Nuclear Regulatory Commission Pt. 50, App.

B
practical and upon loss of actuating power, Criterion 64—Monitoring radioactivity re-
automatic isolation valves shall be designed leases. Means shall be provided for moni-
to take the position that provides greater toring the reactor containment atmosphere,
safety. spaces containing components for recircula-
Criterion 57—Closed system isolation valves. tion of loss-of-coolant accident fluids, efflu-
Each line that penetrates primary reactor ent discharge paths, and the plant environs
containment and is neither part of the reac- for radioactivity that may be released from
tor coolant pressure boundary nor connected normal operations, including anticipated
directly to the containment atmosphere operational occurrences, and from postu-
shall have at least one containment isolation lated accidents.
valve which shall be either automatic, or
locked closed, or capable of remote manual [36 FR 3256, Feb. 20, 1971, as amended at 36
operation. This valve shall be outside con- FR 12733, July 7, 1971; 41 FR 6258, Feb. 12,
tainment and located as close to the contain- 1976; 43 FR 50163, Oct. 27, 1978; 51 FR 12505,
ment as practical. A simple check valve may Apr. 11, 1986; 52 FR 41294, Oct. 27, 1987; 64 FR
not be used as the automatic isolation valve. 72002, Dec. 23, 1999; 72 FR 49505, Aug. 28, 2007]

VI. Fuel and Radioactivity Control APPENDIX B TO PART 50—QUALITY AS-


Criterion 60—Control of releases of radioactive SURANCE CRITERIA FOR NUCLEAR
materials to the environment. The nuclear POWER PLANTS AND FUEL REPROC-
power unit design shall include means to ESSING PLANTS
control suitably the release of radioactive
materials in gaseous and liquid effluents and Introduction. Every applicant for a con-
to handle radioactive solid wastes produced struction permit is required by the provi-
during normal reactor operation, including sions of § 50.34 to include in its preliminary
anticipated operational occurrences. Suffi- safety analysis report a description of the
cient holdup capacity shall be provided for quality assurance program to be applied to
retention of gaseous and liquid effluents con- the design, fabrication, construction, and
taining radioactive materials, particularly testing of the structures, systems, and com-
where unfavorable site environmental condi- ponents of the facility. Every applicant for
tions can be expected to impose unusual an operating license is required to include, in
operational limitations upon the release of its final safety analysis report, information
such effluents to the environment. pertaining to the managerial and adminis-
Criterion 61—Fuel storage and handling and trative controls to be used to assure safe op-
radioactivity control. The fuel storage and eration. Every applicant for a combined li-
handling, radioactive waste, and other sys- cense under part 52 of this chapter is re-
tems which may contain radioactivity shall quired by the provisions of § 52.79 of this
be designed to assure adequate safety under chapter to include in its final safety analysis
normal and postulated accident conditions. report a description of the quality assurance
These systems shall be designed (1) with a applied to the design, and to be applied to
capability to permit appropriate periodic in- the fabrication, construction, and testing of
spection and testing of components impor-
the structures, systems, and components of
tant to safety, (2) with suitable shielding for
the facility and to the managerial and ad-
radiation protection, (3) with appropriate
ministrative controls to be used to assure
containment, confinement, and filtering sys-
safe operation. For applications submitted
tems, (4) with a residual heat removal capa-
after September 27, 2007, every applicant for
bility having reliability and testability that
reflects the importance to safety of decay an early site permit under part 52 of this
heat and other residual heat removal, and (5) chapter is required by the provisions of
to prevent significant reduction in fuel stor- § 52.17 of this chapter to include in its site
age coolant inventory under accident condi- safety analysis report a description of the
tions. quality assurance program applied to site ac-
Criterion 62—Prevention of criticality in fuel tivities related to the design, fabrication,
storage and handling. Criticality in the fuel construction, and testing of the structures,
storage and handling system shall be pre- systems, and components of a facility or fa-
vented by physical systems or processes, cilities that may be constructed on the site.
preferably by use of geometrically safe con- Every applicant for a design approval or de-
figurations. sign certification under part 52 of this chap-
Criterion 63—Monitoring fuel and waste stor- ter is required by the provisions of 10 CFR
age. Appropriate systems shall be provided in 52.137 and 52.47, respectively, to include in its
fuel storage and radioactive waste systems final safety analysis report a description of
the quality assurance program applied to the
wreier-aviles on DSK5TPTVN1PROD with CFR

and associated handling areas (1) to detect


conditions that may result in loss of residual design of the structures, systems, and com-
heat removal capability and excessive radi- ponents of the facility. Every applicant for a
ation levels and (2) to initiate appropriate manufacturing license under part 52 of this
safety actions. chapter is required by the provisions of 10

