You are on page 1of 9
Wabaa Baycol Apuusigt Cleat Laat) sk emma Al-Nabaa Engineering Services Co. Ltd Saba Les Yl 4 hy jaye Aymusigl) Les Li AS yo J ya 5 jaa gall Baits andl SLs! pple CA guar Aes) yah | Aaa ya gal BBN ap Hane yy ok DU He gene AS yd ad IBC-NGL-NR-BGC day 7 Nyasa - Hyderstatic Test GwiDU giudl Liat Goad: gaaiieg 2O1S/3I13 cs! 2015/2241 GH Ce sie Beall gh DAM AS ph uatign IC yea gl pili Seal! li Nac as, plan! ‘Chgiall AB pall pial a eT a ye AD gal Gee se te ine Ue ast Se Dbl ad ye le Par Be yh Gatige Glial ae at He ibe paige See pleat leaq= Baghdad KaredshAl Wahda District 902 St 1 Zayona Bulding #20, Fa + Mobile 07901490887, 07901538877 Ema: info@iragndt.com iraandt@gmailcom Www jragndt.com r So etal deal | as ish gan Feng Lal SY OU ae et be Gandy Sat Alot Bhat al 8 JH SUL Jaa oh eg oehor: yaaa, SP AL teal se Se sae tS ll Ly aap ton tates [veges Mea Cte hy is ES 4. eh 53; 309008830897 2. hsb EF; 1309008830539 3 gh Ei re EWI ca oe Asse pine OP “ BGC iraq - North Romaila g 4 Feteettehe tt Development Project” See Inlet Booster Compressor Ps RADIOGRHYDROSTATIC TEST REPORT erodes HT ABA Reference Codo : ASME Section BS1.3 Reference, Hydrostatic Procedure No. : Q.C-NR+IBC-PR-03. | Pave: 10F1 | oste:2arn018 PIPING PRESSURE TEST RELEASE / REPORT TEST PACKNO: 02 ‘SHEET 1 OF 7 TEST MEDUM :Water Temperature _C Start: 783°C Date of Test: 227272076 CEnd: 113°C ‘StartTime 05/10 pm_ Finish Time 6.08 pm WATER ANALYSIS Report No: (SS Only) Duration of Test Mins. DESIGN TEST PRESSURE : 60 Bar [ACTUAL TEST PRESSURE 197.5 Bar PRESSURE GAUGE NOS PRVNO: SR 180. Drawing No: Run of Line RESULT NO From To "3000-WOP-NOO7-ISGP- ‘oor | 08G 1 PSOTAOC 78,810 | 18.1617 | PASS 440300-MP.2343.02008 3000-WOP-NOOT-ISGP- 005 | O1c es wT PASS 440300-MP.2343.0200: | sea ‘AT Bal PIPING BGC PIPING Name? RUned Wawen~ Name? ‘Sign — Sign e 1 Date: wel Ale Dato: 1 frien syne yh “BGC Iraq — North Romaila Development Project” inlet Booster Compressor RADIOGRHYDROSTATIC TESTY REPORT Report No, HT-IBC-ANOOS Reference Code : ASME Section 33.3 Reference. Hydrostatic Procedure No. : Q.C-NR-IBC-PR-O3 Page: 4 08 [pasrzamane PIPING PRESSURE TEST RELEASE / REPORT (DESIGN TEST PRESSURE 735 Bar WATER ANNALYSIS Roport No: (8S Only) Duration of Test TEST PACK NO? 03 # ‘SHEET OF 7 ‘TEST MEDUM ‘Water Temperature CS? 712°C Date Of Test: 222015 CEnd: asec Start Time 06/27 pm Finish Time 7.14 pm Mins, | AGTUAL TEST PRESSURE 75.25 Bar PRESSURE GAUGE NOS ae 10. Drawing No: RESULT Ne ‘S000-WOP-NODTISGP- PASS {U40300-MP.2343.02139 ieIeh UL- 1+ tHe Fa “| ___ RELEASED FOR TESTING BY a AC fae’ Al Bitat Qc Sian el ae Date = = = Sioa B bg ait Ti IESSED/AC :D’ jn Ai al PIPING SSC PINE 1 —_Anek Giktem, ow: | Sign = Sgar aie? Date 5 f a “BGC Iraq — North Romaila Development Project” Inlet Booster Compressor RADIOGRHYDROSTATIC TESTY REPORT Reson Ne. HT-IBC-ANOO4 Reference Coda : ASME Section 831.3 Referonee, Hydrostts Prosedure Wo. : Q.C-NR-IEC-PR-03 Peae:t OF 1 | bate: zrrz0%s [TEST PACK NO: 07 PIPING PRESSURE TEST RELEASE / REPORT ‘SHEETTOF 7) ‘TEST MEDUM :Water ‘Temperature C Stat: 200°C Date of Test: 17/2/2075 Cent: 100% Stan Time’ o4ifom “Finish Time 48 pm WATER ANNALYSIS Report No: (88 oni Duration of Tet Bin, ‘DESIGN TEST PRESSURE? 