You are on page 1of 4

BILL OF QUANTITIES FOR VRF+DX WORKS AT AYUB TEACHING HOSPITAL ABBOTTABAD

UNIT Price Inclduing


All Duty & Taxes paid
Item No. Description Capacity Qty Unit TOTAL
F.O.R at Site in
PKR(Excluding GST)
Supply and installation of following equipment / system and
material as per specifications and drawings complete in all respects
and ready for use.

1 Latest VRF All DC Inverter Condensing Units with built-in energy


savng mode, with all standard accessories, controls, safeties &
USRT
fittings as Per Design Conditions mentioned in Scheudle of
Equipment
a CU-1 28.85 2 No
CU-2 22.42 1 No
CU-3 24.28 2 No
CU-4 32.28 1 No
CU-5 33.71 3 No
CU-6 37.14 2 No
CU-7 30.42 1 No
CU-8 40.28 1 No
CU-9 25.71 1 No

b
Branch Connectors/Y Joints for VRF All DC Inverter condensing units JOINT 17 No
2
Multi Split IDUs to be connected with Latest VRF All DC Inverter
system with all controls, thermostats and accessories/ fittings
as per design condition mentioned in Schedule of Equipment

Multi system DX Indoor AC units with all controls, thermostats and


USRT
accessories / fittings
a CASSETTE TYPE INDOOR UNITS
CIU-1 0.75 39 No
CIU-2 1 14 No
CIU-3 1.25 5 No
CIU-4 1.42 25 No
CIU-5 1.5 26 No
CIU-6 1.75 31 No
CIU-7 2 33 No
CIU-8 2.25 10 No
CIU-9 2.5 12 No
b DUCTED FRESH AIR INDOOR UNITS

DIU-1 6.4 9 No
DIU-2 8 6 No
c Branch Connectors/Y Joints for indoor Units
Joint-1 76 No
Joint-2 19 No
Joint-3 76 No
Joint-4 25 No

DX coil Hygienic air handling with VRF All DC Inverter Outdoor


3
Unit through AHU Kit
Supply and Installation of DX Coil Hygienic Air Handling Units
equipped with VFD Plug Fan, Pre filter G-4 filter, Bag Filte F-9 ,
3.1 Humidifier, Dehumidifier & Control Panel matching with VRF ALL D.C TR
Inverter Oudtoor Unit All Respect
DX-COIL HYGIENIC AHU WITH MACTNING VRF ALL D.C
12.82 1 No
INVERTER OUTDOOR UNIT AHU-1
DX-COIL HYGIENIC AHU WITH MACTNING VRF ALL D.C
INVERTER OUTDOOR UNIT AHU-2 14.35 1 No

DX-COIL HYGIENIC AHUWITH MACTNING VRF ALL D.C


6.4 1 No
INVERTER OUTDOOR UNIT AHU-3
DX-COIL HYGIENIC AHU WITH MACTNING VRF ALL D.C
INVERTER OUTDOOR UNIT AHU-4 6.4 1 No
DX-COIL HYGIENIC AHU WITH MACTNING VRF ALL D.C
INVERTER OUTDOOR UNIT AHU-5 6.4 1 No

DX-COIL HYGIENIC AHU WITH MACTNING VRF ALL D.C


6.4 1 No
INVERTER OUTDOOR UNIT AHU-6
DX-COIL HYGIENIC AHU WITH MACTNING VRF ALL D.C
6.4 1 No
INVERTER OUTDOOR UNIT AHU-7
DX-COIL HYGIENIC AHU WITH MACTNING VRF ALL D.C
INVERTER OUTDOOR UNIT AHU-8 6.4 1 No

