You are on page 1of 90

COMMITTED TO EXCELLENCE

COMPANY PROFILE

www.jec.qa T +974 4040 9600, F +974 4040 9797, P.O.Box 22801, Doha - Qatar | info@jec.qa
ALJABER ENGINEERING | CORPORATE PROFILE 1

CONTENTS
02 CHAIRMAN’S MESSAGE
03 VISION & MISSION
04 CEO’S MESSAGE
05 COMPANY PROFILE
09 CAPABILITIES
17 PROJECTS PORTFOLIO
28 SELECTED PROJECTS
29 HIGHWAYS, ROADS AND INFRASTRUCTURE
54 OIL & GAS, PETROCHEMICAL AND INDUSTRIAL PROJECTS
61 PIPELINE CONSTRUCTION
64 POWER GENERATION, SUBSTATIONS AND DESALINATION PLANTS
67 SEWAGE TREATMENT PLANTS, DISTRICT COOLING PLANTS AND PUMPING STATIONS
70 LANDMARK BUILDINGS
74 RESOURCES
82 AFFILIATES

JEC_PRO_VER_5_JUNE_2017
CHAIRMAN’S MESSAGE
In response to our Nation’s Vision and enhanced economic growth, AlJaber Engineering has consistently
been involved in the development of Qatar’s construction market and is proud to be recognized as one
of the largest general contractors in Qatar.

With diversified, yet distinguished, construction capabilities in the Qatari market, JE has
successfully completed several prestigious projects and continue to participate in large scale
projects; both independently or in joint venture with international companies.

JE’s future challenge in this dynamic market, is to take full advantage of its competitiveness
and available opportunities. From this perspective, JE has been restructured to become
recognized with high competence in the market to the highest international standards.

We are all working together to support JE’s Mission to deliver projects for the benefit of
our clients, partners, employees and the society.

Mohamed Sultan Al Jaber


Chairman
ALJABER ENGINEERING | CORPORATE PROFILE 3

OUR VISION
JEC’s vision is to be Qatar’s premier general contractor always striving to deliver construction works to complex projects
with excellence. Our track record has proven that regardless of all challenges, we deliver the work to the highest
standards on time and on budget.

OUR MISSION
AlJaber Engineering endeavors to be the market leader and preferred general contractor, widely
recognized for superior construction expertise. We achieve consistency in the delivery of high quality
services and add value for clients through proactivity, transparency in communication, timely
completion of projects, and high quality performance. We practice sustainability to safeguard
our environment, and maintain the highest levels of professionalism, honesty, and trust in our
relationships with clients, employees, and affiliates.
WELCOME MESSAGE
From a modest beginning in 1995, to becoming a leading contractor in Qatar, the emergence of AlJaber
Engineering evolved through a journey that has taken just over two decades of planning, hard work and
dedication. This commitment has made AlJaber Engineering a recognized brand for the successful
delivery of numerous prestigious projects in the State of Qatar.

Under the leadership of His Highness The Emir, Sheikh Tamim bin Hamad Al Thani, together with
Qatar National Vision 2030, our country is rapidly emerging as an international business and
travel hub, playing host to a variety of international conferences and sports events. This vision
has culminated in Qatar’s successful bid to host the FIFA World Cup 2022. AlJaber Engineering
and its affiliates are proud to have been entrusted to participate in the construction of several
venues and the country’s infrastructure.

AlJaber Engineering is firmly committed to Quality, Health, Safety and the Environment.
We continue to invest in qualified talent and modern equipment to undertake large
and complex projects. Our management leads a workforce of over 12,000, who are
trained to industry’s best practices and operate to fully accredited and ISO certified management systems. This enables us to achieve our goal of
successfully delivering large-scale projects and expanding our operations into the region, where we hope to replicate our local success.

We are proud of our achievements and are committed to further enhancing our capabilities to ensure that we remain at the forefront of the
industry, responding to the needs of Qatar and the region.

Osama Hadid
Chief Executive Officer
ALJABER ENGINEERING | CORPORATE PROFILE 5

COMPANY PROFILE
AlJaber Engineering (JEC) is a leading general contractor based in the State of Qatar. Established in 1995 as part of Al Jaber
Group - a major conglomerate with over 30 companies- JEC has successfully completed numerous large-scale turnkey
projects for many prestigious clients in different sectors including:

• Highways, Roads and Infrastructure


• Engineering, Procurement, Installation & Commissioning (EPIC)
• Oil, Gas, Petrochemical and Industrial
• Pipeline Construction
• Power Generation, Substations & Desalination Plants
• Sewage Treatment Plants and Pumping Stations
• Maintenance of Oil & Gas and Petrochemical Installations
• Landmark Buildings

Our commitment to execute projects with the highest quality, on schedule and within budget while
adhering to excellent standards of health, safety and environmental positioned JEC to be recognized
as an icon in the construction community in Qatar. We have recently established an office in Iraq to
undertake projects in contribution to the large ongoing developments.

