Job Group Equipment System Equipment Tag / Name Working contents Planned Date Progress 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Section Schedule

415V Switchgear Motor Supply Isolation / De-isolation Electrical supply isolation / de-isolation with PTW record. 1/3-14/4 1/3 - 14/4 100% 'ü 'ü 'ü 'ü 'ü 'ü 'ü 'ü ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' ' '
Disconnect drive cable, IR test, service terminal box, connect back drive
Motor* P1050A, TPA Slurry Pump, 5.5kW 3/3-19/3 8 - 10/3 100%
cable. Verified by TBPR Chargeman. `ü ` ` ` ` ` ` `
Level Switch LSHH-10202 Dismantle, clean, function test, install back. 3/3-19/3 5 - 9/3 ` ` ` ` `
Level Switch LSHH-10204 Dismantle, clean, function test, install back. 3/3-19/3 5 - 9/3 ` ` ` ` `
Level Switch LSL-10401 Dismantle, clean, function test, install back. 3/3-19/3 5 - 9/3 ` ` ` ` `
Level Switch LSH-10402 Dismantle, clean, function test, install back. 3/3-19/3 5 - 9/3 ` ` ` ` `
Level Switch LSHH-10403 Dismantle, clean, function test, install back. 3/3-19/3 5 - 9/3 ` ` ` ` `
Level Switch LSHH-10502 Dismantle, clean, function test, install back. 3/3-19/3 5 - 9/3 ` ` ` ` `
Level Switch LSL-21004 Dismantle, clean, inspection, function test, install back. 1/3-19/3 5 - 9/3 100% `ü ` ` ` `
Level Switch LSL-21101 Dismantle, clean, inspection, function test, install back. 1/3-19/3 5 - 9/3 100% `ü ` ` ` `
Level Switch LSL-21102 Dismantle, clean, inspection, function test, install back. 1/3-19/3 5 - 9/3 100% ` ` `ü `

Level Transmitter LT-20003 diaphragm Verified good condition of diaphragm, no clogging for XPV and impulse line. 3/3 - 27/3 5 - 9/3 100% `ü ` ` ` `
Level Transmitter LIT-21001 Service, cleaning and check diaphram. 10/3 - 19/3 5 - 9/3 100% `ü ` ` ` `
Pre Poly Routine Job Motor P3010A, 1st Circulation BDO Pump A, 58kW Service teminal box, IR test, replace silica gel pack. 4/3-19/3 5 - 9/3 ` ` ` ` `
(3000) Motor P3010B, 1st Circulation BDO Pump B, 58kW Service teminal box, IR test, replace silica gel pack. 4/3-19/3 5 - 9/3 ` ` ` ` `
Motor P3000A, Pre-Polymer Discharge Pump, 11kW Dismantle, send for service, install, alignament, test run no load. 1/3 - 19/3 5 - 9/3 100% ` `ü ` ` `
Motor J30005, Vacuum Pump, 64kW Replace spare motor, IR test, test run, check rotation. 3/3-19/3 5 - 9/3 ` ` ` ` `
Flowmeter FI-30102 Inspect, clean, service, zeroing, check alarm message. 6/3 - 19/3 6 - 9/3 100% `ü ` ` `
Flowmeter FI-30103 Inspect, clean, service, zeroing, check alarm message. 6/3 - 19/3 6 - 9/3 100% `ü ` ` `
Flowmeter FI-30104 Inspect, clean, service, zeroing, check alarm message. 6/3 - 19/3 6 - 9/3 100% `ü ` ` `
Flowmeter FI-30301 Inspect, clean, service, zeroing, check alarm message. 6/3 - 19/3 6 - 9/3 100% `ü ` ` `
Flowmeter FT-30101 Inspect, clean, service, zeroing, check alarm message. 6/3 - 19/3 6 - 9/3 100% `ü ` ` `
Flowmeter FI-30051 Inspect, clean, service, zeroing, check alarm message. 6/3 - 19/3 6 - 9/3 100% ` `ü ` `