977

VerDate Mar<15>2010 13:43 Mar 06, 2012 Jkt 226030 PO 00000 Frm 00987 Fmt 8010 Sfmt 8002 Y:\SGML\226030.XXX 226030
Pt. 50, App. B 10 CFR Ch. I (1–1–12 Edition)
CFR 52.157 to include in its final safety anal- activities include both the performing func-
ysis report a description of the quality assur- tions of attaining quality objectives and the
ance program applied to the design, and to quality assurance functions. The quality as-
be applied to the manufacture of, the struc- surance functions are those of (1) assuring
tures, systems, and components of the reac- that an appropriate quality assurance pro-
tor. Nuclear power plants and fuel reprocess- gram is established and effectively executed;
ing plants include structures, systems, and and (2) verifying, such as by checking, audit-
components that prevent or mitigate the ing, and inspecting, that activities affecting
consequences of postulated accidents that the safety-related functions have been cor-
could cause undue risk to the health and rectly performed. The persons and organiza-
safety of the public. This appendix estab- tions performing quality assurance functions
lishes quality assurance requirements for the shall have sufficient authority and organiza-
design, manufacture, construction, and oper-
tional freedom to identify quality problems;
ation of those structures, systems, and com-
to initiate, recommend, or provide solutions;
ponents. The pertinent requirements of this
and to verify implementation of solutions.
appendix apply to all activities affecting the
There persons and organizations performing
safety-related functions of those structures,
systems, and components; these activities quality assurance functions shall report to a
include designing, purchasing, fabricating, management level so that the required au-
handling, shipping, storing, cleaning, erect- thority and organizational freedom, includ-
ing, installing, inspecting, testing, oper- ing sufficient independence from cost and
ating, maintaining, repairing, refueling, and schedule when opposed to safety consider-
modifying. ations, are provided. Because of the many
As used in this appendix, ‘‘quality assur- variables involved, such as the number of
ance’’ comprises all those planned and sys- personnel, the type of activity being per-
tematic actions necessary to provide ade- formed, and the location or locations where
quate confidence that a structure, system, or activities are performed, the organizational
component will perform satisfactorily in structure for executing the quality assur-
service. Quality assurance includes quality ance program may take various forms, pro-
control, which comprises those quality as- vided that the persons and organizations as-
surance actions related to the physical char- signed the quality assurance functions have
acteristics of a material, structure, compo- the required authority and organizational
nent, or system which provide a means to freedom. Irrespective of the organizational
control the quality of the material, struc- structure, the individual(s) assigned the re-
ture, component, or system to predetermined sponsibility for assuring effective execution
requirements. of any portion of the quality assurance pro-
gram at any location where activities sub-
I. ORGANIZATION ject to this appendix are being performed,
The applicant 1 shall be responsible for the shall have direct access to the levels of man-
establishment and execution of the quality agement necessary to perform this function.
assurance program. The applicant may dele-
II. QUALITY ASSURANCE PROGRAM
gate to others, such as contractors, agents,
or consultants, the work of establishing and The applicant shall establish at the ear-
executing the quality assurance program, or liest practicable time, consistent with the
any part thereof, but shall retain responsi- schedule for accomplishing the activities, a
bility for the quality assurance program. quality assurance program which complies
The authority and duties of persons and or- with the requirements of this appendix. This
ganizations performing activities affecting program shall be documented by written
the safety-related functions of structures, policies, procedures, or instructions and
systems, and components shall be clearly es- shall be carried out throughout plant life in
tablished and delineated in writing. These accordance with those policies, procedures,
or instructions. The applicant shall identify
1 While the term ‘‘applicant’’ is used in the structures, systems, and components to
these criteria, the requirements are, of be covered by the quality assurance program
course, applicable after such a person has re- and the major organizations participating in
ceived a license to construct and operate a the program, together with the designated
nuclear power plant or a fuel reprocessing functions of these organizations. The quality
plant or has received an early site permit, assurance program shall provide control over
design approval, design certification, or activities affecting the quality of the identi-
manufacturing license, as applicable. These fied structures, systems, and components, to
criteria will also be used for guidance in an extent consistent with their importance
evaluating the adequacy of quality assurance to safety. Activities affecting quality shall
wreier-aviles on DSK5TPTVN1PROD with CFR

programs in use by holders of construction be accomplished under suitably controlled


permits, operating licenses, early site per- conditions. Controlled conditions include the
mits, design approvals, combined licenses, use of appropriate equipment; suitable envi-
and manufacturing licenses. ronmental conditions for accomplishing the

