You are on page 1of 55

LIST OF CONTENTS IN ELECTRONIC FILE

File name TEC's Forms OF Proposal (FOP)

SEC-AGR.DOC SECRECY AGREEMENT FORM


RFP001.DOC PROPOSAL LETTER FORM

RFP.XLS CONTAINS THE SHEETS BELOW:

Overall Price Sumary


RFP002 PRICE SUMMARY SHEET

Direct cost Breakdown (Unit Rates)


RFP003 DIRECT COST SUMMARY-CIVIL/BUILDING/STRUCTURE
RFP003 BKDWN UNIT RATE BREAK DOWN OF PRE-FABRICATED STR. STEEL MATERIAL COST
RFP003A DIRECT COST SUMMARY-EQUIPMENT INSTALLATION
RFP003B DIRECT COST SUMMARY-PIPING WORKS
RFP003C DIRECT COST SUMMARY-ELECTRICAL WORKS
RFP003D DIRECT COST SUMMARY-INSTRUMENTATION WORKS
RFP003E DIRECT COST SUMMARY-INSULATION & FIREPROOFING
RFP003F DIRECT COST SUMMARY-PAINTING
RFP003G DIRECT COST SUMMARY-STEEL STRUCTURE (IN CASE SEPARATED FROM CIVIL WORK PACKAGE)
RFP003E_BRK-DWN DIRECT COST SUMMARY- PIPING INSULATION

Breakdown of each cost item


RFP004 1.1 MATERIALS
RFP004E INSULATION MATERIAL COST BREAKDOWN
RFP005 1.2 DIRECT LABOUR
RFP006 1.3 CONSTRUCTION EQUIPMENT
RFP007 2.1 COMMON TEMPORARY FACILITIES
RFP008 2.2 TRANSPORTATION & INSURANCE
RFP009 2.4 SUPERVISORY AND ADMINISTRATIVE STAFF & LABOUR COST
including 2.3 Mat'l Handling Manpower and 2.5 Travelling Expenses
RFP010 2.9 INSURANCE, TAXES & DUTIES

Rates for day work


RFP011 RATES FOR DAY WORK (CS)
RFP011(1) RATES FOR DAY WORK (CL)
RFP011(2) RATES FOR DAY WORK (CL)
RFP011(3) RATES FOR DAY WORK (CE)
RFP011(4) RATES FOR DAY WORK (CE)

Back up sheets for construction planning


RFP012 MANNING SCHEDULE
RFP013 DETAILED CONSTRUCTION SCHEDULE
RFP014 MAJOR CONSTRUCTION EQUIPMENT MOBILISATION PLAN
RFP015 UTILITY CONSUMPTION SCHEDULE

Price Summary Sheet format for the following are not provided as standard.
2.6 Camp Operation, 2.7 Field Office Expenses and 2.8 Home Office Expenses

379149354.xlsx/INDEX
TEC's FORMS OF PROPOSAL IN ELECTRONIC FILE

USER GUIDE FOR ELECTRONIC FILE

Bidder is strictly advised not change any formats contained in the electronic file, i.e.
delete or insert rows and columns, etc. Bidder can, however, alter the formulas
contained in the electronic file to meet his calculation requirements.

a) The Operation software for all Price Formats is Microsoft Excel 2003.
.
b) For Proposal Letter and Secrecy Agreement forms, the operation software is Microsoft Word 2003.

c) Formulas have been provided in the Forms of Proposal for Bidder's convenience, however,
Bidder shall be fully responsible for all calculation results.

d) E-Files must be returned to TEC after all data have been installed together with full
output of documents for TEC's further use.

e) Bidder to develop present formats as required for detail planning especially for;

- RFP012: Manning Schedule


- RFP013: Detail Construction Schedule
- RFP014: Major Construction Equipment Mobilisation Plan
- RFP015: Utility Consumption Schedule

f) Bidder shall provide all information in accordance with the formats and degree of requirements
of the Forms of Proposal.

379149354.xlsx/NOTES
Work No : PD. 14037 PRICE SUMMARY SHEET Form : RFP-002
Project : Date : xx/xx/xxxx
Inquiry No : PD. 14037-XX-XXXX-XXX-XX Bidder : COMPANY -A
Work Title : Dayung Compression 2 Piping , Painting & Insulation Works

(A) THROUGH (G) (1) + (A) THROUGH (G)


Work Category (B):PIPING (F):PAINTING ERECTION TOTAL ALL TOTAL

Bill of Quantity Base B/Q Dia-Inch M2

Manhours (Foreman & Labour)* Manhours Manhours 0 Manhours 0 Manhours

Offer Currency L.C( ) F.C(US$) L.C( ) F.C(US$) L.C( ) F.C(US$) L.C( ) F.C(US$)

0 0 0 0

1. DIRECT WORK COST 0 0 0 0

0 0 0 0

1.1 Materials 0 0 0 0

A-1) Material 0 0 0 0

A-2) Concumable 0 0 0 0

B ) Transportation, Insurance, etc. 0 0 0 0

1.2 Labour (Direct Labour only) 0 0 0 0

1.3 Construction Equipment 0 0 0 0

0 0 0 0

1. SUB-TOTAL : 0 0 0 0 0 0 0 0

0 0 0 0

2. INDIRECT WORK COST 0 0 0 0

0 0 0 0

2.1 Common Temporary Facilities 0 0 0 0

a) Const. Facilities 0 0 0 0

b) Camp. Facilities 0 0 0 0

2.2 Transportation and Insurance 0 0 0 0

a) Construction Equipment for Heavy Rigging 0 0 0 0

b) Common Temporary Facilities 0 0 0 0

0 0 0 0

2.4 Supervisory & Administrative 0 0 0 0

including 2.3 Mat'l Handling 0 0 0 0

and 2.5 Travelling Expenses 0 0 0 0

0 0 0 0

0 0 0 0

2.6 Camp Operation 0 0 0 0

2.7 Field Office Expense 0 0 0 0

2.8 Home Office Expense 0 0 0 0

2.9 Insurance, Taxes and Duties 0 0 0 0

0 0 0 0

2. SUB-TOTAL : 0 0 0 0 0 0 0 0

3 OVERHEAD AND PROFIT 0 0 0 0

GRAND TOTAL : 0 0 0 0 0 0 0 0

NOTE : = Cell for Input


F.C.:Offer Price in Foreign Currency Portion Bidder's Signature
L.C.:Offer price in Local Currency Portion
Exchange Rate : L.C/F.C =
The above mentioned Exchange rate is used for evaluation purpose only.
Claims for any fluctuations in the Exchange Rates cannot be valid.
379149354.xlsx Security Level 3 RFP002 PRICE SUMMARY SHEET
WORK VOLUME AND DIRECT COST BREAKDOWN
PIPING SYSTEM WORKS

Client : CONOCO PHILLIPS INDONESIA Prepared by : AMJ


Project : Dayung Compression Phase-2 Checked by :
Job No : PD-14037 Approved by :
Subcontractor : Revision : 0B
Date 3-Feb-15
QTY UNIT TOTAL UNIT PRICE (USD) TOTAL PRICE (USD)
NO. DESCRIPTION UNIT REMARKS
Rev.0B MHR'S MHR'S MAT'L LABOUR EQUIP TOTAL MAT'L LABOUR EQUIP TOTAL

M.1 SMALL BORE HANDLING


Handling small pipe 1 1/2" dia or less, as here under for
M.1.1 fabrication,
ABOVE GROUND erection fit up, including installation of support,
clamps, hangers, valves, fitting, inline instrument, etc.
STAINLESS STEEL
SCH 160 0.75 lin m 3.00
SCH 160 1.5 lin m 1.91
SCH 80S 0.5 lin m 0.00
SCH 80S 1 lin m 0.42

