REVERIE POWER & AUTOMATION ENGINEERING LTD.

5th Floor, Evergreen Plaza,


260/B, Tejgaon I/A,
Dhaka-1208, Bangladesh.

Tittle 110V DC Battery Charger Capacity Calculation

Client Confidence Power Rangpur Ltd.

Project Name Confidence Power Rangpur 113MW HFO Based Power Plant.
Revision Date Document/DWG No Pepare Check Approved Remarks
0 24/01/2018 CRPL - ECS 002 Neon Shiddik Shuhan For Approval
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN Project Tittle: Confidence Power Rangpur 113MW HFO Based Power Plant.

Page Tittle: Continuous Load Calculation

1.0 LOAD CALCULATION :


PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

Continuous load of 1734 W ( 15.76A ) for Duration of 10 hours is


considered. Load details are given in Table - 1:

Table-1: Continuous Load Summary of Different Types of Panels

Unit Load Total Load


Sl.No. Description Qty
(Watt) (Watt)

Continuous Loads

1 132kV Line Feeder Panel 1 86 86


2 132kV Transformer Control & Protection Panel 2 123 246
3 11kV Grid Incomer Switchgear Panel-1 2 64 128
4 11kV Generator Switchgear Panel-2 16 44 704
5 11kV Generator Switchgear Panel-2(STG) 2 64 128
6 11kV Aux. Trafo Switchgear Panel 2 64 128
7 11kV Bus Panel 2 16 32
8 11kV Bus Coupler Panel 2 64 128
9 .415V LV Switchgear Panel 1 64 64
10 AC Distribution Panel 1 20 20
11 Tariff Metering Panel 1 70 70

TOTAL 1734W

TOTAL CONTINUOUS CURRENT 15.76A


Project Tittle: Confidence Power Rangpur 113MW HFO Based Power Plant.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS

Page Tittle: Peak or Momentary Load Calculation

2.0 TRIPPING LOADS

Unit Loads for Trip Coils have been given table-2


a) Worst Critical case of assessing the momentary Loading :

i) Worst Critical case assessing the momentary loading has been assessed which
involves simultaneous tripping of 6 Nos. of 132kV CBs on 132kV bus fault and
25 Nos. of 11kV CBs on 11kV bus fault & 3 Nos of 415V ACB on LV bus.

Load of 6 x 2 No. Trip Coils = 5400 W

Load of 25 x 1 No. Trip Coils = 11250 W

Load of 3 x 1 No. Trip Coils = 1050 W

Total Trip Coils = 17700 W

Nominal DC system Voltage = 110 V

Total Tripping Current = 160.91 A

2.1 RESTORATION LOADS

Momentary Loading for restoration is considered as the load for closing 25 no. 11kV CB,
3 Nos. of 132kV CBs, 3 Nos of 415V CBs
OWNER.

Load of 3 x 1 No. Close Coils = 600 W

Load of 25 x 1 No. Close Coils = 3750 W

Load of 3 x 1 No. Close Coils = 450 W

Total Load of Close Coils = 4800 W

Nominal DC system Voltage = 110 V

Total Closing Current = 43.64 A

Table-2: Peak Load Summary of Different Types of Equipments

Sl.No Description Qty Unit Load (Watt ) Total Load (Watt )

a) 132kV Switchgear ( assumed)


Circuit Breakers
Trip Coil-1 1 450 450
Trip Coil-2 1 450 450
Closing Coil 1 200 200
b) 11kV Switchgear
Circuit Breakers
Drive Mechanism 1 450 450
Trip Coil-1 1 450 450
Closing Coil 1 150 150
b) 0.415kV Switchgear
Circuit Breakers
Drive Mechanism 1 350 350
Trip Coil-1 1 350 350
Closing Coil 1 150 150
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE Project Tittle: Confidence Power Rangpur 113MW HFO Based Power Plant.

Page Tittle: Load Summary & Conculsion

2.2 EMERGENCY LOAD

Emergency Lighting load for 1.5 hours is considered as 440W ( 4Amp ) maximum number
of 20 incandascent lamps of 22W each are switched on at any given time by the maintenance
personnel who reach the substation within 1.5 hours of power failure
OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

3 LOAD SUMMARY :

The respective loads are listed below. Duty cycle is given in Annex-1

Continuous Load - 10 hours = 15.764 A

Momentary Tripping Load - 1 min. = 160.91 A

Momentary Restoration Load - 1 min. = 43.64 A

Emergency Lighting Load - 1.5 Hours = 4 A

4 CALCULATION OF REQUUIRED SIZE :

Maximum uncorrected size = 135.52

Temperature Correction = 1.15 (Refer IEEE-1106, Table A.1)


(at minimum Temp = -5°C)

Design Margin = 1.1

Aging Factor = 1.25

Required Capacity = Uncorrected Size x Design Margin x Aging factor


x Temperature Correction Factor

Required Capacity = 214.288

Battery Capacity = 200


THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN Project Tittle: Confidence Power Rangpur 113MW HFO Based Power Plant.

Page Tittle: Kt Factor Calculation

AMPERE
PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

A1 = Continuous Load + momentary Tripping = 176.67 A

A1= 176.67A A2 = Continuous Load = 15.76 A

A3 = Continuous + Emergency = 19.76 A

A4 = Continuous = 15.76 A

A5 = Continuous + Restoration = 59.40 A

A5=59.40A

43.64 A
A3=19.76A

4A
A2=A4=15.76A

M2
M4
M1 M3 M5

0 1 60 90 599 600

Figure: Load duty cycle profile for 110V DC Battery Sizing Calculation of CPRL 113MW Power Plant, Rangpur.
REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS Project Tittle: Confidence Power Rangpur 113MW HFO Based Power Plant.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO

Page Tittle: Charger Sizing Calculation

6 - CALCULATIONS :

The ampere hour rating of a battery charger is determined by equation which is as per
Technical specification

( (1.25 X L)+ (BIF X AHR) ) / 0.83


A = RT
The battery Charger Current Size,

= 40.3067 A

The battery Charger Current Size = 50 A


OWNER.

Where,
The respective loads are listed below. Duty cycle is given in Annex-1

Maximum Required DC load in amperes - L = 15.76 A


( Continuous load is considered )

Battery inefficiency factor - BIF = 1.10

Ampere hour removed during discharge - AHR = 200 A


(Maximum discharger is considered)

Recharge time in hours - RT = 16 A


THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ELECTRICITY CO. NO REPRODUCTION IN FULL OR IN PART SHALL BE Project Tittle: Confidence Power Rangpur 113MW HFO Based Power Plant.

Page Tittle: Kt Factor Calculation

7 CALCULATION OF CAPACITY RATING FACTOR.( KT )

REFERENCE IEEE Std. 1115-2000

Minimum Cell Voltage 1.1 V

Cell Mfg.
OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

Rated Ampere hour capacity (Ay std. Time Rate at 25 ºC


to Std % end of discharge)
KT = Ampere that will be supplied for T minute at 25 ºC to
given end of discharge voltage

The Kt factor for time t is calculated in the table by interpolation using the formula

(Kt2 - Kt1) x ( t2 - t )
Kt = Kt2 - ( t2 - t 1 )

End voltage discharge voltage of cell = 1.1 V

Rated Ampere hour capacity = 200 AH

Calculation of K T Factor :

Sl.No T minute Total Ampere KT Factor

1 1 176.67 1.132

2 60 15.76 12.687

3 90 19.76 10.120

4 599 15.76 12.687

5 600 59.40 3.367