978

VerDate Mar<15>2010 13:43 Mar 06, 2012 Jkt 226030 PO 00000 Frm 00988 Fmt 8010 Sfmt 8002 Y:\SGML\226030.XXX 226030
Nuclear Regulatory Commission Pt. 50, App. B
activity, such as adequate cleanness; and as- draulic, and accident analyses; compatibility
surance that all prerequisites for the given of materials; accessibility for inservice in-
activity have been satisfied. The program spection, maintenance, and repair; and delin-
shall take into account the need for special eation of acceptance criteria for inspections
controls, processes, test equipment, tools, and tests.
and skills to attain the required quality, and Design changes, including field changes,
the need for verification of quality by in- shall be subject to design control measures
spection and test. The program shall provide commensurate with those applied to the
for indoctrination and training of personnel original design and be approved by the orga-
performing activities affecting quality as nization that performed the original design
necessary to assure that suitable proficiency unless the applicant designates another re-
is achieved and maintained. The applicant sponsible organization.
shall regularly review the status and ade-
quacy of the quality assurance program. IV. PROCUREMENT DOCUMENT CONTROL
Management of other organizations partici- Measures shall be established to assure
pating in the quality assurance program that applicable regulatory requirements, de-
shall regularly review the status and ade- sign bases, and other requirements which are
quacy of that part of the quality assurance necessary to assure adequate quality are
program which they are executing. suitably included or referenced in the docu-
III. DESIGN CONTROL ments for procurement of material, equip-
ment, and services, whether purchased by
Measures shall be established to assure the applicant or by its contractors or sub-
that applicable regulatory requirements and contractors. To the extent necessary, pro-
the design basis, as defined in § 50.2 and as curement documents shall require contrac-
specified in the license application, for those tors or subcontractors to provide a quality
structures, systems, and components to assurance program consistent with the perti-
which this appendix applies are correctly nent provisions of this appendix.
translated into specifications, drawings, pro-
cedures, and instructions. These measures V. INSTRUCTIONS, PROCEDURES, AND DRAWINGS
shall include provisions to assure that appro- Activities affecting quality shall be pre-
priate quality standards are specified and in- scribed by documented instructions, proce-
cluded in design documents and that devi- dures, or drawings, of a type appropriate to
ations from such standards are controlled. the circumstances and shall be accomplished
Measures shall also be established for the se- in accordance with these instructions, proce-
lection and review for suitability of applica- dures, or drawings. Instructions, procedures,
tion of materials, parts, equipment, and or drawings shall include appropriate quan-
processes that are essential to the safety-re- titative or qualitative acceptance criteria
lated functions of the structures, systems for determining that important activities
and components. have been satisfactorily accomplished.
Measures shall be established for the iden-
tification and control of design interfaces VI. DOCUMENT CONTROL
and for coordination among participating de-
sign organizations. These measures shall in- Measures shall be established to control
clude the establishment of procedures among the issuance of documents, such as instruc-
participating design organizations for the re- tions, procedures, and drawings, including
view, approval, release, distribution, and re- changes thereto, which prescribe all activi-
vision of documents involving design inter- ties affecting quality. These measures shall
faces. assure that documents, including changes,
The design control measures shall provide are reviewed for adequacy and approved for
for verifying or checking the adequacy of de- release by authorized personnel and are dis-
sign, such as by the performance of design tributed to and used at the location where
reviews, by the use of alternate or simplified the prescribed activity is performed.
calculational methods, or by the perform- Changes to documents shall be reviewed and
ance of a suitable testing program. The approved by the same organizations that per-
verifying or checking process shall be per- formed the original review and approval un-
formed by individuals or groups other than less the applicant designates another respon-
those who performed the original design, but sible organization.
who may be from the same organization.
VII. CONTROL OF PURCHASED MATERIAL,
Where a test program is used to verify the
EQUIPMENT, AND SERVICES
adequacy of a specific design feature in lieu
of other verifying or checking processes, it Measures shall be established to assure
wreier-aviles on DSK5TPTVN1PROD with CFR

shall include suitable qualifications testing that purchased material, equipment, and
of a prototype unit under the most adverse services, whether purchased directly or
design conditions. Design control measures through contractors and subcontractors,
shall be applied to items such as the fol- conform to the procurement documents.
lowing: reactor physics, stress, thermal, hy- These measures shall include provisions, as

