You are on page 1of 31

PROCESS

GAS PIPELINE DEVELOPMENT FOR


CCPP TANJUNG BATU KALTIMRA CIVIL
PROJECT R
E MECHANICAL
CONTRACTOR DOCUMENT REVIEW V
ELECTRICAL
I
DATE E I&C
LOG W
IN COMM NO. : PIPELINE

A APPROVED SUPPORT

B APPROVED AS NOTED CONTRACTOR

C NOT APPROVED D RECORD


I
I INFORMATION S PLN SITE
T
APPROVAL DOES NOT RELIEVE R GM UIP
CONTRACTOR FROM RESPONSIBILITY I
PLN GG
FOR ERRORS OR DEVIATIONS FROM B
CONTRACT REQUIREMENTS U VICO IND.
T
BY : DATE : I PERTAMINA EP
O
LOG DATE N SURVEYOR IND.
OUT COMM NO. :
COMPANY

PT. PERUSAHAAN LISTRIK NEGARA (PERSERO)

ENGINEER
PT. PLN ENJINIRING

CONTRACT NO. : 0546.Pj/EPI.01.02/DITREG-KAL/2017

PLN DOC. NO. :


P G T B - C I V - S P C - 0 0 3

TITLE :
SPECIFICATION FOR CONCRETE DESIGN AND MATERIAL
PURPOSE : ISSUED FOR APPROVAL
Rev Description Prepared Checked Approved Checked
0 Issued for Approval TRI RI PP

CONTRACTOR DOC NO. :

PGTB-CIV-SPC-003
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 2 of 31

TABLE OF CONTENT
1 INTRODUCTION .................................................................................................. 4
1.1 PROJECT OVERVIEW ......................................................................................................................... 4
1.2 PURPOSE ............................................................................................................................................ 4
2 DEFINITIONS ....................................................................................................... 4
3 CODE, STANDARD & REFERENCE................................................................... 5
4 MATERIALS ......................................................................................................... 7
4.1 CEMENT .............................................................................................................................................. 7
4.2 SAND AND GRAVEL (COARSE AGGREGATE) ...................................................................................... 8
4.3 W ATER ................................................................................................................................................ 8
4.4 ACCELERATING ADMIXTURE ............................................................................................................... 9
4.5 REINFORCEMENT BAR ........................................................................................................................ 9
4.6 EPOXY GROUT.................................................................................................................................. 10
4.7 BONDING AGENT FOR CONCRETE.................................................................................................... 10
4.8 CEMENT MORTAR ............................................................................................................................. 10
5 CONCRETE DURABILITY ................................................................................. 10
5.1 W ATER CEMENTIOUS MATERIAL RATIO........................................................................................... 10
6 MATERIAL HANDLING ..................................................................................... 11
7 CONCRETE CONSTRUCTION .......................................................................... 12
7.1 CONCRETE COMPRESSIVE STRENGTH ............................................................................................ 12
7.2 SLUMP IN CONCRETE ....................................................................................................................... 12
7.3 MAXIMUM SIZE OF GRANULAR (COARSE AGGREGATE) .................................................................. 12
7.4 MIXTURE COMPARISON .................................................................................................................... 13
8 MIXING ............................................................................................................... 13
9 TRANSPORTATION .......................................................................................... 14
10 POURING ........................................................................................................... 14
11 VIBRATOR ......................................................................................................... 16
12 CURING ............................................................................................................. 17
13 FORMWORK ...................................................................................................... 17
14 REINFORCED CONCRETE WORK................................................................... 20
15 CONCRETE COVER .......................................................................................... 22
16 ANCHOR BOLTS ............................................................................................... 22
16.1 MOUNTING OF ANCHOR BOLT WITH TEMPLATE ............................................................................... 22
16.2 MOUNTING OF ANCHOR BOLT WITH GAUGE PLATE......................................................................... 23
16.3 THE MOUNTING OF ANCHOR BOLT ON ANCHOR BOX ..................................................................... 23
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 3 of 31

17 REPAIR OF DAMAGED CONCRETE................................................................ 24


18 GROUTING AND MORTAR WORK FOR FOUNDATION ................................. 24
19 CONCRETE TEST ............................................................................................. 24
19.1 CONCRETE MIX DESIGN TEST ......................................................................................................... 24
19.2 COMPRESSIVE STRENGTH TEST ...................................................................................................... 25
19.3 SLUMP TEST ..................................................................................................................................... 26
19.4 AIR CONTENT TEST .......................................................................................................................... 26
19.5 W ATER LOADING TEST FOR CONCRETE SINK ................................................................................. 27
20 CONCRETE WORK AT HOT WEATHER .......................................................... 27
21 CONCRETE TO CATCH FLUID......................................................................... 27
22 EVALUATION AND ACCEPTANCE OF CONCRETE (SAMPLING CONCRETE)27
22.1 GENERAL .......................................................................................................................................... 27
22.2 FREQUENCY OF TESTING ................................................................................................................. 27
22.3 LABORATORY-CURED SPECIMEN ..................................................................................................... 28
22.4 FIELD-CURED SPECIMEN .................................................................................................................. 28
22.5 INVESTIGATION OF LOW STRENGTH TEST RESULT ......................................................................... 29
23 QUALITY OF CONCRETE ................................................................................. 30
24 PRECAST CONCRETE ..................................................................................... 30
24.1 SCOPE .............................................................................................................................................. 30
24.2 GENERAL FOR PRECAST CONCRETE ............................................................................................... 30
24.3 CONCRETE COVER FOR PRECAST-CONCRETE ............................................................................... 31
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 4 of 31

