APPENDIX 1

(Part B)

Technical Specifications

For Conversion of PU Foam Production Lines

Alamdar Vapotherm Co.Ltd.

Riyadh, Saudi Arabia

Company data

Description Alamdar Vapotherm Co.Ltd

Ownership 100% Saudi

Export Little to Jordan, Bahrain 5%

MLF fund No

Date ofestablishment: 1976

1. Introduction

Suppliers raw materials

- KPI, Dow, Basf, Bayer, Yantai Wanhua

Choice of technology to phase out HCFC

The technology chosen is Pentane (either N- or I- or I/N-Pentane) for the continuous


sandwich panel and discontinuous block production. The choice of the type of pentane is
further not relevant for the production equipment.

Products produced

2014.07.30 TECHSPECS Alamdar Vapotherm saudi June 2014 1 / 25


APPENDIX 1
(Part B)

Alamdar has a production of continuous sandwich panels and a production of discontinuous


rigid PU blocks.

1) Sandwich panels

Alamdar produces sandwich panels with a width of 60 to 70 cm in thicknesses from 20 to 110


mm. The panels are covered with a flexible facing, glassfibre, bitum paper, Kraft or
aluminium foil paper, which are fed directly into the continuous foaming line. Densities range
from 35 to 50 kg/m3.

2) Discontinuous rigid PU foam blocks.

The blocks in dimensions of 2,5 x 1 x 1 m are produced by mechanical mixing inside a large
bucket and then poured into moveable carriages. The blocks are then cut for producing
panels and pipe insulation halves.

The foams are mainly produced in a density of 35 kg/m3 and occasionally panels are
requested with densities of 50 kg/m3.

Existing machinery in use

1) Continuous sandwich panel line

The continuous line is from 1976 and has a total length of app. 30 m. and the double
conveyor has a working length of 7 m. The conveyor has rubber belts for transporting the
foam.

The mixing head is placed on a radial moving support which is pneumatically activated.

Note that the position sensors are not EX type and need therefore to be considered for the
conversion. The mixing head portal is enclosed inside a box and the work tanks are placed
on top of this box in a separate air conditioned housing.

After the foaming the line consists of side trimming and cutting to length of the panels. The
shreds produced by the trimming and cutting are collected through a suction system into
bags.

Note the bags suction device will be displaced to the outside area in order to avoid any
release of pentane inside the factory.

The line runs with a speed of about 4 to 4,6 m/min and the refilling of the worktanks is done
through intermediate tanks and pumping system. These intermediate tanks are placed inside
an airconditioned room.

2014.07.30 TECHSPECS Alamdar Vapotherm saudi June 2014 2 / 25


APPENDIX 1
(Part B)

Room on top of the foaming machine, abt 4 x 3 m

This picture shows the conveyor and at the end the box in which the foam is poured. Above
the box is the room for placement of the foaming equipment

Foaming portal with pneumatic drive

2014.07.30 TECHSPECS Alamdar Vapotherm saudi June 2014 3 / 25


APPENDIX 1
(Part B)

Cutting and side trimming of the panels.

Suction device for collecting shreds from trimming and cutting.

2) Discontinuous block production:

The machinery basically consists of a stirrer which can be moved up and down. Under the
stirrer a bin is placed which is than stirred and poured into metal moulds.

The moulds are displaced manually and after foaming transported to an outside location. The
room is air-conditioned and can be used for the new equipment according to the needs. The
idea is to replace completely the platform and stirrer with a typical blockfoam machine.

2014.07.30 TECHSPECS Alamdar Vapotherm saudi June 2014 4 / 25


APPENDIX 1
(Part B)

Platform with stirrer

Overall view of the room

Equipment requested for conversion

1) Continuous sandwich panel line

The complete wet part of the production line needs to be replaced with a 4 component high
pressure metering unit inclusive of a new mixing head.

Pumping and tank ancillary equipment for a pentane tank which will be provided by the
beneficiary according to designs of the Contractor (note the pentane tank will be
underground!).

2) Discontinuous blockfoam foaming equipment

A 4 component wet part is requested including a bin for pouring weights up to 200 kg. The
bin must be moveable so that the existing mould carriages can be used.

Common for both machines a safety system consisting of ventilation and gas sensors is
required. The safety system is allowed to be combined with both production lines.

2014.07.30 TECHSPECS Alamdar Vapotherm saudi June 2014 5 / 25


APPENDIX 1
(Part B)

Technical specifications

2. Continuous sandwich panel line

Equipment specification for conversion of continuous sandwich panel line

The offer must include:

1 x High pressure foaming machine with Iso, Polyol, Pentane and activator

1 x Pentane storage equipment

1 x ancillary equipment and services

Note: the pentane tank storage and feed pumps must be suitable for delivering
pentane to the continuous sandwich panel line and the discontinuous rigid PU block
production.