TOTAL M.1 - SMALL BORE HANDLING 5 - - - -

M.2 LARGE BORE HANDLING


Handling pipe greater than 1 1/2" dia as here under for
fabrication into spool and erection, cutting, beveling fit up and
bolt jointing, including transportation pipe from/to site painting
M.2.1 ABOVE
shop GROUND
and/or to Job Site, installation of supports, clamps,
hangers, etc.CARBON STEEL
SCH 30 16 lin m 9.07
SCH 40 3 lin m 1.54
SCH 40 10 lin m 0.84
SCH 40 16 lin m 1.34
SCH 80 2 lin m 9.52
SCH 80 3 lin m 0.17
SCH STD 16 lin m 5.36

STAINLESS STEEL
SCH 160 2 lin m 0.17
SCH 40 16 lin m 2.24
SCH 40S 2 lin m 2.15
SCH 40S 4 lin m 4.83
SCH 40S 6 lin m 14.55
SCH 40S 8 lin m 32.84
SCH 40S 10 lin m 16.51
SCH 40S 12 lin m 70.41
SCH 40S 16 lin m 0.45
SCH 60 8 lin m 39.03
SCH 80 16 lin m 2.68
SCH 80S 2 lin m 2.81
SCH 80S 6 lin m 6.17
SCH 80S 8 lin m 0.67

TOTAL M.2 - LARGE BORE HANDLING 223 - - - -

M.3 WEIGHT
Weight is attended for trafic and transportation purposes

M.3.1 WEIGHT

CARBON STEEL
2 Ton 0.65
3 Ton 0.16
10 Ton 0.03
16 Ton 7.39

STAINLESS STEEL
0.5 Ton 0.00
0.75 Ton 0.20
1 Ton 0.05
1.5 Ton 0.07
2 Ton 0.30
4 Ton 0.57
6 Ton 3.11
8 Ton 12.87
10 Ton 2.55
12 Ton 16.52
16 Ton 0.72

TOTAL M.3.1 - WEIGHT 45 - - - -

M.3.2 ABOVE GROUND, WELD JOINT

CS
Pipes and Accessories 2 SCH 80 Dia inch 282.00 - - - - -
Pipes and Accessories 3 SCH 40 Dia inch 51.00 - - - - -
Pipes and Accessories 3 SCH 80 Dia inch 18.00 - - - - -
Pipes and Accessories 10 SCH 40 Dia inch 70.00 - - - - -
Pipes and Accessories 16 SCH 30 Dia inch 320.00 - - - - -
Pipes and Accessories 16 SCH 40 Dia inch 112.00
Pipes and Accessories 16 SCH STD Dia inch 160.00

SS
Pipes and Accessories 0.5 SCH 80S Dia inch -
Pipes and Accessories 0.75 SCH 160 Dia inch 132.75
Pipes and Accessories 1 SCH 80S Dia inch 17.00
Pipes and Accessories 1.5 SCH 160 Dia inch 103.50
Pipes and Accessories 2 SCH 160 Dia inch 14.00
Pipes and Accessories 2 SCH 40S Dia inch 72.00
Pipes and Accessories 2 SCH 80S Dia inch 134.00
Pipes and Accessories 4 SCH 40S Dia inch 104.00
Pipes and Accessories 6 SCH 40S Dia inch 378.00
Pipes and Accessories 6 SCH 80S Dia inch 216.00
Pipes and Accessories 8 SCH 40S Dia inch 1,064.00
Pipes and Accessories 8 SCH 60 Dia inch 792.00
Pipes and Accessories 8 SCH 80S Dia inch 80.00
Pipes and Accessories 10 SCH 40S Dia inch 590.00
Pipes and Accessories 12 SCH 40S Dia inch 1,140.00
Pipes and Accessories 16 SCH 40 Dia inch 144.00
Pipes and Accessories 16 SCH 40S Dia inch 16.00
Pipes and Accessories 16 SCH 80 Dia inch 160.00

TOTAL M.3.2 - JOINTING 6,170 - - - -

M.4 STEAM TRACING


Installation of steam tracing tube as follows including supply all
required consumable.

TOTAL M.4 - STEAM TRACING 0 0 0 0

M.5 PIPE SUPPORT AND ACCESSORIES


M.5.1 Pipe Support and Accessories (CARBONSTEEL) TON 6.78 - - - - -

TOTAL M.5 - PIPE SUPPORT AND ACCESSORIES 6.78 - - - -


M.6 TIE-IN WORK
Cover removal of existing insulation, assisting IKPT in Hot Tap
work,
(Lump additional
sum basedpreparation
on ……………… work Tie-ins)
etc. to (excludes welding, EA
flange joints removal of piping and pipe)
or
Cover removal of existing insulation, preparation work cut off
existing joint, reinstallament by welding, flange joint etc as
measurement in the contract
Tie-In Sizes 2 15.00
Tie-In Sizes 3 2.00
Tie-In Sizes 6 3.00
Tie-In Sizes 8 12.00
Tie-In Sizes 10 12.00
Tie-In Sizes 12 5.00
Tie-In Sizes 16 3.00

TOTAL M.6 - TIE-IN WORK 52.00 0 0 0 0

M.7 HYDROSTATIC AND PNEUMATIC TEST


Hydrostatic or pneumatic testing of steel pipe including supply
M.7.1 water, pumping, draining, supply temporary gaskets, in the
Test Package Lot 1.00 - - - - -
pressure and holding time as specified in the contract.

TOTAL M.7 - HYDROSTATIC AND PNEUMATIC TEST 1.00 0 0 0 -

M.8 RADIOGRAPHY & PENETRANT TEST


Provision of radiographic services for weld examination works
M.8.1 including supply of films, scaffolding and other resources. The
RADIOGRAPHY
work shall excluded magnetic particle test / dye penetrant and
ultrasonic. Size 2 JOINT 251.00
3 JOINT 22.00
4 JOINT 26.00
6 JOINT 99.00
8 JOINT 242.00
10 JOINT 66.00
12 JOINT 95.00
16 JOINT 56.00

M.8.2 PENETRANT TEST


Size 0.5 JOINT -
0.75 JOINT 177.00
1 JOINT 17.00
1.5 JOINT 69.00

TOTAL M.8 - RADIOGRAPHY 1,120 - - - -

M.9 POST WELD HEAT TREATMENT


Required for wall thickness specified in the contract
M.9.1 CARBON STEEL

M.9.2 STAINLESS STEEL

TOTAL M.9 - POST WELD HEAT TREATMENT - - - -

M.10 PRECOMMISSIONING
This work shall cover steam blowing, air blowing, lube oil
flushing and chemical cleaning of all pipe in all area.
NONE LS

TOTAL M.10 - PRECOMMISSIONING 0 0 0 -

M.12 INSTALATION OF VALVE, STRAINER, EXPANSION, ETC.


Installation of valve greater than 2" flange type including
securing material from stockpile or warehouse, erection,
alignment and bolt-up all component parts.
Rating 150 VALVE SIZE 1 EA 4 -
BASKET STRAINER 12 EA 4

Rating 300 VALVE SIZE 12 EA 2 -

Rating 900 VALVE SIZE 0.75 EA 18 -


VALVE SIZE 6 EA 4 -
VALVE SIZE 8 EA 4
VALVE SIZE 16 EA 4

TOTAL M.12 - INSTALATION OF VALVE, STRAINER, EXPANSION, ETC. 40.0

M.21 PAINTING
Painting for all size of pipe, fitting and flange including supply
of material and consumable, ect.

