You are on page 1of 109

Intakewell & Components

Estmat Expendit Habs.


S.N Segment Component Locat e Existng/
ure Cover Size
o Name on Amount (lakhs) New
age
(lakhs)

Intakewell 8m dia Existing


SRSP Gandhi
1 - 800 m 62
Adilabad Pumping main nagar Existing
Intakewell 34mX12m New
Approach 930 mts New
Channel
Foot Bridge 380 mts New
SRSP Local 236.85 147.397
2 869
Adilabad Approch Road Velmal 500 mts New
Sub Station
19.80 Km New
Pumping main

Intakewell 14 m dia New


Approch Road 300 m New
SRSP Bhaina
3 Sub Station 1.2 0.85 245 11 Kv New
Adilabad sa
Estmat Expendit Habs.
S.N Segment Component Locat e Existng/
ure Cover Size
o Name on Amount (lakhs) New
age
SRSP Bhaina (lakhs)
3 Adilabad 1.2 0.85 245
sa

Pumping main 1.05 Km New

Intakewell Gudipet 9.68 5.19 337 14m Dia New

Approach Channel 900 New

Yellampaly
6 Mancherial -23
Foot Bridge 160 New
Estmat Expendit Habs.
S.N Segment Component Locat
Yellampaly e Existng/
6 ure Cover Size
o Name-23
Mancherial on Amount (lakhs) New
age
(lakhs)

Approch Road 65 New

Sub Station 33/11 KV New

Pumping main 0.83km New

Intakewell Kaddam 293 10 m dia*17.45m

Approach Channel 660 m

Kadem-
7 Foot Bridge 85 m 79
Khanapur-24

Approch Road 3.85 2.85 200 m (214-nirmal)

Sub Station 11 KV

Pumping main 1.2 Km


17.6m*12m*25.5
Intakewell New
m

4 Komaram Bheem Ada 11500 4205 890


Estmat Expendit Habs.
S.N Segment Component Locat e Existng/
ure Cover Size
o Name on Amount (lakhs) New
age
(lakhs)

Approach Channel 960 m New


4 Komaram Bheem Foot Bridge Ada 11500 4205 890 80 m New
Approch Road 1000 m New
Sub Station 33 KV New
Pumping main 0.175Km New
Intakewell 10m dia Existing
Approach Channel 960 m Existing
Foot Bridge 100 m Existing
5 Komaram Bheem Dhanora Completed Completed 929
Approch Road 1000 m Existing
Sub Station 11 KV Existing
Pumping main 4.2Km Existing
Intakewell & Components

Stage of Work Remarks

Completed (Existing)
Completed (Existing)
Completed
Completed
Completed
Completed

19.80 Km laying
Completed,18.6 Km
hydro testing completed
Complet ed
Completed Covered
in RWS&S
Completed CPWS
NRDWP
Scheme
Stage of Work Remarks
Covered
in RWS&S
CPWS
NRDWP
250 mts Scheme
completed,Remaining
laying in progress

Roof Slab Completed. . Brick work


completed , Plastering work is
completed, Doors and windows are
fixed. Exterior emulsion painting
work Single coat completed . Intake
well trash track work is in progress.

Earthwork excavation 60m


completed and remaining work in
progress

Foot bridge, Kerb wall completed,


both sides railing and painting work
is completed. Wearing coat is
balance.
Stage of Work Remarks

Design submitted to irrigation dept.


for approval, Formation work and
compaction work with vibrating
roller is completed.

Completed

357 m laying completed

Completed-finishings under
progress

Submerged

Completed-Finishings in progress

In progress

In progress

1.140 laying completed

completed
Stage of Work Remarks

submergence
Completed
Completed
Completed
completed
Completed
Completed
Completed
Completed
Completed
Completed
PHASE - I WORKS

Aproach
Intake Structures Approach Bridge Raw water
Channel

MS
Revised
S. New Segment Est Cost Rs. Agency Completon
No. District Cr Date Compl Length
Completed Roof Slab Floor Slab Length in Compl
in
Level Level Meters eted Meters eted

Length in Procured
KM

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

SRSP Compl Compl


1 Nirmal 248.00 MEIL 10.08.2017 Completed 343.00 335.00 380.00 930 19.80 19.80
Adilabad eted eted

Not
Asifabad Komuranb Compl
2 115.00 MEIL 2/22/2017 Completed 252.65 244.50 80.00 Requir 0.175 0.175
heem eted
ed

painting
Mancher Yellampalli Compl 20.00 Compl
3 47.50 MEIL 10.08.2017 work is in 157.50 149.50 160.00 0.83 0.80
ial eted eted
progress
Compl Not
4 Nirmal Kadam 30.00 MEIL 22.02.2017 Completed 223.80 214.80 85.00 Requir 0.00 0
eted
ed
PHASE - I WORKS PHASE - I WORKS

Raw water Pumping Main Clear water Pumping Main

MS DI MS DI
S. New Segment Est Cost Rs.
No. District Cr

Length Length in Procure Length in


Laid Procured Laid Laid Procured Laid
in KM KM d KM

1 2 3 4 16 17 18 19 20 21 22 23 24 25

SRSP
1 Nirmal 248.00 19.80 0 0.00 0.00 0 0.00 0.00 0.00 0.00 0.00
Adilabad

2 Asifabad Komuranb 115.00 0.175 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
heem

Mancher Yellampalli
3 47.50 0.36 5.60 5.40 4.47
ial
4 Nirmal Kadam 30.00 0 1.20 1.2 1.14 0.00 0 0 0.00 0 0
PHASE - I WORKS

WTPs Sumps Pump Houses

Not Not
In Groun In
Complete Progress Compl progre ded/ Compl Progre Groun
No MLD No
d eted eted
ss Remar ss ded/Re
S. New marks
Segment Est Cost Rs. ks
No. District Cr

50 - Below
>75% No No
75^% 50%

1 2 3 4 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

SRSP Compl
1 Nirmal 248.00 1.00 130.00 99.75 - - - 1.00 0.00 0.00 1.00 1.00 Nil
Adilabad eted

Asifabad Komuranb Compl


2 115.00 1 115 98.90% 1 1 0 80%
heem eted

Mancher Yellampalli Compl


3 47.50 1 95 90% 1 1 1 100% 0 0
ial eted
Compl
4 Nirmal Kadam 30.00 1 23 85% 1 1 70% 1
eted
PHASE - I WORKS

Power Supply

11KV 33KV 132 KV 220 KV


S. New Segment Est Cost Rs.
No. District Cr

Compl Progre Not Compl Progre Not Compl Progre Not Compl Progre Not
No No No
eted ss Started eted ss Started eted ss Started eted ss Started

1 2 3 4 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55

SRSP
1 Nirmal 248.00 Nil Nil Nil 2.00 2.00 0.00 - Nil Nil Nil Nil Nil Nil Nil Nil
Adilabad

2 Asifabad Komuranb 115.00 1 1


heem

Mancher Yellampalli
3 47.50 1 1
ial
4 Nirmal Kadam 30.00 1 0 0 0 0 0 0 0 0 0 0 0 0
PHASE - I WORKS

Permission required if any Forest C

S. New Segment Est Cost Rs.


No. District Cr
Canal
Railways NHAI R&B Structures
crossings

Area in
Required Obtained Required Obtained Required Obtained Required Obtained Acrs.

1 2 3 4 56 57 58 59 60 61 62 63 64

SRSP
1 Nirmal 248.00 Nil Nil Nil Nil Nil Nil Nil Nil Nil
Adilabad

2 Asifabad Komuranb 115.00 Nil Nil Nil Nil Nil Nil Nil Nil Nil
heem

Mancher Yellampalli
3 47.50 Nil Nil Nil Nil Nil Nil Nil Nil 0
ial
4 Nirmal Kadam 30.00 Nil Nil Nil Nil 1 1 Nil 3.4
PHASE - I WORKS

Forest Clearence

Agriculture Lands Remarks for


not grounded
S. New Segment Est Cost Rs. Status of Electro- structures &
No. District Cr Mechanical Works specific reasons
for delay in
Pipe Line detail

Status
Status Length in (Permissi Length Laid
(Permission/Acuired) KM on/ Laid)

1 2 3 4 65 66 67 68 69 70 71

Agreement
SRSP
1 Nirmal 248.00 Nil 0.15 0.15 Nil Nil Concluded&Procurement in Nil
Adilabad Progress

Asifabad Komuranb erection works are in


2 115.00 Nil Nil
heem progress

Mancher Yellampalli
3 47.50 0 Nil Nil PROCURED
ial
tiger Order placed, Not
4 Nirmal Kadam 30.00 tiger reserve 169 88.87 88.87 Nil
reserve Proccured
TONE WISE ACTION PLAN FOR COVERAGE OF HABITATIONS Dt.15-06-2017

S.No Esrtwhile New Agency No. of Habs to


Segment
District District be covered
MS DI

% of
Total km Procured km Laid km completon Total km Procured km Laid km
(14/12)
1 2 3 4 5 6 7 8 9 10 11 12 13
SRSP-
1 Adilabad Nirmal MEIL 157 0.00 0.00 0.00 68.25 62.00 58.14
Adilabad
SRSP-
2 Adilabad Nirmal MEIL 20 0.00 0.00 0.00 30.00 30.00 26.10
Adilabad
SRSP-
3 Adilabad Nirmal MEIL 150 0.00 0.00 0.00 55.00 47.16 30.00
Adilabad
SRSP-
4 Adilabad Nirmal MEIL 20 0.00 0.00 0.00 34.00 34.00 34.00
Adilabad
SRSP-
5 Adilabad Adilabad MEIL 725 65.88 65.61 55.07 83.59 651.25 392.53 308.72
Adilabad
SRSP-
6 Adilabad Nirmal MEIL 104 36.16 18.80 12.61 34.88 48.90 45.00 44.87
Adilabad