1 INTRODUCTION
1.1 Project Overview
Kaltimra Electrical system consists of East Kalimantan and North Borneo and managed by PT.
Perusahaan Listrik Negara (PLN) Wilayah Kalimantan Timur dan Kalimantan utara (WKTKU)
based in Balikpapan, East Kalimantan.
Based on the report RUPTL (Rencana Umum Pembangunan Tenaga Listrik) in 2014-2024
Currently, East Kalimantan region has about 816 300 customers with the majority (58.9%) is a
type of household customers. In the future PT. PLN expected growth of electricity requirement
is approximately 8,68% per year at the province.
Mahakam system is interconnected system of 150 KV high voltage serving the city of
Balikpapan, Samarinda, Tenggarong and Bontang. Mahakam’s generator systems is supplied
by the PT. PLN generator’s in Tanjung Batu (about 30 Km Northwest Samarinda). In the area
of Tanjung Batu Power Plant, there are several types of power plants such as
PLTGU,PLTG,PLTD and PLTMG both owned by PT. PLN(Persero) and IPP(Independent
Power Procedur) with peak loads at the end of 2014 amounted to 408 MW.
Under these conditions, PT. Perusahaan Listrik Negara (PLN) Region Kaltimra plans to build
16 "carbon steel pipeline along the ± 55000 m from PK-52 area to PLTGU Tanjung Batu. The
pipeline starts from Tie in point 24 "Gas Pipeline in the area of PK-52 and ending at the tie-in
point PLTGU Tanjung Batu.
PLN has secured commitments from SKK Migas gas supply of 40 MMSCFD continuously to
meet the needs of gas supply to PLTGU Tanjung Batu. Gas resources come from three
companies, namely PT. VICO, PT. PEARL ENERGY and PT. TOTAL.
1.2 Purpose
This document is covers and explain the specification requirements for concrete design and
material of project pipeline of PK-52 is located in VICO towards Central Power Plant (PLN)
Tanjung Batu Tenggarong in East Kalimantan.

2 DEFINITIONS
PROJECT - Gas Pipeline Development for CCPP Tanjung Batu kaltimra
Project.
COMPANY - PT. Perusahaan Listrik Negara (PLN) UIP Kalbagtim, as Client.
CONTRACTOR - Consortium PT. Hutama karya – PT. Moeladi.
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 5 of 31

CONSULTANT - PT. PLN-Enjiniring


VENDOR - The party which supply materials, equipments, technical
documents/drawings and services to perform the duties specified
by CONTRACTOR.
DITJEN MIGAS - Representatives from the Indonesia Goverment which is
responsible for issuing licences and permits oil and gas facilities.

3 CODE, STANDARD & REFERENCE


This specification was arranged based on International and National Standard. Unless
otherwise specified, all the codes and specifications shall be the latest edition.
 ASTM A36/A36M Specification for Carbon Structural Steel
 ASTM A185 Specification for Steel Welded, Wire Fabric, Plain for
Concrete Reinforcement
 ASTMA370-12a Specification for Methods and Definitions for Mechanical
 Testing of Steel Products
 ASTM A615 Specification for Deformed and Plain Billet-Steel Bars for
Concrete Reinforcement
 ASTM C31 Practice for Making and Curing Concrete Test Specimens in
the Field
 ASTM C33 Specification for Concrete Aggregates
 ASTM C39 Test Method for Compressive Strength of Cylindrical Concrete
 ASTM C94 Specification for Ready-mixed Concrete
 ASTM C109 Test Method for Compressive Strength of Hydraulic Cement
Mortars (Using 2 in. or 50 mm Cube Specimens)
 ASTM C136 Standard Test Method for Sieve Analysis of Fine and Coarse
Aggregates
 ASTM C138 Standard Test Method For Unit Weight, Yield, and Air Content
(Gravimetric) of Concrete
 ASTM C143 Test Method for Slump of Hydraulic Cement Concrete
 ASTM C150 Specification for Portland Cement
 ASTM C172 Practice for Sampling Freshly Mixed Concrete
 ASTM C173 Standard Test Method for Air Content of Freshly Mixed
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 6 of 31

Concrete by the Volumetric Method


 ASTM C231 Standard Test Method for Air Content of Freshly Mixed
Concrete by the Pressure Method
 ASTM C260 Specification for Air-Entraining Admixtures
 ASTM C494 Specification for Chemical Admixture for Concrete
 ASTM C618 Specification for Coal Fly Ash and Raw or Calcined Natural
Pozzolan for Use as a Mineral Admixture in Concrete
 ACI 117 Standard Tolerances for Concrete Construction and Materials
 ACI 211.1 Recommended Practice for Selecting Proportions for Normal
and Heavy Weight and Mass Concrete
 ACI 301 Specification for Structural Concrete for Building
 ACI 304 Recommended Practice for Measuring Mixing, Transporting
and Placing Concrete
 ACI 313 Recommended Practice for Hot Weather Concrete
Recommended Practice for Design and Construction of
Concrete Bins, Silo and Bunkers for Storing Granular Material
 ACI 315 Manual of Standard Practice for Detailing Reinforced Concrete
Structures
 ACI 318 Building Code Requirements for Structural Concrete
 ACI 347 Recommended Practice for Concrete Form Work
 SNI 03-2847-2002 Tata Cara Perhitungan Struktur Beton Untuk Bangunan
Gedung
 AWS D12.1 Recommended Practices for Welding Reinforcing Steel, Metal
Insert and Connection in Reinforced Concrete Construction
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 7 of 31

4 MATERIALS

4.1 Cement

Cement used in concrete construction is Portland cement that is in accordance with


provisions of ASTM C150 of the following conditions:

- Type I, Portland cement is known as common or general purpose cement. It is


generally assumed unless another type is specified. It is commonly used for general
construction especially when making precast and precast- prestressed concrete that
is not contact with soils or ground water.

- Type II, this type is for general construction that is exposed to moderate sulfate attack
and is meant for use when concrete is in contact with soils and ground water
especially in the western United States due to the high sulfur content of the soil.

- Type III, this cement is similar to Type I, but with finer ground. Some manufacturers
make a separate clinker with higher C3S and/or C3A content, but this is increasingly
rare, and for the general purpose clinker is usually used, with a specific surface
typically 50-80% higher. The gypsum level may also be increased a small amount.
This gives the concrete using this type of cement a three day compressive strength
equal to the seven day compressive strength of types I and II. Its seven day
compressive strength is almost equal to types I and II 28 day compressive strengths.
The only downside is that the six month strength of type III is the same or slightly less
than that of types I and II. Therefore the long-term strength is sacrificed a little. It is
usually used for precast concrete manufacture, where high 1-day strength allows fast
turnover of molds. It may also be used in emergency construction and repairs and
construction of machine bases and gate installations.