M.21.1 ABOVE GROND


PAINTING AREA NON INSULATION Surface Preparation : SSPC-SP10
Pipes and Accessories 0.5 M2 0.00 Primer Coat : Inorganic Zinc Rich Primer
Pipes and Accessories 0.75 M2 0.15 (DFT = 65 Micron)
Pipes and Accessories 1 M2 0.03 Intermediate Coat : Polyamide Epoxy
Pipes and Accessories 1.5 M2 0.19 (DFT = 50 Micron)
Pipes and Accessories 2 M2 2.03 Top Coat : Polyamide Epoxy
Pipes and Accessories 3 M2 0.41 (DFT = 50 Micron)
Pipes and Accessories 4 M2 0.32
Pipes and Accessories 6 M2 7.21
Pipes and Accessories 8 M2 20.96
Pipes and Accessories 10 M2 13.85
Pipes and Accessories 12 M2 67.42
Pipes and Accessories 16 M2 23.57

TOTAL M.21 - PIPE PAINTING AREA 136 - - - -

M.XXX STEEL STRUCTURE

SS STEEL STRUCTURE WORK


SS-1A STR. Steel for BLDG Ton
SS-2A STR. Steel for Equipment Ton
SS-3A STR. Steel for Pipe Rack Ton 2
SS-4A STR. Steel for Miscellaneous Ton 13
SS-5A Checkered Plate Ton
SS-5B Grating Ton 4
SS-5C Deck Plate Ton
SS-5D Expanded Metal Ton
SS-5E Punching Metal Ton
SS-6A Steel Handrail Ton 2
SS-6B Steel Ladder Ton 0
SS-6C Steel Stair-Case Ton 2
SS-7A Crane Rail Ton
TOTAL M.XXX - STEEL STRUCTURE 23
Note:
1 Nett Area means Area to be Insulated (Before installation of insulation)
Work No: PD. 14037 1.1 MATERIALS
Project: A-1) Material
Inquiry No: PD. 14037-XX-XXXX-XXX-XX A-2) Concumable
Work Title Dayung Compression 2 Piping , Painting & Insulation Works B ) Transportation, Insurance, et
UNIT RATE
DESCRIPTION QTY UNIT
L.C( )

A-1-1) Materials of Overseas


Procurement
a) 0.0
b) 0.0
c) 0.0
d) 0.0
e) 0.0
f) 0.0
g) 0.0
h) 0.0
i) 0.0
j) 0.0
A-1-1) SUB TOTAL: 0.0
0.0
A-1-2) Materials of Local 0.0

379149354.xlsx Security Level 3 RFP004 1.1 MATERIALS


Work No: PD. 14037 1.1 MATERIALS
Project: A-1) Material
Inquiry No: PD. 14037-XX-XXXX-XXX-XX A-2) Concumable
Work Title Dayung Compression 2 Piping , Painting & Insulation Works B ) Transportation, Insurance, et
UNIT RATE
DESCRIPTION QTY UNIT
L.C( )
Procurement(including 0.0
Transportation cost) 0.0
a) 0.0
b) 0.0
c) 0.0
d) 0.0
e) 0.0
f) 0.0
g) 0.0
h) 0.0
i) 0.0
j) 0.0
k) 0.0
l) 0.0
m) 0.0
n) 0.0

379149354.xlsx Security Level 3 RFP004 1.1 MATERIALS


Work No: PD. 14037 1.1 MATERIALS
Project: A-1) Material
Inquiry No: PD. 14037-XX-XXXX-XXX-XX A-2) Concumable
Work Title Dayung Compression 2 Piping , Painting & Insulation Works B ) Transportation, Insurance, et
UNIT RATE
DESCRIPTION QTY UNIT
L.C( )
o) 0.0
p) 0.0
q) 0.0
r) 0.0
s) 0.0
t) 0.0
u) 0.0
v) 0.0
w) 0.0
x) 0.0
y) 0.0
z) 0.0
a') 0.0
b') 0.0
c') 0.0
d') 0.0

379149354.xlsx Security Level 3 RFP004 1.1 MATERIALS


Work No: PD. 14037 1.1 MATERIALS
Project: A-1) Material
Inquiry No: PD. 14037-XX-XXXX-XXX-XX A-2) Concumable
Work Title Dayung Compression 2 Piping , Painting & Insulation Works B ) Transportation, Insurance, et
UNIT RATE
DESCRIPTION QTY UNIT
L.C( )
e') 0.0
f') 0.0
A-1-2) SUB TOTAL: 0.0
0.0
A-2) Consumable 0.0
0.0
a) 0.0
b) 0.0
c) 0.0
d) 0.0
A-2) SUB TOTAL: 0.0
0.0
B) Transportation/ Insurance 0.0
for overseas Procurement 0.0
a) 0.0
b) 0.0

379149354.xlsx Security Level 3 RFP004 1.1 MATERIALS


Work No: PD. 14037 1.1 MATERIALS
Project: A-1) Material
Inquiry No: PD. 14037-XX-XXXX-XXX-XX A-2) Concumable
Work Title Dayung Compression 2 Piping , Painting & Insulation Works B ) Transportation, Insurance, et
UNIT RATE
DESCRIPTION QTY UNIT
L.C( )
B. SUB TOTAL: 0.0
0.0
GRAND TOTAL: 0.0
0.0
Note: = Cell for Input

379149354.xlsx Security Level 3 RFP004 1.1 MATERIALS


Form : RFP-004
Date : xx/xx/xxxx
Bidder : Comapany xxx
ortation, Insurance, etc.
TOTAL
COUNTRY OF ORIGIN
F.C(US$) L.C( ) F.C(US$)

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0 0.00 0.00
0.0
0.0

379149354.xlsx Security Level 3 RFP004 1.1 MATERIALS


Form : RFP-004
Date : xx/xx/xxxx
Bidder : Comapany xxx
ortation, Insurance, etc.
TOTAL
COUNTRY OF ORIGIN
F.C(US$) L.C( ) F.C(US$)
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

379149354.xlsx Security Level 3 RFP004 1.1 MATERIALS


Form : RFP-004
Date : xx/xx/xxxx
Bidder : Comapany xxx
ortation, Insurance, etc.
TOTAL
COUNTRY OF ORIGIN
F.C(US$) L.C( ) F.C(US$)
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

379149354.xlsx Security Level 3 RFP004 1.1 MATERIALS


Form : RFP-004
Date : xx/xx/xxxx
Bidder : Comapany xxx
ortation, Insurance, etc.
TOTAL
COUNTRY OF ORIGIN
F.C(US$) L.C( ) F.C(US$)
0.0
0.0
0.0 0.00 0.00
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0 0.00 0.00
0.0
0.0
0.0
0.0
0.0

379149354.xlsx Security Level 3 RFP004 1.1 MATERIALS


Form : RFP-004
Date : xx/xx/xxxx
Bidder : Comapany xxx
ortation, Insurance, etc.
TOTAL
COUNTRY OF ORIGIN
F.C(US$) L.C( ) F.C(US$)
0.0 0.00 0.00
0.0
0.0 0.00 0.00
0.0

379149354.xlsx Security Level 3 RFP004 1.1 MATERIALS


Work No: PD. 14037 1.2 DIRECT LABOUR
Project: (BASIS : Hours per Day)*
Inquiry No: PD. 14037-XX-XXXX-XXX-XX
Work Title Dayung Compression 2 Piping , Painting & Insulation Works
MANHOUR
DESCRIPTION NATIONALITY Civil/Building Eq't Install Piping Electrical Instrument Insulation
/Structure

1. Expatriate Labour

1.1 Foreman
a)
b)
c)
1.1 Foreman Total 0 0 0 0 0 0
1.2 Skilled labour
a)
b)
c)
1. SUB-TOTAL: 0 0 0 0 0

2. Local Labour
2.1 Foreman
a)
b)
c)
d)
e)

Security Level 3 RFP005 1.2 DIRECT LABOUR


Work No: PD. 14037 1.2 DIRECT LABOUR
Project: (BASIS : Hours per Day)*
Inquiry No: PD. 14037-XX-XXXX-XXX-XX
Work Title Dayung Compression 2 Piping , Painting & Insulation Works
MANHOUR
DESCRIPTION NATIONALITY Civil/Building Eq't Install Piping Electrical Instrument Insulation
/Structure
2.2 Skilled labour
a)
b)
c)
d)
e)
2.3 Unskilled labour
a)
b)
c)
d)
e)
2. SUB-TOTAL : 0 0 0 0 0
GRAND TOTAL : 0 0 0 0 0

NOTE* State the number of base daily working hours in the bracket under the title of this form.

