You are on page 1of 2

QU

UALITY OBSERV
VATION REPOR
RT (QOR
R)
DC
CC Reference N
No:  8015‐0151‐LM
MEL‐00‐000‐QC
C‐RP‐00040 Project:  DAMMAM M WATER
N SYSTEM  
INJECTION
Co
ontractor:  Al‐Bilal  Sub‐Contracto
or:    
Lo
ocation:  Al‐ Bilal Workkshop    Raised by LMEE Representativve:   Hayder H.Hanoon

Involved  Line No. 6”‐36‐106‐07‐TRW‐‐0703‐M6J1‐ Rectification D


Due Date:   
Eq
quipment/Perso
onnel:  N, SP4 joint N
No. FW9 and SP2 joint No. 
FW3 
Daate & Time of O
Observation:    Date & Time C Corrected:   
(LLME)BEFORE  Date Observaation Sent:   (CTR)AFTER  Daate Rectification Sent:   
Insert Pictures 
 
           
 
 

L
Line No. 6”‐36‐1
106‐07‐TRW‐07
703‐M6J1‐N, SP4
4 joint No. FW9
9

Page 1 of 2
QU
UALITY OBSERV
VATION REPOR
RT (QOR
R)

L No. 6”-36--106-07-TRW-00703-M6J1-N, S
Line SP2 joint No. FW3 F
(LME) Observatio on:  During SSurveillance CPY has found thee concerns belo ow in Al‐Bilal Wo orkshop:‐ 
CTR fabricate (fit‐up on nly) SP4 joint No o. FW9 & SP2 jo oint No. FW3 in line No. 6”‐36‐‐106‐07‐TRW‐0703‐M6J1‐
N , With hout any extra length while its tie‐in joints wh hich should be aadjusted in the site 
This issu ue is already no otified to Al‐Bilaal QC inspector ffor further actio on. 
Contracctor’s immediate action is requ uired to close th his issue ASAP 
(CCTR)Corrective A Action Taken:   
(CCTR) Preventativve Measures Taaken:   
Ad dditional Notes:   
REECTIFIED BY CTR’s REPRESENTTIVE                                                                                                                                APPROVED BY CTR’s SITE MA ANAGER: 
 
Naame:                                                 Date:                                                                                                                         Name:                                             Date:
NOTE:  C
Contractor to N Notify LME upon n Rectification.

Page 2 of 2