You are on page 1of 17

CHB LAYING

CONCRETE AND FORMWORKS

DESCRIPTION QTY CONCRETE WORKS


MATERIALS
VOLUME
DESCRIPTION QTY LENGTH WIDTH HEIGHT CEMENT
FOOTING 149.00 0.80 0.80 0.25 23.84 214.56
WALL FOOTING 1.00 546.96 0.50 0.25 68.37 615.33
COLUMN 1-17 17.00 0.25 0.25 4.54 4.82 43.41
COLUMN 18-35 18.00 0.25 0.25 4.04 4.55 40.91
COLUMN 36-77 42.00 0.25 0.25 3.79 9.95 89.54
COLUMN 78-92 15.00 0.25 0.25 3.79 3.55 31.98
COLUMN 93-128 35.00 0.25 0.25 4.29 9.38 84.46
COLUMN 129-149 20.00 0.25 0.25 4.79 5.99 53.89
LINTEL BEAM 2.00 546.96 0.20 0.30 65.64 590.72

TOTAL : 299.00 196.09 1,764.79

CONCRETE MIX CLASS A 1:2:4


FOOTING DIM 1.20m x 1.20m x 0.30m
WALL FOOTING DIM 0.25m x .50m
COLUMN 1 HT 4.38m (3.78m CHB Laying Ht +.60 additional embedment)
COLUMN 2 HT 3.38m (2.78m CHB Laying Ht +.60 additional embedment)
COLUMN 3 HT 4.13m (3.53m CHB Laying Ht +.60 additional embedment)
COLUMN 4 HT 3.63m (3.03m CHB Laying Ht +.60 additional embedment)
LINTEL BEAM DIM 2 sets of 0.30m x 0.20m
CONCRETE WORKS FORMWORKS
MATERIALS MATERIALS
PERIMETER AREA
SAND GRAVEL PHENOLIC LUMBER
11.92 23.84 3.20 119.20 40.71 4.77
34.19 68.37 1,093.92 273.48 93.40 13.674
2.41 4.82 1.00 77.18 26.36 18.44
2.27 4.55 1.00 72.72 24.84 21.21
4.97 9.95 1.00 159.18 54.36 424.17
1.78 3.55 1.00 56.85 19.42
4.69 9.38 1.00 150.15 51.28
2.99 5.99 1.00 95.80 32.72
32.82 65.64 1,093.92 656.35 224.16

98.04 196.09 1,660.91 567.25

141.81
226 13 26
647 36 72
46 3 6
24,389.55 43 3 5
95 6 11
34 2 4
89 5 10
57 4 7
621 35 69
1858 107 210
408760 80250 241500
FOOTING

TOP BARS # OF REBARS


DESCRIPTION # OF FTGS WIDTH LENGTH
SHORT LONG SHORT LONG

FOOTING 149.00 0.80 0.80 0.80 0.80 4.00 4.00

TOTAL KG :

FOOTING BOT BARS USE 4-10mm dia

188 pcs 10mm dia @ 6m 695.6376 KGS

COLUMN

# OF STRAIGHT FULL 15%


DESCRIPTION QTY HEIGHT KG
REBARS LENGTH LENGTH ALLOWANCE

MAIN BARS

COLUMN 1-17 17.00 4.54 4.00 4.84 21.30 321.50 48.23


COLUMN 18-35 18.00 4.04 4.00 4.34 19.10 305.25 45.79
COLUMN 36-77 42.00 3.79 4.00 4.09 18.00 671.22 100.68
COLUMN 78-92 15.00 3.79 4.00 4.09 18.00 239.72 35.96
COLUMN 93-128 35.00 4.29 4.00 4.59 20.20 627.73 94.16
COLUMN 129-149 20.00 4.79 4.00 5.09 22.40 397.77 59.67

TOTAL KG : 147.00 2,563.18

height length #of pcs # of remaining


description 1st spacing 2nd spacing
of column of ties in comm'l length ties 1 length