Security Level 3 RFP005 1.2 DIRECT LABOUR


Hours per Day)* Date: xx/xx/xxxx
Bidder: Comapany xxx

UR UNIT PRICE TOTAL


Painting Total
L.C( ) F.C(US$) L.C( ) F.C(US$)

0 0.0 0.0
0 0.0 0.0
0 0.0 0.0
0 0 0 0.0 0.0 0.00 0.00
0.0 0.0
0 0.0 0.0
0 0.0 0.0
0 0.0 0.0
0 0 0 0.0 0.0 0.00 0.00
0 0.0 0.0
0 0.0 0.0
0 0.0 0.0
0 0.0 0.0
0 0.0 0.0
0 0.0 0.0
0 0.0 0.0
0 0.0 0.0

Security Level 3 RFP005 1.2 DIRECT LABOUR


Hours per Day)* Date: xx/xx/xxxx
Bidder: Comapany xxx

UR UNIT PRICE TOTAL


Painting Total
L.C( ) F.C(US$) L.C( ) F.C(US$)
0 0.0 0.0
0 0.0 0.0
0 0.0 0.0
0 0.0 0.0
0 0.0 0.0
0 0.0 0.0
0 0.0 0.0
0 0.0 0.0
0 0.0 0.0
0 0.0 0.0
0 0.0 0.0
0 0.0 0.0
0 0 0 0.0 0.0 0.00 0.00
0.0 0.0
0 0 0 0.0 0.0 0.00 0.00
0.0 0.0
Bidder's Signature

Security Level 3 RFP005 1.2 DIRECT LABOUR


Form:RFP-005

Comapany xxx

REMARKS

Security Level 3 RFP005 1.2 DIRECT LABOUR


Form:RFP-005

Comapany xxx

REMARKS

Security Level 3 RFP005 1.2 DIRECT LABOUR


Work No : PD. 14037 1.3 CONSTRUCTION EQUIPMENT
Project : (Including transportation cost Other than Heavy Rigging Equipme
Inquiry No : PD. 14037-XX-XXXX-XXX-XX
Work Title : Dayung Compression 2 Piping , Painting & Insulation Works
QUANTITY
DESCRIPTION TYPE, MODEL or Number of UNIT
SPECIFICATION Machines

1. Construction Equipment

A. Civil Works Equipment


a) Concrete Batch Plant M/C*Mth
b) Pile Hammer M/C*Mth
c) Pile Driver M/C*Mth
d) Excavator M/C*Mth
e) Backhoe M/C*Mth
f) Dumptruck M/C*Mth
g) Bulldozer M/C*Mth
h) Motor Grader M/C*Mth
i) Payloader M/C*Mth
j) Vibratory Roller M/C*Mth
k) Tandem Roller M/C*Mth
l) Plate Compactor M/C*Mth
m) Concrete Mixer M/C*Mth
n) Concrete Pump M/C*Mth
o) Water Pump M/C*Mth
p) Asphalt Paver/Finisher M/C*Mth
A.Sub-total

B. Heavy Rigging Equipment


Security Level 3 RFP006 1.3 CONSTRUCTION EQUIPMENT
Work No : PD. 14037 1.3 CONSTRUCTION EQUIPMENT
Project : (Including transportation cost Other than Heavy Rigging Equipme
Inquiry No : PD. 14037-XX-XXXX-XXX-XX
Work Title : Dayung Compression 2 Piping , Painting & Insulation Works
QUANTITY
DESCRIPTION TYPE, MODEL or Number of UNIT
SPECIFICATION Machines
a) Jack-up System M/C*Mth
b) Jin Pole M/C*Mth
c) Crawler Crane (1001Ton & Over) M/C*Mth
d) Crawler Crane (801Ton to 1000Ton) M/C*Mth
e) Crawler Crane (601Ton to 800Ton) M/C*Mth
f) Crawler Crane (400Ton to 600Ton) M/C*Mth
B.Sub-total

C. General Rigging Equipment


a) Crawler Crane (300Ton) M/C*Mth
b) Crawler Crane (250Ton) M/C*Mth
c) Crawler Crane (150Ton) M/C*Mth
d) Hydraulic Crane (126Ton to 150Ton) M/C*Mth
e) Hydraulic Crane (101Ton to 125Ton) M/C*Mth
f) Hydraulic Crane (81Ton to 100Ton) M/C*Mth
g) Hydraulic Crane (51Ton to 80Ton) M/C*Mth
h) Hydraulic Crane (31Ton to 50Ton) M/C*Mth
i) Hydraulic Crane (21Ton to 30Ton) M/C*Mth
j) Hydraulic Crane (11Ton to 20Ton) M/C*Mth
k) Hydraulic Crane (10Ton or Less) M/C*Mth
l) Fork Lift (10Ton) M/C*Mth
m) Fork Lift (3 Ton) M/C*Mth
C.Sub-total
Security Level 3 RFP006 1.3 CONSTRUCTION EQUIPMENT
Work No : PD. 14037 1.3 CONSTRUCTION EQUIPMENT
Project : (Including transportation cost Other than Heavy Rigging Equipme
Inquiry No : PD. 14037-XX-XXXX-XXX-XX
Work Title : Dayung Compression 2 Piping , Painting & Insulation Works
QUANTITY
DESCRIPTION TYPE, MODEL or Number of UNIT
SPECIFICATION Machines

D. Piping/Eqpt. Installation
a) TIG Welding Machine M/C*Mth
b) DC Welding Machine M/C*Mth
c) Engine Welding Machine M/C*Mth
d) Hydrotest Pump M/C*Mth
e) Radiography Equipment & Cons. M/C*Mth
f) Stress Relieving Equipment & Cons. M/C*Mth
g) Sandblasting machine M/C*Mth
h) Air Compressor M/C*Mth
i) Air Compressor M/C*Mth
D.Sub-total

E. Electrical/Instrumentation
a) Power Cable Puller M/C*Mth
b) Electric Cable Cutter M/C*Mth
c) Hydraulic Pipe Bender M/C*Mth
d) Threadimg Machine M/C*Mth
E.Sub-total

F. Painting/Insulation
a) Sheet Metal Cutter M/C*Mth
b) Sheet Metal Roller M/C*Mth
Security Level 3 RFP006 1.3 CONSTRUCTION EQUIPMENT
Work No : PD. 14037 1.3 CONSTRUCTION EQUIPMENT
Project : (Including transportation cost Other than Heavy Rigging Equipme
Inquiry No : PD. 14037-XX-XXXX-XXX-XX
Work Title : Dayung Compression 2 Piping , Painting & Insulation Works
QUANTITY
DESCRIPTION TYPE, MODEL or Number of UNIT
SPECIFICATION Machines
c) Spray Painting Set M/C*Mth
d) Blasting Machine M/C*Mth
F.Sub-total

