Sl NC Issue Description Location Corrective Action Plan Respective Authority Completed BY
No 01 Electrical LT-BBT Riser Electrical Need to set As per Energypac Engineering Ltd. (BBT EEL Switchgear Neutral Neutral Room, Ground standard Section) Not Set as Standard Not Set as Proper Floor Size 02 Electrical LT-BBT Riser ECC Electrical Need to set As per Energypac Engineering Ltd. (BBT EEL Switchgear ECC Not Not Set as Proper Room, Ground standard Section) Set as Standard Size Floor 03 TAP off Box internal TAP Off Box 1st floor to 5th Need to set As per Energypac Engineering Ltd. (BBT EEL wiring Not Set as internal wiring Not Floor standard Section Standard Set as Proper Size of cable, like Phase, neutral 7 ECC 04 TAB front Door Not TAB front Door not 1st floor to 5th Need to cut front door Energypac Engineering Ltd. (BBT EEL Close. Properly closed Floor as per size of breaker Section due to Breaker knob. knob not operate properly 05 System earthing Substation Utility area Need to install as per Energypac Engineering Ltd. Will Done EFL Undersize Earthing not done standard of BNBC (Transformer) (already take one as per standard. quotation) 06 Generator earthing Generator Utility area Need to install as per Energypac Power Generation Ltd. Will Done EFL Undersize Earthing not done standard of BNBC (already take one as per standard. quotation) Energypac Fashions Ltd. Electrical audit Report
Sl NC Issue Description Location Corrective Action Plan Respective Authority Completed BY
No 07 Electrical as Built Factory need to Factory-2 Need to make SLD EFL EFL drawing Not found develop as built electrical drawing 08 Ventilation at Need to make a All electrical Will set a exhaust fan of EFL EFL electrical duct room Proper duck room each room (Thermographic Ventilation Spot Category -2) system 09 Danger Sign Need a danger All electrical We will set a sign of EFL EFL sign in front of all duck room Danger in front of DB DB MDB and MDB and electrical duct electrical duct room room 10 Multiple Looping At There is a 5th floor Fusing We will remove all EFL EFL TAB Multiple Looping area looping within one week at TAB.