COLUMN TIES

COLUMN 1-17 4.54 0.80 7.00 0.15 1.00 4.39 0.15


COLUMN 18-35 4.04 0.80 7.00 0.15 1.00 3.89 0.15
COLUMN 36-77 3.79 0.80 7.00 0.15 1.00 3.64 0.15
COLUMN 78-92 3.79 0.80 7.00 0.15 1.00 3.64 0.15
COLUMN 93-128 4.29 0.80 7.00 0.15 1.00 4.14 0.15
COLUMN 129-149 4.79 0.80 7.00 0.15 1.00 4.64 0.15

TOTAL KG :

COLUMN REBAR USE 4-12mm dia Main Bars with 10mm Lateral Ties Spaced at 150mm O.C

485 pcs 12 mm dia @ 6m 2584.21968 KGS


660 pcs 10 mm dia @ 6m 2442.132 KGS

LINTEL BEAMS
# OF STRAIGHT FULL
DESCRIPTION SETS QTY LENGTH KG
REBARS LENGTH LENGTH

MAIN BARS

top bars
continuous bars 2.00 1.00 546.96 2.00 546.96 1,203.31 1,484.17

bottom bars
continuous bars 2.00 1.00 546.96 2.00 546.96 1,203.31 1,484.17

TOTAL KG : 2,968.33

STIRRUPS

length length #of pcs # of remaining


description 1st spacing 2nd spacing
of beam of ties in 6m length stirrups 1 length

0 546.96 0.80 7.00 0.15 2.00 546.66 0.15

TOTAL KG :

BEAM REBAR USE 4-12mm dia Main Bars with 10mm Lateral Ties Spaced at 100mm O.C

805 pcs 10 mm dia @ 6m 2978.661 KGS


1042 pcs 10 mm dia @ 6m 3855.6084 KGS

WALL FOOTING

# OF STRAIGHT FULL
DESCRIPTION SETS QTY LENGTH KG
REBARS LENGTH LENGTH

MAIN BARS

continuous bars 1.00 1.00 546.96 3.00 546.96 1,804.97 1,113.12

TOTAL KG : 1,113.12

STIRRUPS

length length #of pcs # of remaining


description 1st spacing 2nd spacing
of beam of ties in 6m length stirrups 1 length

DESCRIPTION 546.96 0.50 12.00 0.10 2.00 546.76 0.10

TOTAL KG :
WALL FOOTING REBAR USE 3-10mm dia Main Bars with 10mm Lateral Ties Spaced at 100mm O.C

300 pcs 10 mm dia @ 6m 1110.06 KGS


456 pcs 10 mm dia @ 6m 1687.2912 KGS

TOTAL WEIGHT 17,704.49


TOTAL LENGTH KG BOTTOM BARS # OF REBARS TOTAL LENGTH
SHORT LONG SHORT LONG SHORT LONG SHORT LONG SHORT

3.20 3.20 1.97 1.97 - - -

TOTAL
KG

369.73 362.032
351.03 343.728
771.90 755.832
275.68 269.94
721.88 706.86
457.44 447.92
2886.312
2,947.66 481.052

# of remaining total of pcs using # of 15% total


kg 1 kg 2
ties 2 length stirrups comm'l length columns allowance kg

30.00 (0.11) 31.00 5.00 18.50 17.00 314.52 47.18 361.69


26.00 (0.01) 27.00 4.00 14.80 18.00 266.41 39.96 306.38
25.00 (0.11) 26.00 4.00 14.80 42.00 621.63 93.25 714.88
25.00 (0.11) 26.00 4.00 14.80 15.00 222.01 33.30 255.31
28.00 (0.06) 29.00 5.00 18.50 35.00 647.54 97.13 744.67
31.00 (0.01) 32.00 5.00 18.50 20.00 370.02 55.50 425.52

