You are on page 1of 1

N

FOR CONSTRUCTION
00.00.0000
THIRD BASEMENT (-12000 FFL) SECOND BASEMENT (-8100 FFL) FIRST BASEMENT (-4200 FFL)
STRUCTURAL CONSULTANT: ELECTRICAL CONSULTANT: ARCHITECTS: PROJECT: CHECKED BY: ORIGNAL DATE:
IMPORTANT NOTES D I S T R I B U T I O N R E V I S I O N S CASA PICASSO
DATE ISSUED TO PRINTS REV. NO. DATE DESCRIPTION
THE DESIGNER'S CONSORTIUM AMPOWER CONSULTANCY SERVICES JOB NO. AT SECTOR - 61, GURGAON, HARYANA ROHIT 00.00.00
ALL DIMENSIONS ARE IN MM UNLESS MENTIONED OTHERWISE.
- - - - - - - - VAS 11 008 ERA RESORTS Private Limited DRAWN BY:
DRAWINGS ARE TO BE READ AND NOT SCALED. DRAWING

ALL DIMENSIONS ETC. SHALL BE CO-RELATED WITH OTHER RELEVANT ARCHITECTURAL DRAWINGS AND SITE CONDITIONS.
-

-
-

-
-

-
-

-
-

-
-

- PLUMBING & FIRE FIGHTING CONSULTANT: HVAC CONSULTANT: VASTUKRITI TITLE:


RAMP DETAIL-2 SCALE: REV. DATE:
ARCHITECTURE - INTERIORS - MANAGEMENT
ANY AMBIGUITY IN THE DRAWING MUST BE BROUGHT TO THE ARCHITECT'S NOTICE BEFORE THE COMMENCEMENT OF RELEVANT ITEMS OF WORK.
- - - - - - RAJ KUMAR GUPTA WAC ENGINEERS - 1:100 @ A1 00.00.00
- - - - - - - - STAGE LOCATION TRADE DRAWING NUMBER SHEET REVISION
THIS DRAWING IS THE PROPERTY & COPYRIGHT OF M/S VASTUKRITI AND NOT TO BE COPIED OR USED IN ANY MANNER WITHOUT THEIR WRITTEN PERMISSION.
- - - - - - WD MB GE GE AR 3200 15302 SH-00 R-00

Working Drawing-Site-Entire-Entire-ARCH-Plan-Column-floor00

You might also like