In line with the growing demands to build Qatar’s infrastructure and new developments, JEC has
invested in its resources to meet international standards and upgraded its fleet of equipment in
preparation to participate in upcoming diverse projects.
LEGAL & FINANCIAL STATEMENT
Certificate Document No. Expiry Date
Trade License 25964 03-06-2018
Commercial Registration 21753 10-08-2017
Contractor’s Classification Certificate 1602 28-01-2020
KAHRAMAA Grade “A” Contractors Certificate 1028 04-04-2018
Fire Alarm Certificate 1381 16-08-2017
Fire Protection (Defence) Certificate 1381 16-08-2017

ANNUAL TURNOVER ( Million USD )


900

824 e
800

712
700

600

500

450

400

310
300
273

236

190 201
200

100

2009 2010 2011 2012 2013 2014 2015 2016


ALJABER ENGINEERING | CORPORATE PROFILE 7

Key Personnel
SL. Name Position
01 Osama Hadid Chief Executive Officer

02 Hisham Hadid Executive Director & Deputy CEO

03 Murad Dghaish Executive Director - MEP

04 Amr Nadim Operations Director

05 Baris Nazlim Operations Director

06 Hassan Dajani Business Development Director

07 Bassam Barhoumi Commercial Director

08 Mustafa Qaddoura Operations Director M&E

09 Hisham Obeidat Director Plant & Assets

10 Carlos Haddad Estimation Manager

11 Mohamed Hegazy Procurement Manager

12 Mohamed Al Smadi Engineering Manager

13 Bedros Bidanian Projects Controls Manager

14 Thaer Abu Shaikha Finance & Accounts Manager

15 Anas Al Ereksousi HR Manager


CLIENTS

AlJaber Engineering has successfully associated with many prestigious clients from different industries such as:

Oil & Gas, Petrochemical & Industrial

Large International EPC Contractors

Government Clients

Large Developers
ALJABER ENGINEERING | CORPORATE PROFILE 9

CAPABILITIES
ALJABER ENGINEERING | CORPORATE PROFILE 11

HIGHWAYS, ROADS AND INFRASTRUCTURE


AlJaber Engineering is a leading general contractor executing Highways, Roads, Infrastructure and mega earth
moving projects.

JEC FOCUS AREAS ARE:


• Highways and roads.
• Underpasses, bridges and interchanges.
• Major earth and reclamation works.
• Turnkey Infrastructure Projects.
• Site development works for industrial and petrochemical plants.
• Pipeline construction (water, sewage and drainage).
• Treated sewage effluent system (TSE).
• Drainage and sewage systems.
• Electrical and telecommunication networks.
• Street lighting.
• Signalization and traffic light systems.
• Tunneling including related electrical and mechanical works.

JEC STRENGTH INCLUDES;


• JEC owns the largest fleet of construction and earthmoving equipment in the state of Qatar.
• Concrete supply through JEC affiliated company Al Wataniya, Total production capacity 100,000m3/
month in four different locations (Lusail, Doha, Mesaieed and Ras Laffan).
• Asphalt works through JEC Affiliated company Al Jaber Makhlouf with own fleet of equipment for
production and delivery of Asphalt, total capacity of 10,000 tons/day.
• JEC owns onsite crushing and screening plants utilized for production of fill, structural fill, sub base
and other crushed products.
PETROCHEMICAL, INDUSTRIAL
AND OIL AND GAS
AlJaber Engineering has been a key contractor involved in design, procurement and
construction of turnkey projects related to the following:

• EPIC projects • Waste management facilities

• Oil & Gas facilities • Water treatment plants

• Power and desalination plants • Water transmission systems

• Petrochemical plants • Tanks and reservoirs


• Maintenance of petrochemical and
• Industrial plants
industrial installations
• Sewage treatment plants • HV substations

JEC STRENGTH INCLUDES:

Engineering
JEC has a highly qualified technical team to manage the requirements and performance of
design sub-contractors including any specialized services such as HAZOP.