- Type IV, the percentages of (C2S) and (C4AF) are relatively high and (C3S) and
(C3A) are relatively low. A limitation on this type is that the maximum percentage of
(C3A) is seven, and the maximum percentage of (C3S) is thirty-five. This causes the
heat given off by the hydration reaction to develop at a slower rate. However, as a
consequence the strength of the concrete develops slowly. After one or two years the
strength is higher than the other types after full curing. This cement is used for very
large concrete structures, such as dams, which have a low surface to volume ratio.
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 8 of 31

This type of cement is generally not stocked by manufacturers but some might
consider a large special order. This type of cement has not been made for many
years, because Portland-pozzolan cements and ground granulated blast furnace slag
addition offer a cheaper and more reliable alternative

- Type V, this cement has a very low (C3A) composition which accounts for its high
sulfate resistance. The maximum content of (C3A) allowed is five percent for Type V
Portland cement. Another limitation is that the (C4AF) + 2(C3A) composition cannot
exceed twenty percent. This type is used in concrete that is to be exposed to alkali
soil and ground water sulfates which react with (C3A) causing disruptive expansion.
As with Type IV, Type V Portland cement has mainly been supplanted by the use of
ordinary cement with added ground granulated blast furnace slag or tertiary blended
cements containing slag and fly ash.

4.2 Sand and Gravel (Coarse Aggregate)

 Sand and gravel (coarse aggregate) for mixed concrete shall be in accordance with
provisions of ASTM C33.

 Sand and gravel (coarse aggregate) that is not in accordance with provisions of ASTM
C33, but still can be used after having completed special testing or after having been
properly used can produce concrete of acceptable strength and durability, it is
acceptable for usage only after receiving approval from COMPANY.

 Testing for sieve analysis shall be in accordance with provisions of ASTM C136 and
conducted regularly, the testing outcome shall immediately be submitted to
COMPANY for attaining approval.

4.3 Water

Water used for pouring concrete shall be potable water and free of acid content.

Saline, oil, base, and other organics in hazardous quantity, and shall be in accordance
with provisions of ASTM C94. Non-potable water is subject for usage only if the mortar
testing cube using that water at day-7 and day-28 indicates the strength level of minimum
90%of similar specimen produced using potable water. Mixed water shall not contain
sulphur higher than 1,000 ppm and 500 ppm chloride. The comparison of concentration
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 9 of 31

shall be performed on identical mortar cube, except for mixed water that have been
prepared and tested under ASTM C109.

4.4 Accelerating Admixture

1. The use of accelerating admixture for mixed concrete shall attain prior approval from
COMPANY and shall be in accordance with provisions below or other equivalent and
approved standards:
 Pozzolanic admixture ASTM C618
 Chemical admixture for concrete ASTM C494
 Air-entraining ASTM C260

2. The use of accelerating admixture for mixed concrete is to create increase of concrete
features like strength, durability, workability and density.

3. The acceleration of desiccation on reinforced concrete shall not use accelerating


admixture containing calcium chloride.

4. At high temperature or if it affects the durability of chemical substances like sulphur,


the mixed concrete requires special treatment.

4.5 Reinforcement Bar

1. The use of reinforced concrete shall be in accordance with provisions of Sll - 0316-80
and SNI 07-2052-2002, BJTS 40 for spiral reinforcement and ASTM A185 for wire
mesh reinforcement.

2. Yield test shall be performed to all rebar diameter and types and referred to ASTM
A370-12a

3. For structural main bar type shall use deformed bar. Deformed bar shall conform to
ASTM A615 Grade 40. For stirrup and non structural type such as wall post,
reinforcement for concrete block wall, etc shall use plan bar.

4. Certified mill test reports shall be submitted as per request by COMPANY.


GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 10 of 31

4.6 Epoxy Grout

This part is refer to document PGTB-CIV-SPC-004,"Specification for Building Design and


Material".

4.7 Bonding Agent for Concrete

- Polyvinyl acetate (only for interior) or acrylic-base.


- Epoxy adhesive (epoxy adhesive): ASTM C881,two-component material, suitable for
use on dry or damp surfaces. Use the type, quality and grade of material according to
the provisions.

4.8 Cement Mortar

Cement mortar is a building compound created by mixing sand and a selection of


aggregates with a specified amount of water. The mortar can be used for a number of
applications, such as plastering over bricks or other forms of masonry. Sometimes
referred to as sand cement, mortar blends today often incorporate different grades of
plastics to create various types of polymer cement mortars.

Mortar has been used for centuries as a means of adhering bricks or concrete blocks to
one another. Cement mortar continues to be used in many different types of construction.
Professional building projects often employ mortar as the binder between bricks in walls,
fences, and walkways. Around the house, cement mortar is often employed to make quick
repairs in patio slabs and reset loosened stones or bricks in a walkway or retaining wall.
Home COMPANYs sometimes set children's recreational equipment such as swing sets
firmly in the ground, minimizing the chances of the equipment shifting or toppling while in
use. The reference for Cement Mortar is ASTM C1329 / C1329M - 12, "Standard
Specification for Mortar Cement".

5 CONCRETE DURABILITY

5.1 Water Cementious Material Ratio

The water-cementious materials ratios specified in Tables 1 and 2 shall be calculated


using the weight of cement meeting ASTM C 150, C 595M, or C 845, plus the weight of fly
ash and other pozzolans meeting ASTM C 618, slag meeting ASTM C 989, and silica
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 11 of 31

fume meeting ASTM C 1240, if any. except that when concrete is exposed to deicing
chemicals, 3.2 further limits the amount of fly ash, pozzolans, silica fume, slag, or the
combination of these materials.
Table 1

Maximum water
Minimum fc', normal
cementitious materials
density and low density
Exposure condition ratio, by mass, normal
aggregate concrete,
density aggregate
MPa
concrete

Concrete intended to have low


0.5 28
permeability when exposed to water

Concrete exposed to freezing and


thawing in a moist condition or to deicing 0.45 31
chemicals

For corrosion protection of reinforcement


in concrete exposed to chlorides from
deicing chemicals, salt, salt water, 0.40 35
brackish water, seawater, or spray from
these sources.