TOTAL 1176 102.04 84.40 67.68 66.33 887.40 610.69 501.83

Kadem -
1 Adilabad Nirmal KOYA 20 0.00 0.00 0.00 23.00 22.38 17.18
Khanapur
Kadem - Mancheria KOYA
2 Adilabad 32 0.00 0.00 0.00 17.00 6.86 3.55
Khanapur l
Kadem - Mancheria KOYA
3 Adilabad 47 0.00 0.00 0.00 20.24 12.83 10.92
Khanapur l

Kadem -
4 Adilabad Nirmal KOYA 194 0.00 0.00 0.00 95.66 67.55 34.77
Khanapur

Komaram
1 Adilabad Asifabad L&T 85 0.0 0.0 0.0 0.00 0.00 0.00
Bheem

Komaram
2 Adilabad Asifabad L&T 387 13.7 13.4 12.3 89.5 260.10 260.10 190.47
Bheem

Komaram Mancheria L & T


3 Adilabad 210 0.0 0.0 0.0 168.81 168.81 145.61
Bheem l
Komaram Mancheria L & T
4 Adilabad 21 0.0 0.0 0.0 10.76 10.76 10.76
Bheem l
Komaram
5 Adilabad Adilabad L&T 450 0.0 0.0 0.0 262.90 259.80 126.03
Bheem
Komaram
6 Adilabad Asifabad L&T 639 23.3 23.3 22.2 95.1 625.80 625.80 412.01
Bheem
Komaram Mancheria L & T
7 Adilabad 27 0.0 0.0 0.0 13.73 13.73 13.73
Bheem l
TONE WISE ACTION PLAN FOR COVERAGE OF HABITATIONS

Pipelines which needs to to be completed in order to Cover the Habs by the mile

S.No Esrtwhile New Agency No. of Habs to


Segment
District District be covered
DI PCCP

% of % of
completon Total km Procured km Laid km completon
(18/16) (22/20)
1 2 3 4 5 6 14 15 16 17 18
SRSP-
1 Adilabad Nirmal MEIL 157 85.19 0.00 0.00 0.00
Adilabad
SRSP-
2 Adilabad Nirmal MEIL 20 87.00 0.00 0.00 0.00
Adilabad
SRSP-
3 Adilabad Nirmal MEIL 150 54.55 0.00 0.00 0.00
Adilabad
SRSP-
4 Adilabad Nirmal MEIL 20 100.00 0.00 0.00 0.00
Adilabad
SRSP-
5 Adilabad Adilabad MEIL 725 286.01 0.00 0.00 0.00
Adilabad
SRSP-
6 Adilabad Nirmal MEIL 104 91.75 0.00 0.00 0.00
Adilabad

TOTAL 1176 0.00 0.00 0.00

Kadem -
1 Adilabad Nirmal KOYA 20 74.71 0.00 0.00 0.00
Khanapur
Kadem - Mancheria KOYA
2 Adilabad 32 20.87 0.00 0.00 0.00
Khanapur l
Kadem - Mancheria KOYA
3 Adilabad 47 53.97 0.00 0.00 0.00
Khanapur l

Kadem -
4 Adilabad Nirmal KOYA 194 36.34 0.00 0.00 0.00
Khanapur

Komaram
1 Adilabad Asifabad L&T 85 0.00 0.00 0.00
Bheem

Komaram
2 Adilabad Asifabad L&T 387 73.23 0.00 0.00 0.00
Bheem

Komaram Mancheria L & T


3 Adilabad 210 86.25 0.00 0.00 0.00
Bheem l
Komaram Mancheria L & T
4 Adilabad 21 100.00 0.00 0.00 0.00
Bheem l
Komaram
5 Adilabad Adilabad L&T 450 47.94 0.00 0.00 0.00
Bheem
Komaram
6 Adilabad Asifabad L&T 639 65.84 0.00 0.00 0.00
Bheem
Komaram Mancheria L & T
7 Adilabad 27 100.00 0.00 0.00 0.00
Bheem l
TONE WISE ACTION PLAN FOR COVERAGE OF HABITATIONS

Pipelines which needs to to be completed in order to Cover the Habs by the mile stone

S.No Esrtwhile New Agency No. of Habs to


Segment
District District be covered
BWSCP HDPE

% of
Total km Procured km Laid km completon Total km Procured km Laid km
(26/24)
1 2 3 4 5 6 19 20 21 22 23 24 25
SRSP-
1 Adilabad Nirmal MEIL 157 0.00 0.00 0.00 117.40 117.40 114.00
Adilabad
SRSP-
2 Adilabad Nirmal MEIL 20 0.00 0.00 0.00 19.00 19.00 16.00
Adilabad
SRSP-
3 Adilabad Nirmal MEIL 150 0.00 0.00 0.00 192.00 186.62 127.17
Adilabad
SRSP-
4 Adilabad Nirmal MEIL 20 0.00 0.00 0.00 18.00 18.00 18.00
Adilabad
SRSP-
5 Adilabad Adilabad MEIL 725 0.00 0.00 0.00 805.88 522.44 428.68
Adilabad
SRSP-
6 Adilabad Nirmal MEIL 104 16.63 8.85 6.38 38.39 185.29 185.29 147.76
Adilabad

TOTAL 1176 16.63 8.85 6.38 1337.57 1048.75 851.61

Kadem -
1 Adilabad Nirmal KOYA 20 0.00 0.00 0.00 13.00 10.50 8.35
Khanapur
Kadem - Mancheria KOYA
2 Adilabad 32 0.00 0.00 0.00 39.00 6.60 3.40
Khanapur l
Kadem - Mancheria KOYA
3 Adilabad 47 0.00 0.00 0.00 48.00 0.72 0.00
Khanapur l

Kadem -
4 Adilabad Nirmal KOYA 194 0.00 0.00 0.00 250.00 215.23 84.29
Khanapur

Komaram
1 Adilabad Asifabad L&T 85 0.00 0.00 0.00 0.00 0.00 0.00
Bheem

Komaram
2 Adilabad Asifabad L&T 387 1.65 1.65 0.35 21.20 295.30 295.30 199.11
Bheem

Komaram Mancheria L & T


3 Adilabad 210 6.10 3.58 3.69 60.46 189.92 189.92 154.05
Bheem l
Komaram Mancheria L & T
4 Adilabad 21 0.00 0.00 0.00 23.00 23.00 23.00
Bheem l
Komaram
5 Adilabad Adilabad L&T 450 0.00 0.00 0.00 249.40 150.00 78.92
Bheem
Komaram
6 Adilabad Asifabad L&T 639 4.17 4.17 2.14 51.36 452.20 316.78 185.54
Bheem
Komaram Mancheria L & T
7 Adilabad 27 0.00 0.00 0.00 30.00 30.00 30.00
Bheem l
TONE WISE ACTION PLAN FOR COVERAGE OF HABITATIONS

e Habs by the mile stone

S.No Esrtwhile New Agency No. of Habs to


Segment
District District be covered
HDPE Grand Total

% of % of
completon Total km Procured km Laid km completon
(30/28) (34/32)
1 2 3 4 5 6 26 27 28 29 30
SRSP-
1 Adilabad Nirmal MEIL 157 97.10 185.65 179.40 172.14 92.72
Adilabad
SRSP-
2 Adilabad Nirmal MEIL 20 84.21 49.00 49.00 42.10 85.92
Adilabad
SRSP-
3 Adilabad Nirmal MEIL 150 66.23 247.00 233.78 157.17 63.63
Adilabad
SRSP-
4 Adilabad Nirmal MEIL 20 100.00 52.00 52.00 52.00 100.00
Adilabad
SRSP-
5 Adilabad Adilabad MEIL 725 53.19 1523.01 980.58 792.47 52.03
Adilabad
SRSP-
6 Adilabad Nirmal MEIL 104 79.75 286.98 257.94 211.63 73.74
Adilabad

TOTAL 1176 2343.64 1752.70 1427.51

Kadem -
1 Adilabad Nirmal KOYA 20 64.25 36.00 32.88 25.53 70.93
Khanapur
Kadem - Mancheria KOYA
2 Adilabad 32 58.76 13.46 6.95 11.82
Khanapur l
Kadem - Mancheria KOYA
3 Adilabad 47 0.00 71.24 13.55 10.92 15.33
Khanapur l

Kadem -
4 Adilabad Nirmal KOYA 194 33.72 374.30 282.78 119.06 31.81
Khanapur

Komaram
1 Adilabad Asifabad L&T 85 0.00 0.00 0.00
Bheem

Komaram
2 Adilabad Asifabad L&T 387 67.42 570.78 570.50 402.21 70.5
Bheem

Komaram Mancheria L & T


3 Adilabad 210 81.11 364.83 362.31 303.35 83.1
Bheem l
Komaram Mancheria L & T
4 Adilabad 21 100.00 33.76 33.76 33.76 100.0
Bheem l
Komaram
5 Adilabad Adilabad L&T 450 31.64 512.30 409.80 204.95 40.0
Bheem
Komaram
6 Adilabad Asifabad L&T 639 41.03 1105.51 970.09 621.89 56.3
Bheem
Komaram Mancheria L & T
7 Adilabad 27 100.00 43.73 43.73 43.73 100.0
Bheem l
TONE WISE ACTION PLAN FOR COVERAGE OF HABITATIONS