Procurement
Our Procurement team has extensive experience in managing and performing procurement
activities for large EPIC contracts.

Construction
JEC construction team has worked on complex projects, with technical experience to meet
international contracting standards and capable to perform high-profile projects.
ALJABER ENGINEERING | CORPORATE PROFILE 13

CIVIL WORKS
• Underground and elevated concrete structures
• Silos
• Cooling towers
• Precast concrete pipe racks
• Culverts
• Structural steel works
• Industrial buildings
• Underground utility networks
• Road works
• Fencing

MECHANICAL WORKS
• Supply, fabrication and erection of major process static equipment
• Process piping and Pipelines
• Fire fighting systems
• Pipe gantry’s and support systems
• Cranes
• Supply and erection of rotary equipment
• HVAC systems
• Insulation, Painting and scaffolding works

ELECTRICAL & INSTRUMENTS


• Supply and erection of major electrical equipment.
• Power distribution systems
• Lighting and power
• Fire detection and alarm systems
• Programmable logic control systems (PLC)
• Scada systems
• Structural cabling
• Security systems
• Instrumentation and control works
• Telecommunication systems
ALJABER ENGINEERING | CORPORATE PROFILE 15

LANDMARK BUILDINGS
We have successfully executed various industrial buildings on design and build basis. In addition, JEC currently
executing construction of landmark buildings as part of a Joint Venture with international companies.

JEC is a Kirby Certified builder to supply and erect Kirby Buildings in Qatar.

JEC FOCUS AREAS ARE


• Landmark buildings
• Structural steel buildings
• Control rooms
• Blast proof buildings
• Temporary facilities

JEC STRENGTH INCLUDES


CIVIL WORKS:
• Enabling works
• Concrete works
• Curtain wall systems
• Stone cladding
• Steel structure
• Architectural finishes

MEP WORKS:
• Drainage
• Plumbing
• HVAC systems
• Chilled water systems
• Waste water treatment systems
• Electrical (MV/HV/ELV networks)
• Instrumentation
• Telecommunication
• Lifts
• Fire fighting and fire alarm systems
• Building Management System (BMS)
ALJABER ENGINEERING | CORPORATE PROFILE 17

PROJECTS
PORTFOLIO
HIGHWAYS, ROADS AND INFRASTRUCTURE

Project Client Value (USD) Status of Completion


Lusail Real Estate Development Company
CP12-E Additional Dredging of Southern Marina Channel 26,000,000 Oct. 2015
W.L.L
Supreme Committee for Delivery & Legacy
Al Thumama Stadium (A Joint Venture with Tekfen) N/A Ongoing
(SC)
Roads & Infrastructure in Wadi Aba Seleel – Package 1A, Advanced Grading &
Public Works Authority 44,000,000 May, 2016
Temporary Roads (QS004-P01A)

Camp at Abu Nakhlah Aljaber Engineering LLC 36,000,000 Ongoing

Construction of CP08-A3: Enabling Works - Qetaifan Islands Lusail Real Estate Development Co. W.L.L. 51,000,000 Ongoing

Doha Metro project - Gold Line (A Joint Venture with Aktor, Yapi Merkezi, STFA and
Qatar Rail 3,358,000,000 Ongoing
Larsen & Toubro)
Design and Construct New Orbital Highway and Truck Route Mesaieed to Salwa
Public Works Authority 1,687,000,000 Ongoing
Road (A Joint Venture with Leighton Contracting Qatar)

Site Preparation Works for GASAL Project GASAL Q.S.C 8,000,000 Sept. 2014

Construction of CP7A-1B waterfront commercial / Seef Lusail Infrastructure works Lusail Real Estate Development Co. W.L.L. 39,000,000 Ongoing

Rasgas flow assurance project - Site preparation works RasGas Company Ltd. 2,000,000 May, 2014

Construction of CP7C-1C, enabling works for Commercial Boulevard Lusail Real Estate Development Co. W.L.L. 43,000,000 Aug. 2015

Qatar Electricity & Water Corporation-


Upgrading of Mesaieed Town RPS 28,000,000 Ongoing
KAHRAMAA
Development of new camp for Internal Security Forces (ISF) at Al Duhail (A Joint
Internal Security Force (ISF) 663,000,000 Ongoing
venture with AKTOR).