6 MATERIAL HANDLING

1. Cement shall be stored in dry condition, e.g. inside weather-proof building, container, or
warehouse that can provide protection against moisture and contamination. Cement sack
must not be filled in more than 12 sacks pile and shall be placed on the floor of minimum 30
cm above ground level and put on hard base made of concrete or wooden support to avoid
water absorption.

2. The placement of reinforced steel, both fabricated and non-fabricated shall not have direct
contact with ground level. The placement process shall be performed with utmost care to
ensure that the reinforced steel does not alter in shape (deformation) / transformation
during storing.

3. The placement of coarse aggregate and sand shall be arranged carefully to prevent
contamination with other materials or with other aggregate measure.
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 12 of 31

4. Sand shall be drained to reach the same water content before being put to use.

5. The storing of accelerating admixture shall comply with the recommended requirements by
producer.

7 CONCRETE CONSTRUCTION

7.1 Concrete Compressive Strength

The concrete compressive force to be applied shall be designed according to the drawing
specified. The mixed shall comply with the calculation specified in chapter 8.

7.2 Slump in Concrete

1. Testing performed to analyze the mixed concrete shall meet the maximum value and
minimum slump according to requirements in Table-2.
Table 2
Construction Type Maximum (mm) Minimum (mm)
Column 125 (150)* 25 (50)*
Floor, beam, and reinforced 125 (150)" 25 (50)*
concrete wall
Layer of hardened road 75 (100)* 25 (50)*
Reinforced concrete 75 (100)* 25 (50)*
foundation
Plain concrete foundation. 75 (100)* 25 (50)*
caisson and underground
wall

2. At maximum slump as stated in Table-2 it can be increased until 25 mm if the


densification process does not apply vibration.

7.3 Maximum Size of Granular (Coarse Aggregate)

The maximum size proposed for granular shall not exceed:

- One-fifth of the minimum size between the formwork sides

- One-third of the concrete plate thickness


GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 13 of 31

- Three-fourth of minimum free distance between each reinforced barsunless it is


specified or approved otherwise COMPANY.

7.4 Mixture Comparison

1. The mixture comparison shall be in accordance with provisions of ACI 211.1 and shall
be easily poured, and complying with the other specified durability, strength and
characterization.

2. The mixture comparison including comparison of water-cement shall be specified after


conducting mixture experiment and shall be used as reference afterwards.

3. Comparison for mixture concrete as above mentioned shall attain approval from
COMPANY.

8 MIXING

1. The mixing of concrete shall be performed in batch mixerthat can mix cement, sand,gravel
and water totally to a cohesive mass within the specified mixing time and concrete shall be
poured without separation.

2. Operational manual including the below information concerning the design of batching and
mixingshall be submitted to COMPANY for approval.

- Rotation per minute of batch mixer and capacity of batch mixer shall be
incompliancewith the stated requirements.
- The accuracy of scales used to weigh the concrete mixing material (shall
complete the gauge test in the last 6 months).
- The capacity of water tank and water type - measure equipment.
- The method forfilling sand, gravel and cement.
- The capacity of batch mixer for daily use is maximum 8 hours.
3. Mixer drum having the capacity of 0.75 meter cubic orless shall be mixed for no less than 1
minute. The duration time for mixing shall be added 15 seconds for every 0.75 meter cubic
and its multiplication to attain additional capacity. In the least three-forth of the required
mixing duration has been reached after the last water to be mixed is poured.
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 14 of 31

The mixer drum and blade used in the batch mixer shall be inspected more often during hot
weather and the inside part of the batch mixer shall be free of deposited agents which can
disturb the mixing process.

4. Mixing process of a shorter time than the specified duration as stated in paragraph (3)is
allowed if the testing result indicates the time used is sufficient to produce adhesive mixture
concrete.

5. During hot weather, the mixing time shall comply with the minimum time requirements to
attain adhesive concrete and of sufficient quality.

9 TRANSPORTATION

1. Transportation of concrete from the batch mixer to the final pouring site shall apply the
method approved by COMPANY.

The method used shall have the capability to prevent separation, loss or contamination of
mixing materials.

2. The maximum time applied in the concrete mixing process until the final pouring of concrete
is as follows:
Table 3.Duration for mixing and moulding
Quality of Concrete Temperature Maximum

- Concrete of K-350 quality (for


Maximum 25°C 60 minutes
area containing sulfur)

- Concrete of K-250 quality or


More than 25°C 45 minutes
less

Concrete mixing requiring longer time for transportation than stated in the values in Table 2 is
applicable if it can be proven after having tested that concrete complies all the specified
requirements in this specification and other related documents.

10 POURING

1. Inside part of the formwork shall be previously cleaned before pouring the concrete and shall
be free of foreign agents and water moistening. The inside part of formwork (wooden) shall
be soaked before pouring the concrete.
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 15 of 31

2. The pouring of concrete shall be performed as close as possible with its final position to
prevent separation due to re-treatment.

3. The pouring of concrete shall be performed with specified speed to create concrete of elastic
nature at all time and can flow smoothly into the clank between reinforcement.

4. Concrete that has been polluted with foreign agents or partially hardened may not be used.

5. Once the pouring of concrete starts, it shall be continuously performed until the concrete
pouring for one particular formwork is completed.

6. During the pouring,concrete must be compacted using vibrator, except there is other method
and equipment approved by COMPANY and be carefully performed when concerning the
close area of reinforcement, anchor bolt and other inserted equipment and into the formwork
corner. There shall be back-up vibrators available in site during the concrete pouring
process.

7. The use of construction joints others than shown in the drawings shall be minimized and if it
requires alteration of the quantity and position. The alteration concerned shall attain approval
from COMPANY.

8. When ready to conduct joining, the concrete surface shall be clean, rough and all dirt
attached shall be cleaned using steel brush or being peeled off and coated with thin cement
neatly before additional concrete being poured.