2,442.13 2,808.45

150mm O.C
15% TOTAL
ALLOWANCE KG

296.83 1,781.00 200.55


-
-
296.83 1,781.00 200.55

3,562.00 401.10
401.10
802.21

# of remaining total of pcs using # of 15% total


kg 1 kg 2
stirrups 2 length stirrups 6m length beams allowance kg

3,645.00 - 3,647.00 521.00 1,927.80 2.00 3,855.61 578.34 4,433.95

3,855.61 4,433.95

1,042.00
100mm O.C

15% TOTAL
ALLOWANCE KG

222.62 1,335.75

1,335.75

# of remaining total of pcs using # of 15% total


kg 1 kg 2
stirrups 2 length stirrups 6m length beams allowance kg

5,468.00 - 5,470.00 456.00 1,687.29 1.00 1,687.29 253.09 1,940.38

1,687.29 1,940.38
100mm O.C
TOTAL LENGTH KG 15%
TOTAL KG TOTAL
LONG SHORT LONG ALLOW.

- - - 588.09 88.21 676.30

588.09 676.30

85.00
72.00
168.00
60.00
175.00
100.00
2,917.60
486.27
559.21
599.15

5,469.60
5470
2735
455.833333
1460
FENCE AREA CHB AREA
n of col
LENGTH HT 1 HT 2 TOTAL HT AREA LENGTH HEIGHT AREA
1-2 5.06 1.18 2.35 3.53 17.86 4.81 2.93 14.09
2-7 19.96 1.18 2.35 3.53 70.46 18.71 2.93 54.82
7-12 20.17 1.18 2.35 3.53 71.20 18.92 2.93 55.44
12-17 19.87 1.18 2.35 3.53 70.14 18.62 2.93 54.56
17-22 20.13 1.18 1.85 3.03 60.99 18.88 2.43 45.88
22-27 19.83 1.18 1.85 3.03 60.08 18.58 2.43 45.15
27-32 20.03 1.18 1.85 3.03 60.69 18.78 2.43 45.64
32-35 11.40 1.18 1.85 3.03 34.54 10.65 2.43 25.88
35-60 98.69 1.18 1.60 2.78 274.36 92.44 2.18 201.52
60-73 50.91 1.18 1.60 2.78 141.53 47.66 2.18 103.90
73-78 21.34 1.18 1.60 2.78 59.33 20.09 2.18 43.80
78-84 22.25 2.01 1.60 3.61 80.32 20.75 3.01 62.46
84-92 28.32 2.01 1.60 3.61 102.24 26.32 3.01 79.22
92-97 20.84 2.01 2.10 4.11 85.65 19.59 3.51 68.76
97-110 50.62 2.01 2.10 4.11 208.05 47.37 3.51 166.27
110-122 47.76 2.01 2.10 4.11 196.29 44.76 3.51 157.11
122-129 31.73 2.01 2.10 4.11 130.41 29.98 3.51 105.23
129-131 6.50 2.01 2.60 4.61 29.97 6.00 4.01 24.06
131-148 68.38 2.01 2.60 4.61 315.23 64.38 4.01 258.16
148-149 7.27 1.18 2.60 3.78 27.48 7.02 3.18 22.32
591.06 2,096.83 554.31 1,634.26
606.06

FENCHE Ht 1.18m (from Top of CHB to Sidewalk)