Flowmeter FT-30051 Inspect, clean, service, zeroing, check alarm message. 6/3 - 19/3 6 - 9/3 100% ` `ü ` `
Flowmeter FI-30021 Inspect, clean, service, zeroing, check alarm message. 6/3 - 19/3 6 - 9/3 100% ` `ü ` `
Flowmeter FI-30041 Inspect, clean, service, zeroing, check alarm message. 6/3 - 19/3 6 - 9/3 100% ` `ü ` `
Valve PV-30005, Motoyama Dismantle, send service, repair, leak test, install, function test. I, S) 6/3-19/3 6/3-19/3 50% `ü ` ` ` ` `
Motor P3150A, BDO Eject Circulation Pump-1A, 15kW Service teminal box, IR test, replace silica gel pack. 3/3-19/3 5 -9/3 ` ` ` ` `
Motor P3150B, BDO Eject Circulation Pump-1B, 15kW Service teminal box, IR test, replace silica gel pack. 3/3-19/3 5 -9/3 ` ` ` ` `
Motor P3160, BDO Eject Circulation Pump-2, 15kW Service teminal box, IR test, replace silica gel pack. 3/3-19/3 5 -9/3 ` ` ` ` `
Motor P3170, BDO Eject Circulation Pump-3, 15kW Service teminal box, IR test, replace silica gel pack. 3/3-19/3 5 -9/3 ` ` ` ` `
Disconnect drive cable, IR test, service terminal box, connect back drive
Motor F3100, Screen Changer, 22kW cable. Verified by TBPR Chargeman. 4/3-19/3 5 -9/3 100% ` ` ` `ü `
Motor P3300A, TEG Feed Pump, 5.5kW Service teminal box, IR test, replace silica gel pack. 6/3-19/3 6 -9/3 ` ` ` `
Motor P3410, Discharge Pump For D3410, 1.1kW Service teminal box, IR test, replace silica gel pack. 9/3 - 19/3 6 -9/3 100% ` ` `ü `
Motor P3100, Polymer Discharge Pump Service teminal box, IR test, replace silica gel pack. 2/3-19/3 6 -9/3 ` ` ` `
Disconnect drive cable, IR test, service terminal box, connect back drive
Motor X3100, Viscometer, 5kW cable. Verified by TBPR Chargeman. 5/3-19/3 5 -9/3 100% ` ` ` `ü `
Motor P3110, 2nd Circulation BDO Pump A, 58kW Service teminal box, IR test, replace silica gel pack. 5/3-19/3 5 -9/3 ` ` ` ` `
Motor Z3202A, Mech. Seal Circulation Pump, 2.2kW Service teminal box, IR test, replace silica gel pack. 5/3-19/3 5 -9/3 ` ` ` ` `
Motor BL3410, Exhaust Fan No. 1, 10kW Service teminal box, IR test, replace silica gel pack. 5/3-19/3 5 -9/3 ` ` ` ` `
Motor J3107A, Vacuum Pump, 64kW Service teminal box, IR test, replace silica gel pack. 5/3-19/3 5 -9/3 100% ` ` ` `ü `
Motor J3107B, Vacuum Pump, 64kW Service teminal box, IR test, replace silica gel pack. 5/3-19/3 5 -9/3 100% ` ` ` `ü `
Flowmeter FIT-31302 Inspect, clean, service, zeroing, check alarm message. 5/3-19/3 6 -9/3 100% ` `ü ` `
Flowmeter FIT-31401 Inspect, clean, service, zeroing, check alarm message. 5/3-19/3 6 -9/3 100% ` `ü ` `
Flowmeter FIT-31501 Inspect, clean, service, zeroing, check alarm message. 5/3-19/3 6 -9/3 100% ` `ü ` `
Flowmeter FIT-33003 Inspect, clean, service, zeroing, check alarm message. 6/3-19/3 6 -9/3 100% `ü ` `
Level Switch LSL-31071 Dismantle, clean, function test, install back. 5/3-19/3 5 -9/3 100% `ü ` ` ` `
Level Switch LSL-31507 Dismantle, clean, function test, install back. 5/3-19/3 5 -9/3 100% `ü ` ` ` `
