You are on page 1of 248

PROJECT : AIN ARNAT CCPP

DOC. NO. : ARNA-BE-EGS-49-0002

SUBJECT : RELAY COORDINATION STUDY

(6kV SWGR)

1 24. Nov. 2014 For Approval J. H. AHN S. T. OH M. J. HEO


0 17. Sep. 2014 For Approval J. H. AHN S. T. OH M. J. HEO
Rev. Date Contents Designed Checked Approved
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 1 of 205

TABLE OF CONTENTS
1. GENERAL ............................................................................................................................................................. 4
1.1. Preface ......................................................................................................................................................... 4
1.2. Coordination Curve Tool ......................................................................................................................... 4
1.3. Coordinated Time Interval (CTI) ........................................................................................................... 4
1.4. References ................................................................................................................................................... 4
1.5. Device No. of Protective Relay ................................................................................................................ 5
2. LIST OF PROTECTIVE RELAY ...................................................................................................................... 6
2.1. MV SWGR_UNIT 1................................................................................................................................... 6
2.2. MV SWGR_UNIT 2................................................................................................................................... 7
2.3. MV SWGR_UNIT 3................................................................................................................................... 8
2.4. MV SWGR_COMMON ............................................................................................................................ 9
3. SETTING CRITERIA ....................................................................................................................................... 10
3.1. Incoming feeder ........................................................................................................................................... 10
3.2. Bus tie panel ................................................................................................................................................. 10
3.3. Power cable connection & Common feeder protection .................................................................................11
3.4. Transformer feeder protection .......................................................................................................................11
3.5. Motor feeder protection ................................................................................................................................ 12
4. SETTING CALCULATION ............................................................................................................................. 15
4.1. MV SWGR_UNIT 1................................................................................................................................. 15
4.1.1. INCOMER ..................................................................................................................................... 15
4.1.2. BUS-VT [BUS-VT] ....................................................................................................................... 17
4.1.3. 6kV POWER CONNECTION FEEDER (to 20BBA03, 30BBA03) ..................................... 20
4.1.4. 6kV COMMON FEEDER (to 00BBA01) ................................................................................. 21
4.1.5. 2MVA TR FEEDER [10BFT01] ................................................................................................. 22
4.1.6. 1.8MVA TR FEEDER [10BFT02/03] ........................................................................................ 24
4.1.7. 1MVA TR FEEDER [10BFT04] ................................................................................................. 26
4.1.8. 2.56MVA TR FEEDER [10MKC] .............................................................................................. 28
4.1.9. 3.1MVA TR FEEDER [10MBJ] ................................................................................................. 30
4.1.10. 2,000kW MOTOR FEEDER..................................................................................................... 32
4.1.11. 200kW MOTOR FEEDER ........................................................................................................ 36
4.1.12. 450kW MOTOR FEEDER ........................................................................................................ 39
4.1.13. 220kW MOTOR FEEDER ........................................................................................................ 42
4.1.14. 643kW MOTOR FEEDER ........................................................................................................ 45
4.2. MV SWGR_UNIT 2................................................................................................................................. 48
4.2.1. INCOMER ..................................................................................................................................... 48
4.2.2. BUS-VT [BUS-VT] ....................................................................................................................... 50
4.2.3. 6kV POWER CONNECTION FEEDER (to 10BBA04, 30BBA04) ..................................... 53
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 2 of 205

4.2.4. 6kV COMMON FEEDER (to 00BBA02) ................................................................................. 54


4.2.5. 2MVA TR FEEDER [10BFT01] ................................................................................................. 55
4.2.6. 1.8MVA TR FEEDER [20BFT02/03] ........................................................................................ 57
4.2.7. 1MVA TR FEEDER [20BFT04] ................................................................................................. 59
4.2.8. 2.56MVA TR FEEDER [20MKC] .............................................................................................. 61
4.2.9. 3.1MVA TR FEEDER [20MBJ] ................................................................................................. 63
4.2.10. 2,000kW MOTOR FEEDER..................................................................................................... 65
4.2.11. 200kW MOTOR FEEDER ........................................................................................................ 69
4.2.12. 450kW MOTOR FEEDER ........................................................................................................ 72
4.2.13. 220kW MOTOR FEEDER ........................................................................................................ 75
4.2.14. 643kW MOTOR FEEDER ........................................................................................................ 78
4.3. MV SWGR_UNIT 3................................................................................................................................. 81
4.3.1. INCOMER ..................................................................................................................................... 81
4.3.2. BUS-VT [BUS-VT] ....................................................................................................................... 83
4.3.3. 6kV POWER CONNECTION FEEDER (to 10BBA05, 20BBA05) ..................................... 86
4.3.4. 6kV COMMON FEEDER (to 00BBA03) ................................................................................. 87
4.3.5. 2MVA TR FEEDER [30BFT01] ................................................................................................. 88
4.3.6. 1.8MVA TR FEEDER [30BFT02/03] ........................................................................................ 90
4.3.7. 1MVA TR FEEDER [30BFT04] ................................................................................................. 92
4.3.8. 2.56MVA TR FEEDER [30MKC] .............................................................................................. 94
4.3.9. 3.1MVA TR FEEDER [30MBJ] ................................................................................................. 96
4.3.10. 2,000kW MOTOR FEEDER..................................................................................................... 98
4.3.11. 200kW MOTOR FEEDER ...................................................................................................... 102
4.3.12. 450kW MOTOR FEEDER ...................................................................................................... 105
4.3.13. 220kW MOTOR FEEDER ...................................................................................................... 108
4.3.14. 643kW MOTOR FEEDER ....................................................................................................... 111
4.4. MV SWGR_COMMON .........................................................................................................................114
4.4.1. INCOMER-A, B, C (FROM : 10BBA, 20BBA, 30BBA) .......................................................114
4.4.2. BUS-VT [BUS-VT] ......................................................................................................................116
4.4.3. 2MVA TR FEEDER [00BFT01/02/05/06/07/08] .....................................................................117
4.4.4. 1MVA TR FEEDER [00BFT03/04] ...........................................................................................119
4.4.5. 650kW MOTOR FEEDER ........................................................................................................ 121
4.4.6. 2,200kW GENERATOR FEEDER [BDSG#1~#6] ................................................................ 124
5. PROTECTIVE RELAY SETTING CHART ................................................................................................ 126
5.1. MV SWGR_UNIT 1............................................................................................................................... 129
5.2. MV SWGR_UNIT 2............................................................................................................................... 151
5.3. MV SWGR_UNIT 3............................................................................................................................... 173
5.4. MV SWGR_COMMON ........................................................................................................................ 195
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 3 of 205

6. TIME-CURRENT COORDINATION CURVE ........................................................................................... 204


6.1 TCC LIST & TCC .................................................................................................................................. 204
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 4 of 205

1. GENERAL
1.1. Preface
This protective relay coordination study is applied to AC 6kV, 50Hz system of AIN ARNAT CCPP project.

1.2. Coordination Curve Tool


Where discrimination is to be demonstrated, the discrimination curves have been drawn with the assistance of
the module "Star – Protective Device Coordination" of the “ETAP” power station software by Operation
Technology Inc.

1.3. Coordinated Time Interval (CTI)


When plotting coordination curves, coordinated time interval between upstream and downstream protective
devices is necessary to ensure correct selective operation.
The CTI applied to this project shall be minimum 0.2sec.

1.4. References
The following documents are appropriate ;
• IEC 60909 - Short-circuit current in three-phase a.c. systems

• IEC 60034 - Rotating Electrical Machine

• IEC 60076 - Power Transformers

• Hyundai Key single line diagram

• ABB Switchgear Drawings

• Short-Circuit Analysis diagram (Worst case)

• Motor vendor data

• Instruction manual of relay manufacturer (ABB)


PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 5 of 205

1.5. Device No. of Protective Relay


The device numbers listed in this sheet present major function used for the relay coordination.
DEVICE NO. DESCRIPTION REMARK
24 V/Hz Overexcitation relay
25 Synchronism check relay
27 Under voltage relay
32 Reverse power relay
37 Time under current relay
38 Temperature monitoring relay (Bearing temperature)
49W Temperature monitoring relay (Winding temperature)
40 Loss of excitation (Impedance detection)
40 Loss of excitation (DC current detection)
40Q Loss of excitation (Reverse VAR detection)
46 Negative sequence or unbalance current relay
47 Negative sequence voltage relay
48 Excessive starting time relay
49 Thermal overload relay
50 Instantaneous over current relay
50BF Breaker failure relay
50N, 50G Instantaneous over current earth fault relay
51 Time over current relay
51N, 51G Time over current earth fault relay
51V Voltage-restrained over current relay
51LR Locked rotor relay
59 Over voltage relay
59N Residual overvoltage relay
59F Over excitation voltage
64R Rotor earth fault relay
64S Zero sequence overvoltage relay
66 Number of starts relay
67 Directional overcurrent relay
81O Over frequency relay
81U Under frequency relay
87T Transformer differential protective relay
87M Motor differential protective relay
50BF Breaker failure relay
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 6 of 205

2. LIST OF PROTECTIVE RELAY


2.1. MV SWGR_UNIT 1
PROTECTIVE RELAY
CT, ZCT, VT
SWGR FEEDR NO. DESCRIPTION MAKER/ REMARK
RATIO FUNCTION
TYPE
CT : 3,600/1A 50/51,
INCOMER 6,000V 100V ABB /
GCB-10BBA01 50G/51G,
[ FROM. 10BBT01 ] VT : / REF 542+
3 3 25, 27
ABB /
27
6,000V 100V REF 542+
BUS-VT BUS-VT VT : /
3 3 ABB /
ATS
SUE 3000
POWER CONNECTION
GCB-10BBA03 ABB /
FEEDER CT : 3,600/1A 50/51, 50G
GCB-10BBA04 [ TO. 20BBA03, 30BBA03 ] REF 542+
POWER CONNECTION
ABB /
GCB-10BBA02 FEEDER CT : 2,000/1A 50/51, 50G
[ TO. 00BBA01 ] REF 542+

CT : 300/1A 50/51, 50G, ABB /


2MVA TR FEEDER ZCT :100/1A 49 REF 542+
GCB-10BBA05
[ 10BET01 ] 1ST CT : 300/1A ABB /
87T
2ND CT : 4,000/1A REF 542+
CT : 300/1A 50/51, 50G, ABB /
GCB-10BBA06 1.8MVA TR FEEDER ZCT :100/1A 49 REF 542+
GCB-10BBA07 [ 10BET02, 10BET03 ] 1ST CT : 300/1A ABB /
87T
2ND CT : 4,000/1A REF 542+
CT : 300/1A 50/51, 50G, ABB /
10BBA 1MVA TR FEEDER ZCT :100/1A 49 REF 542+
GCB-10BBA08
[ 10BET04 ] 1ST CT : 300/1A ABB /
87T
2ND CT : 2,000/1A REF 542+
2.67MVA TR FEEDER CT : 400/1A 50/51, 50G, ABB /
GCB-10BBA09
[ 10MKC ] ZCT :100/1A 49 REF 542+
3.1MVA TR FEEDER CT : 800/1A 50/51, 50G, ABB /
GCB-10BBA10
[ 10MBJ ] ZCT :100/1A 49 REF 542+
50/51, 50G,
CT : 400/1A ABB /
49, 46, 27,
GCB-10BBA11 ZCT :100/1A REF 542+
2,000kW MOTOR FEEDER 51LR, 48
GCB-10BBA12
ABB /
CT : 400/1A 87M
REF 542+
50/51, 50G,
CT : 75/1A ABB /
GCB-10BBA13 200kW MOTOR FEEDER 49, 46, 27,
ZCT :100/1A REF 542+
51LR, 48
50/51, 50G,
GCB-10BBA14 CT : 100/1A ABB /
450kW MOTOR FEEDER 49, 46, 27,
GCB-10BBA15 ZCT :100/1A REF 542+
51LR, 48
50/51, 50G,
GCB-10BBA16 CT : 75/1A ABB /
220kW MOTOR FEEDER 49, 46, 27,
GCB-10BBA17 ZCT :100/1A REF 542+
51LR, 48
50/51, 50G,
CT : 100/1A ABB /
GCB-10BBA18 643kW MOTOR FEEDER 49, 46, 27,
ZCT :100/1A REF 542+
51LR, 48
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 7 of 205

2.2. MV SWGR_UNIT 2
PROTECTIVE RELAY
CT, ZCT, VT
SWGR FEEDR NO. DESCRIPTION MAKER/ REMARK
RATIO FUNCTION
TYPE
CT : 3,600/1A 50/51,
INCOMER 6,000V 100V ABB /
GCB-20BBA01 50G/51G,
[ FROM. 20BBT01 ] VT : / REF 542+
3 3 25, 27
ABB /
27
6,000V 100V REF 542+
BUS-VT BUS-VT VT : /
3 3 ABB /
ATS
SUE 3000
POWER CONNECTION
GCB-20BBA03 ABB /
FEEDER CT : 3,600/1A 50/51, 50G
GCB-20BBA04 [ TO. 10BBA03, 30BBA03 ] REF 542+

POWER CONNECTION
ABB /
GCB-20BBA02 FEEDER CT : 2,000/1A 50/51, 50G
[ TO. 00BBA02 ] REF 542+

CT : 300/1A 50/51, 50G, ABB /


2MVA TR FEEDER ZCT :100/1A 49 REF 542+
GCB-20BBA05
[ 20BET01 ] 1ST CT : 300/1A ABB /
87T
2ND CT : 4,000/1A REF 542+
CT : 300/1A 50/51, 50G, ABB /
GCB-20BBA06 1.8MVA TR FEEDER ZCT :100/1A 49 REF 542+
GCB-20BBA07 [ 20BET02, 20BET03 ] 1ST CT : 300/1A ABB /
87T
2ND CT : 4,000/1A REF 542+
CT : 300/1A 50/51, 50G, ABB /
20BBA 1MVA TR FEEDER ZCT :100/1A 49 REF 542+
GCB-20BBA08
[ 20BET04 ] 1ST CT : 300/1A ABB /
87T
2ND CT : 2,000/1A REF 542+
2.67MVA TR FEEDER CT : 400/1A 50/51, 50G, ABB /
GCB-20BBA09
[ 20MKC ] ZCT :100/1A 49 REF 542+
3.1MVA TR FEEDER CT : 800/1A 50/51, 50G, ABB /
GCB-20BBA10
[ 20MBJ ] ZCT :100/1A 49 REF 542+
50/51, 50G,
CT : 400/1A ABB /
49, 46, 27,
GCB-20BBA11 ZCT :100/1A REF 542+
2,000kW MOTOR FEEDER 51LR, 48
GCB-20BBA12
ABB /
CT : 400/1A 87M
REF 542+
50/51, 50G,
CT : 75/1A ABB /
GCB-20BBA13 200kW MOTOR FEEDER 49, 46, 27,
ZCT :100/1A REF 542+
51LR, 48
50/51, 50G,
GCB-20BBA14 CT : 100/1A ABB /
450kW MOTOR FEEDER 49, 46, 27,
GCB-20BBA15 ZCT :100/1A REF 542+
51LR, 48
50/51, 50G,
GCB-20BBA16 CT : 75/1A ABB /
220kW MOTOR FEEDER 49, 46, 27,
GCB-20BBA17 ZCT :100/1A REF 542+
51LR, 48
50/51, 50G,
CT : 100/1A ABB /
GCB-20BBA18 643kW MOTOR FEEDER 49, 46, 27,
ZCT :100/1A REF 542+
51LR, 48
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 8 of 205

2.3. MV SWGR_UNIT 3
PROTECTIVE RELAY
CT, ZCT, VT
SWGR FEEDR NO. DESCRIPTION MAKER/ REMARK
RATIO FUNCTION
TYPE
CT : 3,600/1A 50/51,
INCOMER 6,000V 100V ABB /
GCB-30BBA01 50G/51G,
[ FROM. 30BBT01 ] VT : / REF 542+
3 3 25, 27
ABB /
27
6,000V 100V REF 542+
BUS-VT BUS-VT VT : /
3 3 ABB /
ATS
SUE 3000
POWER CONNECTION
GCB-30BBA03 ABB /
FEEDER CT : 3,600/1A 50/51, 50G
GCB-30BBA04 [ TO. 10BBA03, 20BBA03 ] REF 542+

POWER CONNECTION
ABB /
GCB-30BBA02 FEEDER CT : 2,000/1A 50/51, 50G
[ TO. 00BBA03 ] REF 542+

CT : 300/1A 50/51, 50G, ABB /


2MVA TR FEEDER ZCT :100/1A 49 REF 542+
GCB-30BBA05
[ 30BET01 ] 1ST CT : 300/1A ABB /
87T
2ND CT : 4,000/1A REF 542+
CT : 300/1A 50/51, 50G, ABB /
GCB-30BBA06 1.8MVA TR FEEDER ZCT :100/1A 49 REF 542+
GCB-30BBA07 [ 30BET02, 30BET03 ] 1ST CT : 300/1A ABB /
87T
2ND CT : 4,000/1A REF 542+
CT : 300/1A 50/51, 50G, ABB /
30BBA 1MVA TR FEEDER ZCT :100/1A 49 REF 542+
GCB-30BBA08
[ 30BET04 ] 1ST CT : 300/1A ABB /
87T
2ND CT : 2,000/1A REF 542+
2.67MVA TR FEEDER CT : 400/1A 50/51, 50G, ABB /
GCB-30BBA09
[ 30MKC ] ZCT :100/1A 49 REF 542+
3.1MVA TR FEEDER CT : 800/1A 50/51, 50G, ABB /
GCB-30BBA10
[ 30MBJ ] ZCT :100/1A 49 REF 542+
50/51, 50G,
CT : 400/1A ABB /
49, 46, 27,
GCB-30BBA11 ZCT :100/1A REF 542+
2,000kW MOTOR FEEDER 51LR, 48
GCB-30BBA12
ABB /
CT : 400/1A 87M
REF 542+
50/51, 50G,
CT : 75/1A ABB /
GCB-30BBA13 200kW MOTOR FEEDER 49, 46, 27,
ZCT :100/1A REF 542+
51LR, 48
50/51, 50G,
GCB-30BBA14 CT : 100/1A ABB /
450kW MOTOR FEEDER 49, 46, 27,
GCB-30BBA15 ZCT :100/1A REF 542+
51LR, 48
50/51, 50G,
GCB-30BBA16 CT : 75/1A ABB /
220kW MOTOR FEEDER 49, 46, 27,
GCB-30BBA17 ZCT :100/1A REF 542+
51LR, 48
50/51, 50G,
CT : 100/1A ABB /
GCB-30BBA18 643kW MOTOR FEEDER 49, 46, 27,
ZCT :100/1A REF 542+
51LR, 48
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 9 of 205

2.4. MV SWGR_COMMON
PROTECTIVE RELAY
CT, ZCT, VT
SWGR FEEDR NO. DESCRIPTION REMARK
RATIO MAKER/
FUNCTION
TYPE

GCB-00BBA01 INCOMER-A, B, C CT : 2,000/1A


6,000V 100V 50/51, 50G, ABB /
GCB-00BBA02 [ FROM : 10BBA,
VT : / 25, 27 REF 542+
GCB-00BBA03 20BBA, 30BBA ] 3 3

6,000V 100V ABB /


BUS-VT BUS-VT VT : / 27
3 3 REF 542+

GCB-00BBA04 CT : 300/1A 50/51, 50G, ABB /


GCB-00BBA05 ZCT :100/1A 49 REF 542+
2MVA TR FEEDER
GCB-00BBA08 [ 00BFT01, 00BFT02,
GCB-00BBA09 00BFT01, 00BFT02, 1ST CT : 300/1A ABB /
GCB-00BBA10 00BFT01, 00BFT02, ] 87T
2ND CT : 4,000/1A REF 542+
GCB-00BBA11

00BBA CT : 150/1A 50/51, 50G, ABB /


ZCT :100/1A 49 REF 542+
GCB-00BBA06 1MVA TR FEEDER
GCB-00BBA07 [ 00BFT03, 00BFT04 ]
1ST CT : 150/1A ABB /
87T
2ND CT : 2,000/1A REF 542+

50/51, 50G,
GCB-00BBA12 CT : 100/1A ABB /
650KW MOTOR FEEDER 27, 46, 49,
GCB-00BBA13 ZCT :100/1A REF 542+
51LR, 48

GCB-00BBA14
GCB-00BBA15
2,200KW GENERATOR
GCB-00BBA16 CT : 400/1A 50/51, 50G, ABB /
FEEDER
GCB-00BBA17 BSDG #1/2/3/4/5/6 ZCT :100/1A 49 REF 542+
GCB-00BBA18
GCB-00BBA19
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 10 of 205

3. SETTING CRITERIA
3.1. Incoming feeder
1) 51 : Time overcurrent protection
a) The base current (pickup current) shall be set at 125% of the Transformer rated current.
b) The time multiplier setting shall be so set that the relay shall be operated in less than 0.7 sec at the through
fault current.
c) IEC very inverse curve shall be used.

2) 50 : Instantaneous overcurrent protection


a) The start value (pickup current) shall be set at 1,000% of the transformer rated current.
b) The time setting shall be 0.7sec at the setting current.

3) 51G : Time earth fault protection


a) The base current (pickup current) shall be set to 30% of the NGR rated current(400A).
b) The time multiplier setting shall be so set that the relay shall be operated in less than 1.0 sec at the max. earth
fault current.
c) IEC Very inverse curve shall be used.

4) 50G : Instantaneous earth fault protection


a) The pickup current shall be set to 80% of the rated current of the NGR rated current (400A).
b) The time setting shall be 0.7sec at the setting current.

5) 25 : Check synchronizing
a) Max. allowed voltage difference between 2 sources shall be set to 5% of the nominal voltage.
b) Max. allowed phase angle difference between 2 sources shall be set to 10°.
c) The time delay setting shall be 2.0 sec to syncro detection.

6) 27 : Undervoltage protection
The undervoltage protection shall be set 80% of the nominal voltage with time delay of 3.0sec.

3.2. Bus tie panel


1) 27 : Undervoltage protection
The undervoltage protection shall be set 80% of the nominal voltage with time delay of 2.0sec.
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 11 of 205

3.3. Power cable connection & Common feeder protection


1) 51 : Time overcurrent protection
a) The vase current (pickup current) shall be set at 90~100% of the CT primary current.
b) The time multiplier setting shall be so set that the relay shall be coordinated with the overcurrent
relay in upstream relay.
c) IEC very inverse curve shall be used.

2) 50 : Instantaneous overcurrent protection


a) The start value (pickup current) shall be set at 600~700% of the CT primary current.
b) The time setting shall be 0.3~0.5sec at the setting current.

3) 50G : Instantaneous earth fault protection


a) The start value (pickup current) shall be set to 25% of the rated current of the NGR rated current(400A).
b) The time setting shall be 0.5sec at the setting current.

3.4. Transformer feeder protection


1) 51 : Time overcurrent protection
a) The pickup current shall be set at 150% of the transformer rated current.
b) The time multiplier setting shall be so set that the relay shall be coordinated with the overcurrent relay in
upstream relay.
c) IEC very inverse curve shall be used

2) 50 : Instantaneous overcurrent protection


a) The pickup current shall be set to 150% of the transformer secondary fault current.
b) The time setting shall be 0.05sec.

3) 50G : Instantaneous earth fault protection


a) The pickup current shall be set to 10% of the neutral earthing resistor 400A.
b) The time setting shall be 0.1sec at the setting current.

4) 87T : Transformer differential protection


The transformer differential protection shall be set as below. This is the default value shown in the
relay manual.
a) Threshold current : 20% Ir
b) Unbiased rehion limit : 50% Ir
c) Slightly biased regin threshold : 34% Ir
d) Silightly biased rehion limit : 200% Ir
e) Heavily biased slope : 100%
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 12 of 205

f) Trip by Id> : 80%  (Max. through fault and inrush current)


g) Second Harmonic threshold block : 15%
h) Fifth Harmonic threshold block : 30%

Operating characteristic of the line protection (REF 542+)

5) 49 : Thermal Overload detection


a) The nominal current shall be set at 125% for TR nominal current
b) The Time Constanst normal setting coordinated with transformer damage curve.

3.5. Motor feeder protection


1) 51 : Time overcurrent protection
a) The pickup current shall be set at 105% of the motor full load current.
b) The time multiplier setting shall be so set that the relay shall be coordinated with the overcurrent relay in
upstream relay and shall not pick up during the motor starting operation with full load operation
c) IEC long time inverse curve shall be used

2) 50 : Instantaneous overcurrent protection


a) The pickup current shall be set to 175% of the motor starting current.
This ensures to avoid nuisance operation of the relay against initial motor starting current.
b) The time setting shall be 0.05sec at the setting current.

3) 50G : Instantaneous earth fault protection


a) The pickup current shall be set to 10% of the neutral earthing resistor 400A.
b) The time setting shall be 0.1sec at the setting current.

4) 27 : Undervoltage protection
a) The undervoltage protection shall be set to 80% of the nominal voltage with time delay of 2.0sec.
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 13 of 205

5) 46 : Unbalans load protection


a) The start value shall be set to 15% of the motor full load current.
b) The temperature rise constant accoding to under equation.

t= κ = 10
I 2  IS 2
2

 FLC 2
  FLC  
2
K = t    I 2     I s  
 I n   In  

c) The reset time shall be set to 60s.


d) The time decreasing rate shall be set to 10%.

6) 49 : Thermal overload protection


a) The nominal current shall be set at 105% for motor full load current
b) The Time Constanst normal setting coordinated with motor safe stall time.

7) 51LR : Blocking rotor protection


a) The nominal current shall be set to 100% of the motor full load current.
b) The start value shall be set to 80% of the motor starting current.
c) The time(Delay period) setting shall be starting time + 1.0sec.

8) 48 : Motor start protection


a) The nominal current shall be set to 100% of the motor full load current.
b) The start value (motor start current for trip condition detection) shall be set to 100% of the motor starting
current.
c) The time(Delay period) setting shall be starting time + 1.0sec.
d) The current threshold for motor start condition detection shall be set to 70% of the start value.

9) 87M : Motor differential protection


The Motor differential protection shall be set as below. This is the default value shown in the relay manual.
a) Threshold current : 20% Ir
b) Unbiased rehion limit : 50% Ir
c) Slightly biased regin threshold : 34% Ir
d) Silightly biased rehion limit : 200% Ir
e) Heavily biased slope : 100%
f) Trip by Id> : 150%  (Motor starting current)
g) Second Harmonic threshold block : 15%
h) Fifth Harmonic threshold block : 30%
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 14 of 205

Operating characteristic of the line protection (REF 542+)


PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 15 of 205

4. SETTING CALCULATION
4.1. MV SWGR_UNIT 1
4.1.1. INCOMER
1) Design data
a) Relay Type / Maker : REF 542+ / ABB
b) Relay Designation : 50/51, 50G/51G, 25, 27
c) CT Ratio : 3,600/1A
6,000V 100V
d) VT ratio :
3 3
30,000 kVA
e) Rated current :  2,886 .8A
3  6kV

f) Fault current
① Max. through fault current : 24,840A
② Max. earth fault current : 400A

2) REF 542+ Setting calculation


a) Overcurrent IDMT (51)
① IDMT type : Very inverse
② Base current (Ieb) : Ieb = 1.0 In
1
Base current = 1.25 × 2,886.8A × In = 1.0 In
3,600

(Primary current = 1.0 × 3,600A = 3,600A)


③ TMS (k) : k = 0.4

13.5 I 29,300
0.7 = ×k , (   8.14)
I 1 IP 3,600
( ) ㅡ1
Ip

k = 0.37 → 0.4

b) Overcurrent definite time high set (50)


① Start value : I>> = 4.0 In
Start value = Two phase short circuit current × 70%
22 1
= 5.68 × × 0.7 × = 4.05 In  4.0In
6 3,600

(Primary current = 4.0 × 3,600A = 14,400A)


② Time : Time = 700 msec
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 16 of 205

c) Earth fault IDMT (51G)


① IDMT type : Very inverse
② Base current (Ieb) : Ieb = 0.05 In
1
Base current = 0.3 × 400A × In = 0.033In  0.05 In
3,600

(Primary current = 0.05 × 3,600A = 180A)


③ TMS (k) : k = 0.07

13.5 I 400
0.8 = ×k , (   2.22)
I 1 I P 180
( ) ㅡ1
Ip

k = 0.07

d) Earth fault high (50G)


① Start value : I0>> = 0.1 In
1
Start value = 0.8 × 400A × In = 0.09 In  0.1In
3,600

(Primary current = 0.1 × 3,600A = 360A)


② Time : Time = 700 msec

e) Synchronism check (25)


① Delta voltage : 0.05 Un
② Delta phase : 10˚
③ Time : 2.0sec

f) Under voltage low (27)


① Start value : U< = 0.8 Un
② Time : 3,000 msec
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 17 of 205

4.1.2. BUS-VT [BUS-VT]


1) Design data
a) Relay Type / Maker : REF 542+ / ABB
b) Relay Designation : 27
6,000V 100V
c) VT ratio :
3 3

2) REF 542+ Setting calculation


a) Under voltage low (27)
① Start value : U< = 0.8 Un
② Time : 2,000 msec

3) Design data
a) Relay Type / Maker : SUE 3000 / ABB
b) Relay Designation : ATS
6,000V 100V
c) Bus 10BBA VT Ratio :
3 3
6,000V 100V
d) Bus 20BBA VT Ratio :
3 3

4) SUE 3000 Setting calculation


a) Decoupling delay (Reference : HSTD manual section 4.3.7, page33)
During a fast transfer, there would be a possibility of a coupling of both feeders in case of failure of the
circuit breaker which is to be opened. For this reason, in case where both circuit breakers are closed for
longer than the set value of Decoupling delay time, the High Speed Transfer Device re-opens the circuit
breaker which has just been closed again.

Not used

b) Maximum transfer running time (Reference : HSTD manual section 4.3.5, page32)
When no monitoring of the bus bar voltage is possible, the High Speed Transfer Device carries carries out a
time- delayed transfer upon initiation.

Not used
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 18 of 205

c) Wait after transfer time (Reference : HSTD manual section 4.1.1, page19)
After a transfer, the High Speed Transfer Device is locked for the set time, preventing any further initiation,
without the signaling of “Not ready” appearing.
The length of this time period to be set usually orients itself for vacuum and SF 6 circuit breakers to be
switched over to the duration of the spring charging following a decoupling (Open and Close switching of a
circuit breaker in the briefest of times).

The wait after transfer time, is set to 5sec.

d) Load shedding delay (Reference : HSTD manual section 4.3.6, page33)


For transfers not carried out as fast transfers, a signal which can be used for load-shedding is dispatched on
reaching the voltage value U_Min 2 of the busbar plus the set delay.

Not used

e) Phase leading max


Limiting value of the phase angle enable for leading busbar compared to the standby feeder. This parameter
specifies the maximum allowable phase angle at which the fast transfers can be carried out.

The phase leading max., is set to 10°.

f) Phase lagging max.


Limiting value of the phse angle enable for lagging busbar compared to the stand-by feeder. This parameter
specifies the maximum allowable phase angle at which the fast transfers can be carried out.

The phase lagging max., is set to 10°.

g) Delta freguency max.


Limit frequency difference between U_BB and U_stand-by for determination of frequency enable. If the
busbar voltage exceeds the slippage set with this parameter in relation to stand-by voltage, then no fast
transfer is executed.

The delta frequency max., is set to 1.0Hz.


PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 19 of 205

h) UStand-by > UMin1 (Stand-by feeder voltage criterion)


This criterion monitors the respective stand-by feeder, whereby in practice it is usual that only the decision
is important as to whether or not the stand-by feeder carries voltage. The SUE 3000 is only ready for
transfer if an intact stand-by feeder is available at the moment of an initiation.