G. Transport/Hauling Equipment
a) Water Truck M/C*Mth
b) Fuel Truck M/C*Mth
c) Cargo Truck M/C*Mth
d) Low Bed Trailer M/C*Mth
e) High Bed Trailer M/C*Mth
f) Trailer w/ Tractor M/C*Mth
g) Pick-up M/C*Mth
h) Vehicles M/C*Mth
h) Mini Bus M/C*Mth
G.Sub-total

H. Common Use Equipment


a) Diesel Engine Generator (251KVA & Over) M/C*Mth
b) Diesel Engine Generator (126 to 250KVA) M/C*Mth
c) Diesel Engine Generator (125KVA or less) M/C*Mth
H.Sub-total
1. SUB TOTAL :
2. Tools and Machinery
Security Level 3 RFP006 1.3 CONSTRUCTION EQUIPMENT
Work No : PD. 14037 1.3 CONSTRUCTION EQUIPMENT
Project : (Including transportation cost Other than Heavy Rigging Equipme
Inquiry No : PD. 14037-XX-XXXX-XXX-XX
Work Title : Dayung Compression 2 Piping , Painting & Insulation Works
QUANTITY
DESCRIPTION TYPE, MODEL or Number of UNIT
SPECIFICATION Machines

a)
b)
c)
d)
e)
f)
g)

2. SUB TOTAL :

GRAND TOTAL :

M/C*Mth: Machine * Mont

Security Level 3 RFP006 1.3 CONSTRUCTION EQUIPMENT


her than Heavy Rigging Equipments) Date : xx/xx/xxxx
Bidder : Comapany xxx

QUANTITY UNIT PRICE TOTAL

L.C( ) F.C(US$) L.C( ) F.C(US$)

0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.00 0.00 0.00

Security Level 3 RFP006 1.3 CONSTRUCTION EQUIPMENT


her than Heavy Rigging Equipments) Date : xx/xx/xxxx
Bidder : Comapany xxx

QUANTITY UNIT PRICE TOTAL

L.C( ) F.C(US$) L.C( ) F.C(US$)


0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.00 0.00 0.00

0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.00 0.00 0.00
Security Level 3 RFP006 1.3 CONSTRUCTION EQUIPMENT
her than Heavy Rigging Equipments) Date : xx/xx/xxxx
Bidder : Comapany xxx

QUANTITY UNIT PRICE TOTAL

L.C( ) F.C(US$) L.C( ) F.C(US$)

0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.00 0.00 0.00

0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.00 0.00 0.00

0.0 0.0
0.0 0.0
Security Level 3 RFP006 1.3 CONSTRUCTION EQUIPMENT
her than Heavy Rigging Equipments) Date : xx/xx/xxxx
Bidder : Comapany xxx

QUANTITY UNIT PRICE TOTAL

L.C( ) F.C(US$) L.C( ) F.C(US$)


0.0 0.0
0.0 0.0
0.00 0.00 0.00

0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.00 0.00 0.00

0.0 0.0
0.0 0.0
0.0 0.0
0.00 0.00 0.00
0.00 0.00 0.00

Security Level 3 RFP006 1.3 CONSTRUCTION EQUIPMENT


her than Heavy Rigging Equipments) Date : xx/xx/xxxx
Bidder : Comapany xxx

QUANTITY UNIT PRICE TOTAL

L.C( ) F.C(US$) L.C( ) F.C(US$)

0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0
0.0 0.0

0.00 0.00 0.00

0.00 0.00 0.00

M/C*Mth: Machine * Months

Bidder's Signature :

Security Level 3 RFP006 1.3 CONSTRUCTION EQUIPMENT


Form : RFP-006

REMARKS

Security Level 3 RFP006 1.3 CONSTRUCTION EQUIPMENT


Form : RFP-006

REMARKS

Security Level 3 RFP006 1.3 CONSTRUCTION EQUIPMENT


Form : RFP-006

REMARKS

Security Level 3 RFP006 1.3 CONSTRUCTION EQUIPMENT


Form : RFP-006

REMARKS

Security Level 3 RFP006 1.3 CONSTRUCTION EQUIPMENT


Form : RFP-006

REMARKS

Security Level 3 RFP006 1.3 CONSTRUCTION EQUIPMENT


Work No: PD. 14037 2.1 COMMON TEMPORARY FACILITIES Form:RFP-007
Project: (a) Construction Facilities including transportation cost Date : xx/xx/xxxx
Inquiry No: PD. 14037-XX-XXXX-XXX-XX (b) Camp Facilities cost including transportation cost Bidder : Comapany xxx
Work Title Dayung Compression 2 Piping , Painting & Insulation Works
SPECIFICATION QTY UNIT PRICE TOTAL
ITEMS SIZE Numbers UNIT REMARKS
L.C( ) F.C(US$) L.C( ) F.C(US$)

a)-1 BUILDINGS

a) Field Office M2 0.0 0.0


b) Warehouse M2 0.0 0.0
c) Toolroom M2 0.0 0.0
d) Fabrication Shop M2 0.0 0.0
e) Maintenance Shop M2 0.0 0.0
f) Clinic M2 0.0 0.0
g) Guard Huts M2 0.0 0.0
h) Toilet M2 0.0 0.0
i) Worker's Shed M2 0.0 0.0
j) Canteen M2 0.0 0.0
k) Other Building M2 0.0 0.0

a)-1 BUILDINGS Total 0.00 0.00

a)-2 OTHER FACILITIES

a) Storage Area 0.0 0.0


b) Temporary Road, Sewer, Fence 0.0 0.0
Gate, Bridge, Jetty, etc. 0.0 0.0
c) Safety, Protection and 0.0 0.0
Maintenance Facilities. 0.0 0.0
d) Utility Supply 0.0 0.0
1) Electricity 0.0 0.0
2) Water 0.0 0.0
3) Others 0.0 0.0
e) Others 0.0 0.0
1) Furnishings 0.0 0.0
2) Installation Of Temporary facilities 0.0 0.0

a)-2 OTHER FACILITIES Total 0.00 0.00

b) CAMP FACILITIES

a) Camp facilities 0.0 0.0


b) 0.0 0.0
b)CAMP FACILITIES Total 0.00 0.00

TOTAL AMOUNT: 0.00 0.00

Bidder's Signature

Security Level 3 RFP007 2.1 COMMON TEMPORARY FACILITIES


Work No: PD. 14037 2.2 TRANSPORTATION AND INSURANCE Form :RFP-008
Project: a) Construction Equipment for Heavy Equipment Rigging Date : xx/xx/xxxx
Inquiry No: PD. 14037-XX-XXXX-XXX-XX b) Common Temporary Facilities Bidder : Comapany xxx
Work Title Dayung Compression 2 Piping , Painting & Insulation Works
UNIT PRICE TOTAL
DESCRIPTION VOLUME UNIT REMARKS
or QTY. L.C( ) F.C(US$) L.C( ) F.C(US$)

a) Construction Equipment for Heavy Rigging

1) Overseas Transportation
a) 0.0 0.0
b) 0.0 0.0
c) 0.0 0.0
d) 0.0 0.0
e) 0.0 0.0
f) 0.0 0.0
g) 0.0 0.0
h) 0.0 0.0
i) 0.0 0.0

2) Domestic Transportation
a) 0.0 0.0
b) 0.0 0.0
c) 0.0 0.0
d) 0.0 0.0
e) 0.0 0.0

b) Common Temporary Facilities

NOTE: Transportation & Insurance for Common Temporary Facilities shall be included in 2.1 Common Temporary Facilities Cost.