Level Switch LSL-31508 Dismantle, clean, function test, install back. 5/3-19/3 5 -9/3 100% `ü ` ` ` `
Level Switch LSL-31601 Dismantle, clean, function test, install back. 5/3-19/3 5 -9/3 10% `ü ` ` ` `
Level Switch LSL-31701 Dismantle, clean, function test, install back. 5/3-19/3 5 -9/3 100% `ü ` ` ` `
Level Switch LSL-32002 Dismantle, clean, function test, install back. 5/3-19/3 5 -9/3 100% `ü ` ` ` `
Level Switch LSL-32003 Dismantle, clean, function test, install back. 5/3-19/3 5 -9/3 100% `ü ` ` ` `
Level Switch LSL-33003 Dismantle, clean, function test, install back. 6/3-19/3 5 -9/3 ` ` ` `
Level Switch LSL-34103 Dismantle, clean, function test, install back. 5/3-19/3 5 -9/3 100% `ü ` ` ` `
Valve HV-31001, Aska Dismantle, send service, repair, leak test, install, function test. (I, S) 6/3 - 19/3 6/3 - 19/3 50% ` ` `ü ` ` ` `
Palletizer Chip Routine Job Motor P4020A, Water Circulation Pump, 24kW Service teminal box, IR test, replace silica gel pack. 7/3 - 25/3 7 - 9/3 100% ` `ü `
(4000) Motor P4020B, Water Circulation Pump B, 24kW Service teminal box, IR test, replace silica gel pack. 7/3 - 25/3 7 - 9/3 100% ` `ü `
Motor RV4100A, Chip Hopper Rotary Feeder, 2kW Service teminal box, IR test, replace silica gel pack. 5/3 - 25/3 5 - 9/3 100% ` ` ` `ü `
Disconnect drive cable, IR test, service terminal box, connect back drive
Motor RV4110A, Check Silo Rotary Feeder A, 2.2kW cable. Verified by TBPR Chargeman. Service Motor 5/3 - 25/3 5 - 9/3 100% ` ` ` `ü `
Disconnect drive cable, IR test, service terminal box, connect back drive
Motor RV4110B, Check Silo Rotary Feeder A, 2.2kW cable. Verified by TBPR Chargeman. 5/3 - 25/3 5 - 9/3 100% ` ` ` `ü `
Motor BL4100A, Blower, 45kW Service teminal box, IR test, replace silica gel pack. 5/3 - 25/3 5 - 9/3 100% ` ` ` `ü `
Motor BL4100B, Blower, 45kW Service teminal box, IR test, replace silica gel pack. 5/3 - 25/3 5 - 9/3 100% ` ` ` `ü `
Motor BL4110A, Blower A, 90kW Service teminal box, IR test, replace silica gel pack. 5/3 - 25/3 5 - 9/3 100% ` ` ` `ü `
Motor BL4110B, Blower B, 90kW Service teminal box, IR test, replace silica gel pack. 5/3 - 25/3 5 - 9/3 100% ` ` ` `ü `
Motor BL4000A, Air Fan Service teminal box, IR test, replace silica gel pack. 5/3 - 25/3 5 - 9/3 100% ` ` ` `ü `
Motor BL4000B, Air Fan Service teminal box, IR test, replace silica gel pack. 5/3 - 25/3 5 - 9/3 100% ` ` ` `ü `
Motor BL4010, Ventilation Fan, 5kW Service teminal box, IR test, replace silica gel pack. 5/3 - 25/3 5 - 9/3 100% ` ` ` `ü `
Disconnect drive cable, IR test, service terminal box, connect back drive
5 - 9/3
Motor G4000A1, Rotor Cutter A, 30kW cable. Verified by TBPR Chargeman. 5/3 - 25/3 ` ` ` ` `
Disconnect drive cable, IR test, service terminal box, connect back drive
5 - 9/3
Motor G4000B1, Rotor Cutter B, 30kW cable. Verified by TBPR Chargeman. 5/3 - 25/3 ` ` ` ` `
Disconnect drive cable, IR test, service terminal box, connect back drive
5 - 9/3
Motor G4000A2, Feed Roll A, 5.5kW cable. Verified by TBPR Chargeman. 5/3 - 25/3 ` ` ` ` `