Existng/Ongoing WTPs which needs to WTPs which needs to be completed in order to Cover
be completed in order to Cover the the Habs by mile stone
Habs by mile stone

S.No Esrtwhile New Agency No. of Habs to


Segment
District District be covered

Total
Total Total Capacity In progress Total Completed in In progress
Capacity in
No. in MLD No. No. No. No.
MLD

1 2 3 4 5 6 31 32 33 34 35 36 37
SRSP-
1 Adilabad Nirmal MEIL 157 0 0 0 1 50 0 1
Adilabad
SRSP-
2 Adilabad Nirmal MEIL 20 0 0 0 0 0 0 0
Adilabad
SRSP-
3 Adilabad Nirmal MEIL 150 0 0 0 0 0 0 0
Adilabad
SRSP-
4 Adilabad Nirmal MEIL 20 0 0 0 0 0 0 0
Adilabad
SRSP-
5 Adilabad Adilabad MEIL 725 0 0 0 0 0 0 0
Adilabad
SRSP-
6 Adilabad Nirmal MEIL 104 0 0 0 1 130 0 1
Adilabad

TOTAL 1176 0.00 0.00 0.00 2.00 180.00 0.00 2.00

Kadem -
1 Adilabad Nirmal KOYA 20 0 0 0 1 23 0 1
Khanapur
Kadem - Mancheria KOYA
2 Adilabad 32 0 0 0 0 0 0 0
Khanapur l
Kadem - Mancheria KOYA
3 Adilabad 47 0 0 0 0 0 0 0
Khanapur l

Kadem -
4 Adilabad Nirmal KOYA 194 0 0 0 0 0 0 0
Khanapur

Komaram
1 Adilabad Asifabad L&T 85 1 12 0 1 115 0 1
Bheem

Komaram
2 Adilabad Asifabad L&T 387 2 145 2 1 30 0 1
Bheem

Komaram Mancheria L & T


3 Adilabad 210 0 0 0 0
Bheem l
Komaram Mancheria L & T
4 Adilabad 21 0 0 0 0
Bheem l
Komaram
5 Adilabad Adilabad L&T 450 0 0 0 0
Bheem
Komaram
6 Adilabad Asifabad L&T 639 0 0 0 0
Bheem
Komaram Mancheria L & T
7 Adilabad 27 0 0 0 0
Bheem l
TONE WISE ACTION PLAN FOR COVERAGE OF HABITATIONS

Sumps which needs to be completed in order to Cover the Habs


by mile stone

S.No Esrtwhile New Agency No. of Habs to


Segment
District District be covered

Total No. Completed in No. In progress Not


No. grounded

1 2 3 4 5 6 38 39 40 41
SRSP-
1 Adilabad Nirmal MEIL 157 4 3 1 0
Adilabad
SRSP-
2 Adilabad Nirmal MEIL 20 0 0 0 0
Adilabad
SRSP-
3 Adilabad Nirmal MEIL 150 17 12 5 0
Adilabad
SRSP-
4 Adilabad Nirmal MEIL 20 0 0 0 0
Adilabad
SRSP-
5 Adilabad Adilabad MEIL 725 25 8 17 0
Adilabad
SRSP-
6 Adilabad Nirmal MEIL 104 5 3 2 0
Adilabad

TOTAL 1176 51.00 26.00 25.00 0.00

Kadem -
1 Adilabad Nirmal KOYA 20 0 0 0 0
Khanapur
Kadem - Mancheria KOYA
2 Adilabad 32 0 0 0 0
Khanapur l
Kadem - Mancheria KOYA
3 Adilabad 47 1 0 1 0
Khanapur l

Kadem -
4 Adilabad Nirmal KOYA 194 10 4 2 4
Khanapur

Komaram
1 Adilabad Asifabad L&T 85 0 0 0 0
Bheem

Komaram
2 Adilabad Asifabad L&T 387 11 10 1 0
Bheem

Komaram Mancheria L & T


3 Adilabad 210 0 0 0 0
Bheem l
Komaram Mancheria L & T
4 Adilabad 21 0 0 0 0
Bheem l
Komaram
5 Adilabad Adilabad L&T 450 15 10 5 0
Bheem
Komaram
6 Adilabad Asifabad L&T 639 14 11 3 0
Bheem
Komaram Mancheria L & T
7 Adilabad 27 1 1 0 0
Bheem l
TONE WISE ACTION PLAN FOR COVERAGE OF HABITATIONS

Sumps which needs to be completed in order to Cover the Habs GLBRS which needs to be completed in order to Cover OHBR/BPTS which needs to b
by mile stone the Habs by mile stone Habs b

S.No Esrtwhile New Agency No. of Habs to


Segment
District District be covered

Reasons In Reasons for


Total Completed progress Not Completed
for not not Total No.
No. in No. grounded in NO.
grounding No. grounding

1 2 3 4 5 6 42 43 44 45 46 47 48 49
SRSP-
1 Adilabad Nirmal MEIL 157 0 0 0 0 3 0
Adilabad
SRSP-
2 Adilabad Nirmal MEIL 20 0 0 0 0 1 1
Adilabad
SRSP-
3 Adilabad Nirmal MEIL 150 0 0 0 0 4 2
Adilabad
SRSP-
4 Adilabad Nirmal MEIL 20 0 0 0 0 0 0
Adilabad
SRSP-
5 Adilabad Adilabad MEIL 725 5 0 5 0 8 0
Adilabad
SRSP-
6 Adilabad Nirmal MEIL 104 0 0 0 0 1 0
Adilabad

TOTAL 1176 5.00 0.00 5.00 0.00 17.00 3.00

Kadem -
1 Adilabad Nirmal KOYA 20 0 0 0 0 1 0
Khanapur
Kadem - Mancheria KOYA
2 Adilabad 32 0 0 0 0 0 0
Khanapur l
Kadem - Mancheria KOYA
3 Adilabad 47 0 0 0 0 0 0
Khanapur l

Kadem -
4 Adilabad Nirmal KOYA 194 0 0 0 0 3 0
Khanapur

Komaram
1 Adilabad Asifabad L&T 85 0 0 0 0 0 0
Bheem

Komaram
2 Adilabad Asifabad L&T 387 6 2 4 0 0 0
Bheem

Komaram Mancheria L & T


3 Adilabad 210 0 0 0 0 3 2
Bheem l
Komaram Mancheria L & T
4 Adilabad 21 0 0 0 0 0 0
Bheem l
Komaram
5 Adilabad Adilabad L&T 450 As per 1 0 1 0 5 3
Bheem milestone
Komaram work is
6 Adilabad Asifabad L&T 639 proceeding 4 3 1 0 As per 3 0
Bheem milestone
work is
Komaram Mancheria L & T
7 Adilabad 27 2 2 0 0 proceeding 0 0
Bheem l
TONE WISE ACTION PLAN FOR COVERAGE OF HABITATIONS

OHBR/BPTS which needs to be completed in order to Cover the Pump Houses


Habs by mile stone

S.No Esrtwhile New Agency No. of Habs to


Segment
District District be covered

Reasons for
In progress Not Completed in In progress
not Total No.
No. grounded No. No.
grounding

1 2 3 4 5 6 50 51 52 53 54 55
SRSP-
1 Adilabad Nirmal MEIL 157 3 0 3 1 2
Adilabad
SRSP-
2 Adilabad Nirmal MEIL 20 0 0 0 0 0
Adilabad
SRSP-
3 Adilabad Nirmal MEIL 150 2 0 6 0 6
Adilabad
SRSP-
4 Adilabad Nirmal MEIL 20 0 0 0 0 0
Adilabad
SRSP-
5 Adilabad Adilabad MEIL 725 8 0 11 0 11
Adilabad
SRSP-
6 Adilabad Nirmal MEIL 104 1 0 0 0 0
Adilabad

TOTAL 1176 14.00 0.00 20.00 1.00 19.00

Kadem -
1 Adilabad Nirmal KOYA 20 1 0 0 0 0
Khanapur
Kadem - Mancheria KOYA
2 Adilabad 32 0 0 0 0 0
Khanapur l
Kadem - Mancheria KOYA
3 Adilabad 47 0 0 1 0 0
Khanapur l

Awaiting for
Kadem -
4 Adilabad Nirmal KOYA 194 2 1 Forest 10 0 0
Khanapur Permissions

Komaram
1 Adilabad Asifabad L&T 85 0 0 0 0 0
Bheem

Komaram
2 Adilabad Asifabad L&T 387 0 0 11 10 1
Bheem

Komaram Mancheria L & T


3 Adilabad 210 1 0 0 0 0
Bheem l
Komaram Mancheria L & T
4 Adilabad 21 0 0 0 0 0
Bheem l
Komaram
5 Adilabad Adilabad L&T 450 2 0 15 4 11
Bheem
As per
Komaram milestone
6 Adilabad Asifabad L&T 639 3 0 14 5 9
Bheem work is
proceeding
Komaram Mancheria L & T
7 Adilabad 27 0 0 1 1 0
Bheem l
TONE WISE ACTION PLAN FOR COVERAGE OF HABITATIONS

