Design of Platform Slab @ EL. +418.

150 :

Fy = 415 N/mm²
Fck = 20 N/mm²
Clearcover 15 mm
Th. of slab 125 mm O.K
Clear span 1.25 m
Eff.span 1.25 + 0.11 = 1.355 m

Taking the lesser value(as per code) lx = 1.250 m


Slab thickness = 125 mm
D.L.of slab = 3.13 kN/m²
Floor finishes = 1.50 kN/m²
Live load = 10.00 kN/m² dx= 105
Total 14.625 kN/m² dy= 95
Ast Required Ast Provided
M=1.5*(W*Lx²/8)= 4.285 kN-m Ast 10 mm Ast 10
Mu/bd2 0.389 pt = 0.110 150 523 c/c 523.33 150
8 mm 8
Distribution steel=0.12*1000*d/100= 150 335 c/c 150
Maximum spacing limits
For Main bars 3*d (or) 300 mm 315 (or) 300 mm Whichever is less
Provide 10 dia @ 150 mm c/c top & bottom
For Dist. bars 5*d (or) 450 mm 525 (or) 450 mm Whichever is less
Provide 8 dia @ 150 mm c/c top & bottom

Check for deflection as per IS:456-2000 (FIG.4)


fs =0.58*fy*Astreq/Ast prov. = 69
Pt prov. = 100* Ast/b*d = 0.50 Modification factor k 2.00
d required = lx/(k*20) = 31.3
d provided = = 105.0 O.K
Design of Toilet Room Slab @ EL. +419.360 :

Fy = 415 N/mm²
Fck = 20 N/mm²
Clearcover 15 mm
Th. of slab 100 mm O.K
Clear span 1.3 m
Eff.span 1.30 + 0.08 = 1.38 m

Taking the lesser value(as per code) lx = 1.300 m


Slab thickness = 100 mm
D.L.of slab = 2.50 kN/m²
Floor finishes = 1.50 kN/m²
Live load = 3.00 kN/m² dx= 80
Total 7.000 kN/m² dy= 70
Ast Required Ast Provided
M=1.5*(W*Lx²/8)= 2.218 kN-m Ast 10 mm Ast 10
Mu/bd2 0.347 pt = 0.098 120 654 c/c 523.33 150
8 mm 8
Distribution steel=0.12*1000*d/100= 120 419 c/c 150
Maximum spacing limits
For Main bars 3*d (or) 300 mm 240 (or) 300 mm Whichever is less
Provide 8 dia @ 150 mm c/c top & bottom
For Dist. bars 5*d (or) 450 mm 400 (or) 450 mm Whichever is less
Provide 8 dia @ 150 mm c/c top & bottom

Check for deflection as per IS:456-2000 (FIG.4)


fs =0.58*fy*Astreq/Ast prov. = 55
Pt prov. = 100* Ast/b*d = 0.65 Modification factor k 2.00
d required = lx/(k*20) = 32.5
d provided = = 80.0 O.K