Disconnect drive cable, IR test, service terminal box, connect back drive
5 - 9/3
Motor G4000B2, Feed Roll B, 30kW cable. Verified by TBPR Chargeman. 5/3 - 25/3 ` ` ` ` `
Motor RV4200A, Chip Silo Rotary Feeder A, 3kW Service teminal box, IR test, replace silica gel pack. 5/3 - 25/3 5 - 9/3 ` ` ` ` `
Motor RV4200B, Chip Silo Rotary Feeder B, 3kW Service teminal box, IR test, replace silica gel pack. 5/3 - 25/3 5 - 9/3 ` ` ` ` `
Motor RV4200C, Chip Silo Rotary Feeder C Service teminal box, IR test, replace silica gel pack. 5/3 - 25/3 5 - 9/3 ` ` ` ` `
Motor S4000A1, Screen Machine A1, 0.9kW Service teminal box, IR test, replace silica gel pack. 5/3 - 25/3 5 - 9/3 ` ` ` ` `
Motor S4000A2, Screen Machine A2, 0.9kW Service teminal box, IR test, replace silica gel pack. 5/3 - 25/3 5 - 9/3 ` ` ` ` `
Motor S4000B1, Screen Machine B1, 0.9kW Service teminal box, IR test, replace silica gel pack. 5/3 - 25/3 5 - 9/3 ` ` ` ` `
Motor S4000B2, Screen Machine B2, 0.9kW Service teminal box, IR test, replace silica gel pack. 5/3 - 25/3 5 - 9/3 ` ` ` ` `
Motor Z4111-3, Blower Room, 5.5kW Service teminal box, IR test, replace silica gel pack. 5/3 - 25/3 5 - 9/3 ` ` ` ` `
Valve PV-50504, Samson Dismantle, send service, repair, leak test, install, function test. 9-10/3 - 29/3 8 - 26/3 Waiting HM SD ` ` ` ` `
Valve TV-50201, Samson Dismantle, send service, repair, leak test, install, function test. (I) 9-10/3 - 29/3 8 - 26/3 Waiting HM SD ` ` ` ` `
Valve TV-50401, Samson Dismantle, send service, repair, leak test, install, function test. (I) 9-10/3 - 29/3 8 - 26/3 Waiting HM SD ` ` ` ` `
Valve TV-50602 (Class A), Samson Dismantle, send service, repair, leak test, install, function test. (I, S, F) 9-10/3 - 29/3 8 - 26/3 Waiting HM Sd ` ` ` ` `
Pressure Transmitter PIT-50601 Dismantle, clean, verification test, install back. 8/3 - 29/3 8/3 - 10/3 ` `
Pressure Transmitter PIT-50504 Dismantle, clean, verification test, install back. 8/3 - 29/3 8/3 - 10/3 ` `
THF Plant Routine Job Motor P6040, Bottom Pump For T6000, 2.2kW Service teminal box, IR test, replace silica gel pack. 7/3 - 19/3 5- 9/3 ` ` ` ` `
(6000) Motor P6100, Desorbent Return Pump, 1.5kW Service teminal box, IR test, replace silica gel pack. 7/3 - 19/3 5- 9/3 ` ` ` ` `
Motor P6110, Cooling Liquid Pump, 1.1kW Service teminal box, IR test, replace silica gel pack. 7/3 - 19/3 5- 9/3 ` ` ` ` `
Motor P6200A, Reflux Pump For T6200, 1.5kW Service teminal box, IR test, replace silica gel pack. 7/3 - 19/3 5- 9/3 ` ` ` ` `
Motor P6220, Bottom Pump For T6200, 1.5kW Service teminal box, IR test, replace silica gel pack. 7/3 - 19/3 5- 9/3 ` ` ` ` `
Motor P6230, Bottom Pump For T6300, 1.1kW Service teminal box, IR test, replace silica gel pack. 7/3 - 19/3 5- 9/3 ` ` ` ` `
Motor P6300A, Reflux Pump For T6300, 3.5kW Service teminal box, IR test, replace silica gel pack. 7/3 - 19/3 5- 9/3 ` ` ` ` `