DX-COIL HYGIENIC AHUWITH MACTNING VRF ALL D.C


6.4 1 No
INVERTER OUTDOOR UNIT AHU-9
DX-COIL HYGIENIC AHUWITH MACTNING VRF ALL D.C
6.4 1 No
INVERTER OUTDOOR UNIT AHU-10
DX-COIL HYGIENIC AHU WITH MACTNING VRF ALL D.C
INVERTER OUTDOOR UNIT AHU-11 6.4 1 No
DX-COIL HYGIENIC AHU WITH MACTNING VRF ALL D.C
INVERTER OUTDOOR UNIT AHU-12 8 1 No

1
UNIT Price Inclduing
All Duty & Taxes paid
Item No. Description Capacity Qty Unit TOTAL
F.O.R at Site in
PKR(Excluding GST)
Supply and Installation of AHU Kit for all air handling units to be
No
3.2 connedt with VRF ODU,s 12
4 IMPORTED LAMINAR AIR FLOW UNITS WITH LAMINIZATOR
SHEET ,FLOURECENT LIGHT COMPLETE STAINLESS STEEL
STRUCTURE AND BUILT-IN HEPA FILTERS HAVING EFFICIENCY
99.9 %
Supply and Installation of Imported Laminar Air Flow Units complete
stainless steel structures with LAMINIZATOR sheet,Flourecent light
and built-in Hepa Filters for Hygienic Air Handling Units 8 No

Total Of Sub Head "1"


9 IMPORTED EXHAUST AIR FANS
Supply and Installation of following centrifugal
ducted exhaust fans of approved make and a quality, all to the
satisfaction & approval of the Engineer Incharge.
9.1 Ground Floor Airflow cfm/ESP
EAF-GF-1 180/ 0.3" 1 No
EAF-GF-2 455/ 0.5" 1 No
EAF-GF-3 390/ 0.5" 1 No
EAF-GF-4 110/ 0.3" 1 No
EAF-GF-5 285/ 0.5" 1 No
EAF-GF-6 270/ 0.5" 1 No
EAF-GF-7 290/ 0.5" 1 No
EAF-GF-8 50/ 0.2" 1 No
EAF-GF-9 525/ 0.5" 1 No
EAF-GF-10 70/ 0.2" 1 No
EAF-GF-11 50/ 0.2" 1 No
9.2 First Floor
EAF-FF-1 180/ 0.3" 1 No
EAF-FF-2 1162/ 1" 1 No
EAF-FF-3 711/ 0.5" 1 No
EAF-FF-4 1150/ 1" 1 No
EAF-FF-5 566/ 0.5" 1 No
EAF-FF-6 375/ 0.5" 1 No
EAF-FF-7 445/ 0.5" 1 No
EAF-FF-8 40/ 0.2" 1 No
EAF-FF-9 490/ 0.5" 1 No
EAF-FF-10 35/ 0.2" 1 No
EAF-FF-11 405/ 0.5" 1 No
9.3 Second floor
EAF-SF-01 270/ 0.3" 1 No
EAF-SF-02 435/ 0.5" 1 No
EAF-SF-03 445/ 0.5" 1 No
EAF-SF-04 1115/ 1" 1 No
EAF-SF-05 560/ 0.5" 1 No
EAF-SF-06 370/ 0.5" 1 No
EAF-SF-07 415/ 0.5" 1 No
EAF-SF-08 990/ 1" 1 No
EAF-SF-09 490/ 0.5" 1 No
EAF-SF-10 90/ 0.2" 1 No
9.4 Rooftop
EAF-R.T-01 800/ 2" 1 No
EAF-R.T-02 800/ 2" 1 No

10 Supply, Installation, testing and commissioning of Copper


Piping with all accessories / fittings/hanging frames as per
applicable standard.
a Refrigerant pipe with all fitings and installation 12.7 540 m
b Refrigerant pipe with all fitings and installation 15.9 1185 m
c Refrigerant pipe with all fitings and installation 19.05 985 m
d Refrigerant pipe with all fitings and installation 22.2 285 m
e Refrigerant pipe with all fitings and installation 25.4 165 m
f Refrigerant pipe with all fitings and installation 28.6 405 m
g Refrigerant pipe with all fitings and installation 31.8 305 m
h Refrigerant pipe with all fitings and installation 38.1 290 m
i Refrigerant pipe with all fitings and installation 41.3 85 m
j Refrigerant pipe with all fitings and installation 9.52 1695 m
k Refrigerant pipe with all fitings and installation 6.58 415 m

