QUALITY PROCEDURES AMD/QP-S7-QS-08

Date : 15-3-2004
VARIATION
FEE OF
PROPOSAL Version : 1
WORKS Page : 1 of 5

1.0 PURPOSE

To ensure that all variations works are measured and evaluated in accordance
with the Rules for Valuation of Variations in the Conditions of Contract.

2.0 SCOPE

The procedure covers the valuation of variation works upon the issuance of an
instruction from the Client/Superintending Officer/Architect/Engineer for :-

(a) Variation Works as defined in the Conditions of Contract


(b) Expenditure of Prime Cost (PC) and Provisional Sums

It ends upon agreement and endorsement of the Variation Of Works Certificate


by the parties.

3.0 RESPONSIBILITIES

3.1 PIC - Responsible for Final vetting of the variation works

3.2 OIC/AQS - Responsible for the measurement and evaluation of


the variation works

3.3 AQS/SS - Responsible for typing out variation orders as per the
required format

4.0 DEFINITIONS

4.1 PIC - Partner In-Charge

4.2 OIC - Officer In-Charge (Quantity Surveyor/Contract Executive/


Technical Manager)

4.3 AQS - Assistant Quantity Surveyor

4.4 SS - Secretarial Staff

4.4 AI - Architect’s Instruction

4.5 EI - Engineer’s Instruction

4.6 CMGD - Certificate of Completion of Making Good Defects.

Com 4:C/ISO/Quality Procedures/Section 7-Variation Works/Noted/02/25/18-[Afie]


Document No.
QUALITY PROCEDURES AMD/QP-S7-QS-08

Date : 15-3-2004
VARIATION
FEE OF
PROPOSAL Version : 1
WORKS Page : 2 of 5

5.0 REFERENCES

5.1 Contract Documents

5.2 Architect's Instruction/Superintending Officer’s Instruction/Client Request

5.3 Engineer's Instruction

5.4 As Built Drawings

5.5 Site Records / Dayworks Records

5.6 Non Compliance Records

6.0 PROCEDURES

6.1 Upon Request for Variation (RFV) from the Architect/Superintending


Officer/Client/Engineer, the OIC/AQS shall check for cost implication
against Contract Documents and inform the Architect/Superintending
Officer/Client/Engineer accordingly.

6.2 Where cost implication is identified, OIC/AQS proceed with the cost
estimate of variation and report to Architect/Engineer and Client.

6.3 The Architect/Superintending Officer/Client/Engineer will then issue


A.I./E.I. if variation cost is acceptable to Client. If not, to refer back to
Architect/Superintending Officer/Client/Engineer.

6.4 OIC/AQS to request Contractor to submit a quotation for intended


Variation Works.

6.5 OIC/AQS shall evaluate the quotation submitted by Contractor in


accordance with the Rules for Valuation for Variations in the Conditions of
Contract.

6.6 OIC/AQS is to revert to Contractor commenting on rates whether


acceptable or unacceptable and to recommend fair market/reasonable
rates/pricing for Contractor's review.

Com 4:C/ISO/Quality Procedures/Section 7-Variation Works/Noted/02/25/18-[Afie]


Document No.
QUALITY PROCEDURES AMD/QP-S7-QS-08

Date : 15-3-2004
VARIATION
FEE OF
PROPOSAL Version : 1
WORKS Page : 3 of 5

6.0 PROCEDURES (cont’d)

6.7 OIC/AQS shall vet through the anticipated variation cost prior
recommending to Client for acceptance.

6.8 Upon approval from Client, the OIC/AQS shall proceed to formalise the
Variation Works Certificate for Client and Contractor, Architect/ Engineer
and Quantity Surveyor endorsement.

6.9 The endorsed Variation Of Works Certificate is then filed to be


incorporated in the Statement of Final Account.

7.0 RECORDS

Item Records Retention Period

7.1 Variation Of Works Certificate 6 Years from Final


Certificate

Com 4:C/ISO/Quality Procedures/Section 7-Variation Works/Noted/02/25/18-[Afie]


Document No.
QUALITY PROCEDURES AMD/QP-S7-QS-08

Date : 15-3-2004
VARIATION
FEE OF
PROPOSAL Version : 1
WORKS Page : 4 of 5

8.0 FLOW CHART


PROCESS MAPPING FOR VALUATION OF VARIATION OF WORKS

Request
Request for
for Variation
Variation
from
from Architect //
Architect
Engineer
Engineer

To
To check
check ifif Variation
Variation End
End
Works
Works isis valid
valid

Estimate
Estimate

Acceptable
Acceptable to
to
Client
Client

AI
AI // EI
EI

Contractor
Contractor to
to Submit
Submit Quotation
Quotation

Evaluation
Evaluation of
of Contractor’s
Contractor’s Quotation
Quotation and
and
Negotiation
Negotiation with
with Contractor
Contractor

Contractor
ContractorAgreed
Agreed

Formalised
Formalised Variation
Variation Works
Works isis
signed
signed by
by PIC/Director
PIC/Director
Variation
Variation Order
Order isis distributed
distributed to
to all
all relevant
relevant
Consultants
Consultants forfor endorsement
endorsement

Variation
Variation Works
Works isis distributed
distributed to
to
Client
Client for
for approval
approval

Approved
Approved and and Endorsed
Endorsed Variation
Variation Works
Works
is
is filled
filled for
for Statement
Statement of
of Final
Final Account
Account
Approved
Com 4:C/ISO/Quality Procedures/Section and Endorsed
7-Variation Works/Noted/02/25/18-[Afie]
Variation Orders is filled for
Statement of Final Account
Document No.
QUALITY PROCEDURES AMD/QP-S7-QS-08

Date : 15-3-2004
VARIATION
FEE OF
PROPOSAL Version : 1
WORKS Page : 5 of 5

9.0 ATTACHMENT

9.1 Appendix I : Borang JKR-APK, JKR-KPK (Government)

9.2 Appendix II Variation Order (Private)