Therefore, the offer should include the following items:

Nr. Description
1 Electrical cabinet - Pentane systems
1 Safety cabinet and equipment
1 Worktank Isocyanate non-flammable blowing agent
1 Worktank Polyol non-flammable blowing agent
1 Worktank activator
1 Metering unit Isocyanate
1 Metering unit Polyol
1 Metering unit activator
1 Metering unit Pentane
1 Mixing head continuous panel suitable for PENTANE
1 Mixing head flexible hoses and mixing head support
1 Pentane storage tank equipment
set Documentation
set Safety whitebook

Performance of metering units, machine output, premix unit, mixing head

High pressure Size of the pump Output of the pump Contractor to enter
Metering unit (cc) (l/min) data of size and
output
Polyol/ Pentane >= 12 cc 2 to 16 l/min …..cc, ……l/min
Isocyanate >= 12 cc 2 to 16 l/min …..cc, ……l/min
Activator 0.5 to 2 l/min …..cc, ……l/min
Pentane 0.5 to 3 l/min …..cc, ……l/min

2014.07.30 TECHSPECS Alamdar Vapotherm saudi June 2014 6 / 25


APPENDIX 1
(Part B)

Electrical power supply of the beneficiary factory:

380 V

60 Hz

3 phase + PE + earth

< +/- 10% power fluctuation

The various items should comply with the below detailed specifications:

Electrical cabinet - Pentane systems

Item Qty. Description Contractor Info


Sufficiently sized for sea level and
Cabinet 1 ambient temperature 40°C with cooling
Electrical parts set International Contractors
Industrial International brand PLC with modules for
computer EX parts
Control panel 1 >5 Inch touch-screen
Contractor has to
explain the foam
Mixing head electrical box for start, stop program selection
(Ex version) and foam program selection and placement of
(the same panel of the main cabinet can control panel or
be used when this is placed outside the provide a price as
Mixhead control machine room, otherwise a second panel option for a second
panel 1 to be provided!) panel.
Electrical wires set According to EU standards
Cable channels set Galvanised steel
Signalisation Acoustical horn, status lamp (3 colours)
Safety barriers for all electrical equipment
EX parts set polyol/pentane side
ATEX, VDE, CE certification according to
Certification EU regulation

Safety cabinet and equipment

Contractor Info
Item Qty. Description
Sufficiently sized for sea level and
Cabinet
1 ambient temperature 40°C with cooling
Electrical parts set International Contractors
Safety gas Gas sensors for conveyor and finishing
sensors prod. 6 line

2014.07.30 TECHSPECS Alamdar Vapotherm saudi June 2014 7 / 25


APPENDIX 1
(Part B)

line
Safety gas 2 gas sensors for foaming machine and 2
sensors foaming sensors for pentane tank which includes
equipment 4 also storage area pentane drums
Ventilation
1 Double ventilator for foaming machine
Double ventilator for conveyor and
Ventilation
1 foaming area
Double ventilator for pentane drum
Ventilation
1 storage area
Around conveyor, foaming machine and
Ventilation
pouring areat with sufficient flow throttle
ducting
set valves and evacuation points
Potential free safety contact for power
Safety contacts
2 shutoff beneficiary power supply
Power shutoff interface with foaming
Interface equipment, premix and dry part
set beneficiary
Remote alarm station with acoustical horn
Remote alarm
1 and status lamp alarm with 50 m cables
Grounding connections for supplied
Grounding equipment and cabling for grounding
1 beneficiary dry part

Worktank Isocyanate
Item Qty. Description Contractor Info
Worktank 1 Volume minimal 250 l, min. 4 bar
Double wall for water cooling with safety
Cooling
1 valve (when required)
Continuous level indicator with min and
Level indicator
1 max alarm
Supermax 1 Separate supermax level sensor
Compressed air pressure regulator with
Pressurization
1 safety valve and water sieve
Safety valve CS or greycast with pressure
Safety valve
1 release rigid piping
Insulation 1 Armaflex or mineral wool with Al covering
Exit valve 1 Manual exit valve
Drainage 1 Manual drainage valve
Stirrer 1 Stirrer and electrical drive motor
External Plate heat exchanger welded
Heat exchanger
1 type, with dT of >5°C
1 PT 100
Membrane pump, capacity >30 l/min, with
pneumatic ball valve, support structure,
Charging pressure regulator, pneumatic control
valve and flexible connection to drum or
1 tankstorage
Rigid steel piping from metering unit to
worktank, flexible piping allowed from
Piping worktank to metering unit, piping for
charging rigid on worktank flexible to
1 membrane pump

2014.07.30 TECHSPECS Alamdar Vapotherm saudi June 2014 8 / 25


APPENDIX 1
(Part B)

Temperature control unit feeding Provide cooling


heatexchanger and double wall worktank power (KW) for the
Temperature
with temperature controller, flex piping, beneficiary chiller.
control
valves, temperature sensor. Heating and Note: Chiller is not in
1 cooling power to be indicated. the scope of supply!