UMin1 is set to 0.85Un.

i) UBusbar > UMin2 (Busbar voltage criterion)


The monitoring of the busbar voltage in terms of the failure to achieve a limit value also aids in the decision
concerning the execution of a fast transfer, as is the case with phase angle and frequency difference
monitoring.
If the busbar voltage fails to achieve UMin2, considerable transient effects are to be expected, due to the
difference voltage between busbar and stand-by voltage, even with synchronous network, which means that
no fast transfer can be carried out.

UMin2 is set to 0.7Un.

j) Busbar voltage residual limit.


Limiting value of the busbar voltage for residual voltage dependent connection.

The busbar voltage residual limit, is set to 0.4Un.

k) First phase frequency gradient max. Max.


Max. frequency gradient to enable a connection in the 1st phase coincidence.

Not used

l) Busbar voltage load shedding limit.


Limiting value for the voltage level, on which the load shedding is done.

Not used

m) Undervoltage function. (Reference : HSTD manual section 6.8, page79)


Stand value for the undervoltage initiation is set to 85% Un.

Delay time after which the undervoltage leads to an transfer is set to 0.04sec
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 20 of 205

4.1.3. 6kV POWER CONNECTION FEEDER (to 20BBA03, 30BBA03)


1) Design data
a) Relay Type / Maker : REF 542+ / ABB
b) Relay Designation : 50/51, 50G
c) CT Ratio : 3,600/1A
d) Rated current : 3,600A
e) Fault current
① 3ph fault current : 34,100A
② Max. earth fault current : 400A

2) REF 542+ Setting calculation


a) Overcurrent IDMT (51)
① IDMT type : Very inverse
② Base current (Ieb) : Ieb = 0.9 In
1
Base current = 0.9 × 3,600A × In = 0.9 In
3,600

(Primary current = 0.9 × 3,600A = 3,240A)


③ TMS (k) : k = 0.35

b) Overcurrent definite time high set (50)


① Start value : I>> = 3.5 In
1
Start value = 3.5 × 3,600A × In = 3.5 In
3,600

(Primary current = 3.5 × 3,600A = 12,600A)


② Time : Time = 500 msec

c) Earth fault high (50G)


① Start value : I0>> = 0.05 In
1
Start value = 0.25 × 400A × In = 0.028 In → 0.05 In (Minimum setting value)
3,600

(Primary current = 0.05 × 3,600A = 180A)


② Time : Time = 500 msec
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 21 of 205

4.1.4. 6kV COMMON FEEDER (to 00BBA01)


1) Design data
a) Relay Type / Maker : REF 542+ / ABB
b) Relay Designation : 50/51, 50G
c) CT Ratio : 2,000/1A
d) Rated current : 2,000A
e) Fault current
① 3ph fault current : 34,100A
② Max. earth fault current : 400A

2) REF 542+ Setting calculation


a) Overcurrent IDMT (51)
① IDMT type : Very inverse
② Base current (Ieb) : Ieb = 1.0 In
1
Base current = 1.0 × 2,000A × In = 1.0 In
2,000

(Primary current = 1.0 × 2,000A = 2,000A)


③ TMS (k) : k = 0.35

b) Overcurrent definite time high set (50)


① Start value : I>> = 5.0 In
1
Start value = 5.0 × 2,000A × In = 5.0 In
2,000

(Primary current = 5.0 × 2,000A = 10,000A)


② Time : Time = 300 msec

c) Earth fault high (50G)


① Start value : I0>> = 0.05In
1
Start value = 0.25 × 400A × In = 0.05In
2,000

(Primary current = 0.05 × 2,000A = 100A)


② Time : Time = 300 msec
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 22 of 205

4.1.5. 2MVA TR FEEDER [10BFT01]


1) Design data
a) Relay Type / Maker : REF 542+ / ABB
b) Relay Designation : 50/51, 50G, 49 [-AA1]
: 87T [-AA2]
c) CT Ratio : 300/1A
d) ZCT Ratio : 100/1A
e) TR rated current : 2,000kVA
2,000 kVA
f) TR Rated current :  192 .5A
3  6kV

g) %Z : 7.5%
h) Fault current
① TR 2`ry fault current : 2,913.3A at 6kV base, 46,000A at 0.38kV base
② Max. earth fault current : 400A

2) REF 542+ Setting calculation [-AA1]


a) Overcurrent IDMT (51)
① IDMT type : Very inverse
② Base current (Ieb) : Ieb = 0.96 In

1
Base current = 1.5 × 192.5A × In = 0.96 In
300

(Primary current = 0.96 × 300A = 288A)


③ TMS (k) : k = 0.5

b) Overcurrent definite time high set (50)


① Start value : I>> = 14.6 In

1
Start value = 1.5 × 2,913.3A × In = 14.6 In
300

(Primary current = 14.6 × 300A = 4,380A)


② Time : Time = 50 msec

c) Earth fault high (50G)


① Start value : I0>> = 0.4 In

1
Start value = 0.1 × 400A × In = 0.4 In
100

(Primary current = 0.4 × 100A = 40A)


② Time : Time = 100 msec
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 23 of 205

d) Thermal overload (49)


① TMn (Nominal temperature) : TMn = 103℃
TMn = 33℃ + 70℃ = 103℃
② IMn (Nominal current) : IMn = 0.8 In

1
Nominal current = 192.5A × 1.25 × In = 0.8 In
300

(Primary current = 0.8 × 300A = 240A)


③ Tini (Initial temperature) considering successive start up : Tini = 103℃
④ TCoff (Time constant at standstill : I < 0.1 IMn) : TCoff = 400 sec
4 × TCnormal = 4 × 100 sec = 400 sec
⑤ TCnormal = TCfault = TCoverheat : TCnormal = 100 sec
⑥ Ttrip = Tmax : Ttrip = 125℃
⑦ Twarn (Warning temperature) : Twarn = 120℃
⑧ Tenv = Tambient : Tenv = 33℃
⑨ Trst = Twarn - 10℃ : Tenv = 110℃

3) REF 542+ Setting calculation [-AA2]


a) Differential Protection (87T)
① Transformer group : 1
② Transformer earthing
ⓐ Primary side : No
ⓑ Secondary side : Yes
③ Pri. nominal current (I1r) : I1r = 192.5A
④ Sec. nominal current (I2r) : I2r = 2,886.8A
⑤ Threshold current (Id0) : Id0 = 0.2 Ir
Threshold current = 2 × (Error for TR tap changer + Error for CT) × Margin
= 2 × (0.05 + 0.03) × 1.2 × Ir = 0.192 Ir
⑥ Unbiased region limit (Ib0) : Ib0 = 0.5 Ir
⑦ Slightly biased region threshold (Id1) : Id1 = 0.34 Ir
⑧ Slightly biased region limit (Ib1) : Ib1 = 2.0 Ir
⑨ Heavily biased slope : 1.0
⑩ Trip by Id> : Id> = 10.7 Ir
80% × max. through fault current

100
0.8 × = 10.7 Ir
7 .5
⑪ Second harmonic detection : 0.15 Id
⑫ Fifth harmonic detection : 0.3 Id
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 24 of 205

4.1.6. 1.8MVA TR FEEDER [10BFT02/03]


1) Design data
a) Relay Type / Maker : REF 542+ / ABB
b) Relay Designation : 50/51, 50G, 49 [-AA1]
: 87T [-AA2]
c) CT Ratio : 300/1A
d) ZCT Ratio : 100/1A
e) TR : 1,800kVA
1,800 kVA
f) Rated current :  173 .2A
3  6 kV

g) %Z : 6.5%
h) Fault current
① TR 2`ry fault current : 3,496A at 6kV base, 55,200A at 0.38kV base
② Max. earth fault current : 400A

2) REF 542+ Setting calculation [-AA1]


a) Overcurrent IDMT (51)
① IDMT type : Very inverse
② Base current (Ieb) : Ieb = 0.9 In

1
Base current = 1.5 × 173.2A × In = 0.9 In
300

(Primary current = 0.9 × 300A = 270A)


③ TMS (k) : k = 0.4

b) Overcurrent definite time high set (50)


① Start value : I>> = 17.5 In

1
Start value = 1.5 × 3,496A × In = 17.5 In
300

(Primary current = 17.5 × 300A = 5,250A)


② Time : Time = 50 msec

c) Earth fault high (50G)


① Start value : I0>> = 0.4 In

1
Start value = 0.1 × 400A × In = 0.4 In
100

(Primary current = 0.4 × 100A = 40A)


② Time : Time = 100 msec
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 25 of 205

d) Thermal overload (49)


① TMn (Nominal temperature) : TMn = 103℃
TMn = 33℃ + 70℃ = 103℃
② IMn (Nominal current) : IMn = 0.72 In
1
Nominal current = 173.2A × 1.25 × In = 0.72 In
300

(Primary current = 0.72 × 300A = 216A)


③ Tini (Initial temperature) considering successive start up : Tini = 103℃
④ TCoff (Time constant at standstill : I < 0.1 IMn) : TCoff = 400 sec
4 × TCnormal = 4 × 100 sec = 400 sec
⑤ TCnormal = TCfault = TCoverheat : TCnormal = 100 sec
⑥ Ttrip = Tmax : Ttrip = 125℃
⑦ Twarn (Warning temperature) : Twarn = 120℃
⑧ Tenv = Tambient : Tenv = 33℃
⑨ Trst = Twarn - 10℃ : Tenv = 110℃

3) REF 542+ Setting calculation [-AA2]


a) Differential Protection (87T)
① Transformer group : 1
② Transformer earthing
ⓐ Primary side : No
ⓑ Secondary side : Yes
③ Pri. nominal current (I1r) : I1r = 173.2A
④ Sec. nominal current (I2r) : I2r = 2,598A
⑤ Threshold current (Id0) : Id0 = 0.2 Ir
Threshold current = 2 × (Error for TR tap changer + Error for CT) × Margin
= 2 × (0.05 + 0.03) × 1.2 × Ir = 0.192 Ir
⑥ Unbiased region limit (Ib0) : Ib0 = 0.5 Ir
⑦ Slightly biased region threshold (Id1) : Id1 = 0.34 Ir
⑧ Slightly biased region limit (Ib1) : Ib1 = 2.0 Ir
⑨ Heavily biased slope : 1.0
⑩ Trip by Id> : Id> = 12.3 Ir
80% × max. through fault current

100
0.8 × = 12.3 Ir
6 .5
⑪ Second harmonic detection : 0.15 Id
⑫ Fifth harmonic detection : 0.3 Id
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 26 of 205

4.1.7. 1MVA TR FEEDER [10BFT04]


1) Design data
a) Relay Type / Maker : REF 542+ / ABB
b) Relay Designation : 50/51, 50G, 49 [-AA1]
: 87T [-AA2]
c) CT Ratio : 300/1A
d) ZCT Ratio : 100/1A
e) TR : 1,000kVA
1,000 kVA
f) Rated current :  96.2A
3  6kV

g) %Z : 5.75%
h) Fault current
① TR 2`ry fault current : 1,893.7A at 6kV base, 29,900A at 0.38kV base
② Max. earth fault current : 400A

2) REF 542+ Setting calculation [-AA1]


a) Overcurrent IDMT (51)
① IDMT type : Very inverse
② Base current (Ieb) : Ieb = 0.5 In

1
Base current = 1.5 × 96.2A × In = 0.5 In
300

(Primary current = 0.5 × 300A = 150A)


③ TMS (k) : k = 0.5

b) Overcurrent definite time high set (50)


① Start value : I>> = 9.5 In

1
Start value = 1.5 × 1,893.7A × In = 9.5 In
300

(Primary current = 9.5 × 300A = 2,850A)


② Time : Time = 50 msec

c) Earth fault high (50G)


① Start value : I0>> = 0.4 In

1
Start value = 0.1 × 400A × In = 0.4 In
100

(Primary current = 0.4 × 100A = 40A)


② Time : Time = 100 msec
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 27 of 205

d) Thermal overload (49)


① TMn (Nominal temperature) : TMn = 103℃
TMn = 33℃ + 70℃ = 103℃
② IMn (Nominal current) : IMn = 0.4 In
1
Nominal current = 96.2A × 1.25 × In = 0.4 In
300

(Primary current = 0.4 × 300A = 120A)


③ Tini (Initial temperature) considering successive start up : Tini = 103℃
④ TCoff (Time constant at standstill : I < 0.1 IMn) : TCoff = 600 sec
4 × TCnormal = 4 × 100 sec = 400 sec
⑤ TCnormal = TCfault = TCoverheat : TCnormal = 150 sec
⑥ Ttrip = Tmax : Ttrip = 125℃
⑦ Twarn (Warning temperature) : Twarn = 120℃
⑧ Tenv = Tambient : Tenv = 33℃
⑨ Trst = Twarn - 10℃ : Tenv = 110℃

3) REF 542+ Setting calculation [-AA2]


a) Differential Protection (87T)
① Transformer group : 1
② Transformer earthing
ⓐ Primary side : No
ⓑ Secondary side : Yes
③ Pri. nominal current (I1r) : I1r = 96.2A
④ Sec. nominal current (I2r) : I2r = 1,443A
⑤ Threshold current (Id0) : Id0 = 0.2 Ir
Threshold current = 2 × (Error for TR tap changer + Error for CT) × Margin
= 2 × (0.05 + 0.03) × 1.2 × Ir = 0.192 Ir
⑥ Unbiased region limit (Ib0) : Ib0 = 0.5 Ir
⑦ Slightly biased region threshold (Id1) : Id1 = 0.34 Ir
⑧ Slightly biased region limit (Ib1) : Ib1 = 2.0 Ir
⑨ Heavily biased slope : 1.0
⑩ Trip by Id> : Id> = 13.9 Ir
80% × max. through fault current

100
0.8 × = 13.9 Ir
5.75
⑪ Second harmonic detection : 0.15 Id
⑫ Fifth harmonic detection : 0.3 Id
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 28 of 205

4.1.8. 2.67MVA TR FEEDER [10MKC]


1) Design data
a) Relay Type / Maker : REF 542+ / ABB
b) Relay Designation : 50/51, 50G, 49
c) CT Ratio : 400/1A
d) ZCT Ratio : 100/1A
e) TR rated : 2,670kVA
2,670 kVA
f) TR rated current :  256.9A
3  6kV

g) %Z : 6%
h) Max. earth fault current : 400A

2) REF 542+ Setting calculation [-AA1]


a) Overcurrent IDMT (51)
① IDMT type : Very inverse
② Base current (Ieb) : Ieb = 0.96 In
1
Base current = 1.5 × 256.9 × In = 0.96 In
400

(Primary current = 0.96 × 400A = 384A)


③ TMS (k) : k = 0.4

b) Overcurrent definite time high set (50)


① Start value : I>> = 12.8 In
1
Start value = 20 × 256.9 × In = 12.8 In
400

(Primary current = 12.8 × 400A = 5,120A)


② Time : Time = 50 msec

c) Earth fault high (50G)


① Start value : I0>> = 0.4 In

1
Start value = 0.1 × 400A × In = 0.4 In
100

(Primary current = 0.4 × 100A = 40A)


② Time : Time = 100 msec
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 29 of 205

d) Thermal overload (49)


① TMn (Nominal temperature) : TMn = 103℃
TMn = 33℃ + 70℃ = 103℃
② IMn (Nominal current) : IMn = 0.8 In

1
Nominal current = 256.9A × 1.25 × In = 0.8 In
400

(Primary current = 0.8 × 400A = 320A)


③ Tini (Initial temperature) considering successive start up : Tini = 103℃
④ TCoff (Time constant at standstill : I < 0.1 IMn) : TCoff = 400 sec
4 × TCnormal = 4 × 100 sec = 400 sec
⑤ TCnormal = TCfault = TCoverheat : TCnormal = 100 sec
⑥ Ttrip = Tmax : Ttrip = 125℃
⑦ Twarn (Warning temperature) : Twarn = 120℃
⑧ Tenv = Tambient : Tenv = 33℃
⑨ Trst = Twarn - 10℃ : Tenv = 110℃
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 30 of 205

4.1.9. 3.1MVA TR FEEDER [10MBJ]


1) Design data
a) Relay Type / Maker : REF 542+ / ABB
b) Relay Designation : 50/51, 50G, 49
c) CT Ratio : 800/1A
d) ZCT Ratio : 100/1A
e) TR rated : 3,100kVA
3,100 kVA
f) TR rated current :  298.3A
3  6kV

g) %Z : 6.1%
h) Max. earth fault current : 400A

2) REF 542+ Setting calculation [-AA1]


a) Overcurrent IDMT (51)
① IDMT type : Very inverse
② Base current (Ieb) : Ieb = 0.56 In
1
Base current = 1.5 × 298.3 × In = 0.56 In
800

(Primary current = 0.56 × 800A = 448A)


③ TMS (k) : k = 0.4

b) Overcurrent definite time high set (50)


① Start value : I>> = 7.5 In
1
Start value = 20 × 298.3 × In = 7.5 In
800

(Primary current = 7.5 × 800A = 6,000A)


② Time : Time = 50 msec

c) Earth fault high (50G)


① Start value : I0>> = 0.4 In

1
Start value = 0.1 × 400A × In = 0.4 In
100

(Primary current = 0.4 × 100A = 40A)


② Time : Time = 100 msec
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 31 of 205

d) Thermal overload (49)


① TMn (Nominal temperature) : TMn = 103℃
TMn = 33℃ + 70℃ = 103℃
② IMn (Nominal current) : IMn = 0.47 In

1
Nominal current = 298.3A × 1.25 × In = 0.47 In
800

(Primary current = 0.47 × 800A = 376A)


③ Tini (Initial temperature) considering successive start up : Tini = 103℃
④ TCoff (Time constant at standstill : I < 0.1 IMn) : TCoff = 400 sec
4 × TCnormal = 4 × 100 sec = 400 sec
⑤ TCnormal = TCfault = TCoverheat : TCnormal = 100 sec
⑥ Ttrip = Tmax : Ttrip = 125℃
⑦ Twarn (Warning temperature) : Twarn = 120℃
⑧ Tenv = Tambient : Tenv = 33℃
⑨ Trst = Twarn - 10℃ : Tenv = 110℃
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 32 of 205

4.1.10. 2,000kW MOTOR FEEDER


1) Design data
a) Relay Type / Maker : REF 542+ / ABB
b) Relay Designation : 50/51, 50G, 27, 46, 49, 51LR, 48 [-AA1]
: 87M [-AA2]
c) CT Ratio : 400/1A
d) ZCT Ratio : 100/1A
e) Rated kW : 2,000kW
f) Rated current : 240.6A
g) Starting current : 1,203A (=5In)
h) Starting time : 4.0sec (at 100% Vn)
i) Safe stall time : 14sec - Hot, 18sec - Cold
j) Number of consecutive start : Hot 3, Cold 3

2) REF 542+ Setting calculation [-AA1]


a) Overcurrent IDMT (51)
① IDMT type : Long time inverse
② Base current (Ieb) : Ieb = 0.63 In

1
Base current = 1.05 × 240.6A × In = 0.63 In
400

(Primary current = 0.63× 400A = 252A)


③ TMS (k) : k = 0.25

b) Overcurrent definite time high set (50)


① Start value : I>> = 5.3 In

1
Start value = 1.75 × 1,203A × In = 5.3 In
400

(Primary current = 5.3 × 400A = 2,120A)


② Time : Time = 50 msec

c) Earth fault high (50G)


① Start value : I0>> = 0.4 In

1
Start value = 0.1 × 400A × In = 0.4 In
100

(Primary current = 0.4 × 100A = 40A)


② Time : Time = 100 msec
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 33 of 205

e) Under voltage low (27)


① Start value : U< = 0.8 Un
② Time : 2,000 msec

f) Unbalance load (46)


① Start value (Is) : Is = 0.1 In
1
Start value = 240.6A ×0.15 × In = 0.1 In
400

(Primary current = 0.1 × 400A = 40A)


② Temperature rise constant (K) : K = 3.6
 10
t= 2 2
κ = 10, t = = 30.97
I 2  IS 0.577 2  0.12

 240.6 2
  240.6  
2
K = 30.97   0.577     0.1  = 3.6
 400   400  

③ Reset time : 60 sec


④ Time decreasing rate : 10%

g) Thermal overload (49)


① TMn (Nominal temperature) : TMn = 110℃
TMn = 40℃ + 70℃ = 110℃
② IMn (Nominal current) : IMn = 0.63 In
1
Nominal current = 240.6A × 1.05 × In = 0.63 In
400

(Primary current = 0.63 × 400A = 252A)


③ Tini (Initial temperature) considering successive start up : Tini = 110℃
Tini = (110℃ - 40℃) +40℃ = 110℃
④ TCoff (Time constant at standstill : I < 0.1 IMn) : TCoff = 800 sec
4 × TCnormal = 4 × 200 sec = 800 sec
⑤ TCnormal = TCfault = TCoverheat : TCnormal = 200 sec
te (cold) 18
TCnormal = 2
 2
= 303.4 sec
 IA   1,203 
   
 I mn  ln  240.6 
ln 2 2
 IA   1,203  2
   k 2    1.2
 240.6 
 I mn 
For coordination with motor safe stall time. Select : 200 sec
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 34 of 205

⑥ Ttrip = Tmax : Ttrip = 140℃

140  40
k= = 1.22 ≒ 1.2, Θt = (1.2)2 (105℃-40℃) +40℃ = 133.6℃
110  40
⑦ Twarn (Warning temperature) : Twarn = 124℃
120
Twarn =  110  40  40 = 124℃
100 
⑧ Tenv = Tambient : Tenv = 40℃
⑨ Trst = Twarn - 10℃ : Tenv = 114℃

i) Blocking rotor (51LR)


① IMn (Nominal current) : IMN = 0.6In
1
Nominal current = 240.6A × In = 0.6 In
400

(Primary current = 0.6 × 400A = 240A)


② Is (Start value) : 80% × Starting current : Is = 4.0 IMn
Start value = 0.8 × 5.0 IMn = 4.0 IMn
③ Time (Delay period) : 5,000 msec
Starting time + 1.0 sec = 4.0 sec + 1.0 sec = 5.0 sec

j) Motor start (48)


① IMn (Nominal current) : IMN = 0.6In
1
Nominal current = 240.6A × In = 0.6 In
400

(Primary current = 0.6 × 400A = 240A)


② Is (Start value) : Is = 5.0 IMn
③ Time (Delay period) : 5,000 msec
Starting time + 1.0 sec = 4.0 sec + 1.0 sec = 5.0 sec
④ IMs (Motor start) : IMs = 0.7 Is

3) REF 542+ Setting calculation [-AA2]


a) Differential Protection (87M)
① Transformer group : 0
② Transformer earthing
ⓐ Primary side : No
ⓑ Secondary side : No
③ Pri. nominal current (I1r) : I1r = 240.6A
④ Sec. nominal current (I2r) : I2r = 240.6A
⑤ Threshold current (Id0) = 0.2 × Rated current : Id0 = 0.2 Ir
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 35 of 205

⑥ Unbiased region limit (Ib0) : Ib0 = 0.5 Ir


⑦ Slightly biased region threshold (Id1) : Id1 = 0.34 Ir
⑧ Slightly biased region limit (Ib1) : Ib1 = 2.0 Ir
⑨ Heavily biased slope : 1.0
⑩ Trip by Id> = 1.5 × Starting current : Id> = 7.5 Ir
⑪ Second harmonic detection : 0.15 Id
⑫ Fifth harmonic detection : 0.3 Id
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 36 of 205

4.1.11. 200kW MOTOR FEEDER


1) Design data
a) Relay Type / Maker : REF 542+ / ABB
b) Relay Designation : 50/51, 50G, 27, 46, 49, 51LR, 48
c) CT Ratio : 75/1A
d) ZCT Ratio : 100/1A
e) Rated kW : 200kW
f) Rated current : 24A
g) Starting current : 144A (=6In)
h) Starting time : 1.0sec (at 100% Vn)
i) Safe stall time : 20sec - Hot, 28sec - Cold
j) Number of consecutive start : Hot 2, Cold 3 [assumed]

2) REF 542+ Setting calculation


a) Overcurrent IDMT (51)
① IDMT type : Lomg time inverse
② Base current (Ieb) : Ieb = 0.34 In

1
Base current = 1.05 × 24A × In = 0.34 In
75

(Primary current = 0.34× 75A = 25.5A)


③ TMS (k) : k = 0.15

b) Overcurrent definite time high set (50)


① Start value : I>> = 3.4 In

1
Start value = 1.75 × 144A × In = 3.36 In  3.4In
75

(Primary current = 3.4 × 75A = 255A)


② Time : Time = 50 msec

c) Earth fault high (50G)


① Start value : I0>> = 0.4 In

1
Start value = 0.1 × 400A × In = 0.4 In
100

(Primary current = 0.4 × 100A = 40A)


② Time : Time = 100 msec
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 37 of 205

d) Under voltage low (27)


① Start value : U< = 0.8 Un
② Time : 2,000 msec

e) Unbalance load (46)


① Start value (Is) : Is = 0.05 In
1
Start value = 24A ×0.15 × In = 0.048  0.05In
75

(Primary current = 0.05 × 75A = 3.75A)


② Temperature rise constant (K) : K = 1.0
 10
t= 2 2
κ = 10, t = = 30.3
I 2  IS 0.577  0.05 2
2

 24   24 
2 2

K = 30.3   0.577     0.05   = 1.0
 75   75  

③ Reset time : 60 sec


④ Time decreasing rate : 10%

f) Thermal overload (49)


① TMn (Nominal temperature) : TMn = 110℃
TMn = 40℃ + 70℃ = 110℃
② IMn (Nominal current) : IMn = 0.34 In
1
Nominal current = 24A × 1.05 × In = 0.34 In
75

(Primary current = 0.34 × 75A = 25.5A)


③ Tini (Initial temperature) considering successive start up : Tini = 110℃
Tini = (110℃ - 40℃) +40℃ = 110℃
④ TCoff (Time constant at standstill : I < 0.1 IMn) : TCoff = 600 sec
4 × TCnormal = 4 × 150 sec = 600 sec
⑤ TCnormal = TCfault = TCoverheat : TCnormal = 150 sec
te (cold) 28
TCnormal = 2
 2
= 680.6 sec
 IA   144 
   
 I mn  ln  24 
ln 2 2
 IA   144  2
   k 2    1.2
 24 
 I mn 
For coordination with motor safe stall time. Select : 150 sec
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 38 of 205

⑥ Ttrip = Tmax : Ttrip = 140℃

140  40
k= = 1.22 ≒ 1.2, Θt = (1.2)2 (105℃-40℃) +40℃ = 133.6℃
110  40
⑦ Twarn (Warning temperature) : Twarn = 124℃
120
Twarn =  110  40  40 = 124℃
100 
⑧ Tenv = Tambient : Tenv = 40℃
⑨ Trst = Twarn - 10℃ : Tenv = 114℃

g) Blocking rotor (51LR)


① IMn (Nominal current) : IMN = 0.32In
1
Nominal current = 24A × In = 0.32 In
75

(Primary current = 0.32 × 75A = 24A)


② Is (Start value) : 80% × Starting current : Is = 4.8 IMn
Start value = 0.8 × 6.0 IMn = 4.8 IMn
③ Time (Delay period) : 2,000 msec
Starting time + 1.0 sec = 1.0 sec + 1.0 sec = 2.0 sec

h) Motor start (48)


① IMn (Nominal current) : IMN = 0.32In

1
Nominal current = 24A × In = 0.32 In
75

(Primary current = 0.32 × 75A = 24A)


② Is (Start value) : Is = 6.0 IMn
③ Time (Delay period) : 2,000 msec
Starting time + 1.0 sec = 1.0 sec + 1.0 sec = 2.0 sec
④ IMs (Motor start) : IMs = 0.7 Is
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 39 of 205

4.1.12. 450kW MOTOR FEEDER


1) Design data
a) Relay Type / Maker : REF 542+ / ABB
b) Relay Designation : 50/51, 50G, 27, 46, 49, 51LR, 48
c) CT Ratio : 100/1A
d) ZCT Ratio : 100/1A
e) Rated kW : 450kW
f) Rated current : 53.1A
g) Starting current : 318.6A (=6In)
h) Starting time : 1.2sec (at 100% Vn)
i) Safe stall time : 22sec - Hot, 30sec - Cold
j) Number of consecutive start : Hot 2, Cold 3 [assumed]

2) REF 542+ Setting calculation


a) Overcurrent IDMT (51)
① IDMT type : Long time inverse
② Base current (Ieb) : Ieb = 0.56 In

1
Base current = 1.05 × 53.1A × In = 0.56 In
100

(Primary current = 0.56× 100A = 56A)


③ TMS (k) : k = 0.2

b) Overcurrent definite time high set (50)


① Start value : I>> = 5.6 In

1
Start value = 1.75 × 318.6A × In = 5.57 In  5.6In
100

(Primary current = 5.6 × 100A = 560A)


② Time : Time = 50 msec

c) Earth fault high (50G)


① Start value : I0>> = 0.4 In

1
Start value = 0.1 × 400A × In = 0.4 In
100

(Primary current = 0.4 × 100A = 40A)


② Time : Time = 100 msec
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 40 of 205

d) Under voltage low (27)


① Start value : U< = 0.8 Un
② Time : 2,000 msec

e) Unbalance load (46)


① Start value (Is) : Is = 0.08 In
1
Start value = 53.1A ×0.15 × In = 0.08 In
100

(Primary current = 0.08 × 100A = 8A)


② Temperature rise constant (K) : K = 2.8
 10
t= 2 2
κ = 10, t = = 30.63
I 2  IS 0.577  0.08 2
2

 53.1   53.1 


2 2

K = 30.63   0.577     0.08   = 2.8
 100   100  

③ Reset time : 60 sec


④ Time decreasing rate : 10%

f) Thermal overload (49)


① TMn (Nominal temperature) : TMn = 110℃
TMn = 40℃ + 70℃ = 110℃
② IMn (Nominal current) : IMn = 0.56 In
1
Nominal current = 53.1A × 1.05 × In = 0.56 In
100

(Primary current = 0.56 × 100A = 56A)


③ Tini (Initial temperature) considering successive start up : Tini = 110℃
Tini = (110℃ - 40℃) +40℃ = 110℃
④ TCoff (Time constant at standstill : I < 0.1 IMn) : TCoff = 800 sec
4 × TCnormal = 4 × 200 sec = 800 sec
⑤ TCnormal = TCfault = TCoverheat : TCnormal = 200 sec
te (cold) 30
TCnormal = 2
 2
= 734.9 sec
 IA   318.6 
   
 I mn  ln  53.1 
ln 2 2
 IA   318.6  2
   k 2    1.2
 53.1 
 I mn 
For coordination with motor safe stall time. Select : 200 sec
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 41 of 205

⑥ Ttrip = Tmax : Ttrip = 140℃

140  40
k= = 1.22 ≒ 1.2, Θt = (1.2)2 (105℃-40℃) +40℃ = 133.6℃
110  40
⑦ Twarn (Warning temperature) : Twarn = 124℃
120
Twarn =  110  40  40 = 124℃
100 
⑧ Tenv = Tambient : Tenv = 40℃
⑨ Trst = Twarn - 10℃ : Tenv = 114℃

g) Blocking rotor (51LR)


① IMn (Nominal current) : IMN = 0.54In
1
Nominal current = 54.1A × In = 0.54 In
100

(Primary current = 0.54 × 100A = 54A)


② Is (Start value) : 80% × Starting current : Is = 4.8 IMn
Start value = 0.8 × 6.0 IMn = 4.8 IMn
③ Time (Delay period) : 2,200 msec
Starting time + 1.0 sec = 1.2 sec + 1.0 sec = 2.2 sec

h) Motor start (48)


① IMn (Nominal current) : IMN = 0.54In
1
Nominal current = 54.1A × In = 0.54 In
100

(Primary current = 0.54 × 100A = 54A)


② Is (Start value) : Is = 6.0 IMn
③ Time (Delay period) : 2,200 msec
Starting time + 1.0 sec = 1.2 sec + 1.0 sec = 2.2 sec
④ IMs (Motor start) : IMs = 0.7 Is
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 42 of 205