31 Bar ACTUAL TEST PRESSURE 1@6.5 Bar I. Sr.No: 130904850537 PRESSURE GAUGE NOS 2. Sr. Nos isnsoasEaies PRY NO: 3._ Sr.No aR 10. Drawing Wor ‘She REV: Une Woz Run of Line RESULT] No. : NO From To 000: WOP-NOGT-ISGE: Ooi | 066} —a=FS-BORASEW Fi 7 PASS \U40300.MP.2343-02902 ~ 1 ee ? RELEASED FOR TESTING BY: | y Al, BGC QC Nae Tie gee ‘Sian oo ‘AT Bilal PIPING BGC PIPING An cd Rak ecn, SSS a ole oe (nates 4 oop “BGC Iraq — North Romaila ie OA fetitenacnt Development Project” icine Inlet Booster Compressor RADIOGRHYDROSTATIC TESTY REPORT Referonce Code : ASME Section 231.3 Reference. Hydrectat Procedure No. : Q.C-NRIBC-PR-03 | Page: 0F1 [bate auanewe PIPING PRESSURE TEST RELEASE / REPORT [CEST Pack No = os SHEET 1 OF 7 ‘TEST MEDUM :Water ‘Temperature C Start: 200°C Date of Test: T7ig201s > CEnd: 190°C Start Time Of4§ pm Finish Time 146 pm WATER ANALYSIS Report No: (SS Only) Duration of Test 30 Mins, DESIGN TEST PRESSURE : S00 Bar PRESSURE GAUGE NOS: | aR To rag : Tne NT Ran ofUine RESULT No, To SuRE WOR ROOT ISGP. —|— oot | ~066 | — ar Recaneesy +o 7} pass] ena0o a. 2343-02909, Lh. BGC ac Namie? ‘Sign Date: 27. 2-Gal: BGC PIPING 1 Name? RAwed Wanton ae | ‘Sign? ee Sign? Dato QU Tee Dates “BGC Iraq ~North Romaila Development Project” Inlet Booster Compressor Ss RADIOGRHYDROSTATIC TESTY REPORT FerotNe, HTIBC-ANOOG Roferonce Code : ASME Seeton 831.3 ee Ge ees PIPING PRESSURE TEST RELEASE / REPORT TEST PACKNO: 05 SHEETIOFT TEST MEDUM ‘Water Temperature 0 Stat 2005S Date of Test: i7iaa07e CEnd: 190°C Start Time O7f49 pm Finish Time 1148 pm WATER ANNALYSiS Report No: ($8 Only) Duration of Test, (Pe Mins, DESIGN TEST PRESSURE! 325 Bar [ACTUAL TEST PRESSURE 8.76 Bar iF 4. Si. No: 1309088830531 PRESSURE GAUGE NOS 2. Sr. No 1309648850539 PRVNO: | 3. Sr.No SR 10. Drawing Nor ‘She | REV, Une Wer Ran oF Line RESULT No No From TS | Sao WOR NOOTISGP~|—oot_| Gas] —a-peaTO TOGA oF 6 PASS Ua0300-uP-2343.02114 ‘AT Bia PING BSC PRNG Name: AR EA Wa Coe Namo? a =— ‘Sign 21-t, Cole Date | “a | “BGC Iraq - North Romaii Development Project” inlet Booster Compressor eS ‘HYDROSTATIC TESTY REPORT eniite ROS Roforonco Code : ABNE Sesion 8513 [nets Hye Pente te: QG-NRIBG-PROD | Fe 1OF7 [omens PIPING PRESSURE TEST RELEASE / REPORT TEST PACKNO SHEET 1 OF 7 TEST MEDUM :Wator Temperature Star 18.0°C Date of Test: 13/3/2016 CEnd : 200°C Start Time. 10/18 AM Finish Tine 11.00 AR WATER ANNALYSIS Report No: (SS Only) Duration of Test Mins, (DESIGN TEST PRESSURE: 61 Bar | ACTUAL TEST PRESSURE :81 Bar Si No 150s0RRss05aT PRESSURE GAUGE NOS Pa PRVNO: 3. Sr.No SR Tao. Brawing Nor ht | REV. Tine NS? Ran of Lie RESULT NO NO From To | sa WORKED ISG —|— oor | ase] Ss PeRreTOE oF 08 | Pass Ya0300-MP.2343.02139 Dias" RELEASED FOR TESTING BY: AT Bilal QC BGC OC Kem ; ia i Date? TES ;DIACCEPTED BY ‘Al Bilal PIPING sa ‘BGC PIPING aries? SARA Sgn? Dates tg ls|20%5

You might also like