CHB Laying Ht on Main Road Side 3.78m (1.18m +.60 sidewalk to NGL +2.0m e
CHB Laying Ht on Right Side Rear to CL 3.53m (1.18m +.60 sidewalk to NGL +1.75m
CHB Laying Ht on Right Side CL to Main Road 3.03m (1.18m +.60 sidewalk to NGL +1.25m
CHB 150mm thick
Mortar Class B Mixture
Plaster Class B Mixture 20mm thick
CHB Vertical Reinforcement Spacing at 800mm O.C
CHB Horizontal Reinforcement Spacing at every 4 Layers (800mm O.C)
MATERIALS
MORTAR PLASTER VERTICAL BARS
n of CHB SKIMCOATING
CEMENT SAND CEMENT SAND
n of REBARLENGTH TOTAL L
176.17 14.35 1.19 6.76 0.56 2.35 7.00 2.93 20.51
685.25 55.81 4.63 26.31 2.19 9.14 24.00 2.93 70.32
692.95 56.43 4.68 26.61 2.22 9.24 24.00 2.93 70.32
681.96 55.54 4.60 26.19 2.18 9.09 24.00 2.93 70.32
573.48 46.70 3.87 22.02 1.84 7.65 24.00 2.43 58.32
564.37 45.96 3.81 21.67 1.81 7.52 24.00 2.43 58.32
570.44 46.46 3.85 21.90 1.83 7.61 24.00 2.43 58.32
323.49 26.35 2.18 12.42 1.04 4.31 14.00 2.43 34.02
2,518.99 205.15 17.01 96.73 8.06 33.59 116.00 2.18 252.88
1,298.74 105.77 8.77 49.87 4.16 17.32 60.00 2.18 130.80
547.45 44.58 3.70 21.02 1.75 7.30 26.00 2.18 56.68
780.72 63.58 5.27 29.98 2.50 10.41 26.00 3.01 78.26
990.29 80.65 6.69 38.03 3.17 13.20 33.00 3.01 99.33
859.51 70.00 5.80 33.01 2.75 11.46 25.00 3.51 87.75
2,078.36 169.26 14.03 79.81 6.65 27.71 60.00 3.51 210.60
1,963.85 159.94 13.26 75.41 6.28 26.18 56.00 3.51 196.56
1,315.37 107.12 8.88 50.51 4.21 17.54 38.00 3.51 133.38
300.75 24.49 2.03 11.55 0.96 4.01 8.00 4.01 32.08
3,227.05 262.81 21.79 123.92 10.33 43.03 81.00 4.01 324.81
279.05 22.73 1.88 10.72 0.89 3.72 9.00 3.18 28.62
20,428.22 1,663.67 137.93 784.44 65.37 272.38 2,072.20
23,492.46 2,448.12 203.30 346.00
2,815.34 398.00
m Top of CHB to Sidewalk) 1,472.68
8m +.60 sidewalk to NGL +2.0m embedment)
8m +.60 sidewalk to NGL +1.75m embedment)
8m +.60 sidewalk to NGL +1.25m embedment)

ture 20mm thick


800mm O.C
every 4 Layers (800mm O.C)
HORIZONTAL BARS

n of REBARLENGTH TOTAL L CHBVOL DISPOSAL


5.00 4.81 24.05 2.26
5.00 18.71 93.55 8.91
5.00 18.92 94.60 9.01
5.00 18.62 93.10 8.87
5.00 18.88 94.40 7.08
5.00 18.58 92.90 6.97
5.00 18.78 93.90 7.04
5.00 10.65 53.25 4.01
4.00 92.44 369.76 30.00
4.00 47.66 190.64 15.48
4.00 20.09 80.36 6.49
6.00 20.75 124.50 6.76
6.00 26.32 157.92 8.61
6.00 19.59 117.54 8.32
6.00 47.37 284.22 20.20
6.00 44.76 268.56 19.06
6.00 29.98 179.88 12.66
7.00 6.00 42.00 3.21
7.00 64.38 450.66 33.78
6.00 7.02 42.12 3.59
2,947.91 222.29
pcs 492.00 pcs
pcs 566.00 pcs
kgs 2,094.31 kgs
CHB LAYING

CONCRETE AND FORMWORKS


CONCRETE
DESCRIPTION QTY WORKS

VOLUME
DESCRIPTION QTY LENGTH WIDTH HEIGHT
COLUMN 1-17 1.00 65.06 1.00 2.35 152.89 1.17
COLUMN 18-35 1.00 71.39 1.00 1.85 132.07 0.67
COLUMN 36-77 1.00 221.51 1.00 1.60 354.42 0.42
COLUMN 78-92 1.00 150.95 1.00 2.10 317.00 0.92
COLUMN 93-128 1.00 74.88 1.00 2.60 194.69 1.42
COLUMN 129-149 1.00 7.27 1.00 2.60 18.90 1.42

TOTAL : 6.00 1,169.96

DISPOSAL CONC 196.0877


DISPOSAL CHB 222.293065
418.380765
13.012 15.22
14.278 9.57
44.302 18.61
30.19 27.77
14.976 21.27
1.454 2.06
94.50