979

VerDate Mar<15>2010 13:43 Mar 06, 2012 Jkt 226030 PO 00000 Frm 00989 Fmt 8010 Sfmt 8002 Y:\SGML\226030.XXX 226030
Pt. 50, App. B 10 CFR Ch. I (1–1–12 Edition)
appropriate, for source evaluation and selec- methods, equipment, and personnel shall be
tion, objective evidence of quality furnished provided. Both inspection and process moni-
by the contractor or subcontractor, inspec- toring shall be provided when control is in-
tion at the contractor or subcontractor adequate without both. If mandatory inspec-
source, and examination of products upon de- tion hold points, which require witnessing or
livery. Documentary evidence that material inspecting by the applicant’s designated rep-
and equipment conform to the procurement resentative and beyond which work shall not
requirements shall be available at the nu- proceed without the consent of its des-
clear power plant or fuel reprocessing plant ignated representative are required, the spe-
site prior to installation or use of such mate- cific hold points shall be indicated in appro-
rial and equipment. This documentary evi- priate documents.
dence shall be retained at the nuclear power
plant or fuel reprocessing plant site and XI. TEST CONTROL
shall be sufficient to identify the specific re- A test program shall be established to as-
quirements, such as codes, standards, or sure that all testing required to demonstrate
specifications, met by the purchased mate- that structures, systems, and components
rial and equipment. The effectiveness of the will perform satisfactorily in service is iden-
control of quality by contractors and sub- tified and performed in accordance with
contractors shall be assessed by the appli- written test procedures which incorporate
cant or designee at intervals consistent with the requirements and acceptance limits con-
the importance, complexity, and quantity of tained in applicable design documents. The
the product or services. test program shall include, as appropriate,
proof tests prior to installation,
VIII. IDENTIFICATION AND CONTROL OF
preoperational tests, and operational tests
MATERIALS, PARTS, AND COMPONENTS
during nuclear power plant or fuel reprocess-
Measures shall be established for the iden- ing plant operation, of structures, systems,
tification and control of materials, parts, and components. Test procedures shall in-
and components, including partially fab- clude provisions for assuring that all pre-
ricated assemblies. These measures shall as- requisites for the given test have been met,
sure that identification of the item is main- that adequate test instrumentation is avail-
tained by heat number, part number, serial able and used, and that the test is performed
number, or other appropriate means, either under suitable environmental conditions.
on the item or on records traceable to the Test results shall be documented and evalu-
item, as required throughout fabrication, ated to assure that test requirements have
erection, installation, and use of the item. been satisfied.
These identification and control measures
shall be designed to prevent the use of incor- XII. CONTROL OF MEASURING AND TEST
EQUIPMENT
rect or defective material, parts, and compo-
nents. Measures shall be established to assure
that tools, gages, instruments, and other
IX. CONTROL OF SPECIAL PROCESSES measuring and testing devices used in activi-
Measures shall be established to assure ties affecting quality are properly con-
that special processes, including welding, trolled, calibrated, and adjusted at specified
heat treating, and nondestructive testing, periods to maintain accuracy within nec-
are controlled and accomplished by qualified essary limits.
personnel using qualified procedures in ac-
XIII. HANDLING, STORAGE AND SHIPPING
cordance with applicable codes, standards,
specifications, criteria, and other special re- Measures shall be established to control
quirements. the handling, storage, shipping, cleaning and
preservation of material and equipment in
X. INSPECTION accordance with work and inspection in-
A program for inspection of activities af- structions to prevent damage or deteriora-
fecting quality shall be established and exe- tion. When necessary for particular products,
cuted by or for the organization performing special protective environments, such as
the activity to verify conformance with the inert gas atmosphere, specific moisture con-
documented instructions, procedures, and tent levels, and temperature levels, shall be
drawings for accomplishing the activity. specified and provided.
Such inspection shall be performed by indi-
XIV. INSPECTION, TEST, AND OPERATING
viduals other than those who performed the
STATUS
activity being inspected. Examinations,
measurements, or tests of material or prod- Measures shall be established to indicate,
wreier-aviles on DSK5TPTVN1PROD with CFR

ucts processed shall be performed for each by the use of markings such as stamps, tags,
work operation where necessary to assure labels, routing cards, or other suitable
quality. If inspection of processed material means, the status of inspections and tests
or products is impossible or disadvantageous, performed upon individual items of the nu-
indirect control by monitoring processing clear power plant or fuel reprocessing plant.

