Health, Safety & Environmental Daily Coordination

DORSCH HSE Representative: June, Richard


QD-SBG HSE Representative:
Sunil G
Date:
02/28/2018 Time: Night Shift
Area of workplace visited:
Zone 4

HSE Manpower: QD-SBG: 5 HSEO + 1 Sup Subcontractor: 0

SL Key personnel’s Contact SL Expected General Activities


68877565.70618623. S18D wall X De shuttering,
Construction/Engineering: Ahmad Muner, Mohamed S18B Wall 4 Steel fixing
1 77956000. 31202085 1
Hussin, Abdulla, Hany. S19A Slab Carpentry work,
S19B Wall 4 Steel fixing,
S20B Wall 4 Steel fixing,
2 Temporary Works Representative: SABIR 74431572 2
S21 East ramp Doka scaffold erection,
S22 Column Steel fixing,
3 Lifting Works: Lijo /Gladison 50949079 3 S22 west ramp scaffold erection,
S24 Wall 4 steel fixing,
S25 West ramp Back filling,
4 Scaffold Coordinator: Ahmed 77996050 4 S27 East ramp scaffold dismantling,
S23-29 Back filling,

S33 center carpentry work,


5 Dewatering Coordinator: Aiman 30651993 5
S32 west ramp Back filling,

S32 East ramp backfilling,


6 Carpenter G. Foreman: Fawas / Gufran 70646264 6
S42 East back filling,

7 Steel Fixing G. Foreman: AMIR 70224884 7 Lifting activities (west / east elevation and center down area)

8 Electrician In charge: Jaspal 66505339 8 Housekeeping and material shifting at multiple locations

** Contractor can attach specific activities for each area/location.


Note: This form will be submitted together with the HSE Observation Report at the end of every shift.
CP7B-LUSAIL PLAZA INFRASTRUCTURE, LRT STATION, PUBLIC CAR PARKS AND LANDSCAPE

HSE DEPARTMENT

DAILY JOINT HSE OBSERVATION REPORT


DATE: 02/28/2018 REFERENCE NO:

LOCATION: Zone 4 (Night Shift) MANPOWER: 399

N PICTURE CORRECTIVE RESPONS RISK TARGET


OBSERVATION STATUS
O. BEFORE AFTER ACTIONS IBLE RATE DATE

S22A East ramp,


Informed to the
Exclusion zone
supervisor for the
1 found missing Lijo M 02/28/18 Closed
provision of
during lifting
exclusion zone.
activity.

S19 Center: Informed to the


Protruding rebar foreman in charge
2 Fawas M 02/28/18 Closed
found into the for the removal of
access. protruding rebar.

Doc. Name: CP7B HSES FRM-001 Daily HSES Observation Report


CP7B-LUSAIL PLAZA INFRASTRUCTURE, LRT STATION, PUBLIC CAR PARKS AND LANDSCAPE

HSE DEPARTMENT

S19A West slab,


Informed to the
Improper
foreman in charge
3 stacking of Gufran M 02/28/18 Closed
for proper stacking
material found
of material.
at work place.

S19 Slab, Informed to the


Missing edge foreman in charge
4 protection for the installation Fawas H 02/28/18 Closed
observed on the of missing edge
slab. protection.

Doc. Name: CP7B HSES FRM-001 Daily HSES Observation Report


CP7B-LUSAIL PLAZA INFRASTRUCTURE, LRT STATION, PUBLIC CAR PARKS AND LANDSCAPE

HSE DEPARTMENT

S42 East ramp,


Faulty roller Instructed to the
compactor foreman in charge
5 Kahlid M 02/28/18 Closed
found parked for removal of roller
into the slope. compector.

S23 Center,
Uncovered open
Instructed to the
trench for
6 foreman to cover Ahmed M 02/28/18 Closed
column found at
the open trench.
workplace.

DORSCH HSE REPRESENTATIVE Name: June, Richard QD-SBG REPRESENRATIVE Name: Sunil Kumar

Signature: Signature:
DATE: DATE: 02/28/18