Coast Guard Base - Expansion of the main navigational channel & turning basin Urbacon General Contracting 10,000,000 May, 2014

The Base Project in North Lusail - The Island Bridge Works UrbaCon General Contracting 8,000,000 May, 2014

EPIC for wet utilities distribution network (Potable water supply, fire water and
sewage) for support services for an area of approximately 3000 Hectares complete
Qatar Petroleum 151,000,000 Dec. 2014
with auxiliary facilities, sub-systems and mains network at West End extension, Ras
Laffan Industrial City
ALJABER ENGINEERING | CORPORATE PROFILE 19

Project Client Value (USD) Status of Completion

EPIC for southern perimeter industrial fence, security patrol access and other roads in
Qatar Petroleum 24,000,000 Dec. 2013
Ras Laffan City

Al-Jawhara “Oasis of Life” Infrastructure in Al Erkyah District, Lusail. Infrastructure


Jawhara Greens Company
works consists of earthworks, asphalt works, surface drainage, foul sewerage, primary 20,000,000 Nov. 2013
SPC
irrigation, portable water networks and street lighting

The Base Secondary Chanel Excavation and Disposal Works in Semisima. UrbaCon General Contracting 7,000,000 Apr. 2013

Reconstruction of existing roads and construction of new roads with all associated
services and infrastructure including upgrade of existing utilities and installation of new Qatar Petroleum 190,000,000 Feb. 2012
utilities at Mesaieed Community Area

RasGas- Main Contractor: CCC


Early site earth works for Barzan onshore project at Ras Laffan 36,000,000 Jul. 2011
/Teyseer JV

Construction of road paving at Pearl GTL plant area Strabag Qatar W.L.L. 1,000,000 Jan. 2011

West Bay project. Zone 66: Construction of roads and infrastructure services such as
Public Works Authority
foul sewage, surface water, potable water, TSE lines, pump stations and storm water 55,000,000 Dec. 2010
(ASHGHAL)
system in New Diplomatic area

EPIC for new support services and site development of 3,000,000 m2 land at Ras
Qatar Petroleum 82,000,000 Nov. 2010
Laffan Industrial City

Construction of underground piping systems consist of installation of GRP sea water


pipelines, firewater, process, potable water lines and major infrastructure civil works at SNC-Lavalin 96,000,000 Aug. 2010
Aluminium Smelter in Mesaieed

Site development of service areas and potroom building area including earth works,
Qatar Aluminium Co.
construction of roads, surface drainages supply and installation of potable water lines 18,000,000 Oct. 2009
(Qatalum)
for Qatar Aluminium Smelter in Mesaieed

Site preparation and earth works for Elsewedy Cables factory at Mesaieed. Elsewedy Cables 4,000,000 Feb. 2009

Salwa International Highway interchanges and installation of water pipelines and Public Works Authority
86,000,000 Jan. 2009
street lighting (ASHGHAL)
Hyundai Engineering &
Site preparation and road works for QAFCO 5 project in Mesaieed 8,000,000 Dec. 2008
Construction Co
Site preparation, ground improvement by dynamic compaction and installation of
Qatar Aluminium Co.
8000 Im new security paliside fence for Qatar Aluminium Smelter and Power Plant in 34,000,000 Dec. 2008
(Qatalum)
Mesaieed
Project Client Value (USD) Status of Completion

Gas pipeline crossings for service area and potroom building at Qatar Aluminium
SNC-Lavalin 2,000,000 Apr. 2008
Smelter in Mesaieed

Construction of land water drain outfall at Ras Laffan Port Jan De Nul / Boskalis JV 1,000,000 Feb. 2008

Soil Improvement for Boiler and Demin units in Qatar Vinyl Company Qatar Vinyl Company 1,000,000 May, 2007

Al Khaleej gas project Phase 2 (AKG2): Site preparation for camp and waste water
Chiyoda /Technip JV 3,000,000 Mar. 2007
treatment area

Ras Laffan port expansion project: Excavation and site preparation to construct a lake
Jan De Nul / Boskalis JV 7,000,000 Feb. 2007
within Ras Laffan port expansion and construction of access road and street lighting

QatarGas 3 & 4 project: Site preparation for camp and wastewater treatment (WWT)
Chiyoda / Technip JV 30,000,000 Feb. 2007
areas at Ras Laffan, in connection with Qatar Gas 3 project

Hamad Medical City surface and ground water scheme: Construction of surface and
Public Works Authority
groundwater pipelines by microtunneling and construction of reinforced concrete 13,000,000 Sept. 2006
(ASHGHAL)
outfall structure