Pump Houses

S.No Esrtwhile New Agency No. of Habs to Status of Electro-


Segment
District District be covered Mechanical Works

Reasons for not


Not grounded grounding

1 2 3 4 5 6 56 57 58
SRSP-
1 Adilabad Nirmal MEIL 157 0
Adilabad
SRSP-
2 Adilabad Nirmal MEIL 20 0
Adilabad
SRSP-
3 Adilabad Nirmal MEIL 150 0
Adilabad
Procurement in Progress
SRSP-
4 Adilabad Nirmal MEIL 20 0
Adilabad
SRSP-
5 Adilabad Adilabad MEIL 725 0
Adilabad
SRSP-
6 Adilabad Nirmal MEIL 104 0
Adilabad

TOTAL 1176 0.00

Kadem -
1 Adilabad Nirmal KOYA 20 0
Khanapur

Purchase order given


Kadem - Mancheria KOYA
2 Adilabad 32 0
Khanapur l
Kadem - Mancheria KOYA
3 Adilabad 47 1 Purchase order given
Khanapur l

Kadem -
4 Adilabad Nirmal KOYA 194 10
Khanapur

Komaram
1 Adilabad Asifabad L&T 85 0
Bheem

Komaram As per milestone work is


2 Adilabad Asifabad L&T 387 0
Bheem proceeding

Komaram Mancheria L & T


3 Adilabad 210 0
Bheem l
Komaram Mancheria L & T
4 Adilabad 21 0
Bheem l
Komaram
5 Adilabad Adilabad L&T 450 0
Bheem
Komaram As per milestone work is
6 Adilabad Asifabad L&T 639 0
Bheem proceeding
Komaram Mancheria L & T
7 Adilabad 27 0
Bheem l
TONE WISE ACTION PLAN FOR COVERAGE OF HABITATIONS

Remarks

of Habs to No.100
of habitatons covered with
S.No Esrtwhile New
Segment Agency No. LPCD Bulk water upto
District District be covered Village OHSRs

1 2 3 4 5 6 59 60
SRSP-
1 Adilabad Nirmal MEIL 157 16
Adilabad
SRSP-
2 Adilabad Nirmal MEIL 20 0
Adilabad
SRSP-
3 Adilabad Nirmal MEIL 150 0
Adilabad
SRSP-
4 Adilabad Nirmal MEIL 20 0
Adilabad
SRSP-
5 Adilabad Adilabad MEIL 725 0
Adilabad
SRSP-
6 Adilabad Nirmal MEIL 104 0
Adilabad

TOTAL 1176 16.00

Kadem -
1 Adilabad Nirmal KOYA 20 0
Khanapur
Kadem - Mancheria KOYA
2 Adilabad 32 0
Khanapur l
Kadem - Mancheria KOYA
3 Adilabad 47 0
Khanapur l

Kadem -
4 Adilabad Nirmal KOYA 194 0
Khanapur

Komaram
1 Adilabad Asifabad L&T 85 41
Bheem

Komaram
2 Adilabad Asifabad L&T 387 0
Bheem

Komaram Mancheria L & T


3 Adilabad 210 0
Bheem l
Komaram Mancheria L & T
4 Adilabad 21 0
Bheem l
Komaram
5 Adilabad Adilabad L&T 450 0
Bheem
Komaram
6 Adilabad Asifabad L&T 639 0
Bheem
Komaram Mancheria L & T
7 Adilabad 27 0
Bheem l
WTPs - Segment wise
New Component Present Stage
WTPs
Capaci Locato
S. New Segeme ty in
NO Districts nt Name n
No MLD

1 2 3 4 5 6 7 8
Aerator Completed
Stilling Channel Completed
Flash Mixer Completed
SRSP - Clariflocculator Clarifloculator-1 -completed. ,Clarifloculator-2- Completed
1 Nirmal 1 130 Madego
Nirmal an Filter house Finishings under progress
Chemical house Completed
Chlorination house Completed
Wash water tank completed
Aerator Dome slab reinforcement is in progress
Raw water Channel Sidewall Completed
Stilling Chamber Side wall completed
Flash Mixer Side wall 5th lift completed
Clariflocculator Walkway slab in progress,Electromechanical Equipment procured
SRSP -
2 Nirmal 1 50 Bhainsa Filter house Side wall 3rd lift completed.Inlet channel completed
Nirmal
Chemical house
Brick Work in progress. FF colums progress,Alum tank completed
Chlorination house
Clear Water Sump Top slab completed
Wash water tank Columns completed upto 3rd brace beam
OHBR1 Bottom slab reinforcement in progress
OHBR2 Bottom slab reinforcement in progress
Aerator completed

Stilling Channel completed


New Component Present Stage
WTPs
Capaci Locato
S. New Segeme ty in
NO Districts nt Name n
No MLD

1 2 3 4 5 6 7 8
Flash Mixer completed

Clariflocculator 1 completed
Komaramb Komara Ada Clariflocculator 2 completed
3 heem mbhee 1 115 village
(Asifabad) m
Filter house Finishing work in progress & electro mechanical works in progress

Chemical house completed

Back wash tank Finishing work in progress & electro mechanical works in progress

Chlorination house completed

Aerator completed

Stilling Channel painting work in progress

Komaramb Komara Dhanor


4 heem mbhee 1 30 a
(Asifabad) m
New Component Present Stage
WTPs
Capaci Locato
S. New Segeme ty in
NO Districts nt Name n
No MLD

1 2 3 4 5 6 7 8
Flash Mixer painting work in progress

Clariflocculator painting work in progress


Komaramb Komara Dhanor
4 heem mbhee 1 30 Filter house Valves fitting works in progress
a
(Asifabad) m
Chemical house completed

Chlorination house completed

Pre settling tank painting work in progress

Wash water tank completed

Tiles work completed ,Hand railing work completed Alround


Aerator railing work is completed.
Stilling Chamber Civil structure completed

completed civil work is completed, Electro Mechanicle erection


Flash Mixer completed, Electrical cable connection work is in progress.

Yellamp
New Component Present Stage
WTPs
Capaci Locato
S. New Segeme ty in
NO Districts nt Name n
No MLD

1 2 3 4 5 6 7 8

CFL-1:Civil work completed, Electro Mechanicle erection


completed, Electrical cable connection work is in progress. .
Painting work is in progress.
Clariflocculator CFL2:Civil work completed, Electro Mechanicle erection
completed, Electrical cable connection work is in progress. .
Painting work is in progress.

Yellamp
Mancheria ally - Roof slab completed , Brick work and painting work one side
5 1 90 Gudipet
l Manchir completed another side work is in progress,Electro mechanical
yal works are in progress.Raw water channel with CRS masonary is in
Filter house progress 1)Filter media procured at site2) Valves procured at site
3) Air blower unit is procured at site 4) Motores procures at
site.Admin building plastering work is in progress.

Plastering work is completed. Out side Painting work is


Chemical house completed, inside painting and flooring work and Alum tank tiles
fixing work is balance.

Civil work completed ,plastering completed, Painting work is


Chlorination house completed, windows and doors are fixed ,Chlorine Cylinders are
procured at site.

Wash water tank - 1 :sidewall Completed,Top slab work is in


Wash water tank progress. Wash water tank - 2 : side wall completed ,Top
slab work is in progress.
New Component Present Stage
WTPs
Capaci Locato
S. New Segeme ty in
NO Districts nt Name n
No MLD

1 2 3 4 5 6 7 8

Dome Completed, Channel completed, Walkway completed&Brick


Aerator work completed. Placing of Tiles completed, Hand railing
completed. Painting in progress

Stilling chamber completd except finishings, Hand railing


Stilling Channel completed.Painting in progress

completed finisings in progress, Hand railing completed.Painting


Flash Mixer in progress

Lavender Slab completed, Wall upto final lift completed&Walkway


Clariflocculator completed.Mechanical Bridge erection completed. Baffle wall
completed, Hand railing completed.Painting in progress
Kadem -
6 Nirmal Khanapu 1 23 Kadem
r
Sidewalls completed, Inlet Channel completed&Walkway
completed.back wash tank top slab completed, Portico Area slab
Filter house completed. Brickwork completed and Plastering in progress.head
room concrete completed. Painting in progress.

brick work completed ,plastering in completed painting in


Chemical house progress.

Chlorination house brick work and plastering completed , painting in progress.

Wash Water Tank top slab completed. Plastering work completed.