Supply, Installation, testing and commissioning of of refrigerant


Copper Piping for all Dx Coil Hygeinic air handling and VRF
condensing unit. This refrigerant piping shall be consisting of
suction and liquid lines, these shall further be covered with
1/2" thick closed cell foam insulation and connecting with
l AHU kit,DX AHU and Condensing unit, the copper piping
shall be nitrogen pressure tested and shall be made vacuum,
the refigerant piping shall run in 20 gauge GI trunking
provided outside the building, the refrigerant piping shall be
complete in all respects as per drawings, specifications and
as approved by the Consultant.

For DX Coil Hygienic AHU & VRF -Condensing unit 12 No


2
UNIT Price Inclduing
All Duty & Taxes paid
Item No. Description Capacity Qty Unit TOTAL
F.O.R at Site in
PKR(Excluding GST)
11 Supply, Installation, testing and commissioning of of Closed
1 Job
cell foam insulation ½ “thick for liquid / gas pipes
12 Supply, Installation, testing and commissioning of Condensate
drain piping UPVC with 1/2" thick armaflex insulation or
equivalent
25mm 1500 m
32mm 1500 m
13 Providing and installing supply air diffusers as specified in the
specifications, shown on the drawings and directed by the engineer 168 S.FT
incharge.
14 Providing and installing return air grills as specified in the
specifications, shown on the drawings and directed by the engineer 175 S.FT
incharge.
15
Providing and installing Louvers as specified in the specifications,
95 S.FT
shown on the drawings and directed by the engineer incharge.

16
Supplying and installing opposed blade volume dampers made from
16 SWG. G.I sheets complete as specified in the specifications, 185 S.FT
shown on the drawings and as directed by the engineer incharge.

17
Supply, fabrication and installation of G.I. duct work, using prime
quality sheet metal including all tees, bends, reducers, elbows,
turning vanes splitters and dampers etc. complete in all respect as 49500 S.FT
specified in specifications, shown on layout drawings and Standards
Drawings and as directed by the engineer incharge.

18 Supply & installation of flexible round duct as shown in drawing and


directed by engineer incharge/ consultant
8 inch dia 75 RFT
10 inch dia 75 RFT
19 Providing and installing sound attenuators for operation theaters air
20" X 10" 8 Nos
handling units.
20 Providing terminal hepa filters H-13 and H-14 with perforated
diffusers and with filter housing having filtering efficiency of 99.95 and
99.995% on 0.3 micron particles for H-13 and H-14 respectively
10 S.FT
complete as specified in the specifications, shown on the drawing
and directed by the engineer in charge in following capacities and
sizes
21
Supply and installation of 1” thick, 16 kg/m3 density glass wool
insulation with 8 oz. Canvas cloth wrapping around duct with
adhesive. All longitudinal and circumferential joints shall be sealed 45000 S.FT
with 2” wide adhesive tape as specified in the specifications and
shown on the drawing and directed by the engineer in charge.

22 Providing and installing Flexible duct connector as shown in the


270 S.FT
drawings and directed by the engineer in charge.
23 Providing and installing 1” thick, 24 kg/m3 density sound liner in
supply ducts up 5’ from fan discharge with 100% surface applied with
adhesive and mechanical fastness with washes 1.25 dia on the inner
1400 S.FT
side of the duct at 12” centre to centre complete in all respect as
specified in the specifications and directed by the engineer in charge.

