You are on page 1of 1

Records of Contractor's Personnel

Details as per Clause 6.9 of Document II‐2 Details of Engineer's Approval Period on Project


Position No. Designation Name Letter Reference Date Approved From To

12‐1 Lead Engineer‐Structure‐1
12‐2 Lead Engineer‐Structure‐2

15‐1 Civil Engineer‐1
15‐2 Civil Engineer‐2
15‐3 Civil Engineer‐3
15‐4 Civil Engineer‐4

* Position number and designation listed above is for information only. Contractor shall provide details of the staff as per clause 6.9 of Contract Document II‐2

You might also like