Wash water tank White wash completed, Painting in progress.
WTPs - Segment wise

% of Acton plan for Component wise


Completon completon reasons for delay

9 10 11
100.00%
100.00%
100.00%
100.00%
6/30/2017
98.00%
100.00%
100.00%
100.00%
70.00%
95.00%
90.00% Due to Court case
Land aquisition
85.00% delayed 1
month.Due to
85.00% integration of
NRDWP WTP 27
55.00% 8/30/2017 MLD and Grid WTP
70.00% 23 MLD Designs
delay 2 months.Sand
90.00% Problem 2 months.
Demonitisation 2
45.00% months
80.00%
80.00%
100.00%

100.00%
% of Acton plan for Component wise
Completon completon reasons for delay

9 10 11
100.00%

100.00%

100.00% 8/30/2017

95.00%

100.00%

92.00%

100.00%

100.00%

95.00%

8/30/2017
% of Acton plan for Component wise
Completon completon reasons for delay

9 10 11
95.00%

99.00%

95.00% 8/30/2017

100.00%

100.00%

99.00%

100.00%

96%

96%

96%
% of Acton plan for Component wise
Completon completon reasons for delay

9 10 11

92%

10/8/2017

90%

91%

93%

55%
% of Acton plan for Component wise
Completon completon reasons for delay

9 10 11

95.00%

90.00%

95.00%

90.00%

8/10/2017

80.00%

90.00%

85.00%

90.00%
Power Supply
No of Locatons
HT
220 132

S.N Segment New Reaso


o. District ns for
Nos Grounded Completed Not not Nos Grounded Completed
grounded groun
ding

1 2 3 4 5 6 7 8 9 10 11
SRSP-
1 Adilabad 0 0 0 0 0 0 0
Adilabad
SRSP-
2 Nirmal 0 0 0 0 0 0 0
Adilabad
Komaram
1 Adilabad 0 0 0 0 0 0 0
Bheem

Komaram
2 Komaram Bheem 0 0 0 0 0 0 0
Bheem

Komaram
3 Mancherial 0 0 0 0 0 0 0
Bheem

Yellampally -
6 Mancherial 0
Mancherial
Kadem -
1 Mancherial 0 0 0 0 0 0 0
Khanapur

Kadem -
2 Nirmal 0
Khanapur
Komaram
1 Adilabad 0 0 0 0 0 0 0
Bheem

Komaram
2 Komaram Bheem 0 0 0 0 0 0 0
Bheem

Komaram
3 Mancherial 0 0 0 0 0 0 0
Bheem

Sub Total 0 0 0 0 0 0 0 0
Power Supply
No of Locatons
HT
132 33

S.N Segment New Reaso Reaso


o. District Not ns for Not ns for
groun not Nos Grou Comp groun not
ded groun nded leted ded groun
ding ding

1 2 3 12 13 14 15 16 17 18
SRSP-
1 Adilabad 0 0 0 0 0
Adilabad
SRSP-
2 Nirmal 0 2 0 2 0
Adilabad
Komaram
1 Adilabad 0 0 0 0 0
Bheem

Komaram
2 Komaram Bheem 0 1 0 1 0
Bheem

Komaram
3 Mancherial 0 0 0 0 0
Bheem

Yellampally -
6 Mancherial 0 1 1 1 0
Mancherial
Kadem -
1 Mancherial 0 0 0 0 0
Khanapur

Kadem -
2 Nirmal 0 0 0
Khanapur
Komaram
1 Adilabad 0 0 0 0 0
Bheem

Komaram
2 Komaram Bheem 0 1 0 1 0
Bheem

Komaram
3 Mancherial 0 0 0 0 0
Bheem

Sub Total 0 0 5 1 5 0 0
Power Supply
No of Locatons
HT
LT
11

S.N Segment New


o. District Not Reasons
Nos Grounded Completed groun for not Nos Grounded
ded grounding

1 2 3 19 20 21 22 23 24 25
SRSP-
1 Adilabad 7 7 0 0 20 10
Adilabad
SRSP-
2 Nirmal 4 2 2 0 31 3
Adilabad
Komaram
1 Adilabad 0 0 0 0 15 2
Bheem

Komaram
2 Komaram Bheem 1 0 1 0 25 5
Bheem

Komaram
3 Mancherial 0 0 0 0 1 1
Bheem

Yellampally -
6 Mancherial 0 10 7
Mancherial
Kadem -
1 Mancherial 0 0 0 0 1 1
Khanapur

Kadem -
2 Nirmal 1 1 0 0 10 5
Khanapur
Komaram
1 Adilabad 0 0 0 0 15 2
Bheem

Komaram
2 Komaram Bheem 1 0 1 0 25 5
Bheem

Komaram
3 Mancherial 0 0 0 0 1 1
Bheem

Sub Total 14 10 4 0 0 154 42


Power Supply
No of Locatons
LT TOTAL

S.N Segment New Reason


o. District Not s for Not
Completed ground not Nos Grou Comp ground %
ed ground nded leted ed comp.
ing

1 2 3 26 27 28 29 30 31 32 33
SRSP-
1 Adilabad 0 10 27 17 0 10 0.00
Adilabad
SRSP-
2 Nirmal 11 17 37 5 15 17 40.54
Adilabad
Komaram
1 Adilabad 8 5 15 2 8 5 6.67
Bheem

Komaram
2 Komaram Bheem 15 5 27 5 17 5 27.59
Bheem

Komaram
3 Mancherial 0 0 1 1 0 0 0.00
Bheem

Yellampally -
6 Mancherial 3 3 11 8 4 3 36.36
Mancherial
Kadem -
1 Mancherial 0 0 1 1 0 0 0.00
Khanapur

Kadem -
2 Nirmal 0 5 11 6 0 5 0.00
Khanapur
Komaram
1 Adilabad 8 5 15 2 8 5 6.67
Bheem

Komaram
2 Komaram Bheem 15 5 27 5 17 5 27.59
Bheem

Komaram
3 Mancherial 0 0 1 1 0 0 0.00
Bheem

Sub Total 60 55 0 173 53 69 55 145


STATUS OF PIPE LINE PASSING THROUGH AGRICULTURAL FIELDS

Total Length of Total Length Pipe


Mile Balance to be
S.N No. of Habs to Total Pipeline Pipe line in line in Agricltural
Segment New District stone Procured Laid laid
o be covered to be laid Agricltural lands upto =(8-11)
lands Apr'2017

1 2 3 4 5 6 7 8 9 10 11
1 SRSP-Adilabad Nirmal I 157 185.65 30.00 30.00 30.00 30.00 0.00

2 SRSP-Adilabad Nirmal II 20 49.00 8.04 0.00 8.04 8.04 0.00

3 SRSP-Adilabad Nirmal III 150 285.35 32.00 32.00 32.00 32.00 0.00

4 SRSP-Adilabad Nirmal IV 20 52.00 18.20 0.00 18.20 18.20 0.00

5 SRSP-Adilabad Adilabad V 725 1560.23 180.00 0.00 180.00 180.00 0.00

6 SRSP-Adilabad Nirmal V 104 290.66 9.18 0.00 9.18 9.18 0.00

7 Komaram Bheem I 85 0.00 0.00 0.00 0.00 0.00 0.00


Komaram
Bheem
8 Komaram Bheem III 387 676.67 97.00 77.60 97.00 97.00 0.00

9 Komaram Bheem Mancherial III 210 365.04 72.69 58.15 72.69 72.69 0.00

10 Komaram Bheem Mancherial IV 21 33.76 10.51 8.41 10.51 10.51 0.00

11 Komaram Bheem Adilabad V 450 460.19 45.00 36.00 45.00 45.00 0.00
Komaram
12 Komaram Bheem V 639 1224.63 190.00 152.00 190.00 190.00 0.00
Bheem

13 Komaram Bheem Mancherial V 27 43.73 0.00 0.00 0.00 0.00 0.00

14 Mancherial I 96 134.19 71.90 26.50 71.90 71.90 0.00


Yellampally -
Mancherial
15 Mancherial III 241 427.80 37.79 58.23 37.79 37.79 0.00

16 Nirmal I 20 36.00 7.50 7.50 7.50 7.50 0.00

17 Mancherial II 32 17.00 5.10 5.10 5.10 5.10 0.00


Kadem - Khanapur
18 Mancherial III 47 71.24 22.59 11.60 22.59 22.59 0.00

19 Nirmal III 194 386.10 53.68 25.35 53.68 53.68 0.00


G THROUGH AGRICULTURAL FIELDS

Acton Plan for Name of the TDWSP Staff Reasons for


laying of balance (AEE/AE) delay
pipeline

12 13 14
- N.Ganesh

- Gnaneshwar

- N.Ganesh& Gnaneshwar

- Gnaneshwar

N.Praveen&L.Sunil
15.05.2017 Kumar&K.Venkatesh& Ch.Mahesh
& Quadeer.Md, Rajashekhar

20.04.2017 Gnaneshwar

20.02.2017 P.Santhosh, Md.Irfan Ahmed

15.03.2017 Saikumar

20.04.2017 Saresh

15.05.2017 Srinivas
20.05.2017 Prithvi Raj, Krishna teja, P.Devdas

- Saresh

- Vinay & Venkata ramana

01.05.2017 Vinay ,Vivek & Venkata ramana

R.Rakesh

G.Kumar

G.Kumar

R.Rakesh, A.Rajashekar
STATUS OF CROSSINGS

Railways Crossings Natonal Highway Crossings

S.No Segment New District


. Permission Permission
Total Completed Progress Total Completed
acorded accorded

1 2 3 4 5 6 7 8 9 10

1 SRSP-Adilabad Adilabad 7 7 2 5 25 25 2

2 SRSP-Adilabad Nirmal 0 0 0 0 17 17 13

3 Komaram Bheem Adilabad 0 0 0 0 0 0 0

Komaram Bheem
4 Komaram Bheem 8 8 2 6 0 0 0
(Asifabad)

5 Komaram Bheem Mancherial 3 3 0 3 4 4 0

6 Komaram Bheem Adilabad 0 0 0 0 0 0 0

Komaram Bheem
7 Komaram Bheem 8 8 2 6 0 0 0
(Asifabad)
8 Komaram Bheem Mancherial 3 3 0 3 4 4 0

Sub Total 29 29 6 23 50 50 15
STATUS OF CROSSINGS STATUS OF CROSSINGS

Natonal Highway Crossings R&B Crossings

S.No Segment New District


. Permission
Progress Total Completed Progress
accorded

1 2 3 11 12 13 14 15

1 SRSP-Adilabad Adilabad 23 109 109 36 73

2 SRSP-Adilabad Nirmal 4 89 89 80 9

3 Komaram Bheem Adilabad 0 23 23 1 0

Komaram Bheem
4 Komaram Bheem 0 53 53 36 0
(Asifabad)