4.1.13. 220kW MOTOR FEEDER


1) Design data
a) Relay Type / Maker : REF 542+ / ABB
b) Relay Designation : 50/51, 50G, 27, 46, 49, 51LR, 48
c) CT Ratio : 75/1A
d) ZCT Ratio : 100/1A
e) Rated kW : 220kW
f) Rated current : 26.5A
g) Starting current : 159A (=6In)
h) Starting time : 8.5sec (at 100% Vn) [assumed]
i) Safe stall time : 12sec - Hot, 18sec - Cold [assumed]
j) Number of consecutive start : Hot 2, Cold 3 [assumed]

2) REF 542+ Setting calculation


a) Overcurrent IDMT (51)
① IDMT type : Long time inverse
② Base current (Ieb) : Ieb = 0.37 In

1
Base current = 1.05 × 26.5A × In = 0.37 In
75

(Primary current = 0.37× 75A = 27.8A)


③ TMS (k) : k = 0.5

b) Overcurrent definite time high set (50)


① Start value : I>> = 3.7 In

1
Start value = 1.75 × 159A × In = 3.7 In
75

(Primary current = 3.7 × 75A = 277.5A)


② Time : Time = 50 msec

c) Earth fault high (50G)


① Start value : I0>> = 0.4 In

1
Start value = 0.1 × 400A × In = 0.4 In
100

(Primary current = 0.4 × 100A = 40A)


② Time : Time = 100 msec
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 43 of 205

d) Under voltage low (27)


① Start value : U< = 0.8 Un
② Time : 2,000 msec

e) Unbalance load (46)


① Start value (Is) : Is = 0.05 In

1
Start value = 26.5A ×0.15 × In = 0.05 In
75

(Primary current = 0.05 × 75A = 3.8A)


② Temperature rise constant (K) : K = 1.3
 10
t= 2 2
κ = 10, t = = 30.26
I 2  IS 0.577  0.05 2
2

 26.5 2
  26.5  
2
K = 30.26   0.577     0.05   = 1.3
 75   75  

③ Reset time : 60 sec


④ Time decreasing rate : 10%

f) Thermal overload (49)


① TMn (Nominal temperature) : TMn = 110℃
TMn = 40℃ + 70℃ = 110℃
② IMn (Nominal current) : IMn = 0.37 In

1
Nominal current = 26.5A × 1.05 × In = 0.37 In
75

(Primary current = 0.37 × 75A = 27.8A)


③ Tini (Initial temperature) considering successive start up : Tini = 110℃
Tini = (110℃ - 40℃) +40℃ = 110℃
④ TCoff (Time constant at standstill : I < 0.1 IMn) : TCoff = 1,600 sec
4 × TCnormal = 4 × 400 sec = 1,600 sec
⑤ TCnormal = TCfault = TCoverheat : TCnormal = 400 sec
te (cold) 18
TCnormal = 2
 2
= 441 sec
 IA   159 
   
 I mn  ln  26.5 
ln 2 2
 IA   159  2
   k 2    1.2
 26.5 
 I mn 
For coordination with motor safe stall time. Select : 400 sec
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 44 of 205

⑥ Ttrip = Tmax : Ttrip = 140℃

140  40
k= = 1.22 ≒ 1.2, Θt = (1.2)2 (105℃-40℃) +40℃ = 133.6℃
110  40
⑦ Twarn (Warning temperature) : Twarn = 124℃
120
Twarn =  110  40  40 = 124℃
100 
⑧ Tenv = Tambient : Tenv = 40℃
⑨ Trst = Twarn - 10℃ : Tenv = 114℃

g) Blocking rotor (51LR)


① IMn (Nominal current) : IMN = 0.35In

1
Nominal current = 26.5A × In = 0.35 In
75

(Primary current = 0.35 × 75A = 26.3A)


② Is (Start value) : 80% × Starting current : Is = 4.8 IMn
Start value = 0.8 × 6.0 IMn = 4.8 IMn
③ Time (Delay period) : 9,500 msec
Starting time + 1.0 sec = 8.5 sec + 1.0 sec = 9.5 sec

h) Motor start (48)


① IMn (Nominal current) : IMN = 0.35In

1
Nominal current = 26.5A × In = 0.35 In
75

(Primary current = 0.35 × 75A = 26.3A)


② Is (Start value) : Is = 6.0 IMn
③ Time (Delay period) : 9,500 msec
Starting time + 1.0 sec = 8.5 sec + 1.0 sec = 9.5 sec
④ IMs (Motor start) : IMs = 0.7 Is
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 45 of 205

4.1.14. 643kW MOTOR FEEDER


1) Design data
a) Relay Type / Maker : REF 542+ / ABB
b) Relay Designation : 50/51, 50G, 27, 46, 49, 51LR, 48
c) CT Ratio : 100/1A
d) ZCT Ratio : 100/1A
e) Rated kW : 643kW
f) Rated current : 77.4A
g) Starting current : 464.4A (=6In)
h) Starting time : 8.5sec (at 100% Vn) [assumed]
i) Safe stall time : 12sec - Hot, 18sec - Cold [assumed]
j) Number of consecutive start : Hot 2, Cold 3 [assumed]

2) REF 542+ Setting calculation


a) Overcurrent IDMT (51)
① IDMT type : Long time inverse
② Base current (Ieb) : Ieb = 0.81 In

1
Base current = 1.05 × 77.4A × In = 0.81 In
100

(Primary current = 0.81× 100A = 81A)


③ TMS (k) : k = 0.5

b) Overcurrent definite time high set (50)


① Start value : I>> = 8.2 In

1
Start value = 1.75 × 464.4A × In = 8.2 In
100

(Primary current = 8.2 × 100A = 820A)


② Time : Time = 50 msec

c) Earth fault high (50G)


① Start value : I0>> = 0.4 In

1
Start value = 0.1 × 400A × In = 0.4 In
100

(Primary current = 0.4 × 100A = 40A)


② Time : Time = 100 msec
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 46 of 205

d) Under voltage low (27)


① Start value : U< = 0.8 Un
② Time : 2,000 msec

e) Unbalance load (46)


① Start value (Is) : Is = 0.12 In

1
Start value = 77.4A ×0.15 × In = 0.12 In
100

(Primary current = 0.12 × 100A = 12A)


② Temperature rise constant (K) : K = 6.0
 10
t= 2 2
κ = 10, t = = 31.39
I 2  IS 0.577  0.12 2
2

 77.4 2
  77.4  
2
K = 31.39   0.577     0.12   = 6.0
 100   100  

③ Reset time : 60 sec


④ Time decreasing rate : 10%

f) Thermal overload (49)


① TMn (Nominal temperature) : TMn = 110℃
TMn = 40℃ + 70℃ = 110℃
② IMn (Nominal current) : IMn = 0.81 In

1
Nominal current = 77.4A × 1.05 × In = 0.81 In
100

(Primary current = 0.81 × 100A = 81A)


③ Tini (Initial temperature) considering successive start up : Tini = 110℃
Tini = (110℃ - 40℃) +40℃ = 110℃
④ TCoff (Time constant at standstill : I < 0.1 IMn) : TCoff = 1,600 sec
4 × TCnormal = 4 × 400 sec = 1,600 sec
⑤ TCnormal = TCfault = TCoverheat : TCnormal = 400 sec
te (cold) 18
TCnormal = 2
 2
= 441 sec
 IA   464.4 
   
 I mn  ln  77.4 
ln 2 2
 IA   464.4  2
   k 2    1.2
 77.4 
 I mn 
For coordination with motor safe stall time. Select : 400 sec
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 47 of 205

⑥ Ttrip = Tmax : Ttrip = 140℃

140  40
k= = 1.22 ≒ 1.2, Θt = (1.2)2 (105℃-40℃) +40℃ = 133.6℃
110  40
⑦ Twarn (Warning temperature) : Twarn = 124℃
120
Twarn =  110  40  40 = 124℃
100 
⑧ Tenv = Tambient : Tenv = 40℃
⑨ Trst = Twarn - 10℃ : Tenv = 114℃

g) Blocking rotor (51LR)


① IMn (Nominal current) : IMN = 0.8In

1
Nominal current = 77.4A × In = 0.8 In
100

(Primary current = 0.8 × 100A = 80A)


② Is (Start value) : 80% × Starting current : Is = 4.8 IMn
Start value = 0.8 × 6.0 IMn = 4.8 IMn
③ Time (Delay period) : 9,500 msec
Starting time + 1.0 sec = 8.5 sec + 1.0 sec = 9.5 sec

h) Motor start (48)


① IMn (Nominal current) : IMN = 0.8In

1
Nominal current = 77.4A × In = 0.8 In
100

(Primary current = 0.8 × 100A = 80A)


② Is (Start value) : Is = 6.0 IMn
③ Time (Delay period) : 9,500 msec
Starting time + 1.0 sec = 8.5 sec + 1.0 sec = 9.5 sec
④ IMs (Motor start) : IMs = 0.7 Is
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 48 of 205

4.2. MV SWGR_UNIT 2
4.2.1. INCOMER
1) Design data
a) Relay Type / Maker : REF 542+ / ABB
b) Relay Designation : 50/51, 50G/51G, 25, 27
c) CT Ratio : 3,600/1A
6,000V 100V
d) VT ratio :
3 3
30,000 kVA
e) Rated current :  2,886 .8A
3  6kV

f) Fault current
① Max. through fault current : 24,840A
② Max. earth fault current : 400A

2) REF 542+ Setting calculation


a) Overcurrent IDMT (51)
① IDMT type : Very inverse
② Base current (Ieb) : Ieb = 1.0 In
1
Base current = 1.25 × 2,886.8A × In = 1.0 In
3,600

(Primary current = 1.0 × 3,600A = 3,600A)


③ TMS (k) : k = 0.4

13.5 I 29,300
0.7 = ×k , (   8.14)
I 1 IP 3,600
( ) ㅡ1
Ip

k = 0.37 → 0.4

b) Overcurrent definite time high set (50)


① Start value : I>> = 4.0 In
Start value = Two phase short circuit current × 70%
22 1
= 5.68 × × 0.7 × = 4.05 In  4.0In
6 3,600

(Primary current = 4.0 × 3,600A = 14,400A)


② Time : Time = 700 msec
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 49 of 205

c) Earth fault IDMT (51G)


① IDMT type : Very inverse
② Base current (Ieb) : Ieb = 0.05 In
1
Base current = 0.4 × 400A × In = 0.033In  0.05 In
3,600

(Primary current = 0.05 × 3,600A = 180A)

③ TMS (k) : k = 0.07

13.5 I 400
0.8 = ×k , (   2.22)
I 1 I P 180
( ) ㅡ1
Ip

k = 0.07

d) Earth fault high (50G)


① Start value : I0>> = 0.1 In
1
Start value = 0.8 × 400A × In = 0.09 In  0.1In
3,600

(Primary current = 0.1 × 3,600A = 360A)


② Time : Time = 700 msec

e) Synchronism check (25)


① Delta voltage : 0.05 Un
② Delta phase : 10˚
③ Time : 2.0sec

f) Under voltage low (27)


① Start value : U< = 0.8 Un
② Time : 3,000 msec
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 50 of 205

4.2.2. BUS-VT [BUS-VT]


1) Design data
a) Relay Type / Maker : REF 542+ / ABB
b) Relay Designation : 27
6,000V 100V
c) VT ratio :
3 3

2) REF 542+ Setting calculation


a) Under voltage low (27)
① Start value : U< = 0.8 Un
② Time : 2,000 msec

3) Design data
a) Relay Type / Maker : SUE 3000 / ABB
b) Relay Designation : ATS
6,000V 100V
c) Bus 10BBA VT Ratio :
3 3
6,000V 100V
d) Bus 20BBA VT Ratio :
3 3

4) SUE 3000 Setting calculation


a) Decoupling delay (Reference : HSTD manual section 4.3.7, page33)
During a fast transfer, there would be a possibility of a coupling of both feeders in case of failure of the
circuit breaker which is to be opened. For this reason, in case where both circuit breakers are closed for
longer than the set value of Decoupling delay time, the High Speed Transfer Device re-opens the circuit
breaker which has just been closed again.

Not used

b) Maximum transfer running time (Reference : HSTD manual section 4.3.5, page32)
When no monitoring of the bus bar voltage is possible, the High Speed Transfer Device carries carries out a
time- delayed transfer upon initiation.

Not used
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 51 of 205

c) Wait after transfer time (Reference : HSTD manual section 4.1.1, page19)
After a transfer, the High Speed Transfer Device is locked for the set time, preventing any further initiation,
without the signaling of “Not ready” appearing.
The length of this time period to be set usually orients itself for vacuum and SF 6 circuit breakers to be
switched over to the duration of the spring charging following a decoupling (Open and Close switching of a
circuit breaker in the briefest of times).

The wait after transfer time, is set to 5sec.

d) Load shedding delay (Reference : HSTD manual section 4.3.6, page33)


For transfers not carried out as fast transfers, a signal which can be used for load-shedding is dispatched on
reaching the voltage value U_Min 2 of the busbar plus the set delay.

Not used

e) Phase leading max


Limiting value of the phase angle enable for leading busbar compared to the standby feeder. This parameter
specifies the maximum allowable phase angle at which the fast transfers can be carried out.

The phase leading max., is set to 10°.

f) Phase lagging max.


Limiting value of the phse angle enable for lagging busbar compared to the stand-by feeder. This parameter
specifies the maximum allowable phase angle at which the fast transfers can be carried out.

The phase lagging max., is set to 10°.

g) Delta freguency max.


Limit frequency difference between U_BB and U_stand-by for determination of frequency enable. If the
busbar voltage exceeds the slippage set with this parameter in relation to stand-by voltage, then no fast
transfer is executed.

The delta frequency max., is set to 1.0Hz.


PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 52 of 205

h) UStand-by > UMin1 (Stand-by feeder voltage criterion)


This criterion monitors the respective stand-by feeder, whereby in practice it is usual that only the decision
is important as to whether or not the stand-by feeder carries voltage. The SUE 3000 is only ready for
transfer if an intact stand-by feeder is available at the moment of an initiation.

UMin1 is set to 0.85Un.

i) UBusbar > UMin2 (Busbar voltage criterion)


The monitoring of the busbar voltage in terms of the failure to achieve a limit value also aids in the decision
concerning the execution of a fast transfer, as is the case with phase angle and frequency difference
monitoring.
If the busbar voltage fails to achieve UMin2, considerable transient effects are to be expected, due to the
difference voltage between busbar and stand-by voltage, even with synchronous network, which means that
no fast transfer can be carried out.

UMin2 is set to 0.7Un.

j) Busbar voltage residual limit.


Limiting value of the busbar voltage for residual voltage dependent connection.

The busbar voltage residual limit, is set to 0.4Un.

k) First phase frequency gradient max. Max.


Max. frequency gradient to enable a connection in the 1st phase coincidence.

Not used

l) Busbar voltage load shedding limit.


Limiting value for the voltage level, on which the load shedding is done.

Not used

m) Undervoltage function. (Reference : HSTD manual section 6.8, page79)


Stand value for the undervoltage initiation is set to 85% Un.

Delay time after which the undervoltage leads to an transfer is set to 0.04sec
PROTECTIVE COORDINATION AIN ARNAT CCPP

24. Nov. 2014 STUDY (6kV SWGR) PAGE : 53 of 205

4.2.3. 6kV POWER CONNECTION FEEDER (to 10BBA04, 30BBA04)


1) Design data
a) Relay Type / Maker : REF 542+ / ABB
b) Relay Designation : 50/51, 50G
c) CT Ratio : 3,600/1A
d) Rated current : 3,600A
e) Fault current
① 3ph fault current : 34,100A
② Max. earth fault current : 400A

2) REF 542+ Setting calculation


a) Overcurrent IDMT (51)
① IDMT type : Very inverse
② Base current (Ieb) : Ieb = 0.9 In
1
Base current = 0.9 × 3,600A × In = 0.9 In
3,600

(Primary current = 0.9 × 3,600A = 3,240A)


③ TMS (k) : k = 0.35

b) Overcurrent definite time high set (50)


① Start value : I>> = 3.5 In
1
Start value = 3.5 × 3,600A × In = 3.5 In
3,600

(Primary current = 3.5 × 3,600A = 12,600A)


② Time : Time = 500 msec

c) Earth fault high (50G)


① Start value : I0>> = 0.05 In
1
Start value = 0.25 × 400A × In = 0.028 In → 0.05 In (Minimum setting value)
3,600

(Primary current = 0.05 × 3,600A = 180A)


② Time : Time = 500 msec
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 154 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.2.4.) CT : 2,000/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Very inverse
6kV COMMON FEEDER (-AA1) Base current (Ieb) 0.05 - 40.00 In 1.0 In
(to 00BBA02) TMS (k) 0.05 - 1.50 0.35
Overcurrent instantaneous (50)
[GCB-20BB02]
Start value 0.10 - 40.00 In 5.0 In
Time 15 - 30,000 msec 300 msec
Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
Base current (Ieb) 0.05 - 40.00 In
TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.05 In
Time 40 - 30,000 msec 300 msec
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 155 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.2.5.) CT : 300/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Very inverse
2MVA TR FEEDER ZCT : 100/1A (-AA1) Base current (Ieb) 0.05 - 40.00 In 0.96 In
[GCB-20BBA05] VT : TMS (k) 0.05 - 1.50 0.5
6,000V 100V Overcurrent instantaneous (50)
Start value 0.10 - 40.00 In 14.6 In
3 3
Time 15 - 30,000 msec 50 msec
Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
Base current (Ieb) 0.05 - 40.00 In
TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.4 In
Time 40 - 30,000 msec 100 msec
Thermal overload (49)
Nominal motor temperature (TMn) 50 - 400℃ 103℃
Nominal motor current (IMn) 0.1 - 5.0 In 0.8 In
Initial temperature (Tini) 10 - 400℃ 103℃
Constant off (TCoff) 10 - 100,000 sec 400 sec
Time constant normal (TCnormal 10 - 20,000 sec 100 sec
Time constant overheat (TCoverheat) 10 - 20,000 sec 100 sec
Trip temperature (Ttrip) 50 - 400℃ 125℃
Warning temperature (Twarn) 50 - 400℃ 120℃
Environment temperature (Tenv) 10 - 50℃ 33℃
Rest temperature (Trst) 10 - 400℃ 110℃
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 156 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.2.5.) CT : 300/1A (Primary) ABB REF542+ Differential protection (87T)


Pri. nominal current (I1r) 10.00 - 100,000A 192.5A
2MVA TR FEEDER CT : 4,000/1A (Secondary) (-AA2) Sec. nominal current (I2r) 10.00 - 100,000A 2,886.8A
[GCB-20BBA05] Threshold current (Id0) 0.1 - 0.5 Ir [p.u.] 0.2 Ir
Unbiased region limit (Ib0) 0.5 - 5.0 Ir [p.u.] 0.5 Ir
Slightly biased region threshold (Id1) 0.2 - 2.0 Ir [p.u.] 0.34 Ir
Slightly biased region limit (Ib1) 1.00 - 10.00 Ir [p.u.] 2.0 Ir
Heavily biased slope 0.4 - 1.00 1.0
Trip by Id> 5.00 - 40.00 Ir [p.u.] 10.7 Ir
Second harmonic detection 0.1 - 0.3 Id 0.15 Id
Fifth harmonic detection 0.1 - 0.3 Id 0.3 Id
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 157 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.2.6.) CT : 300/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Very inverse
1.8MVA TR FEEDER ZCT : 100/1A (-AA1) Base current (Ieb) 0.05 - 40.00 In 0.9 In
[GCB-20BBA06] VT : TMS (k) 0.05 - 1.50 0.4
6,000V 100V Overcurrent instantaneous (50)
[GCB-20BBA07]
Start value 0.10 - 40.00 In 17.5 In
3 3
Time 15 - 30,000 msec 50 msec
Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
Base current (Ieb) 0.05 - 40.00 In
TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.4 In
Time 40 - 30,000 msec 100 msec
Thermal overload (49)
Nominal motor temperature (TMn) 50 - 400℃ 103℃
Nominal motor current (IMn) 0.1 - 5.0 In 0.72 In
Initial temperature (Tini) 10 - 400℃ 103℃
Constant off (TCoff) 10 - 100,000 sec 400 sec
Time constant normal (TCnormal 10 - 20,000 sec 100 sec
Time constant overheat (TCoverheat) 10 - 20,000 sec 100 sec
Trip temperature (Ttrip) 50 - 400℃ 125℃
Warning temperature (Twarn) 50 - 400℃ 120℃
Environment temperature (Tenv) 10 - 50℃ 33℃
Rest temperature (Trst) 10 - 400℃ 110℃
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 158 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.2.6.) CT : 300/1A (Primary) ABB REF542+ Differential protection (87T)


Pri. nominal current (I1r) 10.00 - 100,000A 173.2A
1.8MVA TR FEEDER CT : 4,000/1A (Secondary) (-AA2) Sec. nominal current (I2r) 10.00 - 100,000A 2,598A
[GCB-20BBA06] Threshold current (Id0) 0.1 - 0.5 Ir [p.u.] 0.2 Ir
Unbiased region limit (Ib0) 0.5 - 5.0 Ir [p.u.] 0.5 Ir
[GCB-20BBA07] 0.2 - 2.0 Ir [p.u.]
Slightly biased region threshold (Id1) 0.34 Ir
Slightly biased region limit (Ib1) 1.00 - 10.00 Ir [p.u.] 2.0 Ir
Heavily biased slope 0.4 - 1.00 1.0
Trip by Id> 5.00 - 40.00 Ir [p.u.] 12.3 Ir
Second harmonic detection 0.1 - 0.3 Id 0.15 Id
Fifth harmonic detection 0.1 - 0.3 Id 0.3 Id
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 159 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.2.7.) CT : 300/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Very inverse
1MVA TR FEEDER ZCT : 100/1A (-AA1) Base current (Ieb) 0.05 - 40.00 In 0.5 In
[GCB-20BBA08] VT : TMS (k) 0.05 - 1.50 0.5
6,000V 100V Overcurrent instantaneous (50)
Start value 0.10 - 40.00 In 9.5 In
3 3
Time 15 - 30,000 msec 50 msec
Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
Base current (Ieb) 0.05 - 40.00 In
TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.4 In
Time 40 - 30,000 msec 100 msec
Thermal overload (49)
Nominal motor temperature (TMn) 50 - 400℃ 103℃
Nominal motor current (IMn) 0.1 - 5.0 In 0.4 In
Initial temperature (Tini) 10 - 400℃ 103℃
Constant off (TCoff) 10 - 100,000 sec 600 sec
Time constant normal (TCnormal 10 - 20,000 sec 150 sec
Time constant overheat (TCoverheat) 10 - 20,000 sec 150 sec
Trip temperature (Ttrip) 50 - 400℃ 125℃
Warning temperature (Twarn) 50 - 400℃ 120℃
Environment temperature (Tenv) 10 - 50℃ 33℃
Rest temperature (Trst) 10 - 400℃ 110℃
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 160 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.2.7.) CT : 300/1A (Primary) ABB REF542+ Differential protection (87T)


Pri. nominal current (I1r) 10.00 - 100,000A 96.2A
1MVA TR FEEDER CT : 2,000/1A (Secondary) (-AA2) Sec. nominal current (I2r) 10.00 - 100,000A 1,443A
[GCB-20BBA08] Threshold current (Id0) 0.1 - 0.5 Ir [p.u.] 0.2 Ir
Unbiased region limit (Ib0) 0.5 - 5.0 Ir [p.u.] 0.5 Ir
Slightly biased region threshold (Id1) 0.2 - 2.0 Ir [p.u.] 0.34 Ir
Slightly biased region limit (Ib1) 1.00 - 10.00 Ir [p.u.] 2.0 Ir
Heavily biased slope 0.4 - 1.00 1.0
Trip by Id> 5.00 - 40.00 Ir [p.u.] 13.9 Ir
Second harmonic detection 0.1 - 0.3 Id 0.15 Id
Fifth harmonic detection 0.1 - 0.3 Id 0.3 Id
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 161 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.2.8.) CT : 400/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Very inverse
2.56MVA TR FEEDER ZCT : 100/1A (-AA1) Base current (Ieb) 0.05 - 40.00 In 0.96 In
[GCB-20BBA09] VT : TMS (k) 0.05 - 1.50 0.4
6,000V 100V Overcurrent instantaneous (50)
Start value 0.10 - 40.00 In 12.8 In
3 3
Time 15 - 30,000 msec 50 msec
Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
Base current (Ieb) 0.05 - 40.00 In
TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.4 In
Time 40 - 30,000 msec 100 msec
Thermal overload (49)
Nominal motor temperature (TMn) 50 - 400℃ 103℃
Nominal motor current (IMn) 0.1 - 5.0 In 0.8 In
Initial temperature (Tini) 10 - 400℃ 103℃
Constant off (TCoff) 10 - 100,000 sec 400 sec
Time constant normal (TCnormal 10 - 20,000 sec 100 sec
Time constant overheat (TCoverheat) 10 - 20,000 sec 100 sec
Trip temperature (Ttrip) 50 - 400℃ 125℃
Warning temperature (Twarn) 50 - 400℃ 120℃
Environment temperature (Tenv) 10 - 50℃ 33℃
Rest temperature (Trst) 10 - 400℃ 110℃
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 162 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.2.9.) CT : 800/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Very inverse
3.1MVA TR FEEDER ZCT : 100/1A (-AA1) Base current (Ieb) 0.05 - 40.00 In 0.56 In
[GCB-20BBA10] VT : TMS (k) 0.05 - 1.50 0.4
6,000V 100V Overcurrent instantaneous (50)
Start value 0.10 - 40.00 In 7.5 In
3 3
Time 15 - 30,000 msec 50 msec
Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
Base current (Ieb) 0.05 - 40.00 In
TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.4 In
Time 40 - 30,000 msec 100 msec
Thermal overload (49)
Nominal motor temperature (TMn) 50 - 400℃ 103℃
Nominal motor current (IMn) 0.1 - 5.0 In 0.47 In
Initial temperature (Tini) 10 - 400℃ 103℃
Constant off (TCoff) 10 - 100,000 sec 400 sec
Time constant normal (TCnormal 10 - 20,000 sec 100 sec
Time constant overheat (TCoverheat) 10 - 20,000 sec 100 sec
Trip temperature (Ttrip) 50 - 400℃ 125℃
Warning temperature (Twarn) 50 - 400℃ 120℃
Environment temperature (Tenv) 10 - 50℃ 33℃
Rest temperature (Trst) 10 - 400℃ 110℃
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 163 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.2.10.) CT : 400/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Lomg time inverse
2,000kW MOTOR ZCT : 100/1A (-AA1) Base current (Ieb) 0.05 - 40.00 In 0.63 In
FEEDER VT : TMS (k) 0.05 - 1.50 0.25
6,000V 100V Overcurrent instantaneous (50)
[GCB-20BBA11]
Start value 0.10 - 40.00 In 5.3 In
3 3
[GCB-20BBA12] Time 15 - 30,000 msec 50 msec
Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
Base current (Ieb) 0.05 - 40.00 In
TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.4 In
Time 40 - 30,000 msec 100 msec
Under voltage (27)
Start value 0.1 - 1.2 Un 0.8 Un
Time 40 - 30,000 msec 2,000 msec
Unbalance load (46)
Start value (Is) 0.05 - 0.30 In 0.1 In
Temperature rise constant (K) 0.5 - 30.0 3.6
Reset time 0 - 2,000 sec 60 sec
Timer decreasing rate 0 - 100 % 10 %
Thermal overload (49)
Nominal motor temperature (TMn) 50 - 400℃ 110℃
Nominal motor current (IMn) 0.1 - 5.0 In 0.63 In
Initial temperature (Tini) 10 - 400℃ 110℃
Constant off (TCoff) 10 - 100,000 sec 800 sec
Time constant normal (TCnormal) 10 - 20,000 sec 200 sec
Time constant overheat (TCoverheat) 10 - 20,000 sec 200 sec
Trip temperature (Ttrip) 50 - 400℃ 140℃
Warning temperature (Twarn) 50 - 400℃ 124℃
Environment temperature (Tenv) 10 - 50℃ 40℃
Rest temperature (Trst) 10 - 400℃ 114℃
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 164 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.2.10.) CT : 300/1A ABB REF542+ Number of starts (66)


(-AA1) Max. num. of warm starts (Nws) 1 - 10 Not used
2,000kW MOTOR ZCT : 100/1A Max. num. of cold starts (Ncs) 1 - 10
FEEDER VT : Reset time (trst) 1.00 - 7,200.00 sec
6,000V 100V Warm start temp. threshold (Tws) 20 - 200℃
[GCB-20BBA11]
Blocking rotor (51LR)
3 3
[GCB-20BBA12] Nominal motor current (Imn) 0.20 - 2.00 In 0.6 In
Start value (Is) 1.00 - 20.00 Imn 4.0 Imn (=960A)
Time 40 - 30,000 msec 5,000 msec
Motor start (48)
Nominal motor current (Imn) 0.20 - 2.00 In 0.6 In
Start value (Is) 1.00 - 20.00 Imn 5.0 Imn
Time 40 - 300,000 msec 5,000 msec
Motor start (Ims) 0.20 - 0.80 Is 0.7 Is
Low load (37)
Nom real power (Pn) 50 - 1,000,000 kW Not used
Min. load 5 - 100% Pn
Min. current 2 - 20% In
Op. Time 1.0 - 1000.0 sec
REF542+ Differential protection (87M)
(-AA2) Pri. nominal current (I1r) 10.00 - 100,000A 240.6A
Sec. nominal current (I2r) 10.00 - 100,000A 240.6A
Threshold current (Id0) 0.1 - 0.5 Ir [p.u.] 0.2 Ir
Unbiased region limit (Ib0) 0.5 - 5.0 Ir [p.u.] 0.5 Ir
Slightly biased region threshold (Id1) 0.2 - 2.0 Ir [p.u.] 0.34 Ir
Slightly biased region limit (Ib1) 1.00 - 10.00 Ir [p.u.] 2.0 Ir
Heavily biased slope 0.4 - 1.00 1.0
Trip by Id> 5.00 - 40.00 Ir [p.u.] 7.5 Ir
Second harmonic detection 0.1 - 0.3 Id 0.15 Id
Fifth harmonic detection 0.1 - 0.3 Id 0.3 Id
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 165 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.2.11.) CT : 75/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Lomg time inverse
200kW MOTOR FEEDER ZCT : 100/1A (-AA1) Base current (Ieb) 0.05 - 40.00 In 0.34 In
[GCB-20BBA13] VT : TMS (k) 0.05 - 1.50 0.15
6,000V 100V Overcurrent instantaneous (50)
Start value 0.10 - 40.00 In 3.4 In
3 3
Time 15 - 30,000 msec 50 msec
Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
Base current (Ieb) 0.05 - 40.00 In
TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.4 In
Time 40 - 30,000 msec 100 msec
Under voltage (27)
Start value 0.1 - 1.2 Un 0.8 Un
Time 40 - 30,000 msec 2,000 msec
Unbalance load (46)
Start value (Is) 0.05 - 0.30 In 0.05 In
Temperature rise constant (K) 0.5 - 30.0 1.0
Reset time 0 - 2,000 sec 60 sec
Timer decreasing rate 0 - 100 % 10 %
Thermal overload (49)
Nominal motor temperature (TMn) 50 - 400℃ 110℃
Nominal motor current (IMn) 0.1 - 5.0 In 0.34 In
Initial temperature (Tini) 10 - 400℃ 110℃
Constant off (TCoff) 10 - 100,000 sec 600 sec
Time constant normal (TCnormal) 10 - 20,000 sec 150 sec
Time constant overheat (TCoverheat) 10 - 20,000 sec 150 sec
Trip temperature (Ttrip) 50 - 400℃ 140℃
Warning temperature (Twarn) 50 - 400℃ 124℃
Environment temperature (Tenv) 10 - 50℃ 40℃
Rest temperature (Trst) 10 - 400℃ 114℃
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 166 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.2.11.) CT : 75/1A ABB REF542+ Number of starts (66)