9. The surface of vertical joints shall be soaked totally and coated with grout cement neatly
immediately before pouring the concrete nearby.

10. The forming of grooves on the construction joints shall comply with the specification in the
drawings.

11. If otherwise specified,finishing shall be conducted on all flat surface using wooden trowel.lf
rough surface required, finishing conducted on the concerned surface shall use brush of
palm leaf ribs.

12. If there is structural damage found on the structure concrete, the concrete concerned shall
be disassemble and replaced. Concrete that showing damage only on its surface shall be
peeled off until it reach the undamaged surface, and it shall be maintained using epoxy
agents and patched with concrete containing major mortar or epoxy mortar.
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 16 of 31

Repairing method to be conducted shall attain approval from COMPANY.

13. Ex-hole formed due to the extraction of tie-rod shall be fully filled with mortar cement and
being ground.

14. To produce homogenous concrete, the falling height of concrete must not exceed more than
1.5 meter. There must be temporary open launcher or hose available to prevent concrete
separation if the falling altitude is more than 1.5 meter.

15. Pouring for reinforced concrete shall not performed directly on ground surface. There should
be base of lean concrete or plastic sheet with acceptable thickness.

11 VIBRATOR

The process of compacting concrete by vibration consist essentially of the elimination


ofentrapped air and forcing the particles into a closer configuration.
1. Internal Vibrator
It consist of a poker, housing an eccentric shaft driven through a flexible drive from a motor.
The poker is immersed in concrete and thus applies approximately harmonic forces to it;
hence, the alternative names of poker vibrator or immersion vibrator.
2. External Vibrator
This type of vibrator is rigidly clamped to the formwork which rests on an elastic support, so
that both the form and the concrete are vibrated. As a result, a considerable proportion of
the work done is used in vibrating the formwork, which has to be strong and tight so as to
prevent distortion and leakage of grout.
3. Vibrating Table
A vibrating table provides a reliable means of compaction of precast concrete units and has
the advantage of ensuring uniform vibration. The system can be considered as a case of
from work clamped to the vibrator, as opposed to that of an external vibrator, but the
principle of vibrating the concrete an formwork together is the same.

Recommendations for consolidation of concrete are given in detail in "Guide for Consolidation
of Concrete" reported by ACI Committee 309.
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 17 of 31

12 CURING

1. After pouring is completed, all concrete surface must be kept soaked for at least 5 days
except concrete that originally has high concentration and get hardened faster, then it must
be kept soaked for at least 3 days.

2. All concrete surface shall be covered with wet rough fabric, cotton or other suitable fabric,
such as curing compound, immediately after the pouring is complete.

3. During the curing, the cover fabric shall be maintained in place. The cover fabric shall be
released when the concrete is hard enough, and the concrete surface must immediately be
covered with sand, stubble, or other materials of the kind. In any case, material used shall
be fully soaked during the curing period.

4. Formwork (wooden) shall be maintained moist during the curing period.

5. The use of curing compound shall comply with the direction given by producer.

6. The use of sea water shall not be allowed during the curing period.

7. There shall not be any weight put on the concrete during the curing period.

13 FORMWORK

1. The form working and construction shall be conducted in a safely manner and shall attain
approval from COMPANY.

2. The formwork shall be cleaned previously and shall be free of any kind of dust, dirt and
other debris. There should be temporary clank made to throw out water and other dirt
outside if necessary.

3. To prevent shifting and deflection due to construction load, such as construction load from
above, flat line or shock load, all formwork, either made of wood or metal, must be installed
properly and tightened.

4. The permitted limit for formwork installation shall be in accordance with provisions of ACI
347. If necessary, to keep the permitted limit complied with, the formwork can be cambered
to maintain balance from the possible deflection might occur during the form working due to
the weight and pressure from the fresh concrete and construction load.

5. The formwork of water proof plywood must be used for the exposed surface.
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 18 of 31

6. If the surface will remain uncovered the suitable formwork or chamfer strip shall be placed
at the corner of column, beam, and wall formwork.

7. Anchor bolt, angle, pipes, insert plate to be inserted deep inside or through the concrete
shall be firmly inserted in the formwork and shall be cut properly and accurately.

8. Before installation, the formwork surface shall be coated with oil or other releasing agent
approved by COMPANY.

9. To make it easy to be cleaned and examined right before the pouring of concrete,there
should be temporary hole made at the bottom of column, formwork wall and other points if
necessary.

10. Disassembling of Formwork:

a. The disassembling of formwork shall be performed properly to ensure the secured


structure. If the structure is fully supported at the sides, the formwork side beam, main
beam, column and vertical formwork of equivalent shape it can be disassembled after 3
x 24 hours with temperature of more than 10°C or if concrete pressing force has
reached 50 kg.f/cm2. Refer to ACI 347R-94, the formwork also can be disassembling as
Table 4.
Table 4. Formwork Disassembling Period
Structure Period
Walls 12 hr
Columns 12 hr
Sides of beams and girders 12 hr
Pan joist forms
30 in. wide or less 3 days
Over 30 in. wide 4 days
structural live structural live load
load less than more than
structural dead structural dead
load load
Arch centers 14 days 7 days
Joist, beam or girder soffits
Under 10 ft clear span between
7 days 4 days
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 19 of 31

structural supports

10 to 20 ft clear span between 14 days 7 days


structural supports

Over 20 ft clear span between 21 days 14 days


structural supports

b. The shoring shall be maintained in place for a period of not less than what is stated in
Table 5. In case of the use of high-concentration and quickly hardened, this time
duration can be lessened if approved by COMPANY with strong technical reasoning.

The formwork of shoring at the bottom supporting the concrete weight inside the beam,
plate and the other structure parts shall be maintained in place until the structure
reaches the desired strength to support dead load and other load involved.
Table 5. Minimum Free Distance Formwork Between Shoring

Free distancebetween L.L <= D.L L.L > D.L


Shoring (C.S) (m) (Days) (Days)
C.S <= 3.0 4 3
Floor Plate 3.0 < C.S <=6.0 7 4
6.0 < C.S 10 7

C.S <= 3.0 7 4


Lower part of beam
3.0 < C.S <=6.0 14 7
and main beam 6.0 < C.S 21 14

LL = Live Load
DL = Dead Load
C.S = Formwork Space in meter between shoring, referring to the structure
shoring and not to the temporary form working or shore.

c. After the formwork for cable hole is released, the concrete surface shall be cleaned and
all burrs including debris shall be cleaned.