GRAND TOTAL : 0.00 0.00

Bidder's Signature

Security Level 3 RFP008 2.2 TRANSPORTATION INSURANCE


Work No: PD. 14037 2.4 SUPERVISORY AND ADMINISTRATIVE
Project: STAFF AND LABOUR COST
Inquiry No: PD. 14037-XX-XXXX-XXX-XX (Including 2.3 Material Handling and 2.5 Travelling Expenses)
Work Title Dayung Compression 2 Piping , Painting & Ins A) STAFF, B) LABOUR & C) TRAVELLING EXPENSES FOR LOCAL ST
UNIT PRICE
OCCUPATIONAL CATEGORY TOTAL
MANMONTH L.C( )
A. STAFF
1.EXPATRIATE STAFF

a) 0.0
b) 0.0
c) 0.0
d) 0.0
e) 0.0
1.EXPATRIATE STAFF Total 0 0.0
2.LOCAL STAFF
a) 0.0
b) 0.0
c) 0.0
d) 0.0
e) 0.0
f) 0.0
g) 0.0
h) 0.0
i) 0.0
j) 0.0
k) 0.0
l) 0.0
RFP009 2.4 SUPERVISORY AND ADMINISTRATIVE STAFF AND LABOURSecurity
COST Level 3
Work No: PD. 14037 2.4 SUPERVISORY AND ADMINISTRATIVE
Project: STAFF AND LABOUR COST
Inquiry No: PD. 14037-XX-XXXX-XXX-XX (Including 2.3 Material Handling and 2.5 Travelling Expenses)
Work Title Dayung Compression 2 Piping , Painting & Ins A) STAFF, B) LABOUR & C) TRAVELLING EXPENSES FOR LOCAL ST
UNIT PRICE
OCCUPATIONAL CATEGORY TOTAL
MANMONTH L.C( )
m) 0.0
n) 0.0
o) 0.0
p) 0.0
q) 0.0
r) 0.0
s) 0.0
t) 0.0
u) 0.0
v) 0.0
w) 0.0
x) 0.0
y) 0.0
z) 0.0
2.LOCAL STAFF Total 0 0.0
A. SUB TOTAL : 0 0.0

B. INDIRECT LABOUR
1.EXPATRIATE INDIRECT LABOUR

a) 0.0
b) 0.0
RFP009 2.4 SUPERVISORY AND ADMINISTRATIVE STAFF AND LABOURSecurity
COST Level 3
Work No: PD. 14037 2.4 SUPERVISORY AND ADMINISTRATIVE
Project: STAFF AND LABOUR COST
Inquiry No: PD. 14037-XX-XXXX-XXX-XX (Including 2.3 Material Handling and 2.5 Travelling Expenses)
Work Title Dayung Compression 2 Piping , Painting & Ins A) STAFF, B) LABOUR & C) TRAVELLING EXPENSES FOR LOCAL ST
UNIT PRICE
OCCUPATIONAL CATEGORY TOTAL
MANMONTH L.C( )
c) 0.0
d) 0.0
e) 0.0
1.EXPATRIATE INDIRECT LABOUR Total 0 0.0
2.LOCAL INDIRECT LABOUR
a) 0.0
b) 0.0
c) 0.0
d) 0.0
e) 0.0
f) 0.0
g) 0.0
h) 0.0
i) 0.0
j) 0.0
k) 0.0
l) 0.0
m) 0.0
n) 0.0
o) 0.0
p) 0.0
q) 0.0

RFP009 2.4 SUPERVISORY AND ADMINISTRATIVE STAFF AND LABOURSecurity


COST Level 3
Work No: PD. 14037 2.4 SUPERVISORY AND ADMINISTRATIVE
Project: STAFF AND LABOUR COST
Inquiry No: PD. 14037-XX-XXXX-XXX-XX (Including 2.3 Material Handling and 2.5 Travelling Expenses)
Work Title Dayung Compression 2 Piping , Painting & Ins A) STAFF, B) LABOUR & C) TRAVELLING EXPENSES FOR LOCAL ST
UNIT PRICE
OCCUPATIONAL CATEGORY TOTAL
MANMONTH L.C( )
r) 0.0
s) 0.0
t) 0.0
u) 0.0
v) 0.0
w) 0.0
x) 0.0
y) 0.0
z) 0.0
2.LOCAL INDIRECT LABOUR Total 0 0.0
B. SUB TOTAL : 0 0.0

C.TRAVELLING EXPENSE
NUMVER OF TRIPS(TIMES)
a) LOCAL STAFF 0.0
b) EXPATRIATE STAFF 0.0
0.0
C.TRAVELLING EXPENSE Total 0 0.0
0.0
GRAND TOTAL 0.00 0.0
NOTE : 1 MAN MONTH= Manhours

RFP009 2.4 SUPERVISORY AND ADMINISTRATIVE STAFF AND LABOURSecurity


COST Level 3
ADMINISTRATIVE Form :RFP-009
Date : xx/xx/xxxx
d 2.5 Travelling Expenses) Bidder : Comapany xxx
AVELLING EXPENSES FOR LOCAL STAFF AND LABOR
UNIT PRICE TOTAL
REMARKS
F.C(US$) L.C( ) F.C(US$)

0.0
0.0
0.0
0.0
0.0
0.0 0.00 0.00

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
RFP009 2.4 SUPERVISORY AND ADMINISTRATIVE STAFF AND LABOURSecurity
COST Level 3
ADMINISTRATIVE Form :RFP-009
Date : xx/xx/xxxx
d 2.5 Travelling Expenses) Bidder : Comapany xxx
AVELLING EXPENSES FOR LOCAL STAFF AND LABOR
UNIT PRICE TOTAL
REMARKS
F.C(US$) L.C( ) F.C(US$)
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0 0.00 0.00
0.0 0.00 0.00

0.0
0.0
RFP009 2.4 SUPERVISORY AND ADMINISTRATIVE STAFF AND LABOURSecurity
COST Level 3
ADMINISTRATIVE Form :RFP-009
Date : xx/xx/xxxx
d 2.5 Travelling Expenses) Bidder : Comapany xxx
AVELLING EXPENSES FOR LOCAL STAFF AND LABOR
UNIT PRICE TOTAL
REMARKS
F.C(US$) L.C( ) F.C(US$)
0.0
0.0
0.0
0.0 0.00 0.00

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

RFP009 2.4 SUPERVISORY AND ADMINISTRATIVE STAFF AND LABOURSecurity


COST Level 3
ADMINISTRATIVE Form :RFP-009
Date : xx/xx/xxxx
d 2.5 Travelling Expenses) Bidder : Comapany xxx
AVELLING EXPENSES FOR LOCAL STAFF AND LABOR
UNIT PRICE TOTAL
REMARKS
F.C(US$) L.C( ) F.C(US$)
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0 0.00 0.00
0.0 0.00 0.00

0.0
0.0
0.0
0.0 0.00 0.00
0.0
0.0 0.00 0.00
Bidder's Signature

RFP009 2.4 SUPERVISORY AND ADMINISTRATIVE STAFF AND LABOURSecurity


COST Level 3
Work No: PD. 14037 2.9 INSURANCES, TAXES & DUTIES Form :RFP-010
Project: Date : xx/xx/xxxx
Inquiry No: PD. 14037-XX-XXXX-XXX-XX Bidder : Comapany xxx
Work Title Dayung Compression 2 Piping , Painting & Insulation Works
VOLUME UNIT PRICE TOTAL
DESCRIPTION or UNIT
QUANTITY L.C( ) F.C(US$) L.C( ) F.C(US$)

1. INSURANCES

a) Workmen`s Compensation insurances 0.0 0.0


b) Employer`s liability insurance 0.0 0.0
c) Movable Risk Insurance 0.0 0.0
d) 0.0 0.0
e) 0.0 0.0
f) 0.0 0.0

Note : Such Insurances as Marine Insurance and Travel Insurance which


are included in the other cost items, shall not be indicated herein.