(-AA1) Max. num. of warm starts (Nws) 1 - 10 Not used
200kW MOTOR FEEDER ZCT : 100/1A Max. num. of cold starts (Ncs) 1 - 10
[GCB-20BBA13] VT : Reset time (trst) 1.00 - 7,200.00 sec
6,000V 100V Warm start temp. threshold (Tws) 20 - 200℃
Blocking rotor (51LR)
3 3
Nominal motor current (Imn) 0.20 - 2.00 In 0.32 In
Start value (Is) 1.00 - 20.00 Imn 4.8 Imn (=115.2A)
Time 40 - 30,000 msec 2,000 msec
Motor start (48)
Nominal motor current (Imn) 0.20 - 2.00 In 0.6 In
Start value (Is) 1.00 - 20.00 Imn 5.0 Imn
Time 40 - 300,000 msec 5,000 msec
Motor start (Ims) 0.20 - 0.80 Is 0.7 Is
Low load (37)
Nom real power (Pn) 50 - 1,000,000 kW Not used
Min. load 5 - 100% Pn
Min. current 2 - 20% In
Op. Time 1.0 - 1000.0 sec
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 167 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.2.12.) CT : 100/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Lomg time inverse
450kW MOTOR FEEDER ZCT : 100/1A (-AA1) Base current (Ieb) 0.05 - 40.00 In 0.56 In
[GCB-20BBA14] VT : TMS (k) 0.05 - 1.50 0.2
6,000V 100V Overcurrent instantaneous (50)
[GCB-20BBA15]
Start value 0.10 - 40.00 In 5.6 In
3 3
Time 15 - 30,000 msec 50 msec
Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
Base current (Ieb) 0.05 - 40.00 In
TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.4 In
Time 40 - 30,000 msec 100 msec
Under voltage (27)
Start value 0.1 - 1.2 Un 0.8 Un
Time 40 - 30,000 msec 2,000 msec
Unbalance load (46)
Start value (Is) 0.05 - 0.30 In 0.08 In
Temperature rise constant (K) 0.5 - 30.0 2.8
Reset time 0 - 2,000 sec 60 sec
Timer decreasing rate 0 - 100 % 10 %
Thermal overload (49)
Nominal motor temperature (TMn) 50 - 400℃ 110℃
Nominal motor current (IMn) 0.1 - 5.0 In 0.56 In
Initial temperature (Tini) 10 - 400℃ 110℃
Constant off (TCoff) 10 - 100,000 sec 800 sec
Time constant normal (TCnormal) 10 - 20,000 sec 200 sec
Time constant overheat (TCoverheat) 10 - 20,000 sec 200 sec
Trip temperature (Ttrip) 50 - 400℃ 140℃
Warning temperature (Twarn) 50 - 400℃ 124℃
Environment temperature (Tenv) 10 - 50℃ 40℃
Rest temperature (Trst) 10 - 400℃ 114℃
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 168 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.2.12.) CT : 100/1A ABB REF542+ Number of starts (66)


(-AA1) Max. num. of warm starts (Nws) 1 - 10 Not used
450kW MOTOR FEEDER ZCT : 100/1A Max. num. of cold starts (Ncs) 1 - 10
[GCB-20BBA14] VT : Reset time (trst) 1.00 - 7,200.00 sec
6,000V 100V Warm start temp. threshold (Tws) 20 - 200℃
[GCB-20BBA15]
Blocking rotor (51LR)
3 3
Nominal motor current (Imn) 0.20 - 2.00 In 0.54 In
Start value (Is) 1.00 - 20.00 Imn 4.8 Imn (=259.2A)
Time 40 - 30,000 msec 2,200 msec
Motor start (48)
Nominal motor current (Imn) 0.20 - 2.00 In 0.6 In
Start value (Is) 1.00 - 20.00 Imn 5.0 Imn
Time 40 - 300,000 msec 5,000 msec
Motor start (Ims) 0.20 - 0.80 Is 0.7 Is
Low load (37)
Nom real power (Pn) 50 - 1,000,000 kW Not used
Min. load 5 - 100% Pn
Min. current 2 - 20% In
Op. Time 1.0 - 1000.0 sec
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 169 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.2.13.) CT : 75/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Lomg time inverse
220kW MOTOR FEEDER ZCT : 100/1A (-AA1) Base current (Ieb) 0.05 - 40.00 In 0.37 In
[GCB-20BBA16] VT : TMS (k) 0.05 - 1.50 0.5
6,000V 100V Overcurrent instantaneous (50)
[GCB-20BBA17]
Start value 0.10 - 40.00 In 3.7 In
3 3
Time 15 - 30,000 msec 50 msec
Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
Base current (Ieb) 0.05 - 40.00 In
TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.4 In
Time 40 - 30,000 msec 100 msec
Under voltage (27)
Start value 0.1 - 1.2 Un 0.8 Un
Time 40 - 30,000 msec 2,000 msec
Unbalance load (46)
Start value (Is) 0.05 - 0.30 In 0.05 In
Temperature rise constant (K) 0.5 - 30.0 1.3
Reset time 0 - 2,000 sec 60 sec
Timer decreasing rate 0 - 100 % 10 %
Thermal overload (49)
Nominal motor temperature (TMn) 50 - 400℃ 110℃
Nominal motor current (IMn) 0.1 - 5.0 In 0.37 In
Initial temperature (Tini) 10 - 400℃ 110℃
Constant off (TCoff) 10 - 100,000 sec 1,600 sec,
Time constant normal (TCnormal) 10 - 20,000 sec 400 sec
Time constant overheat (TCoverheat) 10 - 20,000 sec 400 sec
Trip temperature (Ttrip) 50 - 400℃ 140℃
Warning temperature (Twarn) 50 - 400℃ 124℃
Environment temperature (Tenv) 10 - 50℃ 40℃
Rest temperature (Trst) 10 - 400℃ 114℃
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 170 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.2.13.) CT : 75/1A ABB REF542+ Number of starts (66)


(-AA1) Max. num. of warm starts (Nws) 1 - 10 Not used
220kW MOTOR FEEDER ZCT : 100/1A Max. num. of cold starts (Ncs) 1 - 10
[GCB-20BBA16] VT : Reset time (trst) 1.00 - 7,200.00 sec
6,000V 100V Warm start temp. threshold (Tws) 20 - 200℃
[GCB-20BBA17]
Blocking rotor (51LR)
3 3
Nominal motor current (Imn) 0.20 - 2.00 In 0.35 In
Start value (Is) 1.00 - 20.00 Imn 4.8 Imn (=126.3A)
Time 40 - 30,000 msec 9,500 msec
Motor start (48)
Nominal motor current (Imn) 0.20 - 2.00 In 0.6 In
Start value (Is) 1.00 - 20.00 Imn 5.0 Imn
Time 40 - 300,000 msec 5,000 msec
Motor start (Ims) 0.20 - 0.80 Is 0.7 Is
Low load (37)
Nom real power (Pn) 50 - 1,000,000 kW Not used
Min. load 5 - 100% Pn
Min. current 2 - 20% In
Op. Time 1.0 - 1000.0 sec
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 171 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.2.14.) CT : 100/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Lomg time inverse
643kW MOTOR FEEDER ZCT : 100/1A (-AA1) Base current (Ieb) 0.05 - 40.00 In 0.8 In
[GCB-20BBA18] VT : TMS (k) 0.05 - 1.50 0.5
6,000V 100V Overcurrent instantaneous (50)
Start value 0.10 - 40.00 In 8.2 In
3 3
Time 15 - 30,000 msec 50 msec
Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
Base current (Ieb) 0.05 - 40.00 In
TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.4 In
Time 40 - 30,000 msec 100 msec
Under voltage (27)
Start value 0.1 - 1.2 Un 0.8 Un
Time 40 - 30,000 msec 2,000 msec
Unbalance load (46)
Start value (Is) 0.05 - 0.30 In 0.12 In
Temperature rise constant (K) 0.5 - 30.0 6.0
Reset time 0 - 2,000 sec 60 sec
Timer decreasing rate 0 - 100 % 10 %
Thermal overload (49)
Nominal motor temperature (TMn) 50 - 400℃ 110℃
Nominal motor current (IMn) 0.1 - 5.0 In 0.81 In
Initial temperature (Tini) 10 - 400℃ 110℃
Constant off (TCoff) 10 - 100,000 sec 1,600 sec
Time constant normal (TCnormal) 10 - 20,000 sec 400 sec
Time constant overheat (TCoverheat) 10 - 20,000 sec 400 sec
Trip temperature (Ttrip) 50 - 400℃ 140℃
Warning temperature (Twarn) 50 - 400℃ 124℃
Environment temperature (Tenv) 10 - 50℃ 40℃
Rest temperature (Trst) 10 - 400℃ 114℃
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 172 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.2.14.) CT : 100/1A ABB REF542+ Number of starts (66)


(-AA1) Max. num. of warm starts (Nws) 1 - 10 Not used
643kW MOTOR FEEDER ZCT : 100/1A Max. num. of cold starts (Ncs) 1 - 10
[GCB-20BBA18] VT : Reset time (trst) 1.00 - 7,200.00 sec
6,000V 100V Warm start temp. threshold (Tws) 20 - 200℃
Blocking rotor (51LR)
3 3
Nominal motor current (Imn) 0.20 - 2.00 In 0.8 In
Start value (Is) 1.00 - 20.00 Imn 4.8 Imn (=384A)
Time 40 - 30,000 msec 9,500 msec
Motor start (48)
Nominal motor current (Imn) 0.20 - 2.00 In 0.8 In
Start value (Is) 1.00 - 20.00 Imn 6.0 Imn
Time 40 - 300,000 msec 9,500 msec
Motor start (Ims) 0.20 - 0.80 Is 0.7 Is
Low load (37)
Nom real power (Pn) 50 - 1,000,000 kW Not used
Min. load 5 - 100% Pn
Min. current 2 - 20% In
Op. Time 1.0 - 1000.0 sec
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 173 of 205

5.3. MV SWGR_UNIT 3
SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED
CT & VT RATIO REMARKS
[FEEDER No.] MAKER TYPE DUTY SETTING RANGE SETTING

5.3.1.) CT : 3,600/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Very inverse
INCOMER VT : (-AA1) Base current (Ieb) 0.05 - 40.00 In 1.0 In
[GCB-30BB01] 6,000V 100V TMS (k) 0.05 - 1.50 0.4
3 3 Overcurrent instantaneous (50)
Start value 0.10 - 40.00 In 4.0 In
Time 15 - 30,000 msec 700 msec
Earth fault low (51G)
IDMT type NI, VI, EI, LI Very inverse
Base current (Ieb) 0.05 - 40.00 In 0.05 In
TMS (k) 0.05 - 1.50 0.07
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.1 In
Time 40 - 30,000 msec 700 msec
Synchronism check (25)
Delta voltage 0.02 - 0.40 Un 0.05 Un
Delta phase 5 - 50˚ 10˚
Time 0.20 - 1,000.00 sec 2.0 sec
Under voltage low(27)
Start value 0.10 - 1.20 Un 0.8 Un
Time 40 - 30,000 msec 3,000 msec
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 174 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] MAKER TYPE DUTY SETTING RANGE SETTING

5.3.2.) VT : ABB REF542+ Under voltage low(27)


(-AA1) Start value 0.10 - 1.20 Un 0.8 Un
BUS-VT 6,000V 100V
Time 40 - 30,000 msec 2,000 msec
3 3 SUE3000 Monitoring
[BUS-VT]
(-AA2) Delay time decoupling 50 – 500 msec Not used
Times
Max. transfer running time 0.5 – 10 sec Not used
Wait after transfer time 1 – 30 sec 5 sec
Load shedding delay 10 – 200 msec Not used
Analog values
Phase loading max 5 - 50˚ 10˚
Phase lagging max. 5 - 50˚ 10˚
Delta frequency max. 0.2 – 2.5 Hz 1.0 Hz
Busbar voltage Umin1. 0.6 – 0.9 Un 0.7 Un
Stand-by feeder voltage Umin2. 0.6 – 0.9 Un 0.85 Un
Busbar voltage residual limit 0.2 – 0.55 Un 0.4 Un
First phase frequency gradient max. 2 – 20Hz/s Not used
Busbar voltage load shedding limit 0.4 – 0.9 Un Not used
Under voltage Initiation feeder 1
Start value 0.10 - 1.20 Un 0.85 Un
Time 40 - 300,000 msec 40 msec
Under voltage Initiation feeder 2
Start value 0.10 - 1.20 Un 0.85 Un
Time 40 - 300,000 msec 40 msec
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 175 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.3.3.) CT : 3,600/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Very inverse
6kV POWER (-AA1) Base current (Ieb) 0.05 - 40.00 In 0.9 In
CONNECTION FEEDER TMS (k) 0.05 - 1.50 0.35
Overcurrent instantaneous (50)
(to 10BBA03, 20BBA03)
Start value 0.10 - 40.00 In 3.5 In
[GCB-30BB03] Time 15 - 30,000 msec 500 msec
[GCB-30BB04] Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
Base current (Ieb) 0.05 - 40.00 In
TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.05 In
Time 40 - 30,000 msec 500 msec
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 176 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.3.4.) CT : 2,000/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Very inverse
6kV COMMON FEEDER (-AA1) Base current (Ieb) 0.05 - 40.00 In 1.0 In
(to 00BBA03) TMS (k) 0.05 - 1.50 0.35
Overcurrent instantaneous (50)
[GCB-30BB02]
Start value 0.10 - 40.00 In 5.0 In
Time 15 - 30,000 msec 300 msec
Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
Base current (Ieb) 0.05 - 40.00 In
TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.05 In
Time 40 - 30,000 msec 300 msec
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 177 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.3.5.) CT : 300/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Very inverse
2MVA TR FEEDER ZCT : 100/1A (-AA1) Base current (Ieb) 0.05 - 40.00 In 0.96 In
[GCB-30BBA05] VT : TMS (k) 0.05 - 1.50 0.5
6,000V 100V Overcurrent instantaneous (50)
Start value 0.10 - 40.00 In 14.6 In
3 3
Time 15 - 30,000 msec 50 msec
Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
Base current (Ieb) 0.05 - 40.00 In
TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.4 In
Time 40 - 30,000 msec 100 msec
Thermal overload (49)
Nominal motor temperature (TMn) 50 - 400℃ 103℃
Nominal motor current (IMn) 0.1 - 5.0 In 0.8 In
Initial temperature (Tini) 10 - 400℃ 103℃
Constant off (TCoff) 10 - 100,000 sec 400 sec
Time constant normal (TCnormal 10 - 20,000 sec 100 sec
Time constant overheat (TCoverheat) 10 - 20,000 sec 100 sec
Trip temperature (Ttrip) 50 - 400℃ 125℃
Warning temperature (Twarn) 50 - 400℃ 120℃
Environment temperature (Tenv) 10 - 50℃ 33℃
Rest temperature (Trst) 10 - 400℃ 110℃
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 178 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.3.5.) CT : 300/1A (Primary) ABB REF542+ Differential protection (87T)


Pri. nominal current (I1r) 10.00 - 100,000A 192.5A
2MVA TR FEEDER CT : 4,000/1A (Secondary) (-AA2) Sec. nominal current (I2r) 10.00 - 100,000A 2,886.8A
[GCB-30BBA05] Threshold current (Id0) 0.1 - 0.5 Ir [p.u.] 0.2 Ir
Unbiased region limit (Ib0) 0.5 - 5.0 Ir [p.u.] 0.5 Ir
Slightly biased region threshold (Id1) 0.2 - 2.0 Ir [p.u.] 0.34 Ir
Slightly biased region limit (Ib1) 1.00 - 10.00 Ir [p.u.] 2.0 Ir
Heavily biased slope 0.4 - 1.00 1.0
Trip by Id> 5.00 - 40.00 Ir [p.u.] 10.7 Ir
Second harmonic detection 0.1 - 0.3 Id 0.15 Id
Fifth harmonic detection 0.1 - 0.3 Id 0.3 Id
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 179 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.3.6.) CT : 300/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Very inverse
1.8MVA TR FEEDER ZCT : 100/1A (-AA1) Base current (Ieb) 0.05 - 40.00 In 0.9 In
[GCB-30BBA06] VT : TMS (k) 0.05 - 1.50 0.4
6,000V 100V Overcurrent instantaneous (50)
[GCB-30BBA07]
Start value 0.10 - 40.00 In 17.5 In
3 3
Time 15 - 30,000 msec 50 msec
Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
Base current (Ieb) 0.05 - 40.00 In
TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.4 In
Time 40 - 30,000 msec 100 msec
Thermal overload (49)
Nominal motor temperature (TMn) 50 - 400℃ 103℃
Nominal motor current (IMn) 0.1 - 5.0 In 0.72 In
Initial temperature (Tini) 10 - 400℃ 103℃
Constant off (TCoff) 10 - 100,000 sec 400 sec
Time constant normal (TCnormal 10 - 20,000 sec 100 sec
Time constant overheat (TCoverheat) 10 - 20,000 sec 100 sec
Trip temperature (Ttrip) 50 - 400℃ 125℃
Warning temperature (Twarn) 50 - 400℃ 120℃
Environment temperature (Tenv) 10 - 50℃ 33℃
Rest temperature (Trst) 10 - 400℃ 110℃
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 180 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.3.6.) CT : 300/1A (Primary) ABB REF542+ Differential protection (87T)


Pri. nominal current (I1r) 10.00 - 100,000A 173.2A
1.8MVA TR FEEDER CT : 4,000/1A (Secondary) (-AA2) Sec. nominal current (I2r) 10.00 - 100,000A 2,598A
[GCB-30BBA06] Threshold current (Id0) 0.1 - 0.5 Ir [p.u.] 0.2 Ir
Unbiased region limit (Ib0) 0.5 - 5.0 Ir [p.u.] 0.5 Ir
[GCB-30BBA07] 0.2 - 2.0 Ir [p.u.]
Slightly biased region threshold (Id1) 0.34 Ir
Slightly biased region limit (Ib1) 1.00 - 10.00 Ir [p.u.] 2.0 Ir
Heavily biased slope 0.4 - 1.00 1.0
Trip by Id> 5.00 - 40.00 Ir [p.u.] 12.3 Ir
Second harmonic detection 0.1 - 0.3 Id 0.15 Id
Fifth harmonic detection 0.1 - 0.3 Id 0.3 Id
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 181 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.3.7.) CT : 300/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Very inverse
1MVA TR FEEDER ZCT : 100/1A (-AA1) Base current (Ieb) 0.05 - 40.00 In 0.5 In
[GCB-30BBA08] VT : TMS (k) 0.05 - 1.50 0.5
6,000V 100V Overcurrent instantaneous (50)
Start value 0.10 - 40.00 In 9.5 In
3 3
Time 15 - 30,000 msec 50 msec
Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
Base current (Ieb) 0.05 - 40.00 In
TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.4 In
Time 40 - 30,000 msec 100 msec
Thermal overload (49)
Nominal motor temperature (TMn) 50 - 400℃ 103℃
Nominal motor current (IMn) 0.1 - 5.0 In 0.4 In
Initial temperature (Tini) 10 - 400℃ 103℃
Constant off (TCoff) 10 - 100,000 sec 600 sec
Time constant normal (TCnormal 10 - 20,000 sec 150 sec
Time constant overheat (TCoverheat) 10 - 20,000 sec 150 sec
Trip temperature (Ttrip) 50 - 400℃ 125℃
Warning temperature (Twarn) 50 - 400℃ 120℃
Environment temperature (Tenv) 10 - 50℃ 33℃
Rest temperature (Trst) 10 - 400℃ 110℃
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 182 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.3.7.) CT : 300/1A (Primary) ABB REF542+ Differential protection (87T)


Pri. nominal current (I1r) 10.00 - 100,000A 96.2A
1MVA TR FEEDER CT : 2,000/1A (Secondary) (-AA2) Sec. nominal current (I2r) 10.00 - 100,000A 1,443A
[GCB-30BBA08] Threshold current (Id0) 0.1 - 0.5 Ir [p.u.] 0.2 Ir
Unbiased region limit (Ib0) 0.5 - 5.0 Ir [p.u.] 0.5 Ir
Slightly biased region threshold (Id1) 0.2 - 2.0 Ir [p.u.] 0.34 Ir
Slightly biased region limit (Ib1) 1.00 - 10.00 Ir [p.u.] 2.0 Ir
Heavily biased slope 0.4 - 1.00 1.0
Trip by Id> 5.00 - 40.00 Ir [p.u.] 13.9 Ir
Second harmonic detection 0.1 - 0.3 Id 0.15 Id
Fifth harmonic detection 0.1 - 0.3 Id 0.3 Id
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 183 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.3.8.) CT : 400/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Very inverse
2.56MVA TR FEEDER ZCT : 100/1A (-AA1) Base current (Ieb) 0.05 - 40.00 In 0.96 In
[GCB-30BBA09] VT : TMS (k) 0.05 - 1.50 0.4
6,000V 100V Overcurrent instantaneous (50)
Start value 0.10 - 40.00 In 12.8 In
3 3
Time 15 - 30,000 msec 50 msec
Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
Base current (Ieb) 0.05 - 40.00 In
TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.4 In
Time 40 - 30,000 msec 100 msec
Thermal overload (49)
Nominal motor temperature (TMn) 50 - 400℃ 103℃
Nominal motor current (IMn) 0.1 - 5.0 In 0.8 In
Initial temperature (Tini) 10 - 400℃ 103℃
Constant off (TCoff) 10 - 100,000 sec 400 sec
Time constant normal (TCnormal 10 - 20,000 sec 100 sec
Time constant overheat (TCoverheat) 10 - 20,000 sec 100 sec
Trip temperature (Ttrip) 50 - 400℃ 125℃
Warning temperature (Twarn) 50 - 400℃ 120℃
Environment temperature (Tenv) 10 - 50℃ 33℃
Rest temperature (Trst) 10 - 400℃ 110℃
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 184 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.3.9.) CT : 800/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Very inverse
3.1MVA TR FEEDER ZCT : 100/1A (-AA1) Base current (Ieb) 0.05 - 40.00 In 0.56 In
[GCB-30BBA10] VT : TMS (k) 0.05 - 1.50 0.4
6,000V 100V Overcurrent instantaneous (50)
Start value 0.10 - 40.00 In 7.5 In
3 3
Time 15 - 30,000 msec 50 msec
Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
Base current (Ieb) 0.05 - 40.00 In
TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.4 In
Time 40 - 30,000 msec 100 msec
Thermal overload (49)
Nominal motor temperature (TMn) 50 - 400℃ 103℃
Nominal motor current (IMn) 0.1 - 5.0 In 0.47 In
Initial temperature (Tini) 10 - 400℃ 103℃
Constant off (TCoff) 10 - 100,000 sec 400 sec
Time constant normal (TCnormal 10 - 20,000 sec 100 sec
Time constant overheat (TCoverheat) 10 - 20,000 sec 100 sec
Trip temperature (Ttrip) 50 - 400℃ 125℃
Warning temperature (Twarn) 50 - 400℃ 120℃
Environment temperature (Tenv) 10 - 50℃ 33℃
Rest temperature (Trst) 10 - 400℃ 110℃
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 185 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.3.10.) CT : 400/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Lomg time inverse
2,000kW MOTOR ZCT : 100/1A (-AA1) Base current (Ieb) 0.05 - 40.00 In 0.63 In
FEEDER VT : TMS (k) 0.05 - 1.50 0.25
6,000V 100V Overcurrent instantaneous (50)
[GCB-30BBA11]
Start value 0.10 - 40.00 In 5.3 In
3 3
[GCB-30BBA12] Time 15 - 30,000 msec 50 msec
Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
Base current (Ieb) 0.05 - 40.00 In
TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.4 In
Time 40 - 30,000 msec 100 msec
Under voltage (27)
Start value 0.1 - 1.2 Un 0.8 Un
Time 40 - 30,000 msec 2,000 msec
Unbalance load (46)
Start value (Is) 0.05 - 0.30 In 0.1 In
Temperature rise constant (K) 0.5 - 30.0 3.6
Reset time 0 - 2,000 sec 60 sec
Timer decreasing rate 0 - 100 % 10 %
Thermal overload (49)
Nominal motor temperature (TMn) 50 - 400℃ 110℃
Nominal motor current (IMn) 0.1 - 5.0 In 0.63 In
Initial temperature (Tini) 10 - 400℃ 110℃
Constant off (TCoff) 10 - 100,000 sec 800 sec
Time constant normal (TCnormal) 10 - 20,000 sec 200 sec
Time constant overheat (TCoverheat) 10 - 20,000 sec 200 sec
Trip temperature (Ttrip) 50 - 400℃ 140℃
Warning temperature (Twarn) 50 - 400℃ 124℃
Environment temperature (Tenv) 10 - 50℃ 40℃
Rest temperature (Trst) 10 - 400℃ 114℃
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 186 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.3.10.) CT : 300/1A ABB REF542+ Number of starts (66)


(-AA1) Max. num. of warm starts (Nws) 1 - 10 Not used
2,000kW MOTOR ZCT : 100/1A Max. num. of cold starts (Ncs) 1 - 10
FEEDER VT : Reset time (trst) 1.00 - 7,200.00 sec
6,000V 100V Warm start temp. threshold (Tws) 20 - 200℃
[GCB-30BBA11]
Blocking rotor (51LR)
3 3
[GCB-30BBA12] Nominal motor current (Imn) 0.20 - 2.00 In 0.6 In
Start value (Is) 1.00 - 20.00 Imn 4.0 Imn (=960A)
Time 40 - 30,000 msec 5,000 msec
Motor start (48)
Nominal motor current (Imn) 0.20 - 2.00 In 0.6 In
Start value (Is) 1.00 - 20.00 Imn 5.0 Imn
Time 40 - 300,000 msec 5,000 msec
Motor start (Ims) 0.20 - 0.80 Is 0.7 Is
Low load (37)
Nom real power (Pn) 50 - 1,000,000 kW Not used
Min. load 5 - 100% Pn
Min. current 2 - 20% In
Op. Time 1.0 - 1000.0 sec
REF542+ Differential protection (87M)
(-AA2) Pri. nominal current (I1r) 10.00 - 100,000A 240.6A
Sec. nominal current (I2r) 10.00 - 100,000A 240.6A
Threshold current (Id0) 0.1 - 0.5 Ir [p.u.] 0.2 Ir
Unbiased region limit (Ib0) 0.5 - 5.0 Ir [p.u.] 0.5 Ir
Slightly biased region threshold (Id1) 0.2 - 2.0 Ir [p.u.] 0.34 Ir
Slightly biased region limit (Ib1) 1.00 - 10.00 Ir [p.u.] 2.0 Ir
Heavily biased slope 0.4 - 1.00 1.0
Trip by Id> 5.00 - 40.00 Ir [p.u.] 7.5 Ir
Second harmonic detection 0.1 - 0.3 Id 0.15 Id
Fifth harmonic detection 0.1 - 0.3 Id 0.3 Id
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 187 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.3.11.) CT : 75/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Lomg time inverse
200kW MOTOR FEEDER ZCT : 100/1A (-AA1) Base current (Ieb) 0.05 - 40.00 In 0.34 In
[GCB-30BBA13] VT : TMS (k) 0.05 - 1.50 0.15
6,000V 100V Overcurrent instantaneous (50)
Start value 0.10 - 40.00 In 3.4 In
3 3
Time 15 - 30,000 msec 50 msec
Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
Base current (Ieb) 0.05 - 40.00 In
TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.4 In
Time 40 - 30,000 msec 100 msec
Under voltage (27)
Start value 0.1 - 1.2 Un 0.8 Un
Time 40 - 30,000 msec 2,000 msec
Unbalance load (46)
Start value (Is) 0.05 - 0.30 In 0.05 In
Temperature rise constant (K) 0.5 - 30.0 1.0
Reset time 0 - 2,000 sec 60 sec
Timer decreasing rate 0 - 100 % 10 %
Thermal overload (49)
Nominal motor temperature (TMn) 50 - 400℃ 110℃
Nominal motor current (IMn) 0.1 - 5.0 In 0.34 In
Initial temperature (Tini) 10 - 400℃ 110℃
Constant off (TCoff) 10 - 100,000 sec 600 sec
Time constant normal (TCnormal) 10 - 20,000 sec 150 sec
Time constant overheat (TCoverheat) 10 - 20,000 sec 150 sec
Trip temperature (Ttrip) 50 - 400℃ 140℃
Warning temperature (Twarn) 50 - 400℃ 124℃
Environment temperature (Tenv) 10 - 50℃ 40℃
Rest temperature (Trst) 10 - 400℃ 114℃
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 188 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.3.11.) CT : 75/1A ABB REF542+ Number of starts (66)


(-AA1) Max. num. of warm starts (Nws) 1 - 10 Not used
200kW MOTOR FEEDER ZCT : 100/1A Max. num. of cold starts (Ncs) 1 - 10
[GCB-30BBA13] VT : Reset time (trst) 1.00 - 7,200.00 sec
6,000V 100V Warm start temp. threshold (Tws) 20 - 200℃
Blocking rotor (51LR)
3 3
Nominal motor current (Imn) 0.20 - 2.00 In 0.32 In
Start value (Is) 1.00 - 20.00 Imn 4.8 Imn (=115.2A)
Time 40 - 30,000 msec 2,000 msec
Motor start (48)
Nominal motor current (Imn) 0.20 - 2.00 In 0.6 In
Start value (Is) 1.00 - 20.00 Imn 5.0 Imn
Time 40 - 300,000 msec 5,000 msec
Motor start (Ims) 0.20 - 0.80 Is 0.7 Is
Low load (37)
Nom real power (Pn) 50 - 1,000,000 kW Not used
Min. load 5 - 100% Pn
Min. current 2 - 20% In
Op. Time 1.0 - 1000.0 sec
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 189 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.3.12.) CT : 100/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Lomg time inverse
450kW MOTOR FEEDER ZCT : 100/1A (-AA1) Base current (Ieb) 0.05 - 40.00 In 0.56 In
[GCB-30BBA14] VT : TMS (k) 0.05 - 1.50 0.2
6,000V 100V Overcurrent instantaneous (50)
[GCB-30BBA15]
Start value 0.10 - 40.00 In 5.6 In
3 3
Time 15 - 30,000 msec 50 msec
Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
Base current (Ieb) 0.05 - 40.00 In
TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.4 In
Time 40 - 30,000 msec 100 msec
Under voltage (27)
Start value 0.1 - 1.2 Un 0.8 Un
Time 40 - 30,000 msec 2,000 msec
Unbalance load (46)
Start value (Is) 0.05 - 0.30 In 0.08 In
Temperature rise constant (K) 0.5 - 30.0 2.8
Reset time 0 - 2,000 sec 60 sec
Timer decreasing rate 0 - 100 % 10 %
Thermal overload (49)
Nominal motor temperature (TMn) 50 - 400℃ 110℃
Nominal motor current (IMn) 0.1 - 5.0 In 0.56 In
Initial temperature (Tini) 10 - 400℃ 110℃
Constant off (TCoff) 10 - 100,000 sec 800 sec
Time constant normal (TCnormal) 10 - 20,000 sec 200 sec
Time constant overheat (TCoverheat) 10 - 20,000 sec 200 sec
Trip temperature (Ttrip) 50 - 400℃ 140℃
Warning temperature (Twarn) 50 - 400℃ 124℃
Environment temperature (Tenv) 10 - 50℃ 40℃
Rest temperature (Trst) 10 - 400℃ 114℃
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 190 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.3.12.) CT : 100/1A ABB REF542+ Number of starts (66)