11. The formwork surface shall be cleaned before re-used.


GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 20 of 31

14 REINFORCED CONCRETE WORK

1. The bending of reinforced concrete to be used shall be in cold condition before being
installed in place.

2. The placing of reinforced bars shall be free of dirt, mill scale, grease, oil, and other foreign
agents that might interrupt the concentration level between reinforcement and concrete.

3. The placing of all reinforced concrete shall be accurately performed as required in the
drawing and shall be supported with a number of small pre-casted mortar block using tie
wire, or approved mortar. Mortar shall have the strength equivalent to or heavier than the
strength of the concrete.

4. To prevent shifting due to construction load or due to the pouring of concrete, the reinforced
bars shall be firmly tightened on the section between strong steel wire and maintained
tightly in place using small pre-casted mortar block.

5. The making of joint shall be performed at locations shown in the drawing. Any additional
joints that are not shown in the drawing shall attain approval from COMPANY.

6. The joining of reinforced concrete must not be performed in one line at one location, but
shall be put on terraces at a minimum distance of 30 times of the diameter of bars.

7. The length and details of reinforcement overlap shall comply with the requirements in the
drawing or standard drawing.

8. Reallocation of reinforced bars can be performed if necessary to prevent disturbance


towards the other reinforcement, sewage pipes or the inserted parts. If reinforced bar is
reallocated more than one diameter or far enough that exceeds the permitted limit
mentioned above, therefore the handling of reinforcement shall attain approval from
COMPANY.

9. Welding work of reinforcement shall comply with the standard in AWS D 12.1, and shall
approved by COMPANY. At the bending location, the tack welding and reinforced concrete
of high concentration may not be welded.
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 21 of 31

10. The permitted limit for fabrication and placement shall be accordance with provisions of ACI
301 paragraph 5.6. as follows ;
5.6 - The tolerated limit for manufacture and placement
5.6.1 - Reinforced bars shall be made in compliance to the standard permit for
implementation in Exhibit 4 and 5 in ACI 315
5.6.2. - Reinforced bars shall be placed within the range of the tolerated limit as follows:
Tolerated Limits
mm
Clear distance
To the surface of bottom mold .............................................. - 6.35
To the surface of other mold ................................................. ± 6.35
Minimum distance between reinforcement ........................... -6.35
Clear distance from the surface without mold to the reinforced bars
Beam of 20 cm height or less ............................................... ±6.35
Beam of a height more than 20 cm but less than 61 cm ...... -6.35, +12.5
Beam of 61 cm height or bigger ........................................... -6.35, +25
Identical distance from reinforced bars but the
total reinforced bars shall not be reduced ...................................... +50
Identical distance from ties but the total
reinforced bars shall not be reduced ............................................ +25
Spots of extended bending and edge of
reinforcement
Generally ..................................................................................... +50
The breaking of reinforced bars edge ........................................... +25
Length from reinforcement joints .................................................. -38
Length of anchoring
For reinforced bar of 10 to 32 mm diameter ......................... -25
For reinforced bar of 12 to 54 mm diameter ......................... -50
5.6.3 - If required to shift reinforced bar to prevent contact with the other reinforced bars,
the channel/pipes or other implanted materials by exceeding the permitted limit for
specified placement, therefore the placement of reinforced bars produced shall be
previously attain approval.
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 22 of 31

15 CONCRETE COVER

The thickness of concrete cover in the concrete-constructed building shall be determined in a


way that and shall be calculated towards fire protection aspect in a fire incident occurring within
estimated more than 2 hours. The minimum thickness of concrete cover shall comply with SNI
03 - 2847 - 2002. The concrete cover for cast in place concrete (non- prestressed) is shown by
table 6 below:
Table 6.Minimum Concrete Cover For Cast in Place Concrete (Non-Prestressed)

Minimum Concrete
Type Of Structure
Cover (mm)

Concrete cast against and permanently exposed to earth 75


Concrete exposed to earth or weather:
- D19 through D56 bars 50
- D16 bar, MW200 or MD200 wire, and smaller 40
Concrete not exposed to weather or in contact with ground:
Slabs, walls, joists:
- D44 and D56 40
- D36 and smaller 20
Beams, Column:
Primary reinforcement, ties, stirrups, spirals 40
Shells, folded plate members:
- D19 or larger 20
- No. 16 bar, MW200 or MD200 wire, and smaller 15

16 ANCHOR BOLTS

The mounting of anchor bolt for foundation shall comply with the following requirements.

16.1 Mounting of Anchor Bolt with Template

1. Shoring shall be provided during the mounting of anchor bolt with template, to prevent
bolt template and anchor not to shift when concrete is poured.

2. Shoring support needed for mounting the template shall not be mounted on reinforced
bars or formwork.

3. Permit for template mounting shall comply with the following limits:
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 23 of 31

Position Orientation Height Vertical Direction

+ 5 mm
± 3 mm ± 2 mm at the edge (t/300) mm
- 0 mm

16.2 Mounting of Anchor Bolt with Gauge Plate

1. If template is not in use, the gauge plate shall be used to mount anchor bolt directly
for structured concrete.

2. Gauge plate shall be mounted properly on the formwork.

3. The tolerated limited for gauge plate mounting is as follows:

Position : ± 3 mm
Height: + 5 mm
- 0 mm

16.3 The Mounting of Anchor Bolt on Anchor Box

1. The dimension and depth of anchor box must accord to the drawing.

2. The tolerated limit for mounting the anchor box is as follows:

Position : ± 10 mm
Height: + 0 mm
- 20 mm
3. The mounting of anchor bolt can be performed after the inside part of anchor box is
cleaned and dried.

4. Filling material for anchor box is concrete or mortar with scale of 1 pc : 3 sand based
on weight percentage in normal cases.