Design and construction of central sewage collection system and construction of


Boom Construction Co. 4,000,000 Oct. 2006
precast concrete boundary wall

Excavation and stockpiling of hard material at Ras Laffan Cracker II project site Qatar Petroleum 10,000,000 May, 2006

Ras Laffan Olefin project: Site preparation and installation offence Technip 8,000,000 Apr. 2006

Environmental clean-up for New Doha International Airport project site including
New Doha International
excavation and removal of waste, transportation from NDIA site and placement at 38,000,000 Oct. 2005
Airport (NDIA)
engineered landfill site in Mesaieed

Underpass and access roads for Doha 2006 Asian Games Village and Hamad Medical Public Works Authority
19,000,000 Oct. 2005
City (ASHGHAL)

Construction of paved walk ways, unpaved track road, landscaping and new boundary
Qatar Petroleum 3,000,000 Mar. 2004
wall at Dukhan Township
ALJABER ENGINEERING | CORPORATE PROFILE 21

OIL & GAS, PETROCHEMICAL AND


INDUSTRIAL PROJECTS

Project Client Value (USD) Status of Completion

Fabrication and installation of above ground metal piping, installation of water supply
pumps, emergency cooling towers, compressed air piping system and closed cooling SNC-Lavalin 20,000,000 Sept. 2010
medium system at Qatar Aluminium Smelter in Mesaieed

Mechanical and electrical works for Doha cable factory at Mesaieed Industrial City Doha Cables 3,000,000 Jun. 2010

Major ground and civil works for rectifier stations at Qatar Aluminium Smelter in Qatar Aluminium Co.
24,000,000 Feb. 2010
Mesaieed (Qatalum)

EPIC for two new kangaroo cranes and upgrading of existing gabbro berths crane
Qatar Petroleum 31,000,000 Mar. 2009
facilities including all mechanical and electrical works at Mesaieed Port

Installation of cathode roding equipment and induction furnace including supply and
erection of all mechanical, electrical and instrumentation works at Qatar Aluminium SNC-Lavalin 8,000,000 Jan. 2009
Smelter in Mesaieed

Al Khaleej Gas Project Phase 2 (AKG2): Civil, infrastructure and electromechanical


works for camps and other facilities including underground piping networks, road
Chiyoda / Technip JV 33,000,000 Nov. 2007
works, installation of treated effluent tanks, waste water treatment units and sludge
treatment units
Project Client Value (USD) Status of Completion

Engineering, procurement, fabrication and installation of dust collection towers and


General Electric (GE) 2,000,000 Aug. 2007
sunshades

EPIC of desalinated water network including installation, testing and commissioning of


Qatar Petroleum 10,000,000 Jul. 2006
14 km GRP pipelines at Ras Laffan

EPIC of potable water transmission system and landscaping mains to distribute water
Qatar Petroleum 14,000,000 Oct. 2005
produced by RLPC to various facilities within Ras Laffan

Construction of new access platforms and walkways in Dukhan oil fields Qatar Petroleum 1,000,000 Jun. 2004

Construction of dry storage sunshades at Camp As Sayliyah US Army 1,000,000 Jan. 2004

EPIC of waste management facility including construction of new landfill cells, HDPE
membrane, access roads, weigh scale and concrete land treatment unit with a total RasGas 5,000,000 Dec. 2002
capacity of 2800 m3 of biodegradable waste at Ras Laffan Industrial City (RUC)

Extension of central control room building at QAFCO. Qatar Fertilizer Co. (QAFCO) 2,000,000 Mar. 2002
ALJABER ENGINEERING | CORPORATE PROFILE 23

PIPELINE CONSTRUCTION

Project Client Value (USD) Status of Completion

GTC/600/2013, Pipelines for Mega Reservoirs Corridor Main 1 Package C & Qatar Electricity & Water Co.
437,000,000 Ongoing
GTC/599/2013, Pipelines for Mega Reservoirs Corridor Main 2 Package A (KAHRAMAA)

Design and construction of 1200 mm of 30 Km transmission main from Doha West Public Works Authority
44,000,000 Dec. 2011
STW to Al Rakhiya farm (ASHGHAL)

Qatar Electricity & Water Co.