(-AA1) Max. num. of warm starts (Nws) 1 - 10 Not used
450kW MOTOR FEEDER ZCT : 100/1A Max. num. of cold starts (Ncs) 1 - 10
[GCB-30BBA14] VT : Reset time (trst) 1.00 - 7,200.00 sec
6,000V 100V Warm start temp. threshold (Tws) 20 - 200℃
[GCB-30BBA15]
Blocking rotor (51LR)
3 3
Nominal motor current (Imn) 0.20 - 2.00 In 0.54 In
Start value (Is) 1.00 - 20.00 Imn 4.8 Imn (=259.2A)
Time 40 - 30,000 msec 2,200 msec
Motor start (48)
Nominal motor current (Imn) 0.20 - 2.00 In 0.6 In
Start value (Is) 1.00 - 20.00 Imn 5.0 Imn
Time 40 - 300,000 msec 5,000 msec
Motor start (Ims) 0.20 - 0.80 Is 0.7 Is
Low load (37)
Nom real power (Pn) 50 - 1,000,000 kW Not used
Min. load 5 - 100% Pn
Min. current 2 - 20% In
Op. Time 1.0 - 1000.0 sec
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 191 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.3.13.) CT : 75/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Lomg time inverse
220kW MOTOR FEEDER ZCT : 100/1A (-AA1) Base current (Ieb) 0.05 - 40.00 In 0.37 In
[GCB-30BBA16] VT : TMS (k) 0.05 - 1.50 0.5
6,000V 100V Overcurrent instantaneous (50)
[GCB-30BBA17]
Start value 0.10 - 40.00 In 3.7 In
3 3
Time 15 - 30,000 msec 50 msec
Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
Base current (Ieb) 0.05 - 40.00 In
TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.4 In
Time 40 - 30,000 msec 100 msec
Under voltage (27)
Start value 0.1 - 1.2 Un 0.8 Un
Time 40 - 30,000 msec 2,000 msec
Unbalance load (46)
Start value (Is) 0.05 - 0.30 In 0.05 In
Temperature rise constant (K) 0.5 - 30.0 1.3
Reset time 0 - 2,000 sec 60 sec
Timer decreasing rate 0 - 100 % 10 %
Thermal overload (49)
Nominal motor temperature (TMn) 50 - 400℃ 110℃
Nominal motor current (IMn) 0.1 - 5.0 In 0.37 In
Initial temperature (Tini) 10 - 400℃ 110℃
Constant off (TCoff) 10 - 100,000 sec 1,600 sec,
Time constant normal (TCnormal) 10 - 20,000 sec 400 sec
Time constant overheat (TCoverheat) 10 - 20,000 sec 400 sec
Trip temperature (Ttrip) 50 - 400℃ 140℃
Warning temperature (Twarn) 50 - 400℃ 124℃
Environment temperature (Tenv) 10 - 50℃ 40℃
Rest temperature (Trst) 10 - 400℃ 114℃
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 192 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.3.13.) CT : 75/1A ABB REF542+ Number of starts (66)


(-AA1) Max. num. of warm starts (Nws) 1 - 10 Not used
220kW MOTOR FEEDER ZCT : 100/1A Max. num. of cold starts (Ncs) 1 - 10
[GCB-30BBA16] VT : Reset time (trst) 1.00 - 7,200.00 sec
6,000V 100V Warm start temp. threshold (Tws) 20 - 200℃
[GCB-30BBA17]
Blocking rotor (51LR)
3 3
Nominal motor current (Imn) 0.20 - 2.00 In 0.35 In
Start value (Is) 1.00 - 20.00 Imn 4.8 Imn (=126.3A)
Time 40 - 30,000 msec 9,500 msec
Motor start (48)
Nominal motor current (Imn) 0.20 - 2.00 In 0.6 In
Start value (Is) 1.00 - 20.00 Imn 5.0 Imn
Time 40 - 300,000 msec 5,000 msec
Motor start (Ims) 0.20 - 0.80 Is 0.7 Is
Low load (37)
Nom real power (Pn) 50 - 1,000,000 kW Not used
Min. load 5 - 100% Pn
Min. current 2 - 20% In
Op. Time 1.0 - 1000.0 sec
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 193 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.3.14.) CT : 100/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Lomg time inverse
643kW MOTOR FEEDER ZCT : 100/1A (-AA1) Base current (Ieb) 0.05 - 40.00 In 0.8 In
[GCB-30BBA18] VT : TMS (k) 0.05 - 1.50 0.5
6,000V 100V Overcurrent instantaneous (50)
Start value 0.10 - 40.00 In 8.2 In
3 3
Time 15 - 30,000 msec 50 msec
Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
Base current (Ieb) 0.05 - 40.00 In
TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.4 In
Time 40 - 30,000 msec 100 msec
Under voltage (27)
Start value 0.1 - 1.2 Un 0.8 Un
Time 40 - 30,000 msec 2,000 msec
Unbalance load (46)
Start value (Is) 0.05 - 0.30 In 0.12 In
Temperature rise constant (K) 0.5 - 30.0 6.0
Reset time 0 - 2,000 sec 60 sec
Timer decreasing rate 0 - 100 % 10 %
Thermal overload (49)
Nominal motor temperature (TMn) 50 - 400℃ 110℃
Nominal motor current (IMn) 0.1 - 5.0 In 0.81 In
Initial temperature (Tini) 10 - 400℃ 110℃
Constant off (TCoff) 10 - 100,000 sec 1,600 sec
Time constant normal (TCnormal) 10 - 20,000 sec 400 sec
Time constant overheat (TCoverheat) 10 - 20,000 sec 400 sec
Trip temperature (Ttrip) 50 - 400℃ 140℃
Warning temperature (Twarn) 50 - 400℃ 124℃
Environment temperature (Tenv) 10 - 50℃ 40℃
Rest temperature (Trst) 10 - 400℃ 114℃
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 194 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.3.14.) CT : 100/1A ABB REF542+ Number of starts (66)


(-AA1) Max. num. of warm starts (Nws) 1 - 10 Not used
643kW MOTOR FEEDER ZCT : 100/1A Max. num. of cold starts (Ncs) 1 - 10
[GCB-30BBA18] VT : Reset time (trst) 1.00 - 7,200.00 sec
6,000V 100V Warm start temp. threshold (Tws) 20 - 200℃
Blocking rotor (51LR)
3 3
Nominal motor current (Imn) 0.20 - 2.00 In 0.8 In
Start value (Is) 1.00 - 20.00 Imn 4.8 Imn (=384A)
Time 40 - 30,000 msec 9,500 msec
Motor start (48)
Nominal motor current (Imn) 0.20 - 2.00 In 0.8 In
Start value (Is) 1.00 - 20.00 Imn 6.0 Imn
Time 40 - 300,000 msec 9,500 msec
Motor start (Ims) 0.20 - 0.80 Is 0.7 Is
Low load (37)
Nom real power (Pn) 50 - 1,000,000 kW Not used
Min. load 5 - 100% Pn
Min. current 2 - 20% In
Op. Time 1.0 - 1000.0 sec
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 195 of 205

5.4. MV SWGR_COMMON
SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED
CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.4.1.) CT : 2,000/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Very inverse
INCOMER-A VT : (-AA1) Base current (Ieb) 0.05 - 40.00 In 1.0 In
(FROM : 10BBA, 20BBA, 6,000V 100V TMS (k) 0.05 - 1.50 0.35
3 3 Overcurrent instantaneous (50)
30BBA)
Start value 0.10 - 40.00 In 5.0 In
[GCB-00BBA01] Time 15 - 30,000 msec 300 msec
[GCB-00BBA02] Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
[GCB-00BBA03] Base current (Ieb) 0.05 - 40.00 In
TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.05 In
Time 40 - 30,000 msec 300 msec
Synchronism check (25)
Delta voltage 0.02 - 0.40 Un 0.1 Un
Delta phase 5 - 50˚ 10˚
Time 0.20 - 1,000.00 sec 2.0 sec
Under voltage low(27)
Start value 0.10 - 1.20 Un 0.8 Un
Time 40 - 30,000 msec 3,000 msec
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 196 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.4.2.) VT : ABB REF542+ Under voltage low(27)


Start value 0.10 - 1.20 Un 0.8 Un
BUS-VT 6,000V 100V (-AA1) Time 40 - 30,000 msec 2,000 msec
3 3
[BUS-VT]
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 197 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.4.3.) CT : 300/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Very inverse
2MVA TR FEEDER ZCT : 100/1A (-AA1) Base current (Ieb) 0.05 - 40.00 In 0.96 In
[GCB-00BBA04] VT : TMS (k) 0.05 - 1.50 0.5
6,000V 100V Overcurrent instantaneous (50)
[GCB-00BBA05]
Start value 0.10 - 40.00 In 13.9 In
3 3
[GCB-00BBA08] Time 15 - 30,000 msec 50 msec
[GCB-00BBA09] Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
[GCB-00BBA10] Base current (Ieb) 0.05 - 40.00 In
[GCB-00BBA11] TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.4 In
Time 40 - 30,000 msec 100 msec
Thermal overload (49)
Nominal motor temperature (TMn) 50 - 400℃ 103℃
Nominal motor current (IMn) 0.1 - 5.0 In 0.8 In
Initial temperature (Tini) 10 - 400℃ 103℃
Constant off (TCoff) 10 - 100,000 sec 400 sec
Time constant normal (TCnormal 10 - 20,000 sec 100 sec
Time constant overheat (TCoverheat) 10 - 20,000 sec 100 sec
Trip temperature (Ttrip) 50 - 400℃ 125℃
Warning temperature (Twarn) 50 - 400℃ 120℃
Environment temperature (Tenv) 10 - 50℃ 33℃
Rest temperature (Trst) 10 - 400℃ 110℃
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 198 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.4.3.) CT : 300/1A (Primary) ABB REF542+ Differential protection (87T)


Pri. nominal current (I1r) 10.00 - 100,000A 192.5A
2MVA TR FEEDER CT : 3,000/1A (Secondary) (-AA2) Sec. nominal current (I2r) 10.00 - 100,000A 2,886.8A
[GCB-00BBA04] Threshold current (Id0) 0.1 - 0.5 Ir [p.u.] 0.2 Ir
Unbiased region limit (Ib0) 0.5 - 5.0 Ir [p.u.] 0.5 Ir
[GCB-00BBA05] 0.2 - 2.0 Ir [p.u.]
Slightly biased region threshold (Id1) 0.34 Ir
[GCB-00BBA08] Slightly biased region limit (Ib1) 1.00 - 10.00 Ir [p.u.] 2.0 Ir
[GCB-00BBA09] Heavily biased slope 0.4 - 1.00 1.0
Trip by Id> 5.00 - 40.00 Ir [p.u.] 10.7 Ir
[GCB-00BBA10] Second harmonic detection 0.1 - 0.3 Id 0.15 Id
[GCB-00BBA11] Fifth harmonic detection 0.1 - 0.3 Id 0.3 Id
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 199 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.4.4.) CT : 150/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Very inverse
1MVA TR FEEDER ZCT : 100/1A (-AA1) Base current (Ieb) 0.05 - 40.00 In 0.96 In
[GCB-00BBA06] VT : TMS (k) 0.05 - 1.50 0.5
6,000V 100V Overcurrent instantaneous (50)
[GCB-00BBA07]
Start value 0.10 - 40.00 In 18.2 In
3 3
Time 15 - 30,000 msec 50 msec
Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
Base current (Ieb) 0.05 - 40.00 In
TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.4 In
Time 40 - 30,000 msec 100 msec
Thermal overload (49)
Nominal motor temperature (TMn) 50 - 400℃ 103℃
Nominal motor current (IMn) 0.1 - 5.0 In 0.8 In
Initial temperature (Tini) 10 - 400℃ 103℃
Constant off (TCoff) 10 - 100,000 sec 400 sec
Time constant normal (TCnormal 10 - 20,000 sec 100 sec
Time constant overheat (TCoverheat) 10 - 20,000 sec 100 sec
Trip temperature (Ttrip) 50 - 400℃ 125℃
Warning temperature (Twarn) 50 - 400℃ 120℃
Environment temperature (Tenv) 10 - 50℃ 33℃
Rest temperature (Trst) 10 - 400℃ 110℃
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 200 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.4.4.) CT : 150/1A (Primary) ABB REF542+ Differential protection (87T)


Pri. nominal current (I1r) 10.00 - 100,000A 96.2A
1MVA TR FEEDER CT : 3,000/1A (Secondary) (-AA2) Sec. nominal current (I2r) 10.00 - 100,000A 1,443.4A
[GCB-00BBA06] Threshold current (Id0) 0.1 - 0.5 Ir [p.u.] 0.2 Ir
Unbiased region limit (Ib0) 0.5 - 5.0 Ir [p.u.] 0.5 Ir
[GCB-00BBA07] 0.2 - 2.0 Ir [p.u.]
Slightly biased region threshold (Id1) 0.34 Ir
Slightly biased region limit (Ib1) 1.00 - 10.00 Ir [p.u.] 2.0 Ir
Heavily biased slope 0.4 - 1.00 1.0
Trip by Id> 5.00 - 40.00 Ir [p.u.] 13.9 Ir
Second harmonic detection 0.1 - 0.3 Id 0.15 Id
Fifth harmonic detection 0.1 - 0.3 Id 0.3 Id
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 201 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.4.5.) CT : 100/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Lomg time inverse
650kW MOTOR FEEDER ZCT : 100/1A (-AA1) Base current (Ieb) 0.05 - 40.00 In 0.8 In
[GCB-00BBA12] VT : TMS (k) 0.05 - 1.50 0.2
6,000V 100V Overcurrent instantaneous (50)
[GCB-00BBA13]
Start value 0.10 - 40.00 In 8.0 In
3 3
Time 15 - 30,000 msec 50 msec
Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
Base current (Ieb) 0.05 - 40.00 In
TMS (k) 0.05 - 1.50
Earth fault high (50G)
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 0.4 In
Time 40 - 30,000 msec 100 msec
Under voltage (27)
Start value 0.1 - 1.2 Un 0.8 Un
Time 40 - 30,000 msec 2,000 msec
Unbalance load (46)
Start value (Is) 0.05 - 0.30 In 0.11 In
Temperature rise constant (K) 0.5 - 30.0 5.8
Reset time 0 - 2,000 sec 60 sec
Timer decreasing rate 0 - 100 % 10 %
Thermal overload (49)
Nominal motor temperature (TMn) 50 - 400℃ 110℃
Nominal motor current (IMn) 0.1 - 5.0 In 0.8 In
Initial temperature (Tini) 10 - 400℃ 110℃
Constant off (TCoff) 10 - 100,000 sec 800 sec
Time constant normal (TCnormal) 10 - 20,000 sec 200 sec
Time constant overheat (TCoverheat) 10 - 20,000 sec 200 sec
Trip temperature (Ttrip) 50 - 400℃ 140℃
Warning temperature (Twarn) 50 - 400℃ 124℃
Environment temperature (Tenv) 10 - 50℃ 40℃
Rest temperature (Trst) 10 - 400℃ 114℃
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 202 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.4.5.) CT : 100/1A ABB REF542+ Number of starts (66)


Max. num. of warm starts (Nws) 1 - 10 Not used
650kW MOTOR FEEDER ZCT : 100/1A (-AA1) Max. num. of cold starts (Ncs) 1 - 10
[GCB-00BBA12] VT : Reset time (trst) 1.00 - 7,200.00 sec
6,000V 100V Warm start temp. threshold (Tws) 20 - 200℃
[GCB-00BBA13]
Blocking rotor (51LR)
3 3
Nominal motor current (Imn) 0.20 - 2.00 In 0.76 In
Start value (Is) 1.00 - 20.00 Imn 4.8 Imn (=364.8A)
Time 40 - 30,000 msec 2,600 msec
Motor start (48)
Nominal motor current (Imn) 0.20 - 2.00 In 0.76 In
Start value (Is) 1.00 - 20.00 Imn 6.0 Imn
Time 40 - 300,000 msec 2,600 msec
Motor start (Ims) 0.20 - 0.80 Is 0.7 Is
Low load (37)
Nom real power (Pn) 50 - 1,000,000 kW Not used
Min. load 5 - 100% Pn
Min. current 2 - 20% In
Op. Time 1.0 - 1000.0 sec
AIN ARNAT CCPP
PROTECTIVE COORDINATION STUDY
17. Sep. 2014 PAGE : 203 of 205

SWIITCHGEAR PROTECTIVE RELAY RECOMMENDED


CT & VT RATIO REMARKS
[FEEDER No.] (PANEL No.) MAKER TYPE DUTY SETTING RANGE SETTING

5.4.6.) CT : 400/1A ABB REF542+ Overcurrent inverse time (51)


IDMT type NI, VI, EI, LI Very inverse
2,200kW GENERATOR ZCT : 100/1A (-AA1) Base current (Ieb) 0.05 - 40.00 In 0.76 In
FEEDER VT : TMS (k) 0.05 - 1.50 0.2
6,000V 100V Overcurrent instantaneous (50)
[GCB-00BBA14]
Start value 0.10 - 40.00 In 3.3 In
3 3
[GCB-00BBA15] Time 15 - 30,000 msec 300 msec
[GCB-00BBA16] Earth fault low (51G)
IDMT type NI, VI, EI, LI Not used
[GCB-00BBA17] Base current (Ieb) 0.05 - 40.00 In
[GCB-00BBA18] TMS (k) 0.05 - 1.50
Earth fault high (50G)
[GCB-00BBA19]
Current measure Sensor, Calculated
Start value 0.05 - 40.00 In 1.0 In
Time 40 - 30,000 msec 700 msec
Under voltage (27)
Start value 0.1 - 1.2 Un Not used
Time 40 - 30,000 msec
Unbalance load (46)
Start value (Is) 0.05 - 0.30 In Not used
Temperature rise constant (K) 0.5 - 30.0
Reset time 0 - 2,000 sec
Timer decreasing rate 0 - 100 %
Thermal overload (49)
Nominal motor temperature (TMn) 50 - 400℃ 110℃
Nominal motor current (IMn) 0.1 - 5.0 In 0.76 In
Initial temperature (Tini) 10 - 400℃ 110℃
Constant off (TCoff) 10 - 100,000 sec 48 sec
Time constant normal (TCnormal) 10 - 20,000 sec 12 sec
Time constant overheat (TCoverheat) 10 - 20,000 sec 12 sec
Trip temperature (Ttrip) 50 - 400℃ 140℃
Warning temperature (Twarn) 50 - 400℃ 124℃
Environment temperature (Tenv) 10 - 50℃ 40℃
R tt t (T ) 10 400℃ 114℃
PROTECTIVE COORDINATION AIN ARNAT CCPP

17. Sep. 2014 STUDY PAGE : 204 of 205

6. TIME-CURRENT COORDINATION CURVE


6.1 TCC LIST & TCC

NO. FEEDER NAME SHEET NO. REMARK

0 PROTECTION DIAGRAM

1 MV UNIT 1 _ CONNECTION FEEDER TCC. 01

2 MV UNIT 1 _2 MVA TR FEEDER TCC. 02

3 MV UNIT 1 _1.8 MVA TR FEEDER TCC. 03

4 MV UNIT 1 _1 MVA TR FEEDER TCC. 04

5 MV UNIT 1 _2.67 MVA TR FEEDER TCC. 05

6 MV UNIT 1 _3.1 MVA TR FEEDER TCC. 06

7 MV UNIT 1 _ 2,000kW MOTOR FEEDER TCC. 07

8 MV UNIT 1 _ 200kW MOTOR FEEDER TCC. 08

9 MV UNIT 1 _ 450kW MOTOR FEEDER TCC. 09

10 MV UNIT 1 _ 220kW MOTOR FEEDER TCC. 10

11 MV UNIT 1 _ 643kW MOTOR FEEDER TCC. 11

12 MV UNIT 1 _ OCGR TCC. 12

13 MV UNIT 2 _ CONNECTION FEEDER TCC. 13

14 MV UNIT 2 _2 MVA TR FEEDER TCC. 14

15 MV UNIT 2 _1.8 MVA TR FEEDER TCC. 15

16 MV UNIT 2 _1 MVA TR FEEDER TCC. 16

17 MV UNIT 2 _2.67 MVA TR FEEDER TCC. 17

18 MV UNIT 2 _3.1 MVA TR FEEDER TCC. 18

19 MV UNIT 2 _ 2,000kW MOTOR FEEDER TCC. 19

20 MV UNIT 2 _ 200kW MOTOR FEEDER TCC. 20

21 MV UNIT 2 _ 450kW MOTOR FEEDER TCC. 21

22 MV UNIT 2 _ 220kW MOTOR FEEDER TCC. 22

23 MV UNIT 2 _ 643kW MOTOR FEEDER TCC. 23


PROTECTIVE COORDINATION AIN ARNAT CCPP

17. Sep. 2014 STUDY PAGE : 205 of 205

24 MV UNIT 2 _ OCGR TCC. 24

25 MV UNIT 3 _ CONNECTION FEEDER TCC. 25

26 MV UNIT 3 _2 MVA TR FEEDER TCC. 26

27 MV UNIT 3 _1.8 MVA TR FEEDER TCC. 27

28 MV UNIT 3 _1 MVA TR FEEDER TCC. 28

29 MV UNIT 3 _2.67 MVA TR FEEDER TCC. 29

30 MV UNIT 3 _3.1 MVA TR FEEDER TCC. 30

31 MV UNIT 3 _ 2,000kW MOTOR FEEDER TCC. 31

32 MV UNIT 3 _ 200kW MOTOR FEEDER TCC. 32

33 MV UNIT 3 _ 450kW MOTOR FEEDER TCC. 33

34 MV UNIT 3 _ 220kW MOTOR FEEDER TCC. 34

35 MV UNIT 3 _ 643kW MOTOR FEEDER TCC. 35

36 MV UNIT 3 _ OCGR TCC. 36

37 MV COMMON _ 2 MVA TR FEEDER TCC. 37

38 MV COMMON _ 1 MVA TR FEEDER TCC. 38

39 MV COMMON _ 650kW MOTOR FEEDER TCC. 39

40 MV COMMON _ 2,200kW MOTOR FEEDER TCC. 40

41 MV COMMON _ OCGR TCC. 41


PROTECTION DIAGRAM

U1
23000 MVAsc

GAS INSULATED SWITCHGEAR

CB184 CB108 CB11

UNIT #3 (30BAT01) UNIT #2 (20BAT01) UNIT #1 (10BAT01)


420 MVA 420 MVA 420 MVA

IPB #3 IPB #2 ± IPB #1


I> Relay1

CB200 STEP DOWN XFMR#3(30BBT01) CB109 STEP DOWN XFMR#2(20BBT01) CB12 STEP DOWN XFMR#1(10BBT01)
UNIT SWGR-1(10BBA) 30 MVA 30 MVA 30 MVA

± ±
± ± ± ±
R R-GCB-30BBA03 R-GCB-30BBA04 R-GCB-20BBA04 R-GCB-20BBA03 R R-GCB-10BBA03 R-GCB-10BBA04
R R R R

(30MKA) GENERATOR #3 (20MKA) GENERATOR #2 (10MKA) GENERATOR #1


347.4 MW ±
347.4 MW ±
GCB-10BBA03 347.4 MW ±
GCB-10BBA04 UNIT SWGR-3(30BBA)
R R-GCB-30BBA01 GCB-20BBA04 R R-GCB-20BBA01 R R-GCB-10BBA01
GCB-30BBA03 GCB-30BBA04 GCB-20BBA03 Open Open

GCB-30BBA01 GCB-20BBA01 GCB-10BBA01


UNIT SWGR-3(30BBA) UNIT SWGR-2(20BBA) UNIT SWGR-1(10BBA)
Open
GCB-30BBA02 GCB-30BBA05 GCB-30BBA06 GCB-30BBA07 GCB-30BBA08 GCB-30BBA09 GCB-30BBA10 GCB-30BBA11 GCB-30BBA13 GCB-30BBA15 GCB-30BBA17 GCB-20BBA02 GCB-20BBA05 GCB-20BBA06 GCB-20BBA07 GCB-20BBA08 GCB-20BBA09 GCB-20BBA10 GCB-20BBA11 GCB-20BBA13 GCB-20BBA15 GCB-20BBA17 GCB-10BBA02 GCB-10BBA05 GCB-10BBA06 GCB-10BBA07 GCB-10BBA08 GCB-10BBA09 GCB-10BBA10 GCB-10BBA11 GCB-10BBA13 GCB-10BBA15 GCB-10BBA17

± ± ±
GCB-30BBA12 GCB-30BBA14 GCB-30BBA16 GCB-30BBA18 ± ± ±
GCB-20BBA12 GCB-20BBA14 GCB-20BBA16 GCB-20BBA18 ± ± ±
GCB-10BBA12 GCB-10BBA14 GCB-10BBA16 GCB-10BBA18
R R-GCB-30BBA06 R R-GCB-30BBA08 R R-GCB-30BBA10 R R-GCB-20BBA06 R R-GCB-20BBA08 R R-GCB-20BBA10 R R-GCB-10BBA06 R R-GCB-10BBA08 R R-GCB-10BBA10
± ± ± ± ± ± ± ± ±

R R-GCB-30BBA05 ±

R-GCB-30BBA07
±

R-GCB-30BBA09
±

R-GCB-30BBA11
±

R-GCB-30BBA14
±

R-GCB-30BBA17
±

R-GCB-20BBA05
±

R-GCB-20BBA07
±

R-GCB-20BBA09
±

R-GCB-20BBA11
±

R-GCB-20BBA14
±

R-GCB-20BBA17
±

R-GCB-10BBA05
±

R-GCB-10BBA07
±

R-GCB-10BBA09
±

R-GCB-10BBA11
±

R-GCB-10BBA14
±

R-GCB-10BBA17
R R R R R R R R R R R R R R R R R
±
±
30BFT02 ±
30BFT04 ± 30MBJ ± ± ± ± ±
20BFT02 ±
20BFT04 ± 20MBJ ± ± ± ± ±
10BFT02 ±
10BFT04 ± 10MBJ ± ± ±

R R-GCB-30BBA02 3.1 MVA R R-GCB-20BBA02 3.1 MVA R R-GCB-10BBA02 3.1 MVA


1.8 MVA 1 MVA 1.8 MVA 1 MVA 1.8 MVA 1 MVA

30BFT01 30BFT03 30MKC 20BFT10 20BFT03 20MKC 10BFT03 10MKC


2 MVA 1.8 MVA 2.67 MVA 2 MVA 1.8 MVA 2.67 MVA 1.8 MVA 2.67 MVA
STATION SWRG-1 (00BBA) STATION SWRG-1 (00BBA) STATION SWRG-1 (00BBA) 10BFT01
HRST HP/IP F.W.P.-1A, POWER A CONDENSTAE-1A, CCWP-1B FOR GT/ST SIDE, HRST HP/IP F.W.P.-1A. POWER A CONDENSTAE-1A. CCWP-1B FOR GT/ST SIDE. 2 MVA HRST HP/IP F.W.P.-1A POWER A CONDENSTAE-1A CCWP-1B FOR GT/ST SIDE
± ±
2000 kW 450 kW 220 kW ± ±
2000 kW 450 kW 220 kW ±
± 2000 kW 450 kW 220 kW
R-30BFB INCOMER R-30BFD INCOMER R-20BFB INCOMER R-20BFD INCOMER R-10BFB INCOMER R R-10BFD INCOMER
R R ± ± ± R R ± ± ± R ± ± ±

R R-GCB-30BBA12 R R-GCB-30BBA15 R R-GCB-30BBA18 R R-GCB-20BBA12 R R-GCB-20BBA15 R R-GCB-20BBA18 R R-GCB-10BBA12 R R-GCB-10BBA15 R R-GCB-10BBA18


± ± ± ± ± ± ± ± ±

30BFB INCOMER 30BFD INCOMER 20BFB INCOMER 20BFD INCOMER 10BFB INCOMER 10BFD INCOMER

ACC MCC-1A (30BFB) GEN.SERV.MCC-1 (30BFD) Bus58 ACC MCC-1A (20BFB) GEN.SERV.MCC-1 (20BFD) Bus27 ACC MCC-1A (10BFB) GEN.SERV.MCC-1 (10BFD) Bus64
HRST HP/IP F.W.P.-1B, POWER A CONDENSTAE-1B, LIQUID FUEL SYSTEM PUMP1, HRST HP/IP F.W.P.-1B. POWER A CONDENSTAE-1B. LIQUID FUEL SYSTEM PUMP1. HRST HP/IP F.W.P.-1B POWER A CONDENSTAE-1B LIQUID FUEL SYSTEM PUMP1
2000 kW 450 kW 643 kW 2000 kW 450 kW 643 kW 2000 kW 450 kW 643 kW
30BFB02 30BFD48 ± ± 20BFB02 20BFD48 ±
10BFB02 10BFD48 ± ±

R R-GCB-30BBA13 R R-GCB-30BBA16 ±
R R-GCB-20BBA16 R R-GCB-10BBA13 R R-GCB-10BBA16
± ± R R-GCB-20BBA13 ± ± ±

30BFB LOAD SUM 30BFD LOAD SUM Network13 20BFB LOAD SUM 20BFD LOAD SUM Network6 10BFB LOAD SUM 10BFD LOAD SUM Network1
1829 kVA 1301 kVA 1829 kVA 1301 kVA 1829 kVA 1301 kVA

BYPASS DEAERATOR P.-1, CCWP-1A FOR GT/ST SIDE, BYPASS DEAERATOR P.-1. CCWP-1A FOR GT/ST SIDE. BYPASS DEAERATOR P.-1 CCWP-1A FOR GT/ST SIDE
200 kW 220 kW 200 kW 220 kW 200 kW 220 kW
±

R-30BFA INCOMER MOTEUR VENTILATEUR #1, EOT for GT / ST, ±


MOTEUR VENTILATEUR #1. EOT for GT / ST. MOTEUR VENTILATEUR #1 EOT for GT / ST
R R-20BFA INCOMER
225 kW R 225 kW 225 kW
±
160 kW R-30BFC INCOMER Bus59 160 kW Bus28 160 kW Bus63
R ± ±

R R-10BFA INCOMER R R-10BFC INCOMER

30BFA INCOMER 30BFC INCOMER R R-20BFC INCOMER


20BFA INCOMER 10BFA INCOMER
UNIT SWRG-3 (30BFA) UNIT SWRG-2 (20BFA) UNIT SWRG-1 (10BFA)
10BFC INCOMER
±
20BFC INCOMER ± ±

R-30BHC MCC INCOMER Network14 ±


Network7 10BFA INTERCONNECTING R-10BHB 10BFA14 R-10BHC Network2
30BFA INTERCONNECTING 30BFA14 R 20BFA INTERCONNECTING Relay10 R R
20BFA14 R
± ±

± ±
± ±

± R R-30BHA ACC MCC-1B (30BFC) ± R R-20BHA ACC MCC-1B (20BFC) R-10BFA INTERCONNECTING R-10BHA ACC MCC-1B (10BFC)
R R
R R-30BFA INTERCONNECTING R R-20BFA INTERCONNECTING ±

30BHC MCC INCOMER 20BHC MCC INCOMER 10BHC MCC INCOMER


30BHD MCC INCOMER 20BHD MCC INCOMER 10BHB MCC INCOMER
30BFC02 20BFC02 10BFC02
30BHD CHP-RECIRCULATION PUMP, 30BHC 20BHD CHP-RECIRCULATION PUMP. 20BHC 10BHB CHP-RECIRCULATION PUMP 10BHC
90 kW 90 kW 90 kW

30BFC LOAD SUM 20BFC LOAD SUM 10BFC LOAD SUM


30BHA MCC INCOMER 1742 kVA 1742 kVA 10BHA MCC INCOMER-A 1742 kVA
30BFA LOAD SUM. 20BFA LOAD SUM. 20BHA MCC INCOMER
930 kVA 10BFA LOAD SUM.
930 kVA 930 kVA
30BHA 20BHA 10BHA
HRSG DIST.BOAED #1, 30BHC MCC MOTEUR VENTILATEUR #10, HRSG DIST.BOAED #1. 20BHC MCC MOTEUR VENTILATEUR #10. 10BHB MCC 10BHC MCC MOTEUR VENTILATEUR #10
170 kVA 104 kVA 170 kVA 104 kVA 170 kVA 104 kVA
160 kW 160 kW 160 kW
STATION SER.SWGR2B(00BFD)
STAT.SER.SWGR2A(00BFC) STAT.SER.SWGR2A(00BFC)