Worktank Polyol

Item Qty. Description Contractor Info


Worktank 1 Volume minimal 250 l, min. 4 bar
double wall for water cooling with safety
Cooling
1 valve (when required)
continuous level indicator with min and
Level indicator
1 max alarm
Supermax 1 Separatesupermaxlevelsensor
compressed air pressure regulator with
Pressurization
1 safety valve and water sieve
safety valve CS or greycast with pressure
Safety valve
1 release rigid piping
Insulation 1 Armaflex or mineral wool with Al covering
Exit valve 1 Pneumatic exit valve
Drainage 1 Manual drainage valve with Lock
Stirrer with Magnetic coupling and
Stirrer
1 electrical drive motor Provide rpm stirrer
External Plate heat exchanger welded
Heat exchanger
1 type, with dT of >5°C
Temperature 1 PT 100
Membrane pump, capacity >30 l/min, with
pneumatic ball valve, support structure,
Charging pressure regulator, pneumatic control
valve and flexible connection to drum or
1 tankstorage
Rigid steel piping from metering unit to
worktank, flexible piping allowed from
Piping worktank to metering unit, piping for
charging rigid on worktank flexible to
1 membrane pump
Temperature control unit feeding heat Provide cooling
exchanger and double wall worktank with power (KW) for the
Temperature
temperature controller, flex piping, valves, beneficiary chiller.
control
temperature sensor. Heating and cooling Note: Chiller is not in
1 power must be indicated the scope of supply!

Work tank Activator “Flammable”

Item Qty. Description Contractor Info


Work tank 1 Volume minimal 250 l, min. 10 bar
double wall for water cooling with safety
Cooling
1 valve (when required)
Level indicator 1 EX - continuous level indicator with min

2014.07.30 TECHSPECS Alamdar Vapotherm saudi June 2014 9 / 25


APPENDIX 1
(Part B)

and max alarm


Supermax 1 EX - separate supermaxlevelsensor
compressed air pressure regulator with
Pressurization
1 safety valve and water sieve
safety valve CS or greycast with pressure
Safety valve
1 release rigid piping
Insulation 1 Armaflex or mineral wool with Al covering
Exit valve 1 EX - Pneumatic exit valve
Drainage 1 Manual drainage valve with Lock
External Plate heat exchanger welded
Heat exchanger
1 type, with dT of >5°C
Temperature 1 EX - PT 100
Membrane pump, capacity >30 l/min, with
EX-pneumatic ball valve, support
Charging structure, pressure regulator, EX-
pneumatic control valve and flexible
1 connection to drum or tank storage
Rigid steel piping from metering unit to
work tank, flexible piping allowed from
Piping work tank to metering unit, piping for
charging rigid on work tank flexible to
1 membrane pump
Temperature control unit feeding heat Provide cooling
exchanger and double wall work tank with power (KW) for the
Temperature
temperature controller, flex piping, valves, beneficiary chiller.
control
temperature sensor. Heating and cooling Note: Chiller is not in
1 power to be indicated the scope of supply!

Metering unit Isocyanate

Item Qty. Description Contractor Info


Swash plate Axial Piston metering pump
Metering unit
1 with hand wheel
Pump size 1 See performance parameters introduction
E-motor 1 Single speed electrical motor, 1500 rpm
E-motor pump Magnetic coupling suitable sized to avoid
coupling 1 overheating
Flowmeter with accuracy +/- 1% output Indicate accuracy,
Flowmeter 1
metering pump type and brand
Suction filter wire edge type with cleaning
Filter
1 handle/knob
Low pressure Digital low pressure gauge 0-50 bar with
gauge 1 display
High pressure Digital High pressure gauge 0-400 bar
gauge 1 with display
Manual high pressure relief valve with
Pump drainage
1 piping
High pressure
valve 1 High pressure ball valve
Low pressure Hydraulic recirculation valve with EX
recirculation 1 solenoid or pneumatic actuated valve
Production Connection with non-return valve on
piping 1 return line to worktank

2014.07.30 TECHSPECS Alamdar Vapotherm saudi June 2014 10 / 25


APPENDIX 1
(Part B)

Piping 1 Carbon Steel


Spillage Metal or plastic removable collection
collection 1 basin underneath complete metering unit