5 Komaram Bheem Mancherial 0 34 34 17 0

6 Komaram Bheem Adilabad 0 23 23 5 0

Komaram Bheem
7 Komaram Bheem 0 53 53 40 0
(Asifabad)
8 Komaram Bheem Mancherial 0 34 34 17 0

Sub Total 27 418 418 232 82


STATUS OF CROSSINGS

Canal Crossings River/rivulet Crossings

S.No Segment New District


. Permission Permission
Total Completed Progress Total Completed
accorded accorded

1 2 3 16 17 18 19 20 21 22

1 SRSP-Adilabad Adilabad 6 6 4 2 0 0 0

2 SRSP-Adilabad Nirmal 9 9 7 2 0 0 0

3 Komaram Bheem Adilabad 0 0 0 0 0 0 0

Komaram Bheem
4 Komaram Bheem 45 45 40 5 7 7 5
(Asifabad)

5 Komaram Bheem Mancherial 20 20 15 5 0 0 0

6 Komaram Bheem Adilabad 0 0 0 0 0 0 0

Komaram Bheem
7 Komaram Bheem 45 45 40 5 7 7 5
(Asifabad)
8 Komaram Bheem Mancherial 20 20 15 5 0 0 0

Sub Total 145 145 121 24 14 14 10


STATUS OF CROSSINGS

River/rivulet Crossings PR Road Crossings

S.No Reasons
Segment New District
. Permission for delay
Progress Total Completed Progress
accorded

1 2 3 23 24 25 26 27 28

1 SRSP-Adilabad Adilabad 0 175 175 75 100

2 SRSP-Adilabad Nirmal 0 119 119 105 14

3 Komaram Bheem Adilabad 0 49 49 20 0

Komaram Bheem
4 Komaram Bheem 0 365 365 290 0
(Asifabad)

5 Komaram Bheem Mancherial 0 70 70 40 0

6 Komaram Bheem Adilabad 0 49 49 20 0

Komaram Bheem
7 Komaram Bheem 0 365 365 290 0
(Asifabad)
8 Komaram Bheem Mancherial 0 70 70 40 0

Sub Total 0 1262 1262 880 114 0


STATUS OF LAND ACQUISITION IN MISSION BHAGIRATHA
Land Acquisiton in Acres
Govt Assigned Pvt. TOTAL
S.No. Erstwhile Reasons for
Segment New District
District delay
Required Acquired Required Acquired Required Acquired Required Acquired
1 2 3 4 5 6 7 8 9 10 11 12 13
1 Adilabad SRSP-Adilabad Adilabad 0.00 0.00 0.00 0.00 15.02 15.02 15.02 15.02

2 Adilabad SRSP-Adilabad Nirmal 21.55 21.55 0.00 0.00 25.50 25.50 47.05 47.05
STATUS OF OFC WORK IN MISSION BHAGIRATHA

Transmission System (Primary & OFC DUCT ( KM) in TDWSP


Secondary)
No.
S.N New Pipeline Pipelines Duct
Segment of Duct
o. District Total s laid Total laid Total Expenditur
Habs laid in Pipeline Order Procured laid in laid
Pipelines upto upto tll e on OFC
this placed this
length last s laid last now (Lakhs)
week week
week week
1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 SRSP-Adilabad Adilabad 725 1523.01 731.8 60.67 792.47 1403.64 750.00 666.77 60.67 727.44 218.372502

2 SRSP-Adilabad Nirmal 451 820.63 624.18 10.86 635.04 728.47 628.47 457.92 10.86 468.78 319.211028

Komaram
3 Mancherial 258 442.323 375.54 1.39 376.93 260 260 188.13 0.6 188.73 143.98
Bheem

Yellampally - Mancherial 337


4 561.99 345.55 7.81 353.36 359.95 359.95 283.99 7.48 291.47 0.00
Mancherial

Kadem -
5 Mancherial 79 130.00 17.87 0.00 17.87 50 20 17.87 0.00 17.87
Khanapur
Kadem -
6 Nirmal 214 410.30 134.59 10.00 144.59 150 150 134.59 10.00 144.59
Khanapur
Komaram
7 Adilabad 450 512.298 187.03 17.92 204.95 200 200 115.25 13.5 128.75 50
Bheem
Komaram
8 Asifabad 1111 1676.28 1001.23 22.877 1024.11 550 550 448.04 12.3 460.34 300
Bheem
Komaram
9 Mancherial 258 442.323 380.086 0.749 380.835 260 260 191.89 0.749 192.64 143.98
Bheem
Total 3883 6519.154 3797.88 132.274 3930.15 3962.06 3178.416 2504.45 116.157 2620.6 1175.54353
ORK IN MISSION BHAGIRATHA

OFC DUCT ( KM) in TDWSP

Date of
Payment

15

05.05.2017

05.05.2017
Structures Abstract

Sumps GLBRs OHBRs/BPTS Total

Sl.N Segment Dist


Total Comple
o In Compl In Compl In Compl
Total Total Total
No. ted in progres No. eted in progre No. eted in progre No. eted in
NO. s No. NO. ss No. NO. ss No. NO.

1 2 3 4 5 6 7 8 9 10 11 12 13 14

SRSP- Nirmal 26 18 8 0 0 0 9 3 6 35 21
1 Adilabad
segment Adilabad 25 8 17 5 0 5 8 0 8 38 8

1 Asifabad 25 20 5 10 4 6 3 0 3 38 24
Komuram
2 Bheem Mancherial 1 1 0 2 2 0 3 2 1 6 5
Asifabad
3 Adilabad 15 10 5 1 0 1 5 2 3 21 12
Yellampally - MANCHERIAL
1 10 6 4 1 1 0 2 0 2 13 7
Mancherial

Kadem- Mancherila/Ni
1 11 4 3 0 0 0 4 0 3 15 4
Khanapur rmal

1 Asifabad 25 21 4 10 5 5 3 0 3 38 26
Komuram
Bheem
Asifabad
Komuram
2 Bheem Mancherial 1 1 0 2 2 0 3 2 1 6 5
Asifabad
3 Adilabad 15 10 5 1 0 1 5 3 2 21 13
Total 154 99 51 32 14 18 45 12 32 231 125
tures Abstract

Total

In
progres
s No.

15

14

30

14
1
9

12
1
8
101
Progress of Forest Clearencs under TDWSP

New District Segment (Sub Forest Area


SI NO Segment RF/WL Uploading No of GPs ROFR Status
Name No Segment)Source required in Ha

1 3 2 4 5 6 7 8 9 10

1 ADBD 21/1 SRSP-Adilabad Mavala 4.145 RF Yes 11 Obtained

2 ADBD 21/2 SRSP-Adilabad Chenchughat 4.698 RF Yes 13 Obtained

3 ADBD 21/3 SRSP-Adilabad Babulodhole 3.623 RF Yes 10 Obtained

4 ADBD 21/4 SRSP-Adilabad Arepally 3.838 RF Yes 2 Obtained

5 ADBD 21/5 SRSP-Adilabad Neredi gonda 3.06 RF Yes 10 Obtained

6 ADBD 21/6 SRSP-Adilabad Kartha wada 3.029 RF Yes 3 Obtained

7 ADBD 21/7 SRSP-Adilabad Madegoan 4.945 RF Yes 19 Obtained

8 ADBD 21/8 SRSP-Adilabad Srichelma 4.737 WL Yes 10 Obtained


SI NO New District Segment (Sub Forest Area
Segment RF/WL Uploading No of GPs ROFR Status
Name No Segment)Source required in Ha

1 3 2 4 5 6 7 8 9 10

9 Asifabad 22/1 komarambheem Kowtla 4.714 WL Yes 13 Obtained

10 Asifabad 22/2 komarambheem Bejjur 3.876 WL Yes 6 Obtained

11 Asifabad 22/3 komarambheem Sirpur 4.684 WL Yes 6 Obtained

12 Asifabad 22/4 komarambheem Kaghaznagar 2.425 WL Yes 4 Obtained

13 Asifabad 22/5 komarambheem Dahegoan 3.813 WL Yes 8 Obtained

14 Asifabad 22/6 komarambheem Tandur 4.377 RF Yes 20 Obtained

15 Asifabad 22/7 komarambheem Vemanplly 1.177 WL Yes 4 Obtained

16 Asifabad 22/8 komarambheem Wankidi 3.655 WL Yes 11 Obtained

17 Asifabad 22/9 komarambheem Asifabad 4.158 WL Yes 14 Obtained

18 Asifabad 22/10 komarambheem Madaram 4.063 RF Yes 1 Obtained


SI NO New District Segment (Sub Forest Area
Segment RF/WL Uploading No of GPs ROFR Status
Name No Segment)Source required in Ha