30BHA MCC 20BHA MCC 10BHA MCC


526 kVA 526 kVA 526 kVA

BDSG#6 BDSG#5 BDSG#4 BDSG#3


2200 kW 2200 kW 2200 kW BDSG#2 BDSG#1
2200 kW 2200 kW 2200 kW

± UNIT SWGR-3(30BBA) UNIT SWGR-2(20BBA) UNIT SWGR-1(10BBA)


I> BSDG relay
± ± ±

R R-00BBA INCOMER C R R-00BBA INCOMER B R R-00BBA INCOMER A


Cable47 Cable46 Cable53 Cable54 Cable55
1-3/C 95 1-3/C 95 1-3/C 95 1-3/C 95 1-3/C 95

± ± ± ± ± ± GCB-00BBA03 GCB-00BBA02 GCB-00BBA01


I> R-GCB-00BBA19 I> R-GCB-00BBA18 I> R-GCB-00BBA17 I> R-GCB-00BBA16 I> R-GCB-00BBA15 R R-GCB-00BBA14
±
Open Open

GCB-00BBA19 GCB-00BBA18 GCB-00BBA17 GCB-00BBA16 GCB-00BBA15 GCB-00BBA14


STATION SWRG-1 (00BBA) Open Open Open Open Open Open

GCB-00BBA06 GCB-00BBA04 GCB-00BBA05 GCB-00BBA07 GCB-00BBA08 GCB-00BBA09 GCB-00BBA10 GCB-00BBA12 GCB-00BBA13


GCB-00BBA11
± ±
± ± ± ± ± ± ± ±
R R-GCB-00BBA06 R R-GCB-00BBA04 R-GCB-00BBA05 R-GCB-00BBA07 R-GCB-00BBA08 R-GCB-00BBA09 R-GCB-00BBA10 R-GCB-00BBA11 R-GCB-00BBA12 R-GCB-00BBA13
R R R R R R R R
± ±
± ± ±
UNIT SWRG-1 (10BFA) ± ± ± ± ±

00BFT03 00BFT01 00BFT04 00BFT05 00BFT06 00BFT10


1 MVA 00BFT02 00BFT11
2 MVA 2 MVA 1 MVA 2 MVA UNIT SWRG-3 (30BFA) UNIT SWRG-2 (20BFA) 2 MVA 2 MVA 2 MVA
±

R R-UNIT SWGR-1A
± ± ± ± ± ±

R R-00BFA INCOMER R R-00BFB INCOMER R R-00BFC INCOMER R R-00BFD INCOMER R R-00BFE INCOMER R R-00BFF ACB INCOMER B

UNIT SWGR-3A UNIT SWGR-1A UNIT SWGR-2A MOTOR DRIVEN PUMP A MOTOR DRIVEN PUMP B
650 kW 650 kW
Open Open Open
00BFA INCOMER 00BFB INCOMER 00BFC INCOMER 00BFD INCOMER 00BFE INCOMER 00BFF ACB INCOMER B
Open Open Open
STAT.SER.SWGR1A(00BFA) STAT.SER.SWGR 1B(00BFB) STAT.SER.SWGR2A(00BFC) STATION SER.SWGR2B(00BFD) COMMON SWGR 1A (00BFE) COMMON SEGR-1B(00BFF)

00BHG 00BHE 00BJA 00BHA R R-00BFA TIE 00BHB 00BJB 00BHF 00BHH 00BHM 00BHK 00BMA 00BMB 00BHL 00BHN 00BHQ 00BHO 00BHS 00BHT 00BHP 00BHR
Open ± ±

R R-00BFC TIE Open Open Open R R-00BFE TIE Open


00BFA TIE 00BFC TIE 00BFE TIE
± ± ± ± ± ± ± ± ± ± ± ± ± ± ± ±

R R-00BHG R R-00BJA R R-00BJB R R-00BHH R R-00BHM R R-00BHK R R-00BMA R R-00BMB R R-00BHL R R-00BHN R R-00BHQ R R-00BHO R R-00BHS R R-00BHT R R-00BHP R R-00BHR
00BFC LOAD SUM 00BFD LOAD SUM
526 kVA 526 kVA

±
AUX.BOILER MCC-1(00BHA) AUX BOILER MCC-2(00BHB) ±

R R-00BHE R R-00BHF 00BMA INCOMER 00BMB INCOMER 00BHS INCOMER 00BHT INCOMER
00BHA TIE

MCC-A1-1 MCC-B1-1
ESSENTIAL MCC-1(00BMA) ESSENTIAL MCC-2(00BMB) ADMIN. BLDG MCC(00BHS) WARE HOUSE MCC(00BHT)
00BJA INCOMER 00BJB INCOMER 00BLT02
± ±

R-00BHK INCOMER 00BMA TIE R-00BHL INCOMER 1 MVA


R R
AUX. BOILER MCC A AUX. BOILER MCC B Open
105 kVA 105 kVA
WT&WWT MCC-1(00BJA) WT&WWT MCC-2(00BJB)
00BHK INCOMER 00BHL INCOMER 00BLT01 00BHO INCOMER Lump16 Lump17 00BHP INCOMER
00BJA TIE Lump18 Lump21 1 MVA 417 kVA 125 kVA
100 kVA 100 kVA Open Open
CB259 CB265
± ±
400KV GIS MCC-1(00BMK) 400KV GIS MCC-2(00BML) CONTROL BLDG MCC-1(00BHO) CONTROL BLDG MCC-2(00BHP)
R R-00BHI INCOMER 00BHE INCOMER 00BHF INCOMER R R-00BHJ INCOMER
00BMK TIE 00BHO TIE
Open
Lump24 Lump26
100 kVA 100 kVA
COMMON MCC-1(00BHE) COMMON MCC-2(00BHF) ± ±

MAX.MCCB, R R-00BHQ INCOMER R R-00BHR INCOMER


00BHE TIE
Lump15 Lump14
CB267 CB268 228 kVA 228 kVA

00BHG INCOMER 00BHH INCOMER 00BHM INCOMER 00BHN INCOMER 00BHQ INCOMER 00BHR INCOMER
Lump19 Lump22
Open 395 kVA 395 kVA Open Open
Lump5 Lump10
185 kVA 185 kVA
H2 GEN MCC-1(00BHG) H2 GEN. MCC-2(00BHH) BSDG MCC-1(00BHM) BSDG MCC-2(00BHN) LTG DB-1(00BHQ) LTG DB-2(00BHR)

00BHG TIE 00BHM TIE


MAX.MCCB
CB269 CB270 ±

R R-00BHQ TIE
00BHI INCOMER 00BHJ INCOMER
Open 00BHQ TIE
Lump6 Lump9 Lump20 Lump23 Lump12 Lump13
100 kVA 200 MVA 235 kVA 235 kVA 800 kVA 800 kVA
FUEL SYS. MCC-1(00BHI) FUEL SYS. MCC-2(00BHJ)

R R-00BHI TIE

MAX.MCCB.
0BHI TIE
Lump8
215 kVA

Lump7
215 kVA

page 1 13:31:00 9 17, 2014 Project File: AIN


Amps X 100 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300 ±

I> F13_Upstream relay

STEP DOWN XFMR#1(10BBT01)


100 100 30 MVA

50 F13_Upstream relay - P 50
OC1 ±

30 Siemens 30 R R-GCB-10BBA01
7UT633/635
R-GCB-10BBA03 - P CT Ratio 2500:1
OC1 Definite Time GCB-10BBA01
ABB Pickup = 1.59 (0.05 - 35 Sec - 1A)
10 REF 542plus Time Dial = 1 10 ±

CT Ratio 3600:1 3x = 1 s, 5x = 1 s, 8x = 1 s R R-GCB-10BBA03


Very Inverse Inst = 3.41 (0.05 - 35 Sec - 1A)
Time Delay = 0.1 s
5 Pickup = 0.9 (0.05 - 40 xCT Sec) 5
Seconds

Seconds
Time Dial = 0.35 GCB-10BBA03
3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
3 Inst = 3.5 (0.05 - 40 xCT Sec) 3
Time Delay = 0.5 s UNIT SWGR-1(10BBA)
STEP DOWN XFMR#1(10BBT01)
R-GCB-10BBA02 - P
OC1 R-GCB-10BBA01 - P GCB-10BBA02
1 ABB OC1 1
REF 542plus ABB
±

R R-GCB-10BBA02
CT Ratio 2000:1 REF 542plus
.5 Very Inverse CT Ratio 3600:1 .5
Pickup = 1 (0.05 - 40 xCT Sec) Very Inverse
Time Dial = 0.35 Pickup = 1 (0.05 - 40 xCT Sec)
.3 .3
3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s Time Dial = 0.4
Inst = 5 (0.05 - 40 xCT Sec) 3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s
Time Delay = 0.3 s Inst = 4 (0.05 - 40 xCT Sec) ±

Time Delay = 0.7 s R R-00BBA INCOMER A


R-00BBA INCOMER A - P
.1 OC1 .1

ABB STEP DOWN XFMR#1(10BBT01)


REF 542plus Inrush GCB-00BBA01
.05 CT Ratio 2000:1 .05
Very Inverse
R-GCB-10BBA01 - 3P
.03 Pickup = 1 (0.05 - 40 xCT Sec) .03
Time Dial = 0.35 24.84kA @ 6kV
3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
R-GCB-10BBA03 - 3P
Inst = 5 (0.05 - 40 xCT Sec) F13_Upstream relay - 3P
24.84kA @ 6kV
Time Delay = 0.3 s 148.2kA @ 22kV
.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 100 (Plot Ref. kV=6) ETAP Star 12.0.0C

01_MV UNIT1_CONNECTION

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 10BFT01 500


FLA
300 300

100 100
±

R R-GCB-10BBA01

50 50
R-GCB-10BBA01 - P
GCB-10BBA01
OC1
30 ABB 30
REF 542plus
CT Ratio 3600:1 ±

R-GCB-10BBA03
R
Very Inverse
Pickup = 1 (0.05 - 40 xCT Sec)
Time Dial = 0.4 GCB-10BBA03 UNIT SWGR-1(10BBA)
10 10
3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s
R-GCB-10BBA05 - OL
Inst = 4 (0.05 - 40 xCT Sec)
ABB Time Delay = 0.7 s
REF 542plus
5 5
Seconds

Seconds
CT Ratio 300:1
Thermal Overload Curve GCB-10BBA05
3 Pickup = 0.8 (0.1 - 5 xCT Sec) 3
Overload Time Constant = 100 10BFT01
Overload Constant (k) = 1 Inrush

1
10BFT01 1
±

R R-GCB-10BBA05
±
R-GCB-10BBA05 - P
OC1
.5 .5
ABB
R-GCB-10BBA03 - P
REF 542plus
.3 CT Ratio 300:1 OC1 .3
Very Inverse ABB 10BFT01
Pickup = 0.96 (0.05 - 40 xCT Sec) REF 542plus 2 MVA
Time Dial = 0.5 CT Ratio 3600:1
3x = 3.37 s, 5x = 1.69 s, 8x = 0.964 s Very Inverse
Inst = 14.6 (0.05 - 40 xCT Sec) Pickup = 0.9 (0.05 - 40 xCT Sec)
.1 Time Delay = 0.05 s Time Dial = 0.35 .1
3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
Inst = 3.5 (0.05 - 40 xCT Sec)
Time Delay = 0.5 s
.05 .05

R-GCB-10BBA01 - 3P
.03 24.84kA @ 6kV .03

R-GCB-10BBA03 - 3P
24.84kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6) ETAP Star 12.0.0C

02_MV UNIT1_2MVA TR

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 10BFT02 500


FLA
300 300

100 100
±

R R-GCB-10BBA01

50 50
R-GCB-10BBA01 - P
GCB-10BBA01
OC1
30 30
ABB
REF 542plus
CT Ratio 3600:1 ±

Very Inverse R R-GCB-10BBA03


Pickup = 1 (0.05 - 40 xCT Sec)
10 Time Dial = 0.4 10 UNIT SWGR-1(10BBA)
R-GCB-10BBA06 - OL 3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s GCB-10BBA03
ABB Inst = 4 (0.05 - 40 xCT Sec)
REF 542plus Time Delay = 0.7 s
5 5
Seconds

Seconds
CT Ratio 300:1
Thermal Overload Curve
3 Pickup = 0.72 (0.1 - 5 xCT Sec) 3
Overload Time Constant = 100 10BFT02
Overload Constant (k) = 1 Inrush GCB-10BBA06

1
10BFT02 1
±

R R-GCB-10BBA06
±

.5 R-GCB-10BBA06 - P .5
OC1 R-GCB-10BBA03 - P
.3 ABB OC1 .3
REF 542plus ABB 10BFT02
CT Ratio 300:1 REF 542plus 1.8 MVA
Very Inverse CT Ratio 3600:1
Pickup = 0.9 (0.05 - 40 xCT Sec) Very Inverse
Time Dial = 0.4 Pickup = 0.9 (0.05 - 40 xCT Sec)
.1 3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s Time Dial = 0.35 .1
Inst = 17.5 (0.05 - 40 xCT Sec) 3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
Time Delay = 0.05 s Inst = 3.5 (0.05 - 40 xCT Sec)
Time Delay = 0.5 s
.05 .05

R-GCB-10BBA01 - 3P
.03 .03
24.84kA @ 6kV

R-GCB-10BBA03 - 3P
24.84kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6) ETAP Star 12.0.0C

03_MV_UNIT1 1.8MVA TR

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 10BFT04 500


FLA
300 300

100 100

R R-GCB-10BBA01
50 50
R-GCB-10BBA01 - P
OC1 GCB-10BBA01
30 30
ABB
REF 542plus ±

R R-GCB-10BBA03
CT Ratio 3600:1
Very Inverse
Pickup = 1 (0.05 - 40 xCT Sec)
10 R-GCB-10BBA08 - OL Time Dial = 0.4 10 GCB-10BBA03
ABB 3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s UNIT SWGR-1(10BBA)
Open
REF 542plus Inst = 4 (0.05 - 40 xCT Sec)
CT Ratio 300:1 Time Delay = 0.7 s
5 5
Thermal Overload Curve
Seconds

Seconds
Pickup = 0.4 (0.1 - 5 xCT Sec)
3 Overload Time Constant = 150 3
Overload Constant (k) = 1 10BFT04 GCB-10BBA08
Inrush

1
10BFT04 1 R R-GCB-10BBA08
±

R-GCB-10BBA08 - P
OC1
.5 .5
ABB
REF 542plus R-GCB-10BBA03 - P
.3 CT Ratio 300:1 OC1 .3
Very Inverse ABB 10BFT04
Pickup = 0.5 (0.05 - 40 xCT Sec) REF 542plus 1 MVA
Time Dial = 0.5 CT Ratio 3600:1
3x = 3.38 s, 5x = 1.69 s, 8x = 0.964 s Very Inverse
Inst = 9.5 (0.05 - 40 xCT Sec) Pickup = 0.9 (0.05 - 40 xCT Sec)
.1 Time Delay = 0.05 s Time Dial = 0.35 .1
3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
Inst = 3.5 (0.05 - 40 xCT Sec)
.05 Time Delay = 0.5 s .05

R-GCB-10BBA01 - 3P
.03 .03
24.84kA @ 6kV

R-GCB-10BBA03 - 3P
24.84kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6)


ETAP Star 12.0.0C

04_MV UNIT1 1MVA TR

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 10MKC 500


FLA
300 300

100 100
±

R R-GCB-10BBA01

50 50
R-GCB-10BBA01 - P GCB-10BBA01
30 OC1 30
ABB
REF 542plus ±

CT Ratio 3600:1 R R-GCB-10BBA03


Very Inverse
Pickup = 1 (0.05 - 40 xCT Sec)
10 Time Dial = 0.4 10 GCB-10BBA03
3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s
R-GCB-10BBA09 - OL Open
Inst = 4 (0.05 - 40 xCT Sec)
ABB Time Delay = 0.7 s UNIT SWGR-1(10BBA)
5 5
REF 542plus
Seconds

Seconds
CT Ratio 400:1
3 Thermal Overload Curve 3
Pickup = 0.8 (0.1 - 5 xCT Sec) 10MKC
Overload Time Constant = 100 Inrush GCB-10BBA09
Overload Constant (k) = 1

1 10MKC 1 ±

R R-GCB-10BBA09
±

.5 R-GCB-10BBA09 - P .5
OC1 R-GCB-10BBA03 - P
.3 ABB OC1 .3
REF 542plus ABB
CT Ratio 400:1 REF 542plus
Very Inverse CT Ratio 3600:1
Pickup = 0.96 (0.05 - 40 xCT Sec) Very Inverse
Time Dial = 0.4 Pickup = 0.9 (0.05 - 40 xCT Sec) 10MKC
.1 3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s Time Dial = 0.35 .1 2.67 MVA
Inst = 12.8 (0.05 - 40 xCT Sec) 3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
Time Delay = 0.05 s Inst = 3.5 (0.05 - 40 xCT Sec)
.05 Time Delay = 0.5 s .05

R-GCB-10BBA01 - 3P
.03 .03
24.84kA @ 6kV

R-GCB-10BBA03 - 3P
24.84kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6) ETAP Star 12.0.0C

05_MV UNIT1_2.67MVA TR

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 100 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 10MBJ 500


FLA
300 300

100 100

R R-GCB-10BBA01
50 50

GCB-10BBA01
30 30

R-GCB-10BBA01 - P ±

R R-GCB-10BBA03
OC1
R-GCB-10BBA10 - OL
ABB
10 ABB 10
REF 542plus GCB-10BBA03
REF 542plus CT Ratio 3600:1
CT Ratio 800:1 Very Inverse Open UNIT SWGR-1(10BBA)
Thermal Overload Curve Pickup = 1 (0.05 - 40 xCT Sec)
5 5
Pickup = 0.47 (0.1 - 5 xCT Sec)
Seconds

Seconds
Time Dial = 0.4
Overload Time Constant = 100 3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s
3 Overload Constant (k) = 1 Inst = 4 (0.05 - 40 xCT Sec) 3
10MBJ Time Delay = 0.7 s GCB-10BBA10
Inrush
±

R R-GCB-10BBA10
1 1 ±

10MBJ
R-GCB-10BBA03 - P
.5 OC1 .5

R-GCB-10BBA10 - P ABB
REF 542plus
.3 OC1 .3
CT Ratio 3600:1 10MBJ
ABB Very Inverse
REF 542plus
3.1 MVA
Pickup = 0.9 (0.05 - 40 xCT Sec)
CT Ratio 800:1 Time Dial = 0.35
Very Inverse 3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
.1
Pickup = 0.56 (0.05 - 40 xCT Sec) Inst = 3.5 (0.05 - 40 xCT Sec) .1
Time Dial = 0.4 Time Delay = 0.5 s
3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s
Inst = 7.5 (0.05 - 40 xCT Sec)
.05 Time Delay = 0.05 s .05

.03 R-GCB-10BBA01 - 3P .03


24.84kA @ 6kV

R-GCB-10BBA03 - 3P
24.84kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 100 (Plot Ref. kV=6) ETAP Star 12.0.0C

06_MV UNIT1_3.1MVA TR

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100

R R-GCB-10BBA01
50 50
R-GCB-10BBA01 - P
30 OC1 30 GCB-10BBA01
ABB
R-GCB-10BBA11 - OL REF 542plus ±

ABB CT Ratio 3600:1 R R-GCB-10BBA03


REF 542plus Very Inverse
CT Ratio 400:1 Pickup = 1 (0.05 - 40 xCT Sec)
10 Thermal Overload Curve Time Dial = 0.4 10 GCB-10BBA03
Pickup = 0.63 (0.1 - 5 xCT Sec) 3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s
Overload Time Constant = 200 Open UNIT SWGR-1(10BBA)
Inst = 4 (0.05 - 40 xCT Sec)
Overload Constant (k) = 1 Time Delay = 0.7 s
5 5

Seconds
Seconds

3 3
GCB-10BBA11

R-GCB-10BBA11 - P
±

1 OC1 1 R R-GCB-10BBA11
ABB ±

REF 542plus
CT Ratio 400:1
.5 .5
Long Time Inverse
Pickup = 0.63 (0.05 - 40 xCT Sec) R-GCB-10BBA03 - P
.3 Time Dial = 0.25 OC1 .3
3x = 15 s, 5x = 7.5 s, 8x = 4.29 s ABB
Inst = 5.3 (0.05 - 40 xCT Sec) REF 542plus
Time Delay = 0.05 s CT Ratio 3600:1
Very Inverse
Pickup = 0.9 (0.05 - 40 xCT Sec) HRST HP/IP F.W.P.-1A
.1 Time Dial = 0.35 .1 2000 kW
3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
Inst = 3.5 (0.05 - 40 xCT Sec)
Time Delay = 0.5 s
.05 .05
HRST HP/IP F.W.P.-1A-100%
2000 KW R-GCB-10BBA01 - 3P
.03 24.84kA @ 6kV
.03

R-GCB-10BBA03 - 3P
24.84kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6)


ETAP Star 12.0.0C

07_MV UNIT1_2,000kW Motor

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100
±

R R-GCB-10BBA01

50 50
R-GCB-10BBA01 - P GCB-10BBA01
R-GCB-10BBA13 - OL
30 OC1 30
ABB
REF 542plus ABB ±

REF 542plus R R-GCB-10BBA03


CT Ratio 75:1
Thermal Overload Curve CT Ratio 3600:1
Pickup = 0.34 (0.1 - 5 xCT Sec) Very Inverse
Pickup = 1 (0.05 - 40 xCT Sec) GCB-10BBA03
Overload Time Constant = 150 UNIT SWGR-1(10BBA)
10 Time Dial = 0.4 10 Open
Overload Constant (k) = 1
3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s
Inst = 4 (0.05 - 40 xCT Sec)
Time Delay = 0.7 s
5 5
Seconds

Seconds
GCB-10BBA13

3 3

R R-GCB-10BBA13
±

1 1

.5 .5
R-GCB-10BBA03 - P
R-GCB-10BBA13 - P
OC1
.3 OC1 .3
ABB
ABB
REF 542plus
REF 542plus
CT Ratio 3600:1 BYPASS DEAERATOR P.-1
CT Ratio 75:1
Very Inverse 200 kW
Long Time Inverse
Pickup = 0.9 (0.05 - 40 xCT Sec)
.1 Pickup = 0.34 (0.05 - 40 xCT Sec) Time Dial = 0.35 .1
Time Dial = 0.15
3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
3x = 9 s, 5x = 4.5 s, 8x = 2.57 s
Inst = 3.5 (0.05 - 40 xCT Sec)
Inst = 3.4 (0.05 - 40 xCT Sec)
Time Delay = 0.5 s
.05 Time Delay = 0.05 s .05

.03 R-GCB-10BBA01 - 3P .03


BYPASS DEAERATOR P.-1-100%
24.84kA @ 6kV
200 KW
R-GCB-10BBA03 - 3P
24.84kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6)


ETAP Star 12.0.0C

08_MV UNIT1_200kW MOTOR

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

R R-GCB-10BBA01
100 100

GCB-10BBA01
50 50
R-GCB-10BBA01 - P
30 OC1 30
ABB
REF 542plus
±
CT Ratio 3600:1 R-GCB-10BBA03
R
Very Inverse
R-GCB-10BBA14 - OL Pickup = 1 (0.05 - 40 xCT Sec)
10 ABB Time Dial = 0.4 10
REF 542plus 3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s GCB-10BBA03
CT Ratio 100:1 Inst = 4 (0.05 - 40 xCT Sec) Open UNIT SWGR-1(10BBA)
5 Thermal Overload Curve
Time Delay = 0.7 s 5
Seconds

Seconds
Pickup = 0.56 (0.1 - 5 xCT Sec)
Overload Time Constant = 200
3 Overload Constant (k) = 1 3
GCB-10BBA14

R R-GCB-10BBA14
1 1 ±

R-GCB-10BBA14 - P
.5
OC1 .5
ABB R-GCB-10BBA03 - P
REF 542plus
.3 CT Ratio 100:1
OC1 .3
Long Time Inverse ABB
Pickup = 0.56 (0.05 - 40 xCT Sec) REF 542plus
Time Dial = 0.2 CT Ratio 3600:1
3x = 12 s, 5x = 6 s, 8x = 3.43 s Very Inverse
Inst = 5.6 (0.05 - 40 xCT Sec) Pickup = 0.9 (0.05 - 40 xCT Sec)
.1 Time Dial = 0.35 .1 POWER A CONDENSTAE-1A
Time Delay = 0.05 s
3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s 450 kW
Inst = 3.5 (0.05 - 40 xCT Sec)
Time Delay = 0.5 s
.05 .05
POWER A CONDENSTAE-1A-100%
R-GCB-10BBA01 - 3P
.03 450 KW 24.84kA @ 6kV .03

R-GCB-10BBA03 - 3P
24.84kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6) ETAP Star 12.0.0C

09_MV UNIT1_450kW Motor

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100 ±

R R-GCB-10BBA01

50 50 GCB-10BBA01
R-GCB-10BBA01 - P
OC1
30 30
ABB
REF 542plus
CT Ratio 3600:1
±
Very Inverse R-GCB-10BBA03
R
Pickup = 1 (0.05 - 40 xCT Sec)
10 Time Dial = 0.4 10
3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s
Inst = 4 (0.05 - 40 xCT Sec) GCB-10BBA03
R-GCB-10BBA16 - OL Time Delay = 0.7 s Open UNIT SWGR-1(10BBA)
5 5
Seconds

Seconds
ABB
REF 542plus
3 CT Ratio 75:1 3
Thermal Overload Curve
Pickup = 0.37 (0.1 - 5 xCT Sec)
GCB-10BBA16
Overload Time Constant = 400
Overload Constant (k) = 1

1 1

R-GCB-10BBA16 - P
.5
OC1 .5
ABB R-GCB-10BBA03 - P ±

REF 542plus R R-GCB-10BBA16


.3 CT Ratio 75:1
OC1 .3 ±

Long Time Inverse ABB


Pickup = 0.37 (0.05 - 40 xCT Sec) REF 542plus
Time Dial = 0.5 CT Ratio 3600:1
3x = 30 s, 5x = 15 s, 8x = 8.57 s Very Inverse
Inst = 3.7 (0.05 - 40 xCT Sec) Pickup = 0.9 (0.05 - 40 xCT Sec)
.1 Time Dial = 0.35 .1
Time Delay = 0.05 s CCWP-1A FOR GT/ST SIDE
3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
Inst = 3.5 (0.05 - 40 xCT Sec)
220 kW
Time Delay = 0.5 s
.05 CCWP-1A FOR GT/ST SIDE-100% .05

220 KW
.03 R-GCB-10BBA01 - 3P .03
24.84kA @ 6kV

R-GCB-10BBA03 - 3P
24.84kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6) ETAP Star 12.0.0C

10_MV UNIT1_220kW Motor

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100

50 50 R R-GCB-10BBA01
R-GCB-10BBA01 - P
30 OC1 30 GCB-10BBA01
ABB
REF 542plus
±
CT Ratio 3600:1 R-GCB-10BBA03
R
Very Inverse
Pickup = 1 (0.05 - 40 xCT Sec)
10 Time Dial = 0.4 10
3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s GCB-10BBA03
Inst = 4 (0.05 - 40 xCT Sec) Open UNIT SWGR-1(10BBA)
5 R-GCB-10BBA18 - OL Time Delay = 0.7 s 5
Seconds

Seconds
ABB
REF 542plus
3 3
CT Ratio 100:1 GCB-10BBA18
Thermal Overload Curve
Pickup = 0.81 (0.1 - 5 xCT Sec)
Overload Time Constant = 400
Overload Constant (k) = 1 ±

1 1 R R-GCB-10BBA18
±

R-GCB-10BBA18 - P
.5 OC1 .5
ABB R-GCB-10BBA03 - P
REF 542plus OC1
.3 .3
CT Ratio 100:1
ABB
Long Time Inverse
REF 542plus
Pickup = 0.81 (0.05 - 40 xCT Sec)
CT Ratio 3600:1 LIQUID FUEL SYSTEM PUMP1
Time Dial = 0.5
Very Inverse 643 kW
3x = 30 s, 5x = 15 s, 8x = 8.57 s
Pickup = 0.9 (0.05 - 40 xCT Sec)
.1 Inst = 8.2 (0.05 - 40 xCT Sec) Time Dial = 0.35 .1
Time Delay = 0.05 s
3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
Inst = 3.5 (0.05 - 40 xCT Sec)
Time Delay = 0.5 s
.05 LIQUID FUEL SYSTEM PUMP1-100% .05

643 KW
.03 R-GCB-10BBA01 - 3P .03
24.84kA @ 6kV

R-GCB-10BBA03 - 3P
24.84kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6) ETAP Star 12.0.0C

11_MV UNIT1_643kW Motor

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

R-GCB-10BBA05 - G
OC1 ±

F27 Upstream
500 500 I>
ABB F27 Upstream - G ±

REF 542plus OC1


300 CT Ratio 100:1 Siemens 300 STEP DOWN XFMR#2(20BBT01)
Inst = 0.4 (0.05 - 40 xCT Sec) 7UT633/635 30 MVA
Time Delay = 0.1 s CT Ratio 500:1 ±

Definite Time ±
R R-GCB-10BBA04
R-GCB-10BBA06 - G R R-GCB-10BBA01
Pickup = 0.42 (0.05 - 35 Sec - 1A)
OC1 Time Dial = 1.5 GCB-10BBA04
100 100 UNIT SWGR-1(10BBA) GCB-10BBA01 Open
3x = 1.5 s, 5x = 1.5 s, 8x = 1.5 s
R-GCB-10BBA07 - G
OC1 GCB-10BBA05 GCB-10BBA07 GCB-10BBA09 GCB-10BBA11 GCB-10BBA13 GCB-10BBA15 GCB-10BBA17

50 50
R-GCB-10BBA08 - G R-GCB-10BBA01 - G
OC1 GCB-10BBA02 GCB-10BBA06 GCB-10BBA08 GCB-10BBA10 GCB-10BBA12 GCB-10BBA14 GCB-10BBA16 GCB-10BBA18
OC1
30 ABB 30
REF 542plus
R-GCB-10BBA09 - G CT Ratio 3600:1 ± ± ±

OC1 Very Inverse R R-GCB-10BBA05 R R-GCB-10BBA08 R R-GCB-10BBA11 ±

R R-GCB-10BBA14
±

R R-GCB-10BBA17
Pickup = 0.05 (0.05 - 40 xCT Sec) ± ± ±
± ±

R-GCB-10BBA10 - G Time Dial = 0.07


3x = 0.472 s, 5x = 0.236 s, 8x = 0.135 s
OC1 Inst = 0.1 (0.05 - 40 xCT Sec)
10 10
Time Delay = 0.7 s 10BFT04
R-GCB-10BBA11 - G 10BFT01
1 MVA
OC1 2 MVA HRST HP/IP F.W.P.-1A POWER A CONDENSTAE-1A CCWP-1B FOR GT/ST SIDE
5 5 2000 kW 450 kW 220 kW
R-GCB-10BBA04 - G

Seconds
Seconds

R-GCB-10BBA12 - G ±

R R-GCB-10BBA09
OC1 ±

R-GCB-10BBA06
±

R-GCB-10BBA12
±

R-GCB-10BBA15
±

OC1 R ±
R R R
3 ABB 3 ± ± ±
R-GCB-10BBA18 ±

REF 542plus
R-GCB-10BBA13 - G CT Ratio 3600:1
OC1 Inst = 0.05 (0.05 - 40 xCT Sec)
10MKC
Time Delay = 0.5 s 10BFT02 2.67 MVA
R-GCB-10BBA02 - G 1.8 MVA
R-GCB-10BBA14 - G
1 OC1 OC1 1 HRST HP/IP F.W.P.-1B POWER A CONDENSTAE-1B
ABB 2000 kW 450 kW LIQUID FUEL SYSTEM PUMP1
REF 542plus 643 kW
R-GCB-10BBA15 - G
± ± ± ± ±