Metering unit Polyol

Item Qty. Description Contractor Info


Swashplate Axial Piston metering pump
Metering unit
1 with handwheel
Pump size 1 See performance parameters introduction
E-motor 1 Single speed electrical motor, 1500 rpm
E-motor pump Magnetic coupling suitable sized to avoid
coupling 1 overheating
Flowmeter with accuracy +/- 1% output Indicate accuracy,
Flowmeter 1
metering pump type and brand
Suction filter wire edge type with cleaning
Filter
1 handle/knob
Low pressure
gauge 1 Digital low pressure gauge 0-50 bar
High pressure
gauge 1 Digital High pressure gauge 0-400 bar
Manual high pressure relief valve with
Pump drainage
1 piping
High pressure
valve 1 High pressure ball valve
Low pressure Hydraulic recirculation valve with EX
recirculation 1 solenoid or pneumatic actuated valve
Production Connection with non-return valve on
piping 1 return line to worktank
Piping 1 Carbon Steel
Spillage Metal or plastic removable collection
collection 1 basin underneath complete metering unit

Metering unit Activator


Item Qty. Description Contractor Info
Indicate pump brand
Metering unit 1 Double high pressure membrane Pump
and type
Single speed electrical motor, 1500 rpm
E-motor 1
with Frequency control
Flowmeter with accuracy +/- 1% output Indicate accuracy,
Flowmeter 1
metering pump type and brand
Suction filter wire edge type with cleaning
Filter 1
handle/knob
Low pressure
1 Digital low pressure gauge 0-50 bar
gauge
High pressure
1 Digital High pressure gauge 0-50 bar
gauge
Temperature
1 PT100
sensor
Pump manual high pressure relief valve with
1
drainage piping
High pressure 1 High pressure ball valve

2014.07.30 TECHSPECS Alamdar Vapotherm saudi June 2014 11 / 25


APPENDIX 1
(Part B)

valve
Low pressure Hydraulic recirculation valve with EX
1
recirculation solenoid valve
Spillage Metal or plastic removable collection basis
1
collection underneath complete metering unit

Metering unit Pentane


Item Qty. Description Contractor Info
Indicate pump
Metering unit 1 Double high pressure membrane Pump
brand and type
Single speed electrical motor, 1500 rpm with
E-motor 1
Frequency control
E-motor pump Magnetic coupling suitable sized to avoid
1
coupling overheating
Indicate
Flowmeter with accuracy +/- 1% output
Flowmeter 1 accuracy, type
metering pump
and brand
Suction filter wire edge type with cleaning
Filter 1
handle/knob
Low pressure
1 EX-Digital low pressure gauge 0-50 bar
gauge
High pressure
1 EX-Digital High pressure gauge 0-50 bar
gauge
Temperature
1 EX-PT100
sensor
Pump drainage 1 manual high pressure relief valve with piping
High pressure
1 High pressure ball valve
valve
Low pressure Hydraulic recirculation valve with EX solenoid
1
recirculation valve
Spillage Metal or plastic removable collection basis
1
collection underneath complete metering unit

Mixing head suitable for PENTANE

Item Qty. Description Contractor Info


Mixing head 1 Straight type with pouring rake
Output max. 1 See performance parameters introduction
Suitable for range of output with 3 sets of
Size head
1 rakes and 3 sets of nozzles
Position 1 Vertical pouring
Cleaning 1 1 piston for air or hot water cleaning
Movement 1 Mounting bracket for existing manipulator
Control box 1 N/A
Actuation 1 Hydraulic/ pneumatic

Mixing head Boom

2014.07.30 TECHSPECS Alamdar Vapotherm saudi June 2014 12 / 25


APPENDIX 1
(Part B)

Item Qty. Description Contractor Info

The beneficiary is using the press and has a support for the flexible hoses etc. in order to
provide a suitable installation the following is requested

Mixhead support 1 Mixhead bracket for horizontal foaming

Set of drawings for flexible hoses support


Flexible hoses and guide. The beneficiary will provide
guide set and install the system.

Replacement of sensors and position


indicators according to the safety concept
Electrical parts set put in place

Static or dynamic mixer of Polyol, Activator and pentane


Item Qty. Description Contractor Info
Provide detailed
High pressure Variable speed dynamic mixer or
Mixer 1 system
static mixing system
description
Air/N2 High pressure Air/N2polyol nucleation with static
1
nucleation mixer and Air/ N2flowmeter
inlet ports for Polyol, pentane, activator and future
Inlet ports 5
additional activator/polyol with non-return valves
E-motor 1 EX type motor variable speed drive
E-motor
pump 1 Magnetic coupling
coupling
Rigid piping to HP machine and connection to
Piping 1
mixhead with flexible hoses
Depending on the technology chosen the pentane
Static mixer 1
is allowed to be mixed in-line with a static mixer