980

VerDate Mar<15>2010 13:43 Mar 06, 2012 Jkt 226030 PO 00000 Frm 00990 Fmt 8010 Sfmt 8002 Y:\SGML\226030.XXX 226030
Nuclear Regulatory Commission Pt. 50, App. C
These measures shall provide for the identi- XVIII. AUDITS
fication of items which have satisfactorily
A comprehensive system of planned and
passed required inspections and tests, where
periodic audits shall be carried out to verify
necessary to preclude inadvertent bypassing
compliance with all aspects of the quality
of such inspections and tests. Measures shall
assurance program and to determine the ef-
also be established for indicating the oper-
fectiveness of the program. The audits shall
ating status of structures, systems, and com-
be performed in accordance with the written
ponents of the nuclear power plant or fuel re-
procedures or check lists by appropriately
processing plant, such as by tagging valves trained personnel not having direct respon-
and switches, to prevent inadvertent oper- sibilities in the areas being audited. Audit
ation. results shall be documented and reviewed by
XV. NONCONFORMING MATERIALS, PARTS, OR management having responsibility in the
COMPONENTS area audited. Followup action, including
reaudit of deficient areas, shall be taken
Measures shall be established to control where indicated.
materials, parts, or components which do
[35 FR 10499, June 27, 1970, as amended at 36
not conform to requirements in order to pre-
FR 18301, Sept. 11, 1971; 40 FR 3210D, Jan. 20,
vent their inadvertent use or installation.
1975; 72 FR 49505, Aug. 28, 2007]
These measures shall include, as appropriate,
procedures for identification, documenta-
tion, segregation, disposition, and notifica-
APPENDIX C TO PART 50—A GUIDE FOR
tion to affected organizations. Noncon- THE FINANCIAL DATA AND RELATED
forming items shall be reviewed and accept- INFORMATION REQUIRED TO ESTAB-
ed, rejected, repaired or reworked in accord- LISH FINANCIAL QUALIFICATIONS FOR
ance with documented procedures. CONSTRUCTION PERMITS AND COM-
BINED LICENSES
XVI. CORRECTIVE ACTION
GENERAL INFORMATION
Measures shall be established to assure
that conditions adverse to quality, such as This appendix is intended to appraise ap-
failures, malfunctions, deficiencies, devi- plicants for construction permits and com-
ations, defective material and equipment, bined licenses for production or utilization
and nonconformances are promptly identi- facilities of the types described in § 50.21(b)
fied and corrected. In the case of significant or § 50.22, or testing facilities, of the general
conditions adverse to quality, the measures kinds of financial data and other related in-
shall assure that the cause of the condition formation that will demonstrate the finan-
is determined and corrective action taken to cial qualification of the applicant to carry
preclude repetition. The identification of the out the activities for which the permit or li-
significant condition adverse to quality, the cense is sought. The kind and depth of infor-
cause of the condition, and the corrective ac- mation described in this guide is not in-
tion taken shall be documented and reported tended to be a rigid and absolute require-
to appropriate levels of management. ment. In some instances, additional perti-
nent material may be needed. In any case,
XVII. QUALITY ASSURANCE RECORDS the applicant should include information
other than that specified, if the information
Sufficient records shall be maintained to is pertinent to establishing the applicant’s
furnish evidence of activities affecting qual- financial ability to carry out the activities
ity. The records shall include at least the for which the permit or license is sought.
following: Operating logs and the results of It is important to observe also that both
reviews, inspections, tests, audits, moni- § 50.33(f) and this appendix distinguish be-
toring of work performance, and materials tween applicants which are established orga-
analyses. The records shall also include nizations and those which are newly-formed
closely-related data such as qualifications of entities organized primarily for the purpose
personnel, procedures, and equipment. In- of engaging in the activity for which the per-
spection and test records shall, as a min- mit is sought. Those in the former category
imum, identify the inspector or data re- will normally have a history of operating ex-
corder, the type of observation, the results, perience and be able to submit financial
the acceptability, and the action taken in statements reflecting the financial results of
connection with any deficiencies noted. past operations. With respect, however, to
Records shall be identifiable and retrievable. the applicant which is a newly formed com-
Consistent with applicable regulatory re- pany established primarily for the purpose of
wreier-aviles on DSK5TPTVN1PROD with CFR

quirements, the applicant shall establish re- carrying out the licensed activity, with little
quirements concerning record retention, or no prior operating history, somewhat
such as duration, location, and assigned re- more detailed data and supporting docu-
sponsibility. mentation will generally be necessary. For

981

VerDate Mar<15>2010 13:43 Mar 06, 2012 Jkt 226030 PO 00000 Frm 00991 Fmt 8010 Sfmt 8002 Y:\SGML\226030.XXX 226030

You might also like