CT Ratio 2000:1 R R-GCB-10BBA02 R R-GCB-10BBA07 R R-GCB-10BBA10 R R-GCB-10BBA13 R


R-GCB-10BBA16
.5 OC1 Inst = 0.05 (0.05 - 40 xCT Sec) .5 ± ± ± ±

Time Delay = 0.3 s ±

R R-00BBA INCOMER A
R-GCB-10BBA16 - G R-00BBA INCOMER A - G
.3 .3 10BFT03 10MBJ
OC1 OC1 GCB-00BBA01 3.1 MVA
ABB
1.8 MVA
REF 542plus BDSG#1
R-GCB-10BBA17 - G CT Ratio 2000:1 2200 kW BYPASS DEAERATOR P.-1 CCWP-1A FOR GT/ST SIDE
200 kW 220 kW
OC1 Inst = 0.05 (0.05 - 40 xCT Sec)
Time Delay = 0.3 s
.1 R-GCB-10BBA18 - G .1 ±

I> BSDG relay


OC1
R-GCB-00BBA14 - G ±

R-GCB-00BBA14
R
.05 OC1 .05
±

ABB
.03 REF 542plus .03 GCB-00BBA14
CT Ratio 100:1
Inst = 1 (0.05 - 40 xCT Sec) Open STATION SWRG-1 (00BBA)
Time Delay = 0.7 s R-GCB-10BBA01 - G - LG
0.4kA @ 6kV

F27 Upstream - G - LG
0.42kA @ 22kV
.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps (Plot Ref. kV=6)


ETAP Star 12.0.0C

12_MV UNIT1_OCGR

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Engineer: Fault: Ground
Amps X 100 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100

R R-GCB-20BBA01
50 50

30 30 GCB-20BBA01
R-GCB-20BBA01 - P Open
OC1
ABB ±

10 R-GCB-20BBA02 - P REF 542plus 10 R R-GCB-20BBA04


OC1 CT Ratio 3600:1
ABB Very Inverse GCB-20BBA04
5 REF 542plus Pickup = 1 (0.05 - 40 xCT Sec) 5
Seconds

Seconds
CT Ratio 2000:1 Time Dial = 0.4
3 Very Inverse 3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s 3 UNIT SWGR-2(20BBA)
Pickup = 1 (0.05 - 40 xCT Sec) Inst = 4 (0.05 - 40 xCT Sec)
Time Dial = 0.35 Time Delay = 0.7 s
3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
Inst = 5 (0.05 - 40 xCT Sec) GCB-20BBA02
1 Time Delay = 0.3 s 1

R-GCB-20BBA04 - P ±

R R-GCB-20BBA02
.5 R-00BBA INCOMER B - P OC1 .5
OC1 ABB
.3 ABB REF 542plus .3
REF 542plus CT Ratio 3600:1
CT Ratio 2000:1 Very Inverse
Very Inverse Pickup = 0.9 (0.05 - 40 xCT Sec)
Pickup = 1 (0.05 - 40 xCT Sec) Time Dial = 0.35 ±

R R-00BBA INCOMER B
.1 Time Dial = 0.35 3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s .1
3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s Inst = 3.5 (0.05 - 40 xCT Sec)
Inst = 5 (0.05 - 40 xCT Sec) Time Delay = 0.5 s
.05 Time Delay = 0.3 s .05

R-GCB-20BBA01 - 3P
.03 24.83kA @ 6kV .03

R-GCB-20BBA04 - 3P
24.84kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 100 (Plot Ref. kV=6)


ETAP Star 12.0.0C

13_MV UNIT2_CONNECTION

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 20BFT10 500


FLA
300 300

100 100

R R-GCB-20BBA01
50 50
R-GCB-20BBA01 - P
OC1 GCB-20BBA01
30 30
ABB Open
REF 542plus
CT Ratio 3600:1
Very Inverse ±

Pickup = 1 (0.05 - 40 xCT Sec) R R-GCB-20BBA04


10 R-GCB-20BBA05 - OL Time Dial = 0.4 10
ABB 3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s
REF 542plus Inst = 4 (0.05 - 40 xCT Sec)
GCB-20BBA04
5 CT Ratio 300:1
Time Delay = 0.7 s 5
Seconds

Seconds
Thermal Overload Curve UNIT SWGR-2(20BBA)
Pickup = 0.8 (0.1 - 5 xCT Sec)
3 Overload Time Constant = 100 3
Overload Constant (k) = 1 20BFT10
GCB-20BBA05
Inrush

1 20BFT10 1

R R-GCB-20BBA05
.5 R-GCB-20BBA05 - P .5 ±

OC1 R-GCB-20BBA04 - P
.3 ABB OC1 .3
REF 542plus ABB
CT Ratio 300:1 REF 542plus 20BFT10
Very Inverse CT Ratio 3600:1 2 MVA
Pickup = 0.96 (0.05 - 40 xCT Sec) Very Inverse
Time Dial = 0.5 Pickup = 0.9 (0.05 - 40 xCT Sec)
.1 Time Dial = 0.35 .1
3x = 3.37 s, 5x = 1.69 s, 8x = 0.964 s
Inst = 14.6 (0.05 - 40 xCT Sec) 3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
Time Delay = 0.05 s Inst = 3.5 (0.05 - 40 xCT Sec)
.05 Time Delay = 0.5 s .05

R-GCB-20BBA01 - 3P
.03 .03
24.83kA @ 6kV

R-GCB-20BBA04 - 3P
24.84kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6) ETAP Star 12.0.0C

14_MV UNIT2_2MVA TR

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 20BFT02 500


FLA
300 300

100 100

R R-GCB-20BBA01
50 50
R-GCB-20BBA01 - P
30 OC1 30 GCB-20BBA01
ABB
REF 542plus Open
CT Ratio 3600:1
±
Very Inverse R R-GCB-20BBA04
Pickup = 1 (0.05 - 40 xCT Sec)
10 Time Dial = 0.4 10
3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s GCB-20BBA04
R-GCB-20BBA06 - OL
Inst = 4 (0.05 - 40 xCT Sec)
ABB Time Delay = 0.7 s
5 REF 542plus 5 UNIT SWGR-2(20BBA)

Seconds
Seconds

CT Ratio 300:1
3
Thermal Overload Curve 3
Pickup = 0.72 (0.1 - 5 xCT Sec) 20BFT02 GCB-20BBA06
Overload Time Constant = 100
Inrush
Overload Constant (k) = 1
±

R R-GCB-20BBA06
1 20BFT02 1 ±

.5 .5
R-GCB-20BBA06 - P R-GCB-20BBA04 - P
.3
OC1 OC1 .3 20BFT02
ABB ABB 1.8 MVA
REF 542plus REF 542plus
CT Ratio 300:1 CT Ratio 3600:1
Very Inverse Very Inverse
Pickup = 0.9 (0.05 - 40 xCT Sec) Pickup = 0.9 (0.05 - 40 xCT Sec)
.1 Time Dial = 0.4 Time Dial = 0.35 .1
3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s 3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
Inst = 17.5 (0.05 - 40 xCT Sec) Inst = 3.5 (0.05 - 40 xCT Sec)
Time Delay = 0.05 s Time Delay = 0.5 s
.05 .05

R-GCB-20BBA01 - 3P
.03 24.83kA @ 6kV .03

R-GCB-20BBA04 - 3P
24.84kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6)


ETAP Star 12.0.0C

15_MV UNIT2_1.8MVA TR

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 20BFT04 500


FLA
300 300

100 100
±

R R-GCB-20BBA01
50 50
R-GCB-20BBA01 - P GCB-20BBA01
30 OC1 30
Open
ABB
REF 542plus ±

CT Ratio 3600:1 R R-GCB-20BBA04


Very Inverse
Pickup = 1 (0.05 - 40 xCT Sec)
10 10 GCB-20BBA04
Time Dial = 0.4
R-GCB-20BBA08 - OL 3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s
ABB Inst = 4 (0.05 - 40 xCT Sec)
UNIT SWGR-2(20BBA)
5
REF 542plus Time Delay = 0.7 s 5
Seconds

Seconds
CT Ratio 300:1
Thermal Overload Curve
GCB-20BBA08
3 Pickup = 0.4 (0.1 - 5 xCT Sec) 3
Overload Time Constant = 150 20BFT04
Overload Constant (k) = 1 Inrush ±

R R-GCB-20BBA08
±

1
20BFT04 1

.5 R-GCB-20BBA08 - P .5
OC1 R-GCB-20BBA04 - P
.3
ABB OC1 .3
REF 542plus ABB
CT Ratio 300:1 REF 542plus
Very Inverse CT Ratio 3600:1
Pickup = 0.5 (0.05 - 40 xCT Sec) Very Inverse 20BFT04
Time Dial = 0.5 Pickup = 0.9 (0.05 - 40 xCT Sec) 1 MVA
.1 3x = 3.38 s, 5x = 1.69 s, 8x = 0.964 s Time Dial = 0.35 .1
Inst = 9.5 (0.05 - 40 xCT Sec) 3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
Time Delay = 0.05 s Inst = 3.5 (0.05 - 40 xCT Sec)
Time Delay = 0.5 s
.05 .05

.03 R-GCB-20BBA01 - 3P .03


24.83kA @ 6kV

R-GCB-20BBA04 - 3P
24.84kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6)


ETAP Star 12.0.0C

16_MV UNIT2_1MVA TR

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100
±

R R-GCB-10BBA01

50 50
R-GCB-10BBA01 - P GCB-10BBA01
30 OC1 30
ABB
REF 542plus ±

CT Ratio 3600:1 R R-GCB-10BBA03


Very Inverse
Pickup = 1 (0.05 - 40 xCT Sec)
10 Time Dial = 0.4 10
R-GCB-10BBA09 - OL 3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s
GCB-10BBA03
ABB Inst = 4 (0.05 - 40 xCT Sec) Open
REF 542plus Time Delay = 0.7 s
5 5 UNIT SWGR-1(10BBA)
Seconds

Seconds
CT Ratio 400:1
Thermal Overload Curve
3 Pickup = 0.8 (0.1 - 5 xCT Sec) 3
Overload Time Constant = 100 10MKC
Overload Constant (k) = 1
GCB-10BBA09
Inrush
10MKC
±
1 1 R R-GCB-10BBA09
±

.5 .5
R-GCB-10BBA09 - P R-GCB-10BBA03 - P
.3
OC1 OC1 .3
ABB ABB
REF 542plus REF 542plus
CT Ratio 400:1 CT Ratio 3600:1
10MKC
Very Inverse Very Inverse 2.67 MVA
Pickup = 0.96 (0.05 - 40 xCT Sec) Pickup = 0.9 (0.05 - 40 xCT Sec)
.1 Time Dial = 0.4 Time Dial = 0.35 .1
3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s 3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
Inst = 12.8 (0.05 - 40 xCT Sec) Inst = 3.5 (0.05 - 40 xCT Sec)
.05
Time Delay = 0.05 s Time Delay = 0.5 s .05

.03 R-GCB-10BBA01 - 3P .03


24.84kA @ 6kV

R-GCB-10BBA03 - 3P
24.84kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6) ETAP Star 12.0.0C

17_MV UNIT2_2.67MVA TR

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 100 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 20MBJ 500


FLA
300 300

100 100

R R-GCB-20BBA01
50 50

30 30
GCB-20BBA01
Open

R-GCB-20BBA10 - OL R-GCB-20BBA01 - P ±

OC1 R R-GCB-20BBA04
10 ABB 10
REF 542plus ABB
CT Ratio 800:1 REF 542plus GCB-20BBA04
Thermal Overload Curve CT Ratio 3600:1 UNIT SWGR-2(20BBA)
5 Pickup = 0.47 (0.1 - 5 xCT Sec) Very Inverse 5

Seconds
Seconds

Overload Time Constant = 100 Pickup = 1 (0.05 - 40 xCT Sec)


Time Dial = 0.4
3 Overload Constant (k) = 1 3
20MBJ 3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s
Inst = 4 (0.05 - 40 xCT Sec) GCB-20BBA10
Inrush Time Delay = 0.7 s
±

R R-GCB-20BBA10
1 1 ±

20MBJ
R-GCB-20BBA04 - P
.5 R-GCB-20BBA10 - P .5
OC1
OC1
ABB
ABB 20MBJ
.3 REF 542plus .3
REF 542plus 3.1 MVA
CT Ratio 3600:1
CT Ratio 800:1
Very Inverse
Very Inverse
Pickup = 0.9 (0.05 - 40 xCT Sec)
Pickup = 0.56 (0.05 - 40 xCT Sec)
Time Dial = 0.35
Time Dial = 0.4
3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
.1 3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s .1
Inst = 3.5 (0.05 - 40 xCT Sec)
Inst = 7.5 (0.05 - 40 xCT Sec)
Time Delay = 0.5 s
Time Delay = 0.05 s

.05 .05

.03 R-GCB-20BBA01 - 3P .03


24.83kA @ 6kV

R-GCB-20BBA04 - 3P
24.84kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 100 (Plot Ref. kV=6)


ETAP Star 12.0.0C

18_MV UNIT2_3.1MVA TR

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100
±

R R-GCB-20BBA01

50 50
R-GCB-20BBA01 - P GCB-20BBA01
OC1 Open
30 30
ABB
REF 542plus
R-GCB-20BBA11 - OL CT Ratio 3600:1
ABB Very Inverse ±

REF 542plus Pickup = 1 (0.05 - 40 xCT Sec) R R-GCB-20BBA04


10 CT Ratio 400:1 Time Dial = 0.4 10
Thermal Overload Curve 3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s GCB-20BBA04
Pickup = 0.63 (0.1 - 5 xCT Sec) Inst = 4 (0.05 - 40 xCT Sec)
Overload Time Constant = 200 Time Delay = 0.7 s
5 Overload Constant (k) = 1 5 UNIT SWGR-2(20BBA)
Seconds

Seconds
3 3
GCB-20BBA11

R-GCB-20BBA11 - P ±

R R-GCB-20BBA11
1 OC1 1
±

ABB
REF 542plus
.5 CT Ratio 400:1 .5
Long Time Inverse R-GCB-20BBA04 - P
Pickup = 0.63 (0.05 - 40 xCT Sec)
.3 Time Dial = 0.25 OC1 .3
3x = 15 s, 5x = 7.5 s, 8x = 4.29 s ABB
Inst = 5.3 (0.05 - 40 xCT Sec) REF 542plus
Time Delay = 0.05 s CT Ratio 3600:1 HRST HP/IP F.W.P.-1A.
Very Inverse 2000 kW
Pickup = 0.9 (0.05 - 40 xCT Sec)
.1 Time Dial = 0.35 .1
3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
Inst = 3.5 (0.05 - 40 xCT Sec)
HRST HP/IP F.W.P.-1A.-100% Time Delay = 0.5 s
.05 .05
2000 KW
.03 R-GCB-20BBA01 - 3P .03
24.83kA @ 6kV

R-GCB-20BBA04 - 3P
24.84kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6)


ETAP Star 12.0.0C

19_MV UNIT2_2,000kW Motor

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100

R R-GCB-20BBA01
50 50
R-GCB-20BBA13 - OL R-GCB-20BBA01 - P
ABB OC1 GCB-20BBA01
30 30
REF 542plus ABB Open
CT Ratio 75:1 REF 542plus
Thermal Overload Curve CT Ratio 3600:1
±
Pickup = 0.34 (0.1 - 5 xCT Sec) Very Inverse R R-GCB-20BBA04
Overload Time Constant = 150 Pickup = 1 (0.05 - 40 xCT Sec)
10 Overload Constant (k) = 1 Time Dial = 0.4 10
3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s GCB-20BBA04
Inst = 4 (0.05 - 40 xCT Sec) UNIT SWGR-2(20BBA)
Time Delay = 0.7 s
5 5

Seconds
Seconds

3 3 GCB-20BBA13

R R-GCB-20BBA13
±

1 1

.5 R-GCB-20BBA13 - P .5
OC1 R-GCB-20BBA04 - P
.3 ABB
OC1 .3
REF 542plus ABB
CT Ratio 75:1 REF 542plus BYPASS DEAERATOR P.-1.
Long Time Inverse CT Ratio 3600:1 200 kW
Pickup = 0.34 (0.05 - 40 xCT Sec) Very Inverse
Time Dial = 0.15 Pickup = 0.9 (0.05 - 40 xCT S
.1 3x = 9 s, 5x = 4.5 s, 8x = 2.57 s Time Dial = 0.35 .1
Inst = 3.4 (0.05 - 40 xCT Sec) 3x = 2.36 s, 5x = 1.18 s, 8x =
Time Delay = 0.05 s Inst = 3.5 (0.05 - 40 xCT Sec
.05
Time Delay = 0.5 s .05

.03 BYPASS DEAERATOR P.-1.-100% R-GCB-20BBA01 - 3P .03


24.83kA @ 6kV
200 KW
R-GCB-20BBA04 - 3P
24.84kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6)


ETAP Star 12.0.0C

20_MV UNIT2_200kW Motor

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100

R R-GCB-20BBA01
50 50
R-GCB-20BBA01 - P
30 OC1 30 GCB-20BBA01
ABB
REF 542plus
Open
CT Ratio 3600:1
Very Inverse
Pickup = 1 (0.05 - 40 xCT Sec) ±
10 R-GCB-20BBA14 - OL Time Dial = 0.4 10
R R-GCB-20BBA04
ABB 3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s
REF 542plus Inst = 4 (0.05 - 40 xCT Sec)
Time Delay = 0.7 s GCB-20BBA04
5 CT Ratio 100:1 5
Seconds

Seconds
Thermal Overload Curve
UNIT SWGR-2(20BBA)
Pickup = 0.56 (0.1 - 5 xCT Sec)
3 Overload Time Constant = 200 3
Overload Constant (k) = 1
GCB-20BBA14

±
1 1 R-GCB-20BBA14
R
R-GCB-20BBA14 - P ±

OC1
.5 ABB .5
REF 542plus R-GCB-20BBA04 - P
CT Ratio 100:1
.3 Long Time Inverse
OC1 .3
Pickup = 0.56 (0.05 - 40 xCT Sec) ABB
Time Dial = 0.2 REF 542plus
3x = 12 s, 5x = 6 s, 8x = 3.43 s CT Ratio 3600:1
Inst = 5.6 (0.05 - 40 xCT Sec) Very Inverse
Time Delay = 0.05 s Pickup = 0.9 (0.05 - 40 xCT Sec) POWER A CONDENSTAE-1A.
.1 Time Dial = 0.35 .1 450 kW
3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
Inst = 3.5 (0.05 - 40 xCT Sec)
Time Delay = 0.5 s
.05 .05
POWER A CONDENSTAE-1A.-100%
450 KW
R-GCB-20BBA01 - 3P
.03 .03
24.83kA @ 6kV

R-GCB-20BBA04 - 3P
24.84kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6)


ETAP Star 12.0.0C

21_MV UNIT2_450kW Motor

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100

R R-GCB-20BBA01
50 50
R-GCB-20BBA01 - P
OC1 GCB-20BBA01
30 30
ABB Open
REF 542plus
CT Ratio 3600:1 ±

Very Inverse R R-GCB-20BBA04


Pickup = 1 (0.05 - 40 xCT Sec)
10 Time Dial = 0.4 10
3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s GCB-20BBA04
Inst = 4 (0.05 - 40 xCT Sec) UNIT SWGR-2(20BBA)
Time Delay = 0.7 s
5 R-GCB-20BBA16 - OL 5
Seconds

Seconds
ABB
REF 542plus
3 3 GCB-20BBA16
CT Ratio 75:1
Thermal Overload Curve
Pickup = 0.37 (0.1 - 5 xCT Sec) ±

Overload Time Constant = 400 R R-GCB-20BBA16


Overload Constant (k) = 1 ±

1 1

R-GCB-20BBA16 - P
.5 .5
OC1
R-GCB-20BBA04 - P
ABB
.3 REF 542plus OC1 .3
CT Ratio 75:1 ABB
Long Time Inverse REF 542plus CCWP-1A FOR GT/ST SIDE.
Pickup = 0.37 (0.05 - 40 xCT Sec) CT Ratio 3600:1 220 kW
Time Dial = 0.5 Very Inverse
3x = 30 s, 5x = 15 s, 8x = 8.57 s Pickup = 0.9 (0.05 - 40 xCT Sec)
.1 Inst = 3.7 (0.05 - 40 xCT Sec) Time Dial = 0.35 .1
Time Delay = 0.05 s 3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
Inst = 3.5 (0.05 - 40 xCT Sec)
Time Delay = 0.5 s
.05 .05
CCWP-1A FOR GT/ST SIDE.-100%
.03 220 KW R-GCB-20BBA01 - 3P .03
24.83kA @ 6kV

R-GCB-20BBA04 - 3P
24.84kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6)


ETAP Star 12.0.0C

22_MV UNIT2_220kW Motor

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100
±

R R-GCB-20BBA01
50 50
R-GCB-20BBA01 - P GCB-20BBA01
30 OC1 30
ABB
Open
REF 542plus
CT Ratio 3600:1
Very Inverse ±

Pickup = 1 (0.05 - 40 xCT Sec) R R-GCB-20BBA04


10 Time Dial = 0.4 10
3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s
GCB-20BBA04
R-GCB-20BBA18 - OL Inst = 4 (0.05 - 40 xCT Sec)
Time Delay = 0.7 s UNIT SWGR-2(20BBA)
5 ABB 5
Seconds

Seconds
REF 542plus
CT Ratio 100:1
3 3
Thermal Overload Curve GCB-20BBA18
Pickup = 0.81 (0.1 - 5 xCT Sec)
Overload Time Constant = 400
Overload Constant (k) = 1
±

R R-GCB-20BBA18
1 1 ±

R-GCB-20BBA18 - P
.5
OC1 .5
ABB R-GCB-20BBA04 - P
REF 542plus
.3 CT Ratio 100:1 OC1 .3
Long Time Inverse ABB
Pickup = 0.81 (0.05 - 40 xCT Sec) REF 542plus
Time Dial = 0.5 CT Ratio 3600:1
3x = 30 s, 5x = 15 s, 8x = 8.57 s Very Inverse LIQUID FUEL SYSTEM PUMP1.
Inst = 8.2 (0.05 - 40 xCT Sec) Pickup = 0.9 (0.05 - 40 xCT Sec) 643 kW
.1 Time Dial = 0.35 .1
Time Delay = 0.05 s
3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
Inst = 3.5 (0.05 - 40 xCT Sec)
Time Delay = 0.5 s
.05 .05
LIQUID FUEL SYSTEM PUMP1.-100%
643 KW
R-GCB-20BBA01 - 3P
.03 .03
24.83kA @ 6kV

R-GCB-20BBA04 - 3P
24.84kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6)


ETAP Star 12.0.0C

23_MV UNIT2_643kW Motor

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

R-GCB-20BBA05 - G
500 OC1 500

ABB ±

REF 542plus I> F27 Upstream


300 CT Ratio 100:1
±

F27 Upstream - G 300


Inst = 0.4 (0.05 - 40 xCT Sec)
Time Delay = 0.1 s OC1
Siemens STEP DOWN XFMR#2(20BBT01)
30 MVA
7UT633/635
R-GCB-20BBA06 - G
CT Ratio 500:1
OC1 Definite Time
±

R R-GCB-20BBA01 ±

100 Pickup = 0.42 (0.05 - 35 Sec - 1A) 100 R R-GCB-20BBA04


R-GCB-20BBA07 - G Time Dial = 1.5
3x = 1.5 s, 5x = 1.5 s, 8x = 1.5 s GCB-20BBA01
OC1
UNIT SWGR-2(20BBA) Open GCB-20BBA04
50 50 GCB-20BBA05 GCB-20BBA07 GCB-20BBA09 GCB-20BBA11 GCB-20BBA13 GCB-20BBA15 GCB-20BBA17
R-GCB-20BBA08 - G
OC1
R-GCB-20BBA01 - G GCB-20BBA12 GCB-20BBA14 GCB-20BBA16
30
OC1 30 GCB-20BBA02 GCB-20BBA06 GCB-20BBA08 GCB-20BBA10 GCB-20BBA18
R-GCB-20BBA09 - G ABB
OC1 REF 542plus
CT Ratio 3600:1 ± ± ±
±
±
Very Inverse R-GCB-20BBA05 R-GCB-20BBA08 R-GCB-20BBA11 R R-GCB-20BBA14
R R R R
R-GCB-20BBA10 - G Pickup = 0.05 (0.05 - 40 xCT Sec) ± ± ±
±
±

Time Dial = 0.07 R-GCB-20BBA17


OC1 3x = 0.472 s, 5x = 0.236 s, 8x = 0.135 s
10 10
Inst = 0.1 (0.05 - 40 xCT Sec)
Time Delay = 0.7 s 20BFT04
R-GCB-20BBA11 - G 20BFT10 HRST HP/IP F.W.P.-1A.
2 MVA 1 MVA
OC1 2000 kW
POWER A CONDENSTAE-1A. CCWP-1B FOR GT/ST SIDE.
5 5 450 kW 220 kW

Seconds
Seconds

R-GCB-20BBA12 - G R-GCB-20BBA04 - G ±
±

R-GCB-20BBA12 ± ±
±
R-GCB-20BBA09 R R-GCB-20BBA15
OC1 R-GCB-20BBA06 R R R
OC1 R ±
3 3 ± ± ±

ABB ±
R-GCB-20BBA18
REF 542plus
R-GCB-20BBA13 - G CT Ratio 3600:1
OC1 Inst = 0.05 (0.05 - 40 xCT Sec)
20MKC
Time Delay = 0.5 s 20BFT02
1.8 MVA 2.67 MVA
R-GCB-20BBA14 - G R-GCB-20BBA02 - G HRST HP/IP F.W.P.-1B. POWER A CONDENSTAE-1B.
1 OC1 1 2000 kW 450 kW
OC1 ±

ABB ± R R-GCB-20BBA16
REF 542plus ± ±
R R-GCB-20BBA13 ±

R-GCB-20BBA15 - G CT Ratio 2000:1


±
R R-GCB-20BBA07 R R-GCB-20BBA10 ±
R R-GCB-20BBA02
.5
OC1 Inst = 0.05 (0.05 - 40 xCT Sec)
.5
± ±

Time Delay = 0.3 s LIQUID FUEL SYSTEM PUMP1.


±
643 kW
R R-00BBA INCOMER B
R-GCB-20BBA16 - G R-00BBA INCOMER B - G 20MBJ
.3 OC1 .3
20BFT03
OC1 GCB-00BBA02 1.8 MVA 3.1 MVA CCWP-1A FOR GT/ST SIDE.
BYPASS DEAERATOR P.-1. 220 kW
ABB 200 kW
REF 542plus Open
R-GCB-20BBA17 - G BDSG#1
CT Ratio 2000:1
2200 kW
OC1 Inst = 0.05 (0.05 - 40 xCT Sec)
Time Delay = 0.3 s
±

.1
R-GCB-20BBA18 - G .1 I> BSDG relay
OC1
±

R R-GCB-00BBA14
R-GCB-00BBA14 - G ±

.05 .05
OC1
ABB
REF 542plus GCB-00BBA14
.03 CT Ratio 100:1 .03
Open STATION SWRG-1 (00BBA)
Inst = 1 (0.05 - 40 xCT Sec)
Time Delay = 0.7 s
R-GCB-20BBA01 - G - LG F27 Upstream - G - LG
0.4kA @ 6kV 0.42kA @ 22kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps (Plot Ref. kV=6)


ETAP Star 12.0.0C

24_MV UNIT2_OCGR

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Ground
Amps X 100 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100
±

R R-GCB-30BBA01
50 50

GCB-30BBA01
30 30

R-GCB-30BBA01 - P
OC1 ±

R-GCB-30BBA03
R
10 ABB 10
REF 542plus
R-GCB-30BBA02 - P
CT Ratio 3600:1 GCB-30BBA03
OC1 Very Inverse
5 5
ABB
Seconds

Seconds
Pickup = 1 (0.05 - 40 xCT Sec) UNIT SWGR-3(30BBA)
REF 542plus Time Dial = 0.4
3 CT Ratio 2000:1 3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s 3
Very Inverse Inst = 4 (0.05 - 40 xCT Sec)
Pickup = 1 (0.05 - 40 xCT Sec) Time Delay = 0.7 s
GCB-30BBA02
Time Dial = 0.35
3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
Inst = 5 (0.05 - 40 xCT Sec)
1 Time Delay = 0.3 s 1 ±

R R-GCB-30BBA02
R-GCB-30BBA03 - P
.5 .5
R-00BBA INCOMER C - P OC1
OC1 ABB
.3 ABB REF 542plus .3
REF 542plus CT Ratio 3600:1
CT Ratio 2000:1 Very Inverse
Very Inverse Pickup = 0.9 (0.05 - 40 xCT Sec) ±

R R-00BBA INCOMER C
Pickup = 1 (0.05 - 40 xCT Sec) Time Dial = 0.35
Time Dial = 0.35 3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
.1 Inst = 3.5 (0.05 - 40 xCT Sec) .1
3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
Inst = 5 (0.05 - 40 xCT Sec) Time Delay = 0.5 s
Time Delay = 0.3 s
.05 .05

R-GCB-30BBA01 - 3P
.03 .03
24.83kA @ 6kV

R-GCB-30BBA03 - 3P
24.84kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 100 (Plot Ref. kV=6)


ETAP Star 12.0.0C

25_MV UNIT3_CONNECTION

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 100 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 30BFT01 500


FLA
300 300

R-GCB-30BBA05 - OL
ABB
REF 542plus
100 100
CT Ratio 300:1
Thermal Overload Curve
±
Pickup = 0.8 (0.1 - 5 xCT Sec) R-GCB-30BBA01
R
50 Overload Time Constant = 100 50
Overload Constant (k) = 1

30 30 GCB-30BBA01

R-GCB-30BBA01 - P ±

R-GCB-30BBA03
R
OC1
10 ABB 10
REF 542plus GCB-30BBA03
CT Ratio 3600:1
Very Inverse
5 5
Seconds

Seconds
Pickup = 1 (0.05 - 40 xCT Sec)
Time Dial = 0.4
3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s 3 UNIT SWGR-3(30BBA)
3
30BFT01 Inst = 4 (0.05 - 40 xCT Sec)
Inrush Time Delay = 0.7 s
GCB-30BBA05

1 1
30BFT01 ±

R-GCB-30BBA03 - P R R-GCB-30BBA05
.5
OC1 .5
±

ABB
REF 542plus
.3 CT Ratio 3600:1 .3
R-GCB-30BBA05 - P
Very Inverse
OC1
Pickup = 0.9 (0.05 - 40 xCT Sec)
ABB Time Dial = 0.35
REF 542plus 3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
CT Ratio 300:1
30BFT01
Inst = 3.5 (0.05 - 40 xCT Sec) 2 MVA
.1 Very Inverse .1
Time Delay = 0.5 s
Pickup = 0.96 (0.05 - 40 xCT Sec)
Time Dial = 0.5
.05
3x = 3.37 s, 5x = 1.69 s, 8x = 0.964 s .05
Inst = 14.6 (0.05 - 40 xCT Sec)
Time Delay = 0.05 s
.03 R-GCB-30BBA01 - 3P .03
24.83kA @ 6kV

R-GCB-30BBA03 - 3P
24.84kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 100 (Plot Ref. kV=6)


ETAP Star 12.0.0C

26_MV UNIT3_2MVA TR

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 30BFT02 500


FLA
300 300

R-GCB-30BBA06 - OL
ABB
REF 542plus
CT Ratio 300:1
100 100
Thermal Overload Curve
Pickup = 0.72 (0.1 - 5 xCT Sec) ±