1 3 2 4 5 6 7 8 9 10

19 Asifabad 22/11 komarambheem Chintala madaram 3.823 RF Yes 11 Obtained

20 Adilabad 22/12 komarambheem Rajulaguda 4.851 RF Yes 13 Obtained

21 Adilabad 22/13 komarambheem Thadihatnor 2.43 RF Yes 11 Obtained

22 Adilabad 22/14 komarambheem Wagaithnda 1.711 RF Yes 16 Obtained

23 Asifabad 22/15 komarambheem Dhanora 4.804 WL Yes 6 Obtained

24 Asifabad 22/16 komarambheem Kasulaguda 3.703 RF Yes 6 Obtained

25 Asifabad 22/17 komarambheem Power guda-WI 29.216 WL Yes 12 Obtained

26 Mancherial 23/1 Mancherial Mancherial 3.645 RF Yes Obtained

27 Mancherial 23/2 Mancherial Mancherial 3.822 RF Yes Obtained

28 Mancherial 23/3 Mancherial Chennur 3.386 RF Yes Obtained


SI NO New District Segment (Sub Forest Area
Segment RF/WL Uploading No of GPs ROFR Status
Name No Segment)Source required in Ha

1 3 2 4 5 6 7 8 9 10

29 Nirmal&Manc 24 Kaddam Kadem 20.418 WL Yes 32 Obtained


herial
s under TDWSP

Stage 1
Stage 1 Submitted by
approved by Stage 2 Status Status
DFO to HOFF HOFF

11 12 13 14

Demand Notice received&Bills


Yes Yes Submitted Submitted to PAO

Demand Notice received&Bills


Yes Yes Submitted Submitted to PAO

Demand Notice received&Bills


Yes Yes Submitted Submitted to PAO

Demand Notice received&Bills


Yes Yes Submitted Submitted to PAO

Demand Notice received&Bills


Yes Yes Submitted Submitted to PAO

Demand Notice received&Bills


Yes Yes Submitted Submitted to PAO

Demand Notice received&Bills


Yes Yes Submitted Submitted to PAO

Yes Yes Submitted Approved


Stage 1
Stage 1 Submitted by approved by Stage 2 Status Status
DFO to HOFF HOFF

11 12 13 14

Yes No

Yes No

Yes Yes

Yes No
Forwarded to Ministry of
environment, forests(GoI)
Yes No

Yes Yes

Yes No

Yes No

Yes Yes
Stage I Approved
Yes Yes
Stage 1
Stage 1 Submitted by approved by Stage 2 Status Status
DFO to HOFF HOFF

11 12 13 14

Yes Yes Submitted to PCCF

Yes Yes

Yes Yes Stage I Approved

Yes Yes

Yes No Forwarded to GoI

Yes Yes Stage I Approved

Yes No Forwarded to GoI

Yes Yes
Stage I Approved
Yes Yes

Yes No Forwarded to PCCF


Stage 1
Stage 1 Submitted by approved by Stage 2 Status Status
DFO to HOFF HOFF

11 12 13 14

Yes No Stage I Approved


RA Bills Abstract (Phase-1)

Total Value of
S.N RA Bill Value of Work
BMS Date Work Done Gross Amount Recoveries Net Amount
o No. done (V.W+Vat+Q.C+L.C)

1 RA-1 20.07.2015 126125366.00 133024423 123380152 10190172 113189980

2 RA-2 27.08.2015 71568816.00 75483629 70011066 5782329 64228737


3 RA-3 10.03.2015 291581031.00 307530513 91843331 7585496 84257835
4 RA-4 18.11.2015 337754719.26 356229901.97 45168683 4138063 41030620
5 RA-5 14.12.2015 478095234.00 504247044 137285899 11338673 125947226
6 RA-6 01.12.2015 587755701.00 619905937 107273624 8859907 98413717
7 RA-7 15.02.2016 684085823.00 721505317 94233425 7782896 86450529

8 RA-8 19.03.2016 874610786.00 926803185 190413772 19831488 170582284

9 RA-9 23.04.2016 980229576.00 1038724775 103807275 9069325 94737950


10 RA-10 27.05.2016 1152013732.00 1177839054 129223437 11277034 117946403
11 RA-11 30.06.2016 1430247696.00 1472676631 273461853 25895205 247566648
12 RA-12 01.10.2016 1511252015.00 1558514882 79614977 8945920 70669157
13 RA-13 09.11.2016 1702774647.00 1742858787 170978972 15225503 155753469
14 RA-14 02.12.2016 1785122056.00 1829481946 80342980 7138110 73204870
15 RA-16 04.01.2017 1815637864.00 1861508968 29705064 2694154 27010910
16 RA-17 03.02.2017 1902037959.00 1952577949 84466747 7574322 76892425
17 RA-18 03.03.2017 2040097818.00 2098163789 135030867 11941109 123089758

18 RA-19 15.06.2017 2331071682.00 2406501518 285983243 25317713 260665530

Total 2331071682.00 2406501518 2232225367 200587419 2031638048


Bills Abstract (Phase-1)

Rema
Payment Date Chq No. rks

27.07.2015 CN38748942

03.09.2015 CN40446047
09.10.2015 CN42067732
23.11.2015 CN43256281
06.01.2016 CN45935579
22.01.2016 CN46843111
14.03.2016 CR12017019

04.04.2016 CR12198437

13.05.2016 CR12520088
30.06.2016
RA Bills Abstract (Phase-2)

Total Value of
RA
S. Bill Total Work done Work Done
BMS Date (V.W+Vat+Q.C+L. Gross Amount Recoveries Net Amount
No No. Amount
C)

SRSP NIRMAL
1 RA-1 22.02.2016 134333395 141743830.00 131467402 10984146 120483256
2 RA-2 24.03.2016 390134811.00 413596349.00 252141212 228965060 229246152
3 RA-3 22.04.2016 800159735.00 832353318.00 388397088 34301929 354095159
4 RA-4 05.08.2016 1316505882.00 1365940713.00 494902309 43871594 451030715
5 RA-5 19.10.2016 1563040336.00 1627301009.00 242411675 21454760 220956915
6 RA-6 18.11.2016 1715000699.00 1760039164.00 123114639 10884705 112229934
7 RA-7 5.12.2016 1796860503.00 1841228541.00 75303147 6655280 68647867
8 R.A-9 04.01.2017 2074758817.00 2115953215.00 254807135 22547315 232259820
9 R.A-10 04.02.2017 2355468276.00 2392177342.00 256197879 22868458 233329421
10 R.A-11 04.03.2017 2786389281.00 2807256747.00 384986148 34113780 350872368
11 R.A-12 24.03.2017 3132077893.00 3155251384.00 322765026 28509536 294255490
12 R.A-13 05.05.2017 3562112133.00 3640449995.00 450021711 39749251 410272460
13 R.A-14 06.06.2017 3902459752.00 4002690192.00 335977783 29893758 306084025
14 R.A-15 29.06.2017 4381227829.00 4530153825.00 489222520 43297969 445924551
Sub Total 4381227829.00 4530153825.00 4201715674 578097541 3829688133
stract (Phase-2)

Payment Chq No. Rema


Date rks

NIRMAL
14.03.2016 CB12012818
04.04.2016 CR12198442
18.05.2016 CN52370484
19.08.2016 318632
Name of the Name of the Type of
S.No District Panchayath Revenu Village Locaton
Consttuency Mandal Structure

1 Nirmal Nirmal Dilawarpur Kusli Kusli Sump Kusli

2 Nirmal Nirmal Sarangapur Potia Sump Dupya thanda


3 Nirmal Nirmal Sarangapur Jam Jam Sump Sevalal thanda
4 Nirmal Nirmal Sarangapur Chincholi-B Ranapur Sump Ranapur
5 Nirmal Nirmal Sarangapur Ponkur Ponkur Sump Lingapur

6 Nirmal Mudhole Kubeer Chondi Rajura Sump Rajura

7 Nirmal Mudhole Tanoor Bolsa Bolsa Sump Bolsa


8 Nirmal Mudhole Mudhole Karegaon Karegaon Sump Karegaon
9 Nirmal Mudhole Mudhole Sump Owni
10 Nirmal Mudhole Kuntala Kuntala Kuntala Sump Kuntala

11 Nirmal Mudhole Lokeshwaram Puspur Puspur Sump Durga Nagar

12 Nirmal Mudhole Kubeer Sonari Sonari Sump Sonari

13 Nirmal Mudhole Kubeer Kubeer Kubeer Sump Kubeer

14 Nirmal Mudhole Kubeer Sownly Lingi Sump Lingi

15 Nirmal Mudhole tanoor Kaloor Kaloor Sump Koloor Thanda

16 Nirmal Mudhole kuntala Gollamada Gollamada Sump Ambakanti


Name of the Name of the Type of
S.No District Panchayath Revenu Village Locaton
Consttuency Mandal Structure

17 Nirmal Mudhole bhainsa Chinthalbori Chinthalbori Sump Chinthalbori

18 Nirmal Mudhole Kubeer Marlagonda Marlagonda Sump Marlagonda

19 Nirmal Mudhole Kubeer Marlagonda Brahmeshwar Sump Brahmeshwar

Abdullapur(Kanak
20 Nirmal Mudhole Lokeshwaram Kanakapur Kanakapur Sump apur)

21 Nirmal Mudhole Tanoor Hipnelly Hipnelly Sump Hipnelly Thanda

22 Nirmal Mudhole Tanoor Bolsa Wadjhari Sump Wadjhari

23 Nirmal Mudhole Kuntala Suryapur Ambugaon Sump Ambugaon

24 Nirmal Mudhole Kubeer Chata Rangashivini Sump Rangashivini

25 Nirmal Mudhole Kubeer Sirpally Sirpally Sump Sirpally Thanda

26 Nirmal Mudhole Kuntala Ambakanti Ambakanti Sump Rayapad Thanda

Sakriya naik
27 Adilabad Boath Neredigonda Rajura Rajura Sump thanda

28 Adilabad Boath Neredigonda Bondidi Darba Sump Darba thanda


Name of the Name of the Type of
S.No District Panchayath Revenu Village Locaton
Consttuency Mandal Structure