24 Controls For HVAC Systems


a Supply, Installation of Central Controller for Latest VRF All DC
1 Job
Inverter system with built-in energy saving modes
b supply and Installation of DDC controller for Hygienic DX-Coil Air
Handling Units including wiring,Sensors display Screen with 12 NOS
humdification and dehumdification controls etc.
25 Air balancing of complete system 1 NO
26 Preparing & supplying of shop drawings for complete job. 1 NO
27 Preparing & supplying of as built drawings for Complete job, 3 Sets
1 NO
on paper and one set on CD
28 18 Gauge G.I Trunking for outside building piping,wiring etc. 18" x 6" 150 m
29 Supply, Installation, testing and commissioning of Cladding work for
exposed ducting 6000 S.FT

30 Painting and Identification of complete system 1 NO


31 Rigging, lifting, placement & crannage for complete sysetm at rooftop
and as loctions marked in drawings. 1 NO

32 Transportation of complete equipment at site


1 NO

33 Operation & Maintenance Manuals


1 NO

3
UNIT Price Inclduing
All Duty & Taxes paid
Item No. Description Capacity Qty Unit TOTAL
F.O.R at Site in
PKR(Excluding GST)
34 Testing Commissioning of Entire HVAC system , the entire HVAC
system includeds the VRF System, Dx-AHU's, Laminar flow
units,DDC Controller, Central controller for VRF system, exhaust fans
extra gas charging etc,and Testing Commissioning shall be done as
recommended by the ASHRAE, contractor shall also submit
commissioning report for each equipment to meet the specification 1 NO
and shall carry out all the necessary and recommended test to the
entire satisfaction of consultant complete in all respects as per
specification, drawings and apprvoed by the consultant

Total Of Sub Head "2"


Sub Head "3" Electrical Work.
36
Supply & installation of electrical work related to HVAC
system including power wire, earth wire electrical panels/
DB. (Main power wire to HVAC electrical panel/DB shall be
provided by client.)
a 1x 4 core 16 mm square pvc/pvc copper conductor cable 16mm2 (4core) 500 m
b 1x 4 core 10 mm square pvc/pvc copper conductor cable 10mm2 (4core) 625 m
c 1 x 3 core 6 mm square pvc/pvc copper conductor cable 6mm2 (3core) 3500 m
d 1 x 3 core 3.5 mm square pvc/pvc copper conductor cable 3.5mm2 (3core) 900 m
e 1 x 3 core 2.5 mm square pvc/pvc copper conductor cable 2.5mm2 (3core) 900 m
37 Earth wiring
1.5mm2 1800 m
2.5mm2 3500 m
10mm2 1125 m
38 Communication wiring
Communication wiring from outdoor relevant unit to each indoor unit.
Sheilded wire 2 core 0.75 sqmm out side in cable tray and inside in 0.75mm2 4900 m
PVC conduit

39 HVAC Electrical panels


DB for HVAC system 5 No
Total Of Sub Head "3"
Sub Head "4" Civil Work
40 RCC Foundation for all equipment as per drawing and Engineer
1 Job
incharge
Proper approval
Wall Cutting and other holes for pipes.
41 1 Job
42 Cannopy work required for air handling units 1 Job
Total Of Sub Head "4"
Sub Head "5" Miscellaneous
43 Dismantling of Installed false cielig for HVAC work and reinstallation
of dismantelled ceiling including damaged pieces during this 1 Job
particular work. Approx quantity ( 165,000 SFT)
44 Supply & installation of PPR water supply pipe for all Hygienic air
1 Job
handling units including valves, fittings etc.
45 Cost of 12 Months Operation and Maitenance Services - Minimum 06
1 Job
Technical Persons required for 03 Shifts.
Total Of Sub Head "5"
Total Of Sub Head "1" Rs.
Total Of Sub Head "2" Rs.
Total Of Sub Head "3" Rs.
Total Of Sub Head "4" Rs.
Total Of Sub Head "5" Rs.
FINAL NET VALUE

You might also like