R R-GCB-30BBA01
Overload Time Constant = 100
50 Overload Constant (k) = 1 R-GCB-30BBA01 - P 50
OC1 GCB-30BBA01
30
ABB 30
REF 542plus
CT Ratio 3600:1
Very Inverse ±

Pickup = 1 (0.05 - 40 xCT Sec) R R-GCB-30BBA03


Time Dial = 0.4
10 3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s 10
Inst = 4 (0.05 - 40 xCT Sec) GCB-30BBA03
R-GCB-30BBA03 - P
Time Delay = 0.7 s
OC1 UNIT SWGR-3(30BBA)
5 ABB 5
Seconds

Seconds
REF 542plus
CT Ratio 3600:1
3 3
Very Inverse 30BFT02 GCB-30BBA06
Pickup = 0.9 (0.05 - 40 xCT Sec)
Time Dial = 0.35 Inrush
3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s ±

Inst = 3.5 (0.05 - 40 xCT Sec) R R-GCB-30BBA06


1 Time Delay = 0.5 s 30BFT02
±
1

.5 .5

.3 .3
30BFT02
R-GCB-30BBA06 - P 1.8 MVA
OC1
ABB
.1 REF 542plus .1
CT Ratio 300:1
Very Inverse
Pickup = 0.9 (0.05 - 40 xCT Sec)
.05 Time Dial = 0.4 .05
3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s
.03
Inst = 17.5 (0.05 - 40 xCT Sec) R-GCB-30BBA01 - 3P .03
Time Delay = 0.05 s 24.83kA @ 6kV

R-GCB-30BBA03 - 3P
24.84kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6)


ETAP Star 12.0.0C

27_MV UNIT3_1.8MVA TR

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 30BFT04 500


FLA
300 300

R-GCB-30BBA08 - OL
ABB
REF 542plus
CT Ratio 300:1
100 Thermal Overload Curve 100
Pickup = 0.4 (0.1 - 5 xCT Sec) ±

Overload Time Constant = 150 R R-GCB-30BBA01


Overload Constant (k) = 1
50 R-GCB-30BBA01 - P 50
OC1 GCB-30BBA01
30 ABB 30
REF 542plus
CT Ratio 3600:1
±
Very Inverse R R-GCB-30BBA03
Pickup = 1 (0.05 - 40 xCT Sec)
Time Dial = 0.4
10 3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s 10 GCB-30BBA03
Inst = 4 (0.05 - 40 xCT Sec)
Time Delay = 0.7 s UNIT SWGR-3(30BBA)
5 5
R-GCB-30BBA03 - P
Seconds

Seconds
OC1
3 ABB 3
REF 542plus
30BFT04 GCB-30BBA08
CT Ratio 3600:1 Inrush
Very Inverse ±

Pickup = 0.9 (0.05 - 40 xCT Sec) R R-GCB-30BBA08


1
Time Dial = 0.35 30BFT04 1
±

3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s


Inst = 3.5 (0.05 - 40 xCT Sec)
Time Delay = 0.5 s
.5 .5

.3 .3

30BFT04
R-GCB-30BBA08 - P 1 MVA
OC1
ABB
.1 REF 542plus .1
CT Ratio 300:1
Very Inverse
Pickup = 0.5 (0.05 - 40 xCT Sec)
.05 .05
Time Dial = 0.5
3x = 3.38 s, 5x = 1.69 s, 8x = 0.964 s
.03 Inst = 9.5 (0.05 - 40 xCT Sec) R-GCB-30BBA01 - 3P .03
Time Delay = 0.05 s 24.83kA @ 6kV

R-GCB-30BBA03 - 3P
24.84kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6)


ETAP Star 12.0.0C

28_MV UNIT3_1MVA TR

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 30MKC 500


FLA
300 300

100 100

50 50 R R-GCB-30BBA01
R-GCB-30BBA01 - P
OC1
30 ABB 30 GCB-30BBA01
REF 542plus
R-GCB-30BBA03 - P CT Ratio 3600:1
Very Inverse
OC1 ±
Pickup = 1 (0.05 - 40 xCT Sec) R R-GCB-30BBA03
ABB Time Dial = 0.4
10 REF 542plus 3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s 10
CT Ratio 3600:1 Inst = 4 (0.05 - 40 xCT Sec)
Very Inverse GCB-30BBA03
Time Delay = 0.7 s
Pickup = 0.9 (0.05 - 40 xCT Sec) UNIT SWGR-3(30BBA)
5 5
Time Dial = 0.35
Seconds

Seconds
3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
3 Inst = 3.5 (0.05 - 40 xCT Sec) 3
Time Delay = 0.5 s 30MKC GCB-30BBA09
Inrush
R-GCB-30BBA09 - OL ±

R-GCB-30BBA09
R
ABB ±
1 1
REF 542plus
CT Ratio 400:1
Thermal Overload Curve
.5 Pickup = 0.8 (0.1 - 5 xCT Sec) .5
Overload Time Constant = 100
Overload Constant (k) = 1
.3 30MKC .3

30MKC
2.67 MVA
R-GCB-30BBA09 - P
OC1
.1 ABB .1
REF 542plus
CT Ratio 400:1
.05 Very Inverse .05
Pickup = 0.96 (0.05 - 40 xCT Sec)
Time Dial = 0.4
R-GCB-30BBA01 - 3P
.03 3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s .03
24.83kA @ 6kV
Inst = 12.8 (0.05 - 40 xCT Sec)
Time Delay = 0.05 s
R-GCB-30BBA03 - 3P
24.84kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6)


ETAP Star 12.0.0C

29_MV UNIT3_2.67MVA TR

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 100 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 30MBJ 500


FLA
300 300

100 100

R R-GCB-30BBA01
50 50

30 30 GCB-30BBA01

R-GCB-30BBA01 - P ±

R-GCB-30BBA03
R
R-GCB-30BBA10 - OL OC1
10 ABB ABB 10
REF 542plus REF 542plus GCB-30BBA03
CT Ratio 800:1 CT Ratio 3600:1
Thermal Overload Curve Very Inverse UNIT SWGR-3(30BBA)
5 Pickup = 1 (0.05 - 40 xCT Sec) 5
Seconds

Seconds
Pickup = 0.47 (0.1 - 5 xCT Sec)
Overload Time Constant = 100 Time Dial = 0.4
3 Overload Constant (k) = 1 3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s 3
30MBJ Inst = 4 (0.05 - 40 xCT Sec)
Time Delay = 0.7 s GCB-30BBA10
Inrush
±

R R-GCB-30BBA10
1 1 ±

R-GCB-30BBA03 - P
.5 .5
OC1
ABB
.3 REF 542plus .3
R-GCB-30BBA10 - P
30MBJ CT Ratio 3600:1 30MBJ
OC1 Very Inverse 3.1 MVA
Pickup = 0.9 (0.05 - 40 xCT Sec)
ABB
Time Dial = 0.35
REF 542plus
3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
.1 CT Ratio 800:1 .1
Inst = 3.5 (0.05 - 40 xCT Sec)
Very Inverse
Time Delay = 0.5 s
Pickup = 0.56 (0.05 - 40 xCT Sec)
Time Dial = 0.4
.05 3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s .05
Inst = 7.5 (0.05 - 40 xCT Sec)
Time Delay = 0.05 s
.03 .03

R-GCB-30BBA01 - 3P
24.83kA @ 6kV
R-GCB-30BBA10 - 3P
34.1kA @ 6kV
.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 100 (Plot Ref. kV=6)


ETAP Star 12.0.0C

30_MV UNIT3_3.1MVA TR

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 100 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

±
100 100 R-GCB-30BBA01
R

50 50 GCB-30BBA01

30 30 ±

R R-GCB-30BBA03

R-GCB-30BBA01 - P
OC1 GCB-30BBA03
ABB
10 10
REF 542plus UNIT SWGR-3(30BBA)
CT Ratio 3600:1
Very Inverse
5 Pickup = 1 (0.05 - 40 xCT Sec) 5
Seconds

Seconds
Time Dial = 0.4 GCB-30BBA11
3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s
3 R-GCB-30BBA11 - OL Inst = 4 (0.05 - 40 xCT Sec) 3
ABB Time Delay = 0.7 s
±
REF 542plus R-GCB-30BBA11
R
CT Ratio 400:1 ±

Thermal Overload Curve


Pickup = 0.63 (0.1 - 5 xCT Sec)
1 1
Overload Time Constant = 200
Overload Constant (k) = 1
R-GCB-30BBA03 - P
.5 OC1 .5
R-GCB-30BBA11 - P
ABB
OC1 REF 542plus
.3 .3
ABB CT Ratio 3600:1
REF 542plus Very Inverse
CT Ratio 400:1 Pickup = 0.9 (0.05 - 40 xCT Sec)
Long Time Inverse Time Dial = 0.35
Pickup = 0.63 (0.05 - 40 xCT Sec)
HRST HP/IP F.W.P.-1A,
3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
2000 kW
.1 Time Dial = 0.25 Inst = 3.5 (0.05 - 40 xCT Sec) .1
3x = 15 s, 5x = 7.5 s, 8x = 4.29 s Time Delay = 0.5 s
Inst = 5.3 (0.05 - 40 xCT Sec)
Time Delay = 0.05 s
.05 .05

HRST HP/IP F.W.P.-1A,-100%


.03 .03
2000 KW

R-GCB-30BBA03 - 3P
R-GCB-30BBA01
24.84kA @ 6kV
24.83kA
R-GCB-30BBA11 - 3P
.01 34.1kA @ 6kV .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 100 (Plot Ref. kV=6)


ETAP Star 12.0.0C

31_MV UNIT3_2,000kW Motor

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100

R-GCB-30BBA13 - OL R R-GCB-30BBA01
50 50
ABB R-GCB-30BBA01 - P
REF 542plus OC1 GCB-30BBA01
30 CT Ratio 75:1 30
ABB
Thermal Overload Curve
REF 542plus
Pickup = 0.34 (0.1 - 5 xCT Sec)
CT Ratio 3600:1
Overload Time Constant = 150
Very Inverse ±

Overload Constant (k) = 1 R R-GCB-30BBA03


Pickup = 1 (0.05 - 40 xCT Sec)
Time Dial = 0.4
10 10
3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s
Inst = 4 (0.05 - 40 xCT Sec) GCB-30BBA03
Time Delay = 0.7 s
5 5 UNIT SWGR-3(30BBA)
Seconds

Seconds
3 3
GCB-30BBA13

R R-GCB-30BBA13
±

1 1

.5 .5
R-GCB-30BBA13 - P R-GCB-30BBA03 - P
.3 OC1 OC1 .3
ABB ABB
REF 542plus REF 542plus
CT Ratio 75:1 CT Ratio 3600:1
Long Time Inverse Very Inverse BYPASS DEAERATOR P.-1,
Pickup = 0.34 (0.05 - 40 xCT Sec) Pickup = 0.9 (0.05 - 40 xCT Sec) 200 kW
.1 Time Dial = 0.15 Time Dial = 0.35 .1
3x = 9 s, 5x = 4.5 s, 8x = 2.57 s 3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
Inst = 3.4 (0.05 - 40 xCT Sec) Inst = 3.5 (0.05 - 40 xCT Sec)
.05 Time Delay = 0.05 s Time Delay = 0.5 s .05

.03 R-GCB-30BBA13 .03


BYPASS DEAERATOR P.-1,-100%
34.1kA @ 6kV
200 KW
R-GCB-30BBA01 - 3P
24.83kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6)


ETAP Star 12.0.0C

32_MV UNIT3_200kW Motor

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100
±

R R-GCB-30BBA01

50 R-GCB-30BBA01 - P 50
GCB-30BBA01
OC1
30 ABB 30
REF 542plus
CT Ratio 3600:1 ±

R R-GCB-30BBA03
Very Inverse
R-GCB-30BBA14 - OL Pickup = 1 (0.05 - 40 xCT Sec)
ABB Time Dial = 0.4
10 3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s 10
GCB-30BBA03
REF 542plus
CT Ratio 100:1 Inst = 4 (0.05 - 40 xCT Sec)
Time Delay = 0.7 s UNIT SWGR-3(30BBA)
Thermal Overload Curve
5 Pickup = 0.56 (0.1 - 5 xCT Sec) 5
Seconds

Seconds
Overload Time Constant = 200
Overload Constant (k) = 1
3 3 GCB-30BBA14

R R-GCB-30BBA14
±

1 1

R-GCB-30BBA14 - P
.5 .5
OC1
R-GCB-30BBA03 - P
ABB
.3 REF 542plus OC1 .3
CT Ratio 100:1 ABB
Long Time Inverse REF 542plus POWER A CONDENSTAE-1A,
Pickup = 0.56 (0.05 - 40 xCT Sec) CT Ratio 3600:1 450 kW
Time Dial = 0.15 Very Inverse
3x = 9 s, 5x = 4.5 s, 8x = 2.57 s Pickup = 0.9 (0.05 - 40 xCT Sec)
.1 Time Dial = 0.35 .1
Inst = 5.6 (0.05 - 40 xCT Sec)
Time Delay = 0.05 s 3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
Inst = 3.5 (0.05 - 40 xCT Sec)
Time Delay = 0.5 s
.05 .05
POWER A CONDENSTAE-1A,-100%
R-GCB-30BBA14 - 3P
.03 450 KW .03
34.1kA @ 6kV

R-GCB-30BBA01 - 3P
24.83kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6)


ETAP Star 12.0.0C

33_MV UNIT3_450kW Motor

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100
±

R R-GCB-30BBA01
50 50
R-GCB-30BBA01 - P
OC1 GCB-30BBA01
30 30
ABB
REF 542plus ±

CT Ratio 3600:1 R R-GCB-30BBA03


Very Inverse
Pickup = 1 (0.05 - 40 xCT Sec)
10 Time Dial = 0.4 10 GCB-30BBA03
3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s
Inst = 4 (0.05 - 40 xCT Sec) UNIT SWGR-3(30BBA)
Time Delay = 0.7 s
5 R-GCB-30BBA16 - OL 5
Seconds

Seconds
ABB
REF 542plus GCB-30BBA16
3 3
CT Ratio 75:1
Thermal Overload Curve
Pickup = 0.37 (0.1 - 5 xCT Sec) ±
Overload Time Constant = 400 R R-GCB-30BBA16
Overload Constant (k) = 1 ±

1 1

.5
R-GCB-30BBA16 - P .5
OC1 R-GCB-30BBA03 - P
ABB OC1
.3 .3
REF 542plus
CT Ratio 75:1 ABB
Long Time Inverse REF 542plus
Pickup = 0.37 (0.05 - 40 xCT Sec) CT Ratio 3600:1 CCWP-1A FOR GT/ST SIDE,
Time Dial = 0.5 Very Inverse 220 kW
Pickup = 0.9 (0.05 - 40 xCT Sec)
.1 3x = 30 s, 5x = 15 s, 8x = 8.57 s Time Dial = 0.35 .1
Inst = 3.7 (0.05 - 40 xCT Sec)
Time Delay = 0.05 s 3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
Inst = 3.5 (0.05 - 40 xCT Sec)
.05 Time Delay = 0.5 s .05

R-GCB-30BBA16
CCWP-1A FOR GT/ST SIDE,-100% 34.1kA @ 6kV
.03 .03
220 KW

R-GCB-30BBA01 - 3P
24.83kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6)


ETAP Star 12.0.0C

34_MV UNIT3_220kW Motor

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

±
100 100 R-GCB-30BBA01
R

50 50 GCB-30BBA01
R-GCB-30BBA01 - P
OC1
30 30
ABB
REF 542plus
CT Ratio 3600:1 ±

Very Inverse R R-GCB-30BBA03


Pickup = 1 (0.05 - 40 xCT Sec)
10 Time Dial = 0.4 10
3x = 2.7 s, 5x = 1.35 s, 8x = 0.771 s GCB-30BBA03
Inst = 4 (0.05 - 40 xCT Sec) UNIT SWGR-3(30BBA)
Time Delay = 0.7 s
5 R-GCB-30BBA18 - OL 5
Seconds

Seconds
ABB GCB-30BBA18
3 REF 542plus 3
CT Ratio 100:1
Thermal Overload Curve ±

Pickup = 0.81 (0.1 - 5 xCT Sec) R R-GCB-30BBA18


Overload Time Constant = 400 ±

Overload Constant (k) = 1


1 1

R-GCB-30BBA18 - P
.5 OC1 .5
ABB R-GCB-30BBA03 - P
REF 542plus OC1
.3 .3
CT Ratio 100:1
ABB
Long Time Inverse LIQUID FUEL SYSTEM PUMP1,
REF 542plus
Pickup = 0.81 (0.05 - 40 xCT Sec) 643 kW
CT Ratio 3600:1
Time Dial = 0.5
Very Inverse
3x = 30 s, 5x = 15 s, 8x = 8.57 s
Pickup = 0.9 (0.05 - 40 xCT Sec)
.1 Inst = 8.2 (0.05 - 40 xCT Sec) Time Dial = 0.35 .1
Time Delay = 0.05 s
3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
Inst = 3.5 (0.05 - 40 xCT Sec)
Time Delay = 0.5 s
.05 .05
LIQUID FUEL SYSTEM PUMP1,-100%
643 KW R-GCB-30BBA18
.03 34.1kA @ 6kV .03

R-GCB-30BBA01 - 3P
24.83kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6)


ETAP Star 12.0.0C

35_MV UNIT3_643kW Motor

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Amps (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

R-GCB-30BBA05 - G I> F27 Upstream


500 OC1 500 ±

ABB
REF 542plus STEP DOWN XFMR#2(20BBT01)
300 300 30 MVA
CT Ratio 100:1
Inst = 0.4 (0.05 - 40 xCT Sec) ±

Time Delay = 0.1 s R R-GCB-30BBA01


±

R-GCB-30BBA06 - G R R-GCB-30BBA03
F27 Upstream - G GCB-30BBA01
OC1
100 OC1 100 GCB-30BBA03
UNIT SWGR-3(30BBA)
R-GCB-30BBA07 - G Siemens
7UT633/635 GCB-30BBA05 GCB-30BBA07 GCB-30BBA09 GCB-30BBA11 GCB-30BBA13 GCB-30BBA15 GCB-30BBA17
OC1 CT Ratio 500:1
50 Definite Time 50
Pickup = 0.42 (0.05 - 35 Sec - 1A)
R-GCB-30BBA08 - G Time Dial = 1.5
GCB-30BBA02 GCB-30BBA06 GCB-30BBA08 GCB-30BBA10 GCB-30BBA12 GCB-30BBA14 GCB-30BBA16 GCB-30BBA18
OC1 3x = 1.5 s, 5x = 1.5 s, 8x = 1.5 s
30 30

R-GCB-30BBA09 - G ±

R R-GCB-30BBA05 ±

R-GCB-30BBA08
±

R-GCB-30BBA11
±

R-GCB-30BBA14
±

R R R R
OC1 ±
± ± ± ±
R-GCB-30BBA17
R-GCB-30BBA01 - G
R-GCB-30BBA10 - G OC1
OC1 ABB
10 10 30BFT01 30BFT04
REF 542plus
CT Ratio 3600:1 2 MVA 1 MVA
R-GCB-30BBA11 - G Very Inverse HRST HP/IP F.W.P.-1A, POWER A CONDENSTAE-1A, CCWP-1B FOR GT/ST SIDE,
Pickup = 0.05 (0.05 - 40 xCT Sec) 2000 kW 450 kW 220 kW
5 OC1 Time Dial = 0.07 5
Seconds

Seconds
± ± ± ±
3x = 0.472 s, 5x = 0.236 s, 8x = 0.135 s ±
R R-GCB-30BBA09 R R-GCB-30BBA12 R R-GCB-30BBA15 R
R-GCB-30BBA06
R-GCB-30BBA12 - G Inst = 0.1 (0.05 - 40 xCT Sec)
±
R
± ± ± ±

Time Delay = 0.7 s


3 OC1 3 R-GCB-30BBA18
R-GCB-30BBA03 - G
R-GCB-30BBA13 - G OC1 30BFT02 30MKC
2.67 MVA
OC1 ABB 1.8 MVA
REF 542plus HRST HP/IP F.W.P.-1B, POWER A CONDENSTAE-1B,
R-GCB-30BBA14 - G CT Ratio 3600:1 2000 kW 450 kW
1 Inst = 0.05 (0.05 - 40 xCT Sec) 1 ±

OC1 Time Delay = 0.5 s


±

R R-GCB-30BBA02
±

R R-GCB-30BBA07
±

R R-GCB-30BBA10 R R-GCB-30BBA13 ±

R R-GCB-30BBA16
±
± ± ±

R-GCB-30BBA15 - G
R-GCB-30BBA02 - G
.5 OC1 .5 ±

R-00BBA INCOMER C LIQUID FUEL SYSTEM PUMP1,


OC1 R
30MBJ 643 kW
30BFT03
ABB 3.1 MVA
R-GCB-30BBA16 - G GCB-00BBA03
1.8 MVA
.3 REF 542plus .3 BYPASS DEAERATOR P.-1, CCWP-1A FOR GT/ST SIDE,
OC1 CT Ratio 2000:1 Open BDSG#1 200 kW 220 kW
Inst = 0.05 (0.05 - 40 xCT Sec) 2200 kW
R-GCB-30BBA17 - G Time Delay = 0.3 s
OC1 ±

R-00BBA INCOMER C - G I> BSDG relay


.1 R-GCB-30BBA18 - G OC1 .1
OC1 ABB ±

R-GCB-00BBA14
R
REF 542plus
CT Ratio 2000:1 ±

.05 R-GCB-00BBA14 - G Inst = 0.05 (0.05 - 40 xCT Sec) .05


OC1 Time Delay = 0.3 s GCB-00BBA14
ABB
.03 REF 542plus .03 Open STATION SWRG-1 (00BBA)
CT Ratio 100:1
Inst = 1 (0.05 - 40 xCT Sec)
Time Delay = 0.7 s R-GCB-30BBA01 - G - LG
0.4kA @ 6kV
F27 Upstream - G - LG
0.42kA @ 22kV
.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps (Plot Ref. kV=6)


ETAP Star 12.0.0C

36_MV UNIT3_OCGR

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Ground
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 00BFT01 500


FLA
300 300

R R-00BBA INCOMER A
100 100

50 R-GCB-00BBA04 - OL 50
ABB GCB-00BBA01
REF 542plus
30 30
CT Ratio 300:1
Thermal Overload Curve R-00BBA INCOMER A - P
Pickup = 0.8 (0.1 - 5 xCT Sec)
Overload Time Constant = 100 OC1
Overload Constant (k) = 1 ABB
10
REF 542plus
10
STATION SWRG-1 (00BBA)
CT Ratio 2000:1
Very Inverse
Pickup = 1 (0.05 - 40 xCT Sec)
5 Time Dial = 0.35 5
Seconds

Seconds
3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
Inst = 5 (0.05 - 40 xCT Sec)
3 Time Delay = 0.3 s 3 GCB-00BBA04
00BFT01
Inrush

R-GCB-00BBA04 - P 00BFT01
1 1
OC1 ±

ABB R R-GCB-00BBA04
REF 542plus
.5 CT Ratio 300:1 .5
Very Inverse
Pickup = 0.96 (0.05 - 40 xCT Sec)
.3 .3
Time Dial = 0.5
3x = 3.37 s, 5x = 1.69 s, 8x = 0.964 s
Inst = 13.9 (0.05 - 40 xCT Sec)
00BFT01
Time Delay = 0.05 s 2 MVA

.1 .1

.05 .05

R-GCB-00BBA04
.03 34.1kA @ 6kV .03

R-00BBA INCOMER A - 3P
24.83kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6)


ETAP Star 12.0.0C

37_MV COMMON_2MVA TR

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Engineer:
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500
00BFT03 500
FLA
300 300

100 100

50 50 R R-00BBA INCOMER A

30 R-GCB-00BBA06 - OL 30
ABB
REF 542plus
CT Ratio 150:1 GCB-00BBA01
Thermal Overload Curve R-00BBA INCOMER A - P
10 Pickup = 0.8 (0.1 - 5 xCT Sec) OC1 10
Overload Time Constant = 150 ABB
Overload Constant (k) = 1 REF 542plus
STATION SWRG-1 (00BBA)
CT Ratio 2000:1
5 5
Very Inverse
Seconds

Seconds
Pickup = 1 (0.05 - 40 xCT Sec)
3 Time Dial = 0.35 3
00BFT03 3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s
GCB-00BBA06
Inrush Inst = 5 (0.05 - 40 xCT Sec)
Time Delay = 0.3 s

±
1 1
R-GCB-00BBA06 - P R R-GCB-00BBA06
OC1 00BFT03
ABB 00BFT03
.5 REF 542plus .5
1 MVA
CT Ratio 150:1
.3
Very Inverse .3
Pickup = 0.96 (0.05 - 40 xCT Sec)
Time Dial = 0.6
3x = 4.05 s, 5x = 2.02 s, 8x = 1.16 s
Inst = 18.2 (0.05 - 40 xCT Sec)
Time Delay = 0.05 s
.1 .1

.05 .05

R-GCB-00BBA06
.03 .03
34.1kA @ 6kV

R-00BBA INCOMER A
24.83kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6) ETAP Star 12.0.0C

38_MV COMMON_1MVA TR

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Engineer:
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100 ±

R R-00BBA INCOMER A

50 50

30 R-GCB-00BBA12 - OL 30
ABB GCB-00BBA01
REF 542plus
CT Ratio 100:1 R-00BBA INCOMER A - P
Thermal Overload Curve
OC1
10 Pickup = 0.8 (0.1 - 5 xCT Sec) 10 STATION SWRG-1 (00BBA)
ABB
Overload Time Constant = 200 REF 542plus
Overload Constant (k) = 1 CT Ratio 2000:1
5 Very Inverse 5
Seconds

Seconds
Pickup = 1 (0.05 - 40 xCT Sec)
Time Dial = 0.35
3
3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s 3
Inst = 5 (0.05 - 40 xCT Sec)
Time Delay = 0.3 s
GCB-00BBA12

1 1 ±

R-GCB-00BBA12 - P R R-GCB-00BBA12
OC1
.5 ABB .5
REF 542plus
CT Ratio 100:1 MOTOR DRIVEN PUMP A
.3 Long Time Inverse .3 650 kW
Pickup = 0.8 (0.05 - 40 xCT Sec)
Time Dial = 0.2
3x = 12 s, 5x = 6 s, 8x = 3.43 s
Inst = 8 (0.05 - 40 xCT Sec)
Time Delay = 0.05 s
.1 .1

.05
MOTOR DRIVEN PUMP A-100% .05
650 KW
R-GCB-00BBA12
.03 .03
34.1kA @ 6kV

R-00BBA INCOMER A
24.83kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6)


ETAP Star 12.0.0C

39_MV COMMON_650kW MOTOR

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Engineer:
Amps X 10 (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

BSDG relay - P
300 OC1 300
ABB
REM 543
CT Ratio 400:1
Inst = 4.96 (0.05 - 40 xCT Sec)
Time Delay = 2 s
100 100

BDSG#1
50 50 2200 kW

30 30

R-00BBA INCOMER A - P ±

OC1 I> BSDG relay


10
BDSG#1 ABB
10
2200 kW REF 542plus
(I2)^2 t = 30 CT Ratio 2000:1 ±

Very Inverse R R-00BBA INCOMER A


5 Pickup = 1 (0.05 - 40 xCT Sec) 5
Seconds

Seconds
Time Dial = 0.35
R-GCB-00BBA14 - OL
3x = 2.36 s, 5x = 1.18 s, 8x = 0.675 s ±
3 ABB Inst = 5 (0.05 - 40 xCT Sec) 3
REF 542plus R R-GCB-00BBA14
Time Delay = 0.3 s
CT Ratio 400:1 GCB-00BBA01
Thermal Overload Curve
Pickup = 0.76 (0.1 - 5 xCT Sec)
Overload Time Constant = 12 GCB-00BBA14
1 Overload Constant (k) = 1 1

.5 .5
R-GCB-00BBA14 - P
STATION SWRG-1 (00BBA)
OC1
.3 ABB .3
REF 542plus
CT Ratio 400:1
Very Inverse
Pickup = 0.76 (0.05 - 40 xCT Sec)
Time Dial = 0.2
.1 .1
3x = 1.35 s, 5x = 0.675 s, 8x = 0.386 s
Inst = 3.3 (0.05 - 40 xCT Sec)
Time Delay = 0.3 s
.05 .05

R-00BBA INCOMER A
.03 BDSG#1 BDSG#1 24.83kA @ 6kV
.03
No Load
No Load
Constant Excitation R-GCB-00BBA14
Constant Excitation
AC Fault Current 34.1kA @ 6kV
Total Fault Current

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 (Plot Ref. kV=6)


ETAP Star 12.0.0C

40_MV COMMON_2,200kW Gen

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Phase
Engineer:
Amps (Plot Ref. kV=6)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500
R-GCB-00BBA05 - G
300 OC1 300 BDSG#1
ABB 2200 kW
REF 542plus
CT Ratio 100:1
Inst = 0.4 (0.05 - 40 xCT Sec) ±

Time Delay = 0.05 s R-GCB-00BBA14 - G I> BSDG relay


100 OC1 100
ABB ±

R-00BBA INCOMER A
± R
REF 542plus R R-GCB-00BBA14
R-GCB-00BBA07 - G CT Ratio 100:1 ±

50 OC1 Inst = 1 (0.05 - 40 xCT Sec) 50


Time Delay = 0.7 s GCB-00BBA01
GCB-00BBA14
30 30 Open
STATION SWRG-1 (00BBA)
R-GCB-00BBA12 - G
OC1
GCB-00BBA06 GCB-00BBA07 GCB-00BBA10 GCB-00BBA13
R-00BBA INCOMER A - G
OC1 ± ± ± ±

10 10 R R-GCB-00BBA06 R R-GCB-00BBA07 R R-GCB-00BBA10 R R-GCB-00BBA13


ABB ± ± ±
±

REF 542plus
R-GCB-00BBA08 - G CT Ratio 2000:1
5
OC1 Inst = 0.05 (0.05 - 40 xCT Sec)
5 00BFT03 00BFT04 00BFT10
Seconds

Seconds
Time Delay = 0.3 s 1 MVA 1 MVA 2 MVA
MOTOR DRIVEN PUMP B
3 3 650 kW

R-GCB-00BBA09 - G GCB-00BBA11
GCB-00BBA04 GCB-00BBA08
OC1 R-GCB-00BBA06 - G ±

OC1 ±

R R-GCB-00BBA04 ± R R-GCB-00BBA11
R R-GCB-00BBA08 ±
ABB ±

1 REF 542plus 1
CT Ratio 100:1
R-GCB-00BBA10 - G Inst = 0.4 (0.05 - 40 xCT Sec) 00BFT11
00BFT01 00BFT05
OC1 Time Delay = 0.05 s 2 MVA 2 MVA
2 MVA
.5 .5

.3 .3
R-GCB-00BBA11 - G GCB-00BBA05
R-GCB-00BBA04 - G GCB-00BBA09 GCB-00BBA12
OC1 OC1
±

R R-GCB-00BBA05 ±
±

ABB ±
R-GCB-00BBA09 R R-GCB-00BBA12
R ±

REF 542plus ±

.1 CT Ratio 100:1 .1
Inst = 0.4 (0.05 - 40 xCT Sec) 00BFT02
R-GCB-00BBA13 - G Time Delay = 0.05 s 2 MVA 00BFT06
2 MVA MOTOR DRIVEN PUMP A
OC1 650 kW
.05 .05

.03 .03

R-00BBA INCOMER A - G - LG
0.4kA @ 6kV

.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps (Plot Ref. kV=6) ETAP Star 12.0.0C

41_MV COMMON_OCGR

Project: AIN ARNAT Date: 24-Nov-2014


Location: Rev: Base
Contract: Fault: Ground