29 Adilabad Boath Neredigonda Bondidi Bondidi Sump Bondidi

30 Adilabad Boath Neredigonda Boregaon Peechara Sump Peechara

31 Adilabad Boath Bazarhatnoor Morkandi Morkandi Sump Upparpalli

32 Adilabad Boath Gudihatnoor Machapoor Neredigpmda Sump Neredigpmda

33 Adilabad Boath Bazarhatnoor Gokonda Dhabidi Sump Dhabbidi new jn

34 Adilabad Boath Bazarhatnoor Jatharla Jatharla Sump Chinthakarra

35 Adilabad Boath Gudihatnoor Muthnur Muthnur Sump Mathura Thanda

36 Adilabad Boath Boath Andur Andur Sump Mandabaguda jn

37 Adilabad Boath Gudihatnoor Muthnur Muthnur Sump Damanguda

38 Adilabad Boath Bazarhatnoor BUTHAI-K GIRJAI Sump Buthai

39 Adilabad Boath Boath sakera sakera Sump Suryanagar


Chinna
40 Adilabad Boath Boath Karathwada Karathwada Sump karathwada

41 Adilabad Boath Ichoda Boregaon Babuldhole Sump Babuldhole

42 Adilabad Boath Boath Sump Gudem JN


Name of the Name of the Type of
S.No District Panchayath Revenu Village Locaton
Consttuency Mandal Structure

43 Adilabad Adilabad Adilabad Chinchughat Chinchughat Sump Jandaguda

44 Adilabad Adilabad Adilabad Pippaldhari Pippaldhari Sump Daheguda

45 Adilabad Adilabad Adilabad Khandala Khandala Sump Darloddi

46 Adilabad Adilabad Adilabad Ramai Ramai Sump Addagutta

47 Adilabad Boath Talamadugu Kappardevi Ratnapur Sump Ratnapur

48 Adilabad Boath Talamadugu Umri Dahegaon Sump Dahegaon

49 Adilabad Boath Adilabad Pippaldhari Asodhaburkhi Sump marutiguda

50 Adilabad Boath Talamadugu Bharampur Bharampur Sump regulaguda

51 Adilabad Adilabad Bela Sonkhas Sonkhas Sump sonkhas Jn

at Head Works
52 Nirmal Nirmal Dilawarpur OHBR Madegaon

53 Nirmal Nirmal Mamada Kishanraopet Pulimadugu BPT Pulimadugu OHBR

Headworks
54 Nirmal Mudhole Bhainsa Bhainsa Bhainsa OHBR Bhainsa
Name of the Name of the Type of
S.No District Panchayath Revenu Village Locaton
Consttuency Mandal Structure

Headworks
55 Nirmal Mudhole Bhainsa Bhainsa Bhainsa OHBR Bhainsa
Headworks
56 Nirmal Mudhole Bhainsa Bhainsa Bhainsa OHBR Bhainsa

57 Nirmal Mudhole Mudhole Karegaon Karegaon OHBR Karegaon

58 Nirmal Mudhole Kubeer Pardi-B Pardi-B OHBR Pardi-B

59 Nirmal Mudhole Tanoor Bember Boregaon OHBR Boregaon

60 Nirmal Mudhole Kuntala Kuntala Kuntala OHBR Kuntala

61 Adilabad Boath Boath OHBR Devulnaik Thanda

62 Adilabad Boath Bazarhatnur BUTHAI-K Girjai OHBR Umardha-G

63 Adilabad Boath Bazarhatnoor Tembi Tembi OHBR Ratanguda

64 Adilabad Adilabad Adilabad Khandala Khandala OHBR Molalgutta

65 Adilabad Adilabad Jainad Mangurla Keslaguda OHBR Mangurla

66 Adilabad Boath Boath Karathwada Karathwada OHBR Karathwada


Name of the Name of the Type of
S.No District Panchayath Revenu Village Locaton
Consttuency Mandal Structure

67 Adilabad Boath Gudihatnoor Gudihatnoor Gudihatnoor BPT Dharampur

68 Adilabad Adilabad Adilabad Mavala Mavala BPT Adilabad gutta

69 Adilabad Boath Neradigonda Koritikal-B Arepally GLBR Arepally

70 Adilabad Boath Ichoda GLBR Babuldhole

71 Adilabad Boath Talamadugu Sunkidi Sunkidi GLBR sunkidi gutta

72 Adilabad Adilabad Adilabad chinchughat chinchughat GLBR chinchughat

73 Adilabad Boath Talamadugu palsi B palsi B GLBR palsi B


Capacity in KL Staging Status of Structure

Side wall 2nd lift


150 - completed
40 - Completed
40 - Completed
40 - Completed
100 - Side wall Completed

800 - Sidewall completed

250 - Completed
250 - Completed
250 - SidewallCompleted
200 - Side wall completed

120 - Completed

120 - Completed

500 - Completed

100 - side wall completed

100 - Completed

100 - Completed
Capacity in KL Staging Status of Structure

60 - Completed

60 - Completed

60 - Completed

40 - Completed

Raft steel fabrication in


30 - progress
30 - Completed

40 - Completed

40 - Completed

Raft steel fabrication in


40 - progress

20 - Completed

10 - Earthwork in Progress

20 - Excavation in Progress
Capacity in KL Staging Status of Structure

20 - Completed

20 - Earthwork Completed

20 - Completed

20 - Earthwork completed

40 - Completed

40 - Completed

40 - Earthwork in Progress

150 - Side wall Completed

150 - Side wall completed

E/w excavation
150 - completed
400 - Side wall completed
Sidewall reinforcement in
1000 - progress
Top slab concreting in
2500 - progress
60 - Earthwork in Progress
Capacity in KL Staging Status of Structure

400 - Completed

100 - Completed

40 - Excavation completed

E/W excavation
300 - completed

20 - Side wall completed

150 - Completed

20 - Excavation in Progress

150 - Completed

100 - PCC Completed

250 30 Completed

Side wall 25th lift


90 30 completed

Bottom slab
250 30 reinforcement in progress
Capacity in KL Staging Status of Structure

Bottom slab beam


300 30 shuttering in progress

250 30 22 m staging completed

Side wall 30m staging


40 30 complted
40 30 Completed
Botom slab steel
40 30 fabrication in progress
40 30 Completed

60 20 Bottom slab completed

Approach road formation


20 30 work under progress

E/W excavation
20 30 completed
29.6 mts staging
40 30 completed

40 10 Earthwork in Progress

120 30 Raft completed


Capacity in KL Staging Status of Structure

20 10 Earthwork completed

Shaft concreting up to
250 25 24.6 m completed
Sidewall 2ndt lift
2000 - completed
E/W excavation
500 - completed
250 - Sidewall in progress

60 - Earthwork in Progress

40 - Earthwork in Progress
RA Bills Abstract (Phase-1)
Total Value of
S.N RA Bill BMS Date Value of Work Work Done
(V.W+Vat+Q.C+L.C Gross Amount Recoveries Net Amount
o No. done
)

1 RA-1 20.07.2015 126125366.00 133024423 123380152 10190172 113189980


2 RA-2 27.08.2015 71568816.00 75483629 70011066 5782329 64228737
3 RA-3 10.03.2015 291581031.00 307530513 91843331 7585496 84257835
4 RA-4 18.11.2015 337754719.26 356229901.97 45168683 4138063 41030620
5 RA-5 14.12.2015 478095234.00 504247044 137285899 11338673 125947226
6 RA-6 01.12.2015 587755701.00 619905937 107273624 8859907 98413717
7 RA-7 15.02.2016 684085823.00 721505317 94233425 7782896 86450529
8 RA-8 19.03.2016 874610786.00 926803185 190413772 19831488 170582284
9 RA-9 23.04.2016 980229576.00 1038724775 103807275 9069325 94737950
10 RA-10 27.05.2016 1152013732.00 1177839054 129223437 11277034 117946403
11 RA-11 30.06.2016 1430247696.00 1472676631 273461853 25895205 247566648
12 RA-12 01.10.2016 1511252015.00 1558514882 79614977 8945920 70669157
13 RA-13 09.11.2016 1702774647.00 1742858787 170978972 15225503 155753469
14 RA-14 02.12.2016 1785122056.00 1829481946 80342980 7138110 73204870
15 RA-16 04.01.2017 1815637864.00 1861508968 29705064 2694154 27010910
16 RA-17 03.02.2017 1902037959.00 1952577949 84466747 7574322 76892425
17 RA-18 03.03.2017 2040097818.00 2098163789 135030867 11941109 123089758
18 RA-19 15.06.2017 2331071682.00 2406501518 285983243 25317713 260665530
19 RA-20 10.08.2017 2441661212.00 2523690479 107192762 9567058 97625704
Total 2441661212.00 2523690479.00 2339418129 210154477 2129263752
Payment Date Chq No. Remarks

27.07.2015 CN38748942
03.09.2015 CN40446047
In this bill
09.10.2015 CN42067732 Extra
23.11.2015 CN43256281 Deductions
Balance
06.01.2016 CN45935579 FSD&EMD
22.01.2016 CN46843111
14.03.2016 CR12017019
04.04.2016 CR12198437
13.05.2016 CR12520088
30.06.2016