H.b construction co.

residential house
date:10/08/2017 material
NO. description of work unit quantity rates in $
1 hardwood Nos 80 28
2 roof. Sheet Nos 120 6
3 cement bags 350 7
4 steel bars nos 80 8
5 water fosto 150 1.5
6 stones load 20 50
7 sand load 20 35
8 bricks no. 5000 0.5
9 gravel load 10 60
10 white washing (lime) bags 40 6
11 paint
12 Windows (alumium) No. 6 200
13 glass paint
14 doors (wooden Nos 10 170
15 steel door Nos 2 100
16 floor tiles no 200 6
17 compaction
18 water tank
19 gate Nos 1 600
20 ceiling (chip board) nos 115 6.5
21 back filling (sand)
22 Plumbing Installation
23 Electrical Installation
24 Sewage Pepping
25 Toilet . Accessories
26 nails
27 varendah RCC
28 facia board and others
29 face stone

contengance and checking

ground total
labour
216 65

prepared and submitted by:hoy-bila construction.co net ground total($):


amounts in $
2240
720
2450
640
225
1000
700
2500
600
240
600
1200
200
1700
200
1200
300
300
600
747.5
1600
300
400
300
137.5
400
6000
3000
5000
35500

2500
38000

14040

52040 $