5. Concerning specified machine and equipment, it is required to use non-shrinking


cement for filling the anchor box. Therefore CONTRACTOR shall use and submit to
COMPANY the specification, catalog, and/or sample of non-shrinking cement to attain
approval.
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 24 of 31

6. Anchor bolt mounted and still exposed shall be coated with anti-corrosion agent
(grease).

17 REPAIR OF DAMAGED CONCRETE

All damage found in the concrete after the formwork is open such as honeycombing or
detrimental cracking shall be repaired according to the requirements in ACI 301, Chapter 9 and
COMPANY and it shall be immediately informed following the below requirements:

1. Repair can be performed if the reparation procedure has been approved by COMPANY. All
damage that can decrease the strength of structure, water impenetrability and durability
shall be repaired by applying the approved method.

2. The surface of damage concrete shall be peeled off until it reaches the undamaged surface.
The undamaged surface of concrete shall be examined by COMPANY before being coated
as required.

18 GROUTING AND MORTAR WORK FOR FOUNDATION

Finishing work using grouting and mortar for foundation shall comply with the following
requirements:

1. Grouting work will use special material designed for that purpose, using grouting material of
brand name Sikka Grout 214-11 or equivalent approved by COMPANY.

2. Requirement on the thickness of grouting or mortar shall not be less than 25 mm.

3. The surface of concrete that subject for grouting shall be coarse.

4. The non-shrink grouting shall be used for shoring to support the immense weight and
reciprocating equipment where accuracy should remain maintained.

19 CONCRETE TEST

19.1 Concrete Mix Design Test

1. The mix design test shall be conducted by CONTRACTOR before the concrete work
begins to specify the type and comparison of a mix of cement, sand, gravel, water an
d admixture.
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 25 of 31

2. The result of mix design test shall be put on report and given to COMPANY in the
specified forms as shown in Table-7 below.

Table 7. Result of Concrete Mix Design Testing

No. Testing Material Type / Score


Compressing force 28-days (kg/cm')
Type of cement
Size of maximum gravel (mm)
Slump (cm)
Air content (%)
Water-cement comparison (%)
Sand ratio
Unit water content (kg/m3)
Cement
Total Volume (1/m3) Sand
Gravel
Cement
Weight (kg/m3) Sand
Gravel
Accelerated Admixture (cc/ma) or (gr/m3)
Testing material of 7- days
Test result for old.
Pressing Force
(kg/cm2) Testing material of 28-
days
REMARK

19.2 Compressive Strength Test

The compression test shall be conducted according to the below procedures:

1. The compression test shall be conducted using equipment and laboratory approved
and recommended by COMPANY and shall be in accordance with provisions of in
ASTM C94.

2. The sample taking of concrete for the purpose of compression test shall comply with
standard stated in ASTM C172 with minimum requirements of four testing materials
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 26 of 31

that shall be made based on the standard in ASTM C31 unless it is specified
otherwise.

3. There shall be in the least one testing conducted for each 50 meter cubic or every
concrete structure for each designed mixture of concrete structure or every pouring or
each construction structure to be poured in one specific day. Four testing specimen
must be made for each testing at specified stage.

4. Unless it is specified otherwise, the age of concrete during the compression test shall
be 3, 7, 14 and 28 days.

5. The concrete pressing test is adequate if meeting the below requirements :

a. Out of the 20 scores of the examination results of the testing material


consecutively shall not exceed 1 score of less than fcr (the required concrete
compression stress).

b. The average value acquired from the four examination output of the tested
material consecutively shall not less than (fc' + 0.82Sr), (Sr is deviation value of
the design standard).

c. The difference of the highest and the lowest value in the four examination output
of the tested material consecutively shall not exceed 4.3 Sr.

19.3 Slump Test

1. Testing shall be conducted according to ASTM C143 unless it is specified otherwise.

2. The total slump test shall be specified based on the condition of weather and
condition of the batch mixer. However the testing shall be conducted at least twice a
day, once in the morning and second in the afternoon or 2 slump scores for each
concrete construction.

3. The permitted limit for slump test is as specified in chapter 6.2. Table-1, unless it is
specified otherwise in the drawing.

19.4 Air Content Test

The air content test shall be conducted if requested by COMPANY and shall comply with
the requirements stated in ASTM C138, ASTM C173 or ASTM C231.
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 27 of 31

19.5 Water Loading Test for Concrete Sink

Before pouring the concrete sink, it shall be conducted water loading test, unless
indicated others in the drawing. Water shall be loaded until it reaches the peak point
which is precited to be reached and maintained for minimum 24 hours. Concrete sink
shall only be filled after having approval from COMPANY.

20 CONCRETE WORK AT HOT WEATHER

The conduct of concrete work during hot weather shall be in accordance with provisions of ACI
305.

21 CONCRETE TO CATCH FLUID

Mixture concrete to be used for catching fluid shall be added with admixture/additive to attain
impermeable construction.

22 EVALUATION AND ACCEPTANCE OF CONCRETE (SAMPLING CONCRETE)

22.1 General

Concrete shall be tested in accordance with the requirements of subchapter 22.2 through
22.5. Qualified field testing technicians shall perform tests on fresh concrete at the job
site, prepare specimens required for curing under field conditions, prepare specimens
required for testing in the laboratory, and record the temperature of the fresh concrete
when preparing specimens for strength tests. Qualified laboratory technicians shall
perform all required.

22.2 Frequency of Testing

1. Samples for strength tests of each class of concrete placed each day shall be taken
not less than once a day, nor less than once for each 120 m3 of concrete, nor less
than once for each 500 m2 of surface area for slabs or walls.

2. On a given project, if total volume of concrete is such that frequency of testing


required by subchapter 22.2 point 1 would provide less than five strength tests for a
given class of concrete, tests shall be made from at least five randomly selected
batches or from each batch if fewer than five batches are used.
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 28 of 31

3. When total quantity of a given class of concrete is less than 40 m3, strength tests are
not requiredwhen evidence of satisfactory strength is submitted to and approved by
the building official.

4. A strength test shall be the average of the strengths of two cylinders made from the
same sample of concrete and tested at 28 days or at test age designated for
determination of fc'.