Rigid Steel piping / mixhead electrical cables

Item Qty. Description Contractor Info


Set of rigid piping for supply of
HP machine to polyol/pentane, Isocyanate and
dry part Abt. hydraulics to be purchased by the
10m beneficiary from HP machine to dry part
Abt Piping to fill the HP machine work tank to
Premix unit to
50 be supplied and installed by beneficiary
HP machine
m according to specification of Contractor
Supports and Provided by beneficiary according to

2014.07.30 TECHSPECS Alamdar Vapotherm saudi June 2014 13 / 25


APPENDIX 1
(Part B)

fixation Contractor design


PU or other type of insulation >20 mm
Insulation
50m thickness
Flexible hoses for hydraulics,
Polyol/Pentane and Isocyanate to the Contractor must
Flexible hoses
App mixing head to be provided by the include in the scope
20m CONTRACTOR. of supply
Contractor must
Mixhead
Set of electrical cables according to include in the scope
electrical cables
set required length of supply

Note the HP machine must be suitable dimensioned for the above indicated piping lengths

Note the beneficiary will provide a suitable room for placement of the machine

All the piping lengths are approximate

Pentane tank storage equipment

Item Qty. Description Contractor Info


Double membrane pumps with pulsation
damper or pump according to choice of Indicate clearly
Feed pumps
the Contractor with sufficient output for output and type of
Set the production line pump proposed
Pressure sensor 1 Pressure manometer or guage
Temperature
sensor 1 PT 100 in feed line
Set of ball valves pneumatically operated
Tank charging
1 and grounding plier for loading by gravity
Double wall Leakage control device for double wall of
leakage control 1 the tank
Pressure Pressure relief valve on feed line to
keeping valve 1 metering pump continuous line
Pressure Pressure relief valve on feed line to
keeping valve metering pump discontinuous block
discount. block 1 foaming equipment
Safety valve 1 Safety valve
Level control 1 Continuous level control
Safety valve, pressure regulator and
Tank blanketing ancillary equipment for tank blanketing
1 with Nitrogen
Electrical cabinet for control of the pumps,
interface with production equipment,
Electrical control
grounding and tank loading inclusive of
1 acoustical horn and warning lamps
Standards All equipment for ATEX Zone 0
Drawing for double wall pentane tank 5 to
Drawings
Set 20 T for the underground storage

Note: the pentane tank equipment must be suitable to feed Pentane to the continuous
production line and the discontinuous block foam line.

2014.07.30 TECHSPECS Alamdar Vapotherm saudi June 2014 14 / 25


APPENDIX 1
(Part B)

Documentation

Necessary documentation to be provided


Nr. Description
1+1 User manual
1+1 Maintenance and repair manual
1+1 Spare parts manual
List of certifications, ATEX, CE, Pressure vessel, safety valves etc. of all
1+1
components
1+1 Electrical cabinet VDE, CE certification according to EU
1+1 Electrical cabinet electrical diagram
Whitebook with layout of the factory (dwg drawing will be provided by the
beneficiary) and description of all the safety measures taken for the use of
1+1
Pentane. This whitebook shall be according to TüV standards and can upon the
decision of the beneficiary be submitted to the TüV.
Full installation report with settings of the machinery, verification of all safety
1+1
systems, commissioning record and final drawings, electrical schematic.
1+1 Layout drawings for premix room and pentane storage area
1+1 Layout drawings for High pressure foaming machine
1+1 Drawings for mixing head guide and support system
Drawings for the local manufacture of a 5 to 20 T pentane tank for the
1+1
underground storage

Language manual and all component manuals: ENGLISH

All manuals in hard and electronic copy

2014.07.30 TECHSPECS Alamdar Vapotherm saudi June 2014 15 / 25


APPENDIX 1
(Part B)

3. Discontinuous block production

Equipment specification for discontinuous rigid PU block foaming.

Type of
Rigid
foam:
Discontinuous blocks
Width: abt. 1 m
Product: Length: 2 to 6 m
Height: 1,2 . 1,5 m

Density: 35 to 50 kg/m3
Mixture ratio Abt. 1:1.5 and for special applications 1:2,5
Raw
materials Polyol, MDI, Pentane
used:
Viscosity MDI and Polyol up to 3000 mPas.