Motor P6400A, KO Drum Draw-Off Pump, 1.1kW Service teminal box, IR test, replace silica gel pack. 7/3 - 19/3 5- 9/3 ` ` ` ` `
Disconnect drive cable, IR test, service terminal box, connect back drive
Motor VP6100A, Vacuum Pump For E6100, 55kW 7/3 - 19/3 5- 9/3
cable. Verified by TBPR Chargeman. ` ` ` ` `
Disconnect drive cable, IR test, service terminal box, connect back drive
Motor VP6100B, Vacuum Pump For E6100, 55kW 7/3 - 19/3 5- 9/3
cable. Verified by TBPR Chargeman. ` ` ` ` `
Flowmeter FIT-60001, Emerson Dismantle, install spool, MSDS, send for calibration, installation. 8/3 - 16/3 8 - 16/3 50% `Dü `S `R `I
Flowmeter FIT-60002 Inspect, clean, service, zeroing, check alarm message. 7/3 - 19/3 7 - 9/3 ` ` `
Flowmeter FIT-60003 Inspect, clean, service, zeroing, check alarm message. 7/3 - 19/3 7 - 9/3 ` ` `
Flowmeter FIT-60004, Yokogawa Dismantle, install spool, MSDS, send for calibration, installation. 8 - 16/3 8 - 16/3 50% `Dü `S `R `I
Flowmeter FIT-60201 Inspect, clean, service, zeroing, check alarm message. 7/3 - 19/3 7 - 9/3 ` ` `
Flowmeter FT-60301, Tokyo Keiso Inspect, clean, service, zeroing, check alarm message. 7/3 - 19/3 7 - 9/3 ` ` `
Flowmeter FIT-60501 Inspect, clean, service, zeroing, check alarm message. 7/3 - 19/3 7 - 9/3 ` ` `
Flowmeter FIT-62001 Inspect, clean, service, zeroing, check alarm message. 7/3 - 19/3 7 - 9/3 ` ` `
Flowmeter FIT-62002 Inspect, clean, service, zeroing, check alarm message. 7/3 - 19/3 7 - 9/3 ` ` `
Flowmeter FIT-62003, Yokogawa Inspect, clean, service, zeroing, check alarm message. 7/3 - 19/3 7 - 9/3 ` ` `
Flowmeter FIT-63001 Inspect, clean, service, zeroing, check alarm message. 7/3 - 19/3 7 - 9/3 ` ` `
Flowmeter FIT-63002 Inspect, clean, service, zeroing, check alarm message. 7/3 - 19/3 7 - 9/3 ` ` `
Flowmeter FIT-63003 Inspect, clean, service, zeroing, check alarm message. 7/3 - 19/3 7 - 9/3 ` ` `
Flowmeter FIT-63004, Yokogawa Inspect, clean, service, zeroing, check alarm message. 8 - 16/3 50% `Dü `S `R `I
Valve LV-63001 / FV-63301 Dismantle, send service, repair, leak test, install, function test. 7/3 - 21/3 7/3 - 21/3 50% ` `ü ` ` ` ` `
Valve FV-60001 Dismantle, send service, repair, leak test, install, function test. 7/3 - 21/3 7/3 - 21/3 50% ` `ü ` ` ` ` `
Valve FV-60002 Dismantle, send service, repair, leak test, install, function test. (I) 7/3 - 21/3 7/3 - 21/3 50% ` `ü ` ` ` ` `
Valve FV-60003 Dismantle, send service, repair, leak test, install, function test. (I) 7/3 - 21/3 7/3 - 21/3 50% ` `ü ` ` ` ` `
Valve FV-60201 Dismantle, send service, repair, leak test, install, function test. (I) 7/3 - 21/3 7/3 - 21/3 50% ` `ü ` ` ` ` `
Valve FV-60301 Dismantle, send service, repair, leak test, install, function test. (I) 7/3 - 21/3 7/3 - 21/3 30% - Pipeline drop ` ` ` ` ` ` `
Valve FV-61003 Dismantle, send service, repair, leak test, install, function test. (I) 7/3 - 21/3 7/3 - 21/3 50% ` `ü ` ` ` ` `
Valve FV-61004 Dismantle, send service, repair, leak test, install, function test. 7/3 - 21/3 7/3 - 21/3 50% ` `ü ` ` ` ` `