22.3 Laboratory-cured Specimen

1. Samples for strength tests shall be taken in accordance with "Method of Sampling
Freshly Mixed Concrete" (ASTM C 172).

2. Cylinders for strength tests shall be molded and laboratory-cured in accordance with
"Practice for Making and Curing Concrete Test Specimens in the Field" (ASTM C 31)
and tested in accordance with "Test Method for Compressive Strength of Cylindrical
Concrete Specimens" (ASTM C 39).

3. Strength level of an individual class of concrete shall be considered satisfactory if both


of the following requirements are met:

a. Every arithmetic average of any three consecutive strength tests equals or


exceeds fc';

b. No individual strength test (average of two cylinders) falls below fc' by more than
3.5 MPa.

4. If either of the requirements of subchapter 22.3 point 3are not met, steps shall be
taken to increase the average of subsequent strength test results. Requirements of
subchapter 22.5 shall be observed if requirement of subchapter 22.3 point 3(b) is not
met.

22.4 Field-cured Specimen

1. If required by the building official results of strength tests of cylinders cured under field
conditions shall be provided.

2. Field-cured cylinders shall be cured under field conditions in accordance with


"Practice for Making and Curing Concrete Test Specimens in the Field" (ASTM C31).
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 29 of 31

3. Field-cured test cylinders shall be molded at the same time and from the same
samples as laboratory-cured test cylinders.

4. Procedures for protecting and curing concrete shall be improved when strength of
field-cured cylinders at test age designated for determination of fc' is less than 85
percent of that of companion laboratory-cured cylinders. The 85 percent limitation
shall not apply if field-cured strength exceeds fc' by more than 3.5 MPa.

22.5 Investigation of Low Strength Test Result

1. If any strength test (see subchapter 22.2 point 4) of laboratory-cured cylinders falls
below specified value of fc' by more than 3.5 MPa [see subchapter 22.3 point 3(b)] or
if tests of field-cured cylinders indicate deficiencies in protection and curing (see
subchapter 22.4 point 4), steps shall be taken to assure that load-carrying capacity of
the structure is not jeopardized.

2. If the likelihood of low-strength concrete is confirmed and calculations indicate that


load-carrying capacity is significantly reduced, tests of cores drilled from the area in
question in accordance with "Method of Obtaining and Testing Drilled Cores and
Sawed Beams of Concrete" (ASTM C 42) shall be permitted. In such cases, three
cores shall be taken for each strength test more than 3.5 MPa below the specified
value of fc'.

3. If concrete in the structure will be dry under service conditions, cores shall be air dried
(temperature 15 to 25°C, relative humidity less than 60 percent) for 7 days before test
and shall be tested dry. If concrete in the structure will be more than superficially wet
under service conditions, cores shall be immersed in water for at least 40 hours and
be tested wet.

4. Concrete in an area represented by core tests shall be considered structurally


adequate if the average of three cores is equal to at least 85 percent of fc' and if no
single core is less than 75 percent of fc'. Additional testing of cores extracted from
locations represented by erratic core strength results shall be permitted.

5. If criteria of subchapter 22.5 point 4 are not met and if the structural adequacy
remains in doubt, the responsible authority shall be permitted to order a strength
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 30 of 31

evaluation in accordance with ACI 318-99 chapter 20 or SNI 03-2847-2002 chapter


22.

23 QUALITY OF CONCRETE

- All structure/building that have contact


with sulphur during operational = K-350 (f’c 27.6 MPA)
- Exposed Beam = K-350 (f’c 27.6 MPA)
- Exposed Column = K-350 (f’c 27.6 MPA)
- Underground Beam = K-350 (f’c 27.6 MPA)
- Foundation = K-400 (f’c 35 MPA)
- Floor = K-350 (f’c 27.6 MPA)
- Lean floor = K-150 (f’c 13.6 MPA)
- Pipe Sleeper = K-350 (f’c 27.6 MPA)
- Pipe Support = K-350 (f’c 27.6 MPA)

24 PRECAST CONCRETE

24.1 Scope

All provisions of this code, not specifically excluded and not in conflict with the provisions
of this chapter shall apply to structures incorporating precast concrete structural
members.

24.2 General for Precast Concrete

1. Design of precast members and connections shall include loading and restraint
conditions from initial fabrication to end use in the structure, including form removal,
storage, transportation, and erection.

2. When precast members are incorporated into a structural system, the forces and
deformations occurring in and adjacent to connections shall be included in the design.

3. Tolerances for both precast members and interfacing members shall be specified.
Design of precast members and connections shall include the effects of these
tolerances.
GAS PIPELINE DEVELOPMENT FOR CCPP TANJUNG BATU
KALTIMRA PROJECT

Date:
CIVIL SPECIFICATION FOR CONCRETE 29/01/2018
PGTB-CIV-SPC-003 Rev. 0
DESIGN AND MATERIAL Page 31 of 31

4. In addition to the requirements for drawings and specifications, the following shall be
included in either the contract documents or shop drawings:

a. Details of reinforcement, inserts and lifting devices required to resist temporary


loads from handling, storage, transportation, and erection;

b. Required concrete strength at stated ages or stages of construction.

24.3 Concrete Cover for Precast-Concrete

The minimum concrete cover for precast concrete based on SNI 03-2847-2002 shown by
table 8.
Table 8. Minimum Concrete Cover For Precast Concrete
Minimum Concrete
Type Of Structure
Cover (mm)
Concrete exposed to earth or weather:
Wall:
40
- D44 and D56 bars 20
- D36 bars and smaller
Other Members:

- D44 and D56 bars 50


- No. 19 through No. 36 bars 40
- No. 16 bar. MW200 or MD200 wire, and smaller 30
Concrete not exposed to weather or in contact with ground:
Slab. Wall, and joist:
- D44 and D56 bars 30
- D36 bars and smaller 15
Beams Column:
- Primary reinforcement a
- Ties, stirrups, spirals 10
Shells, folded plate members:
- D19 or larger 15
- No. 16 bar, MW200 or MD200 wire, and smaller 10

a*) db but not less than 15 mm and need not exceed 40 mm