Qty. Description

1 x Foaming machine consisting of:

1 Electrical cabinet

1 Safety system

1 Work tank Polyol

1 Work tank Isocyanate

1 Work tank Pentane

1 Drum pump, Pentane

1 Metering unit,Iso

1 Metering unit, Pol


1 Metering unit, Pentane
1 Mixing cylinder 150 to 200 kg
1 Steel structure
Set Documentation
Set Safety whitebook

2014.07.30 TECHSPECS Alamdar Vapotherm saudi June 2014 16 / 25


APPENDIX 1
(Part B)

Performance of metering units, machine output, premix unit, mixing head

Contractor to
pump size Capacity (indicative) enter data of size
and output
…..cc, ……l/min
Polyol Abt. 25 to 50 l/min
…..cc, ……l/min
Iso Abt. 60 – 70 l/min
…..cc, ……l/min
Pentane Abt. 10 l/min

Catalyst Will be added manually, DMCHA and Niax

Electrical power supply of the beneficiary factory:

380 V

60 Hz

3 phase + PE + earth

< +/- 10% power fluctuation

E-cabinet

Item Qty. Description Contractor Info


Sufficiently sized and ambient
Cabinet 1
temperature 40°C, with cooling
Indicate
According to EU standards brand/models
Electrical parts set
contactors,
switches
Industrial PLC with modules for EX parts Indicate
Set
computer brand/model
At least 20 programmable recipes
Number of
including mixture ratio, stirrer speed
recipes
and time.
>5 Inch touchscreen, control panel
with start, stop and foam program Indicate
Control panel 1
selection, variation of output to be brand/model
placed outside ATEX zone
standards to be
Electrical wires set according to EU standards
indicated

Cable channels set galvanised steel

Acoustical horn, status lamp (3


Signalisation 1
colours)
Safety barriers for all electrical
EX parts set provide details
equipment polyol/pentane side

2014.07.30 TECHSPECS Alamdar Vapotherm saudi June 2014 17 / 25


APPENDIX 1
(Part B)

Safety cabinet

Item Qty. Description Contractor Info


Sufficiently sized and ambient
Cabinet 1
temperature 40°C, with cooling
Indicate
Electrical According to EU standards brand/models
set
parts contactors,
switches.
Control panel with status indication
Control panel 1 and indication of status individual
gas sensors, ventilators.
This is a minimum
2 sensors for the machine, 2 requirement if
Safety gas
sensors for foaming area and 2 more are needed
sensors 6
spare sensors, placement to be the Bidder has to
defined indicate and quote
separately.
Ventilation Double ventilator for foaming
foaming 1 machine and storage area pentane
equipment inclusive of flow sensor.
Ventilation double ventilator for moulds
1
foaming area inclusive of flow sensor
around complete foaming machine,
storage area 5 x 5 m and foaming
Ventilation
set area 8 x 3 m with sufficient flow
ducting
throttle valves and evacuation
points
Potential free safety contact for
Safety
power shut-off beneficiary power
contacts
supply
Emergency alarm buttons to be
placed in storage area, foaming
Emergency area and production hall. Equipped
buttons 3 with glass cover.
Lamps indicating the safety status
(yellow 15% LEL, red 30% LEL,
green no alarm) inclusive horn to
Signalisation be placed around the production
alarm status 3 line.
Remote alarm station with
Remote alarm 1 acoustical horn and status lamp
alarm with 100 m cables
Grounding connections for supplied
Grounding equipment and cabling for
grounding beneficiary dry part

2014.07.30 TECHSPECS Alamdar Vapotherm saudi June 2014 18 / 25


APPENDIX 1
(Part B)

Drum pump Pentane

Item Qty. Description Contractor Info


Membrane pump, capacity >5 l/min,
with EX-pneumatic ball valve,
support structure, pressure regulator, Indicate pump
Charging 1
EX-pneumatic control valve and capacity
flexible connection to drum rigid to
worktank.
Hoses 1set Flexible hose abt. 3 m
Nitrogen pressure regulator for
Nitrogen
1 blanketing of the drum inclusive of
blanketing
hose
Grounding plier for connection to the
Grounding plier 1
drum and sufficient grounding wire-

Work tanks Polyol and Isocyanate

Item Qty. Description Contractor Info


Work tank 1+1 Volume minimal 250 l, 4 bar Indicate tank volume
double wall for water cooling with
Cooling 1+1
safety valve (when required)
continuous level indicator with min
Level indicator 1+1
and max alarm

Supermax 1+1 Separate super max level sensor


compressed air pressure regulator
Pressurization 1+1 with safety valve, water sieve and
silicagel air filter
safety valve CS or greycast with
Safety valve 1+1
pressure release rigid piping
Armaflex or mineral wool with Al
Insulation 1+1
covering
Exit valve 1+1 Pneumatic exit valve
Drainage 1+1 Manual drainage valve with lock
Temperature 1+1 PT 100

Rigid steel piping from premix and


metering unit to worktank, flexible
Piping 1+1
piping allowed from worktank to
metering unit

2014.07.30 TECHSPECS Alamdar Vapotherm saudi June 2014 19 / 25


APPENDIX 1
(Part B)

