DIMENSIONS OF THE SERVICE
Egina is a deep offshore development located in block OML130 in Nigeria operated by TOTAL Upstream Nigeria Limited. The
development is located 150 km from the coast in 1,550m water depth and includes a spread moored FPSO of 240 POB,
associated offloading calm buoy, 2 productions loops connecting six subsea manifolds with 21 production wells and 3
injection lines connecting 23 water injection wells through 52 km of flowlines. An additional 20km gas export line ties in to the
Akpo export pipeline to Amenam. Production is 200 kBPD of oil, 456 kBPD of water and 127 mmscfd of gas export capacity.

Egina OLT Buoy is a Catenary Anchored Leg Moored (CALM) Buoy of about 1000ton weight moored to the seabed at water
depth of about 1445m. It will provide support to two (2) Oil Offloading Lines, the Floating hoses and to the tanker mooring
hawsers.
The buoy mooring system will comprise of chain/wire/chain lines in a semi-taut configuration connected to a spread of 3x3
suction piles. Oil Offloading lines will be two (2) unbonded flexible (20.5 in), transferring the stabilized oil to the buoy located
at about 2km from the FPSO.
Contract Effective Date was April 2013. The management of the Egina integrated project is located in Lagos, supported (as
necessary) by a core of specialists based at Lagos and other locations and including a dedicated team for inspection of
package equipment at vendors’ premises. The project activities and worksites are located within and outside Nigeria. The
OLT Naval Engineer is normally resident based in Lagos with frequent overseas trip with possibility of some missions to Port
Harcourt construction yard.
ACTIVITIES
The OLT Naval architect is responsible for the delivery of the OLT hull and naval systems, in accordance with Contracts
requirements, in particular technical requirements and schedule, ensuring all aspects of the EPCI works are accounted for in
due time. This means:
• Following up the Naval Engineering / Qualification / Procurement activities performed by OLT Contractor
• Follow up OLT contractor engineering regarding mooring design and naval architecture
• Direct the OLT contractor to effective resolution of all interface matter related to OLT naval architecture and mooring
design (RAO).
• Ensuring that Engineering / Qualification / Procurement activities are performed in line with Contracts requirements and
Project Specifications, all within project schedule
• Ensuring that Engineering / Qualification / Procurement activities are performed in line with TOTAL General Specifications
and issue proper derogations, if required
• Ensuring that for the Manufacturing and Fabrication of critical items, ITPs are reviewed in due time by the relevant parties
and are given the right level of attention
• Assisting Manufacturing, Fabrication, Installation and Pre-commissioning activities and leading the resolution of technical
issues when necessary
• Ensuring correct and timely information is provided by OLT contractor to other contractors
• Assisting in interface management with UFR and FPSO Contractors
• Answering OLT Contractor technical queries as necessary
• Ensuring that HSE requirements are taken into consideration during design
• Getting assistance from TOTAL specialists, or third parties, if required, for specific topics
• Providing inputs to contract correspondence, as necessary
• Issuing reports and presentations as necessary
• Participating in various technical reviews (Hazids, Hazops, Project Technical Reviews, Risk Assessments…) and
SERVICE DESCRIPTION – OLT Naval Engineer
ensuring implementation of recommendations as necessary

The OLT Naval architect will also assist the UFR package regarding mooring design and naval architecture subjects.

HSE
• To ensure that all safety and environmental required studies for the OLT Buoy will be reviewed/updated and that final
design will comply with ALARP policy,
• To ensure that the OLT Buoy design will comply with all HSE requirements,
• To attend safety inductions as required and adapt behaviour to fully comply with office security, health and safety
instruction,
• To stay vigilant and maintain continuous awareness of hazard and surroundings,
• To participate to local programmes or initiative to improve HSSE performance,
• To report to Management on any issue or observation and propose way of improvement.
ACCOUNTABILITIES
• Reports directly to the OLT System Leader
• Accountable for the Naval architecture of the OLT in accordance with Contract requirements, in particular technical/ HSE
requirements, within schedule and without undue change to the scope
• Ensure achievement and good coordination of all engineering activities and studies related to execution of OLT Buoy
scope
QUALIFICATIONS / EXPERIENCE REQUIRED
• Graduate degree in a relevant engineering discipline MANDATORY with MSc or equivalent. Pending experience
candidates with BSc may be also given consideration
• 7 years experience in naval architecture and mooring design for deepwater Projects (pending profile, candidates with less
experience and previous exposure to OLT/FPSO EPCI projects will be also given due considerations). Relevant
experience will include development of detail design specifications, performance and / or validation of detail design
calculations for FPSO or OLT.
• Good knowledge of international design codes / standards and TOTAL general specifications
• Good sense of organization, ability to prioritize activities, to identify critical aspects, to propose way forwards, to lead
specialists or third parties, to summarize and present complex design issues including transverse and interfaces matters
• Fully conversant with Naval architecture software (calculation of RAO) and mooring design
Fluent in English both verbally and in writing.
• Geographical mobility is required.