Upgrading of New and Old Salwa distillate and rising mains (22km of pipes) 32,000,000 Sept. 2007
(KAHRAMAA)

EPIC of potable water pipeline to west side camp area at Ras Laffan in connection with
CHIYODA - TECHNIP JV 21,000,000 Feb. 2007
RasGas expansion project

Supply and lay the extension of water distribution mains (58 km) in north Duhail Qatar Electricity & Water Co.
5,000,000 Jan. 2006
Phase C & D (KAHRAMAA)

Supply and lay the extension of water distribution mains (57 km) in north Duhail Qatar Electricity & Water Co.
4,000,000 Nov. 2005
Phase A & B. (KAHRAMAA)

Extension of approx. 12 km of 600 mm diameter HDPE pipes to supply water to motor Qatar Electricity & Water Co.
13,000,000 Jul. 2004
cycle race track (KAHRAMAA)
POWER GENERATION, SUBSTATIONS
AND DESALINATION PLANTS
Project Client Value (USD) Status of Completion

Umm Al Houl Power Project - Package A (Civil & Building Works) & Package B (HVAC
Hitachi Zosen Corporation 96,000,000 Ongoing
Works)

Ras Abu Fontas A1 new water plant- Onshore civil works execution related to the
construction of distillers and boilers areas, intake structure and potable water Fisia Italimpianti 76,000,000 Mar. 2010
reservoirs for 45 MIGD water desalination plant at Ras Abu Fontas

RAFB2 - site - 0001, Ras Abu Fontas B, expansion project: Fabrication of pipe rack and General Electric
4,000,000 Dec. 2006
large bore pipes (CS & SS) (GE)

Qatar transmission system - Phase VI, Substations: Civil works associated with various
VATECH 5,000,000 Mar. 2006
substations

Ras Laffan power and desalination project - Water plant island desalination unit and
auxiliaries: Civil works related to the construction of 40 MIGD desalination plant at Ras Fisia Italimpianti / Enel Power 20,000,000 May, 2003
Laffan
ALJABER ENGINEERING | CORPORATE PROFILE 25

SEWAGE TREATMENT PLANTS, DISTRICT COOLING PLANTS AND


PUMPING STATIONS
Project Client Value (USD) Status of Completion

Engineering, Procurement, Construction, Testing & Commissioning of the District Qatar District Cooling
87,000,000 Ongoing
Cooling Plant - 3 in West Bay (Q.C.S.C)

Refurbishment and upgrading works for various foul and storm water pumping stations Public Works Authority
53,000,000 Ongoing
including civil, mechanical, electrical and HVAC works (Ashghal)

Construction of treated sewage effluent permanent disposal system including 21 km of Chiyoda Technip JV -QGE
11,000,000 Feb. 2009
HDPE pipeline at Ras Laffan (CTJV)

Civil works and upgrading of pumping stations Torishima Pump Mfg. Co. Ltd. 2,000,000 May, 2008

Design and construction of sewage treatment plant and labour compound New Doha International
13,000,000 Feb. 2006
infrastructure including boundary wall, roadworks and chainlink fence Airport (NDIA)

Upgrade of sewage network and refurbishment of pumping stations and relocation of


Qatar Petroleum 5,000,000 Jun. 2005
TSE distribution mains

Construction of treated sewage effluent network (TSE) T5 to T7 including 14 km of TSE Ministry of Municipal Affairs
4,000,000 Nov. 2004
mains Agriculture (MMAA)

Construction of treated sewage effluent network (TSE) T6 to T7 including 48 km of Ministry of Municipal Affairs
13,000,000 Apr. 2004
TSE mains Agriculture (MMAA)

Construction of additional sludge drying beds and other labour accommodation Ministry of Municipal Affairs
1,000,000 Feb. 2002
facilities including one storey building Agriculture (MMAA)
MAINTENANCE OF OIL & GAS, PETROCHEMICAL
AND INDUSTRIAL INSTALLATIONS
Project Client Status of Completion

Shutdown associated works for Qatar Aluminium Smelter in Mesaieed SNC - Lavalin Completed

Long term fabrication and maintenance support on call off basis Qatar Vinyl Company (QVC) Completed

Civil work for rolling mill major repair Qatar Steel Company (QASCO) Completed

Refurbishment of administration building ground floor corridor flooring tiles Qatar Fertilizer Co. (QAFCO) Completed

Revamp of closed cooling water cycle and civil works Qatar Fertilizer Co. (QAFCO) Completed