Work tank Pentane

Item Qty. Description Contractor Info


Work tank 1 Volume minimal 50 l, 4 bar Indicate tank volume
double wall for water cooling with
Cooling 1
safety valve (when required)
EX continuous level indicator with
Level indicator 1
min and max alarm
EX separate super max level
Supermax 1
sensor
Nitrogen pressure regulator with
Pressurization 1
safety valve, water sieve
safety valve CS or greycast with
Safety valve 1
pressure release rigid piping
Armaflex or mineral wool with Al
Insulation 1
covering
Exit valve 1 EX Pneumatic exit valve
Drainage 1 Manual drainage valve with lock
Temperature 1 PT 100

Rigid steel piping from premix and


metering unit to worktank, flexible
Piping 1
piping allowed from worktank to
metering unit

Metering unit Isocyanate

Item Qty. Description Contractor Info

Indicate pump brand


Metering unit 1 Screw or gear pump
and type

E-motor 1 electrical motor

E-motor pump Magnetic coupling suitable sized to


1
coupling avoid overheating
Flowmeter with accuracy +/- 1% Indicate accuracy,
Flowmeter 1
output metering pump type and brand
Suction filter wire edge type with
Filter 1
cleaning handle/knob
High pressure Digital delivery side pressure
1
guage gauge
manual high pressure relief valve
Pump drainage 1
with piping

2014.07.30 TECHSPECS Alamdar Vapotherm saudi June 2014 20 / 25


APPENDIX 1
(Part B)

valves set ball valve suction and delivery side


connection with non-return valve
Production piping 1
on return line to worktank
Piping 1 Carbon Steel
Metal or plastic removable
Spillage collection 1 collection basis underneath
complete metering unit

Metering unit Polyol

Item Qty. Description Contractor Info

Indicate pump brand


Metering unit 1 Screw or gear pump
and type

E-motor 1 electrical motor

E-motor pump Classical coupling suitable sized to


1
coupling avoid overheating
Flowmeter with accuracy +/- 1% Indicate accuracy,
Flowmeter 1
output metering pump type and brand
Suction filter wire edge type with
Filter 1
cleaning handle/knob
High pressure Digital delivery side pressure
1
guage gauge
manual high pressure relief valve
Pump drainage 1
with piping
valves set ball valve suction and delivery side
connection with non-return valve
Production piping 1
on return line to worktank
Piping 1 Carbon Steel
Metal or plastic removable
Spillage collection 1 collection basis underneath
complete metering unit

Metering unit Pentane

Item Qty. Description Contractor Info

Indicate pump brand


Metering unit 1 Screw or gear pump
and type

E-motor 1 EX electrical motor

E-motor pump Magnetic coupling suitable sized to


1
coupling avoid overheating
EX Flowmeter with accuracy +/- Indicate accuracy,
Flowmeter 1
1% output metering pump type and brand

2014.07.30 TECHSPECS Alamdar Vapotherm saudi June 2014 21 / 25


APPENDIX 1
(Part B)

Suction filter wire edge type with


Filter 1
cleaning handle/knob
High pressure EX Digital delivery side pressure
1
guage gauge
manual high pressure relief valve
Pump drainage 1
with piping
valves set ball valve suction and delivery side
connection with non-return valve
Production piping 1
on return line to worktank
Piping 1 Carbon Steel
Metal or plastic removable
Spillage collection 1 collection basis underneath
complete metering unit
A dedicated housing for the pump
is required for connection to an
Pump housing 1 evacuation system – in this
housing also the worktank is
allowed

Note: all the electrical components used shall be rigorously EX for zone 0! The bidder has to
confirm the use of EX components in his quotation.

Mixing cylinder 150 – 200 kg

Item Qty. Description Contractor Info


Steel cylinder attached to vertical
Mixing cylinder 1
movement system
Flange placed on top cover with
Exhaust flange 1 flexible ventilation hose for removal of
exhaust gasses
Propeller or disk type stirrer( mixer)
Stirrer 1 with variable speed to be set on
control panel – EX certified
E-motor stirrer 1 Variable speed EX electrical motor
E-motor stirrer Magnetic or liquid coupling suitable
1
coupling sized to avoid overheating
5 m with guidance and support for
Flexible piping set
friction free movement
Electrical wiring set support for electrical wires

Mixing cylinder
1 Pneumatic lid cylinder with sealing
opening lid
Manipulator for up and down
movement of the cylinder, moulds
height from floor abt. 20-30 cm, height Provide details of the
Manipulator 1
of moulds side walls1,5 m. The up manipulator
and down movement is to be actuated
pneumatically or electrically.