2. TAXES AND DUTIES

a) Sales Tax 0.0 0.0


b) Corporation Tax 0.0 0.0
c) With holding Tax 0.0 0.0
d) Stamp duty 0.0 0.0
e) 0.0 0.0

Note : Personal Income taxes which are included in


other cost items, shall not be indicated herein

3. OTHERS

a) 0.0 0.0
b) 0.0 0.0
c) 0.0 0.0
d) 0.0 0.0
e) 0.0 0.0

TOTAL : 0.00 0.00

Bidder's Signature

Security Level 3 RFP010 2.9 INSURANCE, TAXES DUTIES


RATES FOR DAY WORK RFP-011
Job/Proposal No PD. 14037 DATE : xx/xx/xxxx
Project : Bidder: Comapany xxx
Inquiry No : PD. 14037-XX-XXXX-XXX-XX
Work Title : Dayung Compression 2 Piping , Painting & Insulation Works
UNIT RATE LC ( ) UNIT RATE FC (US$)
HOURLY DAILY HOURLY DAILY REMARKS

a) Field Engineer

b) Construction Supervisor

c) Inspector

d) Buyer

e) Administrator

f) Secretary

g) Driver

h)

NOTE :Overtime will be chargeable at the following premium factor.


Week Day Overtime(6 days per week)
Nightwork (22:00 to 06:00)
Holiday, National Holidays Bidder's Signature

Security Level 3 RFP011 RATES FOR DAYWORKS


Work No: PD. 14037 MANNING SCHEDULE Date : xx/xx/xxxx RFP - 012
Project: (Unit : Man-Month) Bidder : Comapany xxx
Inquiry No: PD. 14037-XX-XXXX-XXX-XX ( : Scheduled working hours/Man-Month)
Work Title: Dayung Compression 2 Piping , Painting & Insulation Works (Bidder to fill in)
CRAFT / POSITION YEAR Man-Month
Indire
Direct
ct
MONTH Staff Labou Total Nationality
Labou
r
r
(Staff) (IDL) (DL)
1. Supervisory Class
Administration STAFF
1.1 and
Site Indirect Labor
Management 0 0 0 0
- Project Manager Staff 0 0 0 0
- Site Manager Staff 0 0 0 0
- 0 0 0 0
- 0 0 0 0
0 0 0 0
1.2 Field Control Group 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
0 0 0 0
1.3 Safety Group 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
0 0 0 0
1.4 Warehousing & Material Control Group 0 0 0 0
- Warehouse supervisor Staff 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- Store Worker IDL 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
0 0 0 0
1.5 Execution Group 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
0 0 0 0
1.6 Field Engineering Group 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
0 0 0 0
1.7 Quality Group 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
0 0 0 0
1.8 Admisnistration Group 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
0 0 0 0
1.9 Others 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
- 0 0 0 0
0 0 0 0
1. Staff & Indirect Labor Tot 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.Direct Labour
2.1 Civil 0 0 0 0
- Foreman DL 0 0 0 0
- Carpenter DL 0 0 0 0
- Iron Worker DL 0 0 0 0
- Mayson DL 0 0 0 0
- Concrete finisher DL 0 0 0 0
- Rigger DL 0 0 0 0
- Equipment Operator DL 0 0 0 0
- Plumber DL 0 0 0 0
- Electrician DL 0 0 0 0
- DL 0 0 0 0
- Common worker DL 0 0 0 0
0 0 0 0
2.2 Erection 0 0 0 0
- Foreman DL 0 0 0 0
- Boilor maker DL 0 0 0 0
- Millwright DL 0 0 0 0
- Pipe fitter DL 0 0 0 0
- Arc welder DL 0 0 0 0
- TIG welder DL 0 0 0 0
- Electrician DL 0 0 0 0
- Instrument technician DL 0 0 0 0
- Insulator DL 0 0 0 0
- Sheet metal worker DL 0 0 0 0
- Painter DL 0 0 0 0
- Iron worker DL 0 0 0 0
- Rigger DL 0 0 0 0
- Equipment Operator DL 0 0 0 0
- DL 0 0 0 0
- Common Worker DL 0 0 0 0
- DL 0 0 0 0
- DL 0 0 0 0
0 0 0 0
2. Direct Labor Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3.Subcontractor
- DL 0 0 0 0
- DL 0 0 0 0
- DL 0 0 0 0
- DL 0 0 0 0
- DL 0 0 0 0
- DL 0 0 0 0
0 0 0 0
3. Subcotractor Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Grand Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Note: Bidder can change name and position of staffs and labors according to bidder's planning.
Staff: Supervisory & administrative staff, IDL: Indirect labor, DL: Direct labor.
Bidder`s Signature

Security Level 3 RFP012 MANNING SCHEDULE


Job/Proposal No PD. 14037 DETAILED CONSTRUCTION SCHEDULE Date : xx/xx/xxxx
Project Bidder : Comapany xxx
Inquiry No PD. 14037-XX-XXXX-XXX-XX RFP - 013
Work Title Dayung Compression 2 Piping , Painting & Insulation Works
YEAR
WORK ACTIVITY MONTH REMARKS

a)
b)
c)
d)
e)
f)

Bidder's Signature

Security Level 3 RFP013 DETAILED CONSTRUCTION SCHEDULE


Print date:02/15/2018

Work No: PD. 14037 MAJOR CONSTRUCTION EQUIPMENT MOBILISATION PLAN Date : xx/xx/xxxx RFP - 014
Project: Bidder : Comapany xxx
Inquiry: PD. 14037-XX-XXXX-XXX-XX
Work Title: Dayung Compression 2 Piping , Painting & Insulation Works
Identification
YEAR TOTAL of rental, own
CONSTRUCTION EQUIPMENT MONTH Machine*Month or
subcontractor
Specification
Type Capacity
1. Construction Equipment

A. Civil Works Equipment


a) Concrete Batch Plant 0
b) Pile Hammer 0
c) Pile Driver 0
d) Excavator 0
e) Backhoe 0
f) Dumptruck 0
g) Bulldozer 0
h) Motor Grader 0
i) Payloader 0
j) Vibratory Roller 0
k) Tandem Roller 0
l) Plate Compactor 0
m) Concrete Mixer 0
n) Concrete Pump 0
o) Water Pump 0
p) Asphalt Paver/Finisher 0
q) 0
r) 0
s) 0
t) 0
u) 0

B. Heavy Rigging Equipment


a) Jack-up System 0
b) Jin Pole 0
c) Crawler Crane (1001Ton & Over) 0
d) Crawler Crane (801Ton to 1000Ton) 0
e) Crawler Crane (601Ton to 800Ton) 0
f) Crawler Crane (400Ton to 600Ton) 0
g) 0
h) 0

C. General Rigging Equipment


a) Crawler Crane (300Ton) 0
b) Crawler Crane (250Ton) 0
c) Crawler Crane (150Ton) 0
d) Hydraulic Crane (126Ton to 150Ton) 0
e) Hydraulic Crane (101Ton to 125Ton) 0
f) Hydraulic Crane (81Ton to 100Ton) 0
g) Hydraulic Crane (51Ton to 80Ton) 0
h) Hydraulic Crane (31Ton to 50Ton) 0
i) Hydraulic Crane (21Ton to 30Ton) 0
j) Hydraulic Crane (11Ton to 20Ton) 0
k) Hydraulic Crane (10Ton or Less) 0
l) Fork Lift (10Ton) 0
m) Fork Lift (3 Ton) 0
n) 0
o) 0