Surface protection of buried sealine O.S.B.L. at Ras Laffan QatarGas Completed

Repair of transformer DHTS 90000/140 ANSALDO Industrial Completed


ALJABER ENGINEERING | CORPORATE PROFILE 27

LANDMARK BUILDINGS
Project Client Value (USD) Status of Completion

Qatar Petroleum District. (A Joint venture with Bouygues and Midmac Contracting) Barwa Real Estate Company 1,301,000,000 May, 2016

Dubai Tower in Doha Meraas Development L.L.C 400,000,000 On Hold - Design Changes

Alwaha Club RasGas 7,000,000 Mar. 2002

AlJaber Engineering Headquarters - Fox Hills Plot No. MU-B04, Lusail-Qatar AlJaber Holding 34,000,000 Sep. 2015

OTHER BUILDINGS

Project Client Value (USD) Status of Completion


Central warehouse at Mesaieed Qatar Steel Co. 3,000,000 Jul. 2005
EPIC of 2600 m² pre-engineered steel structure store building with all associated
Qatar Fertilizer Co. (QAFCO) 2,000,000 Nov. 2003
electrical and mechanical works at QAFCO 4 expansion project in Mesaieed
EPIC of 3240 m² new office building with all associated roads and external works
RasGas 3,000,000 Oct. 2003
including MEP, telecommunications, HVAC and fire fighting systems at Ras Laffan
EPIC of steel frame structure bagging and storage warehouse at Q-CHEM
petrochemical complex including complete civil and Electro - mechanical works at KBR / Technip 5,000,000 Jan. 2002
Mesaieed
Design, supply, installation and commissioning of Q-Chem prefab temporary training
Q-CHEM 1,000,000 Jul. 2001
facility, with all associated civil and MEP works

EPIC of temporary facilities consist of prefabricated office with all associated power
KBR / Technip 2,000,000 Apr. 2000
supply,mechanical and electrical works for Q-Chem project at Mesaieed
SELECTED
PROJECTS
ALJABER ENGINEERING | CORPORATE PROFILE 29

(0.1) HIGHWAYS, ROADS & INFRASTRUCTURE


CP12-E ADDITIONAL DREDGING OF SOUTHERN MARINA CHANNEL

Client Lusail Real Estate Development Company W.L.L

Value (USD $) 33,500,000

Project Scope The Scope of Works consists of deepening the Southern Marina (By Dredging) from -3.00 ONHD to -4.50 QNHD as
well as dredging additional isolated areas, including deepening of the Central Lagoon entrance.

The major work elements are:


Dredging operation – average Dredging productivity 60,000 m3/Day.

Transportation of dredged material to a multi-cell Spoil Pit.

Pumping of sea water from the Spoil Pit to the existing sedimentation ponds 1 & 2

Removal of the wet silty material from the spoil pit to the “Drying multi-cell pit” for Drying process

Finally, transportation of the dried material off site to approved municipality disposal site.

Completion Date October, 2015


ALJABER ENGINEERING | CORPORATE PROFILE 31

AL THUMAMA STADIUM

Client Supreme Committee for Delivery & Legacy (SC)

AlJaber Engineering and Tekfen win Qatar stadium contract

AlJaber Engineering (JEC) together with Tekfen Construction, as joint-venture partners, have been awarded the
construction contract for the stadium in the Al Thumama district of Doha, Qatar.

Al Thumama Stadium – one of the proposed venues for the 2022 FIFA World Cup Qatar – is the seventh stadium for
which the main construction contract has been awarded.
The venue, located just minutes from Hamad International Airport and in the center of Doha, is scheduled for completion
by 2020 and will host matches up to the quarter-final stage.
The 40,000 seat stadium will have a reduced capacity of 20,000 seats in its post tournament legacy mode as part of
the SC’s modular stadium legacy plans.

Completion Date Ongoing


ROADS & INFRASTRUCTURE IN WADI ABA SELEEL – PACKAGE 1A, ADVANCED GRADING & TEMPORARY ROADS (QS004-
P01A)
Client Public Works Authority

Value (USD $) 44,000,000

Project Scope The purpose of this project is to provide both single lane and dual two lane temporary roads in Wadi Aba Seleel within
the project limits. This includes advance grading and levelling of specific sections of the roadways within the main
project boundary, including the construction of temporary roads, over an area of aproximately 19.7km as follows;

The major scope of works Dual carriageway - 9.00km (approx.)


Single Carriageway - 11.00km (approx.)

