60 38 0.19 421
crk main 10 61.26 38 0.19 429
st. main 10 50 20 0.19 182
SD 1
crk main 10 51.26 20 0.19 187
ex. T 12 31.33 38 0.27 316
ex. T 12 31 20 0.27 163
st. main 10 89 14 0.19 228
crk main 10 91.52 14 0.19 235
st. main 10 89 24 0.19 393
crk main 10 91.52 24 0.19 404
LD st. main 10 66.5 11 0.19 1 139
crk main 10 68.18 11 0.19 142
ex. T 12 48 14 0.27 177
ex. T 12 42 24 0.27 271
ex. T 12 35 11 0.27 105
total 3791
10mm 2759

material required & total costing for SLAB

wastage
sl item unit qty. Q rate amount
(in %)

1 cement bag 349 2 356 400 142522


2 sand cft 655 8 707 45 31832
3 brick chips cft 1310 8 1415 115 162695
7 12 mm re bar kg 1032 8 1115
8 10 mm re bar kg 2759 12 3090
9 total re-bar kg 3791 4205 60 252287
total amount 589335
S
long column

rcc ratio 1 1.5 3


item sub-title L (ft) W (ft) H (ft) A(sft) N V (cft)
C-1 2.08 1 8.33 8 138.8333
C-2 2.50 1 8.33 7 145.775
C-3 2.92 1 8.33 5 121.4792
column C-4 3.33 1 8.33 2 55.53333
CC-1 3.17 1 8.33 2 52.75667
CC-2 1.83 1 8.33 2 30.54333
CC-3 2.75 1 8.33 1 22.9075
total rcc volume (cft) 567.828
Re-bar spacing (avg) 7.5
L with
N U.W W
item sub-title dia (mm) lap L N (col.)
(bar) (ft) (kg)
(ft)
20 13.33 8 0.75 638
C-1 8 0
10 5.42 15.3 0.19 124
20 13.33 8 0.75 558
C-2 7 0
10 6.25 15.3 0.19 125
25 14 10 1.17 818
C-3 5 0
10 7.08 15.3 0.19 101
25 14 12 1.17 393
column C-4 2 0
10 8.5 15.3 0.19 49
20 13.33 12 0.75 239
CC-1 2 0
10 13.83 16.7 0.19 86
20 13.33 8 0.75 159
CC-2 2 0
10 8.2 16.7 0.19 51
20 13.33 10 0.75 100
CC-3 1 0
10 7.75 16.7 0.19 24

material required & total costing for column below gb


wastage
sl item unit qty. Q rate amount
(in %)

1 cement bag 124 2 126 410 51811


2 sand cft 232 8 251 45 11289
3 stone chips cft 465 8 502 180 90316

4 25 mm re bar kg 1210 2 1234

5 20 mm re bar kg 1694 5 1779

6 16 mm re bar kg 2 0

7 12 mm re bar kg 2 0

8 10 mm re bar kg 561 15 645


9 total re-bar kg 3466 3659 60 219521
total amount 372936