D. Piping/Eqpt. Installation
a) TIG Welding Machine 0
b) DC Welding Machine 0
c) Engine Welding Machine 0
d) Hydrotest Pump 0
e) Radiography Equipment & Cons. 0
f) Stress Relieving Equipment & Cons. 0
g) Sandblasting machine 0
h) Air Compressor 0
i) Air Compressor 0
j) 0
k) 0

E. Electrical/Instrumentation
a) Power Cable Puller 0
b) Electric Cable Cutter 0
c) Hydraulic Pipe Bender 0
d) Threadimg Machine 0
e) 0

F. Painting/Insulation
a) Sheet Metal Cutter 0
b) Sheet Metal Roller 0
c) Spray Painting Set 0
d) Blasting Machine 0
e) 0
f) 0

G. Transport/Hauling Equipment
a) Water Truck 0
b) Fuel Truck 0
c) Cargo Truck 0
d) Low Bed Trailer 0
e) High Bed Trailer 0
f) Trailer w/ Tractor 0
g) Pick-up 0
h) Vehicles 0
h) Mini Bus 0
i) 0
j) 0

H. Common Use Equipment


a) Diesel Engine Generator (251KVA & Over) 0
b) Diesel Engine Generator (126 to 250KVA) 0
c) Diesel Engine Generator (125KVA or less) 0
d) 0
e) 0

1. SUB TOTAL :
2. Tools and Machinery

a) 0
b) 0
c) 0
d) 0
e) 0
f) 0
g) 0
h) 0
i) 0
j) 0
k) 0
l) 0
m) 0
n) 0
o) 0
0

Note: Bidder can change equipment name according to Bidder's planning.

Security Level 3 RFP014 MAJOR CONSTRUCTION EQUIPMENT MOBILSATION SCHEDULE


Job/Proposal No PD. 14037 UTILITY CONSUMPTION SCHEDULE Date : xx/xx/xxxx
Project Bidder : Comapany xxx
Inquiry No PD. 14037-XX-XXXX-XXX-XX
Work Title Dayung Compression 2 Piping , Painting & Insulation Works
YEAR
MONTH Total
Consumption

1.0 Electricity (kwh) 0 (KWH)


( KVA at Peak)

2.0 Water
2.1 Potable Water (cubic meter) 0 (M3)
2.2 Industrial Water (cubic meter) 0 (M3)

3.0 Fuel
3.1 Gasoline (cubic meter) 0 (M3)
3.2 Diesel Oil (cubic meter) 0 (M3)
3.3 Kerosene (cubic meter) 0 (M3)

4.0 Others

Bidder's Signature

Security Level 3 RFP015 UTILITY CONSUMPTION SCHEDULE


RATES FOR DAY WORK RFP-011(1)
Job/Proposal No PD. 14037
Project DATE : xx/xx/xxxx
Inquiry No PD. 14037-XX-XXXX-XXX-XX Bidder : Comapany xxx
Work Title Dayung Compression 2 Piping , Painting & Insulation Works
OCCUPATIONAL CATEGORY UNIT RATE LC ( ) UNIT RATE FC (US$)
HOURLY DAILY HOURLY DAILY REMARKS

a) Concrete Finisher - Foreman


- Skilled
- Unskilled
b) Carpenter - Foreman
- Skilled
- Unskilled
c) Rigger - Foreman
- Skilled
- Unskilled
d) Mason Refractor - Foreman
- Skilled
- Unskilled
e) Iron Worker - Foreman
- Skilled
- Unskilled
f) Boiler Maker - Foreman
- Skilled
- Unskilled
g) Pipe Fitter - Foreman
- Skilled
- Unskilled
h) Welder - Foreman
- Skilled
- Unskilled
i) Millwright - Foreman
- Skilled
- Unskilled
j) Electrician - Foreman
- Skilled
- Unskilled

NOTE:(1) Overtime will be chargeable at the following premium factor.


Week Day Overtime(6 days per week)
Nightwork (22:00 to 06:00)
Holiday, National Holidays

(2) Day Work Rate for Construction Service shall be applied to the indirect work only.
Day Work Rate for Construction Labor and Construction Equipment shall be applied
to the direct work.
Day Work Rate for Construction Service shall include all the cost including overhead,
profit, and cost for general administration such as printing, computer, tax, duties etc.
and other indirect cost including cost relating to management, etc.

Bidder's Signature

Security Level 3 RFP011(1) RATES FOR DAYWORK


RATES FOR DAY WORK RFP-011(2)
Job/Proposal No PD. 14037
Project DATE : xx/xx/xxxx
Inquiry No PD. 14037-XX-XXXX-XXX-XX Bidder : Comapany xxx
Work Title Dayung Compression 2 Piping , Painting & Insulation Works
OCCUPATIONAL CATEGORY UNIT RATE LC ( ) UNIT RATE FC (US$)
HOURLY DAILY HOURLY DAILY REMARKS
k) Instrument Fitter - Foreman
- Skilled
- Unskilled
l) Insulator - Foreman
- Skilled
- Unskilled
m) Sheet Metal - Foreman
Worker - Skilled
- Unskilled
n) Painter - Foreman
- Skilled
- Unskilled
o) Operation - Foreman
- Skilled
- Unskilled
p) Plant Maintenance - Foreman
- Skilled
- Unskilled
q) Construction - Foreman
Support - Skilled
- Unskilled

NOTE:(1) Overtime will be chargeable at the following premium factor.


Week Day Overtime(6 days per week)
Nightwork (22:00 to 06:00)
Holiday, National Holidays

(2) Day Work Rate for Construction Labor shall be applied to the direct work and shall
include all the cost including overhead, profit, and all the indirect cost for general
administration such as printing, computer, tax, duties etc. and other indirect cost
relating to supervising, coordination, management and accommodation etc.

Bidder's Signature

Security Level 3 RFP011(2) RATES FOR DAYWORK


RATES FOR DAY WORK RFP-011(3)
Job/Proposal No PD. 14037 DATE : xx/xx/xxxx
Project : Bidder : Comapany xxx
Inquiry No : PD. 14037-XX-XXXX-XXX-XX
Work Title :Dayung Compression 2 Piping , Painting & Insulation Works
UNIT RATE LC ( ) UNIT RATE FC (US$)
EQUIPMENT CATEGORY HOURLY DAILY WEEKLY HOURLY DAILY WEEKLY REMARKS

a) Crawler Crane (Capacity : Ton)

b) Crawler Crane (Capacity : Ton)

c)

d) Crawler Crane 150 Ton

e) Crawler Crane 75 Ton

f) Hydraulic Crane 45 Ton

g) Hydraulic Crane 20 Ton

h) Hydraulic Crane 12 Ton

i) Generator (Capacity : 250 KVA)

j) Forklift 5 Ton

k) Trailer with Tractor 40 Ton

l) Trailer with Tractor 20 Ton

m) Bulldozer 180 HP

n) Hydraulic Excavator 1.50 m 3

o) Water Truck

p) Dump Crane 5 Ton capacity

r) Others

NOTE:(1) Overtime will be chargeable at the following premium factor.


Week Day Overtime(6 days per week)
Nightwork (22:00 to 06:00)
Holiday, National Holidays

(2) Day Work Rate for Construction Equipment shall include all the cost including fuel,
maintenance, operators salary, transportation, insurance, other indirect cost
such as overhead, profit, cost for general administration (Computer, tax, duties etc.)
and cost for supervising, coordination and management.

Bidder's Signature