Valve FV-62001 Dismantle, send service, repair, leak test, install, function test. (I) 7/3 - 21/3 7/3 - 21/3 50% ` `ü ` ` ` ` `
Valve FV-62003 Dismantle, send service, repair, leak test, install, function test. (I) 7/3 - 21/3 7/3 - 21/3 50% ` `ü ` ` ` ` `
Valve FV-63001 Dismantle, send service, repair, leak test, install, function test. 7/3 - 21/3 7/3 - 21/3 50% ` `ü ` ` ` ` `
Valve FV-63002 Dismantle, send service, repair, leak test, install, function test. 7/3 - 21/3 7/3 - 21/3 50% ` `ü ` ` ` ` `
Valve LV-60001 Dismantle, send service, repair, leak test, install, function test. (I) 7/3 - 21/3 7/3 - 21/3 50% ` `ü ` ` ` ` `
Valve LV-61101 Dismantle, send service, repair, leak test, install, function test. 7/3 - 21/3 7/3 - 21/3 50% ` `ü ` ` ` ` `
Valve LV-62002 Dismantle, send service, repair, leak test, install, function test. (I) 7/3 - 21/3 7/3 - 21/3 50% ` `ü ` ` ` ` `
Valve PV-61008 Dismantle, send service, repair, leak test, install, function test. 7/3 - 21/3 7/3 - 21/3 ` ` ` ` ` ` `
Valve PV-62001A Dismantle, send service, repair, leak test, install, function test. 7/3 - 21/3 7/3 - 21/3 50% ` `ü ` ` ` ` `
Valve HV-61001 Dismantle, send service, repair, leak test, install, function test. (I, C, F) 7/3 - 21/3 7/3 - 21/3 50% ` `ü ` ` ` ` `
Valve HV-61002 Dismantle, send service, repair, leak test, install, function test. (I, C, F) 7/3 - 21/3 7/3 - 21/3 50% ` `ü ` ` ` ` `
Valve HV-61003 Dismantle, send service, repair, leak test, install, function test. (I, C, F) 7/3 - 21/3 7/3 - 21/3 50% ` `ü ` ` ` ` `
Valve HV-61004 Dismantle, send service, repair, leak test, install, function test. (I, C, F) 7/3 - 21/3 7/3 - 21/3 50% ` `ü ` ` ` ` `
Valve HV-61005 Dismantle, send service, repair, leak test, install, function test. (I, C, F) 7/3 - 21/3 7/3 - 21/3 50% ` `ü ` ` ` ` `
Valve HV-61006 Dismantle, send service, repair, leak test, install, function test. (I, C, F) 7/3 - 21/3 7/3 - 21/3 50% ` `ü ` ` ` ` `
Valve HV-61007 Dismantle, send service, repair, leak test, install, function test. (I, C, F) 7/3 - 21/3 7/3 - 21/3 50% ` `ü ` ` ` ` `
Valve HV-61008 Dismantle, send service, repair, leak test, install, function test. (I, C, F) 7/3 - 21/3 7/3 - 21/3 50% ` `ü ` ` ` ` `
Valve HV-61009 Dismantle, send service, repair, leak test, install, function test. (I, C, F) 7/3 - 21/3 7/3 - 21/3 50% ` `ü ` ` ` ` `
Valve HV-61010 Dismantle, send service, repair, leak test, install, function test. (I, C, F) 7/3 - 21/3 7/3 - 21/3 ` ` ` ` ` ` `
Valve HV-61011 Dismantle, send service, repair, leak test, install, function test. (I, C, F) 7/3 - 21/3 7/3 - 21/3 ` ` ` ` ` ` `
Valve HV-61012 Dismantle, send service, repair, leak test, install, function test. (I, C, F) 7/3 - 21/3 7/3 - 21/3 ` ` ` ` ` ` `

Temperature Element TE-61001, TE-61002, TE-61003, TE 61004 and To replace new multipoint temperature elements 7/3 & 28/3 7-9/3 & 18-21/3 50%
TE-61005, TE-61006, TE-61007, TE-61008 ` `ü ` ` ` ` `