2014.07.30 TECHSPECS Alamdar Vapotherm saudi June 2014 22 / 25


APPENDIX 1
(Part B)

Cleaning of System for cleaning of the cylinders Provide details of the


1
mixing cylinder with hot water cleaning method

Steel structure for metering pumps, work tanks and mixing cylinder
Item Qty. Description Contractor Info

Carbon steel structure ground paint


Steel structure 1
and RAL finish

Documentation
Nr. Description
1+1 User manual
1+1 Maintenance and repair manual
1+1 Spare parts manual
List of certifications, ATEX, CE, Pressure vessel, safety valves etc. of all
1+1
components
1+1 Electrical cabinet VDE, CE certification according to EU
1+1 Electrical cabinet electrical diagram
Whitebook with layout of the factory (dwg drawing will be provided by the
beneficiary) and description of all the safety measures taken for the use of
1+1
Pentane. This whitebook shall be according to TüV standards and can upon the
decision of the beneficiary be submitted to the TüV.
Full installation report with settings of the machinery, verification of all safety
1+1
systems, commissioning record and final drawings, electrical schematic.
1+1 Layout drawings for premix room and pentane storage area
1+1 Layout drawings for High pressure foaming machine
1+1 Drawings for mixing head guide and support system
Drawings for the local manufacture of a 5 to 20 T pentane tank for the
1+1
underground storage

- Language manual and all component manuals: ENGLISH


- All manuals in hard and electronic copy

4. Local Works (provided by the Beneficiary)


The beneficiary will provide the following:

- Room with air conditioning for storage of raw materials


- Room for Pentane drums and premix unit according to drawings of Contractor
- Electrical power supply to the E-cabinets of the Contractor equipment
- Compressed air 6 bar minimum and piping to the HP machine
- Nitrogen for blanketing of Polyol/pentane worktank and piping to the HP machine
(bottles)
- Chilled water for cooling HP machine
- Ventilation ducting to the roof of the factory from the ventilators upwards
- Grounding of the press and provision of grounding points according to Contractor
indication
- Water heating of the presses
- Power shut-off switch activated by potential free contact of Contractor safety system

2014.07.30 TECHSPECS Alamdar Vapotherm saudi June 2014 23 / 25


APPENDIX 1
(Part B)

- Antistatic floor when required


- Polyol/Pentane piping from the premix unit to the HP machine worktank
- All required legal allowances
- Sufficient raw materials for testing
- Civil works (works related to the installation of the foaming machines)

5. Training

Training on site at the Project Counterpart

The Contractor shall provide 3 days training. All costs for flight, board and room shall be
borne by the Contractor. Local transport will be provided by the beneficiary as well as lunch.

The training shall start after the commissioning has been finished and acceptance signed.

6. Implementation/Installation/Personnel

Contractor scope

Bidders shall specify in their proposals the implementation schedule as well as the number,
details, and CVs of key personnel.

The beneficiary will provide 1 Electrical-, 1 Mechanical engineer as well as sufficient


workers. Specific lifting equipment and tools required for the installation should be timely
notified by the Contractor to the beneficiary.

All costs for flight, board and room shall be borne by the Contractor. Local transport will be
provided by the beneficiary as well as lunch.

Responsibilities of the Beneficiary

Based on the final detailed technical information provided by the Contractor, the beneficiary
will prepare all required local works. One month before shipment of the equipment the
Contractor has the right to visit the installation site and verify the status of work. In case of
severe deviations by either party, the parties agree to inform each other so that eventual
delays can be discussed on a timely basis.

Safety verification

The verification of the proper installation performed by the Contractor in full compliance with
the Whitebook shall be performed jointly by the Contractor and the beneficiary and shall be
properly documented.

7. After Sales Service


During the first year of operation a minimum of two visits of service engineers should be
envisaged by the Contractor for trouble shooting and general after sales service. One
engineer visit after one calendar quarter and one visit at the end of the warranty period.

2014.07.30 TECHSPECS Alamdar Vapotherm saudi June 2014 24 / 25


APPENDIX 1
(Part B)

If some problems concerning equipment and technology occur during the process of
production and the beneficiary cannot resolve them, also through assistance with other
means of communication, the Contractor shall send proper qualified personnel to the
beneficiary site assisting to resolve the problems.

The expenses in connection with such work shall be borne by the Contractor in case these
problems are attributed to the equipment or technology during the warranty period. In case
the problems are due to wrong handling of the equipment the beneficiary shall bear the costs
of the not programmed after sales service visits.

8. Warranty period
12 months from the date of final acceptance but not longer than 24 months after shipment

9. Packaging and transport conditions


Packaging for sea transport INCOTERMS 2010, DAP Riyadh, Kingdom of Saudi Arabia,
shall be performed by the Contractor, by duly considering the type and nature of the
equipment.

10. Timeline
The delivery of equipment has to be accomplished no later than six (6) months of contract
signature. The installation and commission shall be accomplished not later than two (2)
months after the delivery of equipment at work site.

2014.07.30 TECHSPECS Alamdar Vapotherm saudi June 2014 25 / 25