process conditions.
Open KCV-1A and KCV-2A putting Vessel A on Adsorption Mode and Open KCV-3B and KCV-4B for
putting Vessel – B on Regeneration Mode. Open KCV-6 so that the temperature of Regeneration gas can
be increased by Heat Exchanger E-001.
Note-1: The operation of TCV-3 is controlled by a PID controller having set point of 550 ⁰F interlocked
with KCV-6. If KCV-6 is closed then TCV-3 will be automatically closed in 30 seconds. However, if KCV-6 is
opened then TCV-3 follow its PID controller set point.
Note-2: After TCV-3 is fully closed, KCV-9 must also be closed. When KCV-6 is opened, KCV-9 must also
be opened.
Step – 2 :-
Vessel A will remain on adsorption. As the temperature of regeneration gas at inlet and outlet of Vessel
B is ideally equal (practically TT1B – TT2B = 20 ⁰F). Open KCV-7 for 10 minutes then close KCV-7 (to avoid
thermal shock). Open KCV-8 and then close KCV-6.
As the temperature of regeneration gas at the outlet of Vessel B is equal to 75 ⁰F. Open KCV-5 and then
close KCV-3B and KCV-4B (Regeneration KCVs).
i. AT-2A installed at 70% of the bed length is at 0.15ppm AND AT-3A installed at 90% of the
bed length is 0.1ppm.
Then, the Adsorption cycle will be switched to that Vessel whose regeneration gas inlet KCVs is closed
AND which achieved standby mode earlier.
Open KCV-1C and KCV-2C and then close KCV-1A and KCV-2A. Open KCV-3A, KCV-4A and close KCV-5
and open KCV-6 and close KCV-8.
As the temperature of regeneration gas at inlet and outlet of Vessel A is ideally equal (practically TT1A –
TT2A = 20 ⁰F). Open KCV-7 for 10 minutes then close KCV-7 (to avoid thermal shock). Open KCV-8 and
then close KCV-6.
As the temperature of regeneration gas at the outlet of Vessel A is equal to 75 ⁰F. Open KCV-5 and then
close KCV-3A and KCV-4A (Regeneration KCVs).
i. AT-2C installed at 70% of the bed length is at 0.15ppm AND AT-3C installed at 90% of the
bed length is 0.1ppm.
Then, the Adsorption cycle will be switched to that Vessel whose regeneration gas inlet KCVs is closed
AND which achieved standby mode earlier.
Open KCV-1B and KCV-2B and then close KCV-1C and KCV-2C. Open KCV-3C, KCV-4C and close KCV-5 and
open KCV-6 and close KCV-8.
As the temperature of regeneration gas at the outlet of Vessel C is equal to 75 ⁰F. Open KCV-5 and then
close KCV-3C and KCV-4C (Regeneration KCVs).
Note: After completion of Adsorption cycle of Vessel B, the logic will jump to Step 1.