E&I Parts E&I Parts Dismantle / Install To supervise Sakyu Install / Dismantle 7-9/3 & 18-21/3 7-9/3 & 18-21/3 ` ` ` ` ` ` `
Tank Farm Routine Job Motor A7030, Agaitator For D7030, 11kW Service teminal box, IR test, replace silica gel pack. 3/3 - 16/3 5 -9/3 ` ` ` ` `
(7000) Motor P7000A, THF Feed Pump, 2.2kW Service teminal box, IR test, replace silica gel pack. 3/3 - 16/3 5 -9/3 ` ` ` ` `
Motor P7020A, New BDO Feed Pump A, 11kW Service teminal box, IR test, replace silica gel pack. 3/3 - 19/3 5 -9/3 ` ` ` ` `
Motor P7020B, New BDO Feed Pump B, 11kW Service teminal box, IR test, replace silica gel pack. 3/3 - 19/3 5 -9/3 ` ` ` ` `
Motor P7020C, New BDO Feed Pump C 11kW Service teminal box, IR test, replace silica gel pack. 3/3 - 19/3 5 -9/3 ` ` ` ` `
Motor P7030, R-BDO Feed Pump, 11kW Service teminal box, IR test, replace silica gel pack. 3/3 - 19/3 5 -9/3 ` ` ` ` `
Motor P7040A, R-THF Feed Pump, 1.5kW Service teminal box, IR test, replace silica gel pack. 3/3 - 19/3 5 -9/3 ` ` ` ` `
Motor P7040B, R-THF Feed Pump, 1.5kW Service teminal box, IR test, replace silica gel pack. 3/3 - 19/3 5 -9/3 ` ` ` ` `
Motor P7050A, R-THF Feed Pump For Heater, 2.2kW Service teminal box, IR test, replace silica gel pack. 3/3 - 19/3 5 -9/3 ` ` ` ` `
Motor P7060A, TEG Feed Pump, 2.2kW Service teminal box, IR test, replace silica gel pack. 6/3 - 19/3 5 -9/3 ` ` ` ` `
Motor P7080A, R-TEG Feed Pump, 1.5kW Service teminal box, IR test, replace silica gel pack. 6/3 - 19/3 5 -9/3 ` ` ` ` `
Masterlist 17_159, 17_240. Replace rusted bracket and body with stainless
Level Transmitter Cable pipe couple for level transmitter 5/3 - 23/3 5/3 - 23/3 100% ` ` ` ` `
Defect / Back Log Job steel material. ` ` ` ` ` ` ` ` ` ` ` ` ` `
Valve Air regulator at Chip Silo Masterlist 17_161. Replace new regulator due to leakage. 5/3 - 23/3 5/3 - 23/3 50% ` ` ` 'ü ' ` ` `
Utility (8000) Routine Job Motor LEV Blower, BL9000B Swing blower, dismantle, send for service, repaint, install, test run. 12/3 - 28/3 5 - 9/3 50% ` ` ` `ü ` ` ` '
Motor LEV Blower, BL9000B Service teminal box, IR test, replace silica gel pack. 12/3 - 28/3 5 - 9/3 ` ` ` ` `
Motor P8000A, CHW Feed Pump, 11kW Service teminal box, IR test, replace silica gel pack. 4/3 - 28/3 5 - 9/3 ` ` ` ` `
Motor P8000B, CHW Feed Pump, 11kW Service teminal box, IR test, replace silica gel pack. 4/3 - 28/3 5 - 9/3 ` ` ` ` `
Motor P8010A , CHW Circulation Pump, 7.5kW Service teminal box, IR test, replace silica gel pack. 4/3 - 28/3 5 - 9/3 ` ` ` ` `
Motor P8010B , CHW Circulation Pump, 7.5kW Service teminal box, IR test, replace silica gel pack. 4/3 - 28/3 5 - 9/3 ` ` ` ` `
Erect scaffold, dismantle motor, service, test run at workshop, install at site,
Motor P8100A, Booster Pump, 100kW 5/3 - 28/3 5 - 9/3 50%
no load test run and take vibration. ` ` ` `ü ` ` ` '
Motor P8100B, Booster Pump, 100kW Service teminal box, IR test, replace silica gel pack. 5/3 - 28/3 5 - 9/3 ` ` ` ` `

No cooling water 19/3 - 31/3