The Major quantities are:


• Site Clearance - 147 Ha
• Excavation - 533,200 m3
• Filling - 786,300 m3
• Roadworks (Sub-Base, Base Course & Wearing Course) - 323,500 m2
• 14m Street light Columns - 1,262 Nos.
• Swales for Surface Water Drainage - 39,365 m
• Gulleys & Soakaways
• Road Marking & Road Signs
• Kerb Stone & Precast Concrete Barricades

Completion Date May, 2016


ALJABER ENGINEERING | CORPORATE PROFILE 33

CAMP AT ABU NAKHLAH

Client Aljaber Engineering LLC

Value (USD $) 36,000,000

Project Scope Construction of new Worker’s Accommodation Facility as per the latest welfare standards. The facility estimated for a
capacity of 4,500 workers with all the welfare & recreation facilities. The major elements consists of:

Labour Accommodation, Mess Hall & Kitchen, Camp Office & Training Room, Grocery & Retail
Barber Shop, Clinic, Mosque, Guard Room, Delivery Area & Parking
Money Exchange, Delivery Area & Parking, Car & Bus parking Lots, Garbage Collection
Sewerage Treatment Plant, Generator Farm & Diesel Farm, Cricket Ground, Basket Ball Ground, Foot Ball Ground
External Works & Utilities:
• Road Works, Road Marking & Sign Boards
• Hard Scaping works
• Hoarding / Fencing, Gates & Barriers
• Street Lighting
• Drainage Network
• Water Network
• Fire Fighting Network
• Electrical Works

Completion Date Ongoing


CONSTRUCTION OF CP08-A3: ENABLING WORKS - QETAIFAN ISLANDS

Client Lusail Real Estate Development Company W.L.L

Value (USD $) 51,000,000

Project Scope The Major Scope of the Project consists of:

• Design & Construction of the civil works and associated MEP works for two large diameter utility tunnels for the
Bridge 9 and Bridge 8
• Construction of the Marafeq - designed 7 Nos. gasline crossings.
• Removal of a section of the existing sea wall (198m) and construction of new realigned sea walls (152m).
• Widening of the five (5) existing temporary earth bunds with pipe culverts
• Raising the finished level of the existing sea wall on Qetaifan Islands from 2.0m to 2.5m QNHD by the
installation of precast reinforced concrete capping blocks.
• Construct concrete block staircases adjacent to the sea wall at five (5) locations providing restricted access from
the promenade to the tidal lagoon basin.

Completion Date Ongoing


ALJABER ENGINEERING | CORPORATE PROFILE 35

DOHA METRO PROJECT - GOLD LINE


(A JOINT VENTURE WITH AKTOR, YAPI MERKEZI, STFA AND LARSEN & TOUBRO)

Client Qatar Rail

Value (USD $) 3,358,000,000

Project Scope The Doha Metro is part of the Qatar Integrated Railways Program (QIRP). The Gold Line Underground section of the
network runs East/West through the heart of Doha City, starting to the East at Airport City and continuing through Al
Sharq, Doha Souq, Msheireb and Al Adhawaa, before following both Al Sadd Street and Al Waab Street to the West of
Doha and terminating at Sports City in the Aspire Zone.

The major elements consist of:

• 10 Nos. stations.
• 11.7km of twin bored tunnels

Completion Date Ongoing


DESIGN AND CONSTRUCT NEW ORBITAL HIGHWAY AND TRUCK ROUTE - MESAIEED TO SALWA ROAD - MRPSC/014/2012
2013/L (A JOINT VENTURE WITH LEIGHTON CONTRACTING QATAR).

Client Public Works Authority

Value (USD $) 1,687,000,000

Project Scope The Project is located west and south of the Doha city and providing the New Orbital Highway connecting Mesaieed
to Salwa Road.
The major elements are:
• 57 Km of road works with 5 Main Interchanges
- 30 Km of 14 lanes Orbital Highway
- 27 Km of 8-16 lane side roads
• 4 no. grade separated clover leaf type Interchange and 1 no. grade separated Junction comprising 24 no. bridge
structures
• 18 no’s Braiding and Emergency exists
• Pedestrian & Bicycle paths with appropriate underpass structures
• New Utilities such as Surface Drainage Works, TSE Line, Electrical Works, Street lighting works, Q-Tel, QAF, ITS
Ducts
• Diversion and Protection of Existing Utilities (including QP gas pipelines)
• Crossing Points of EHV Pylons
• Landscaping (Within Interchange)

Completion Date May 2017 (Ongoing)


ALJABER ENGINEERING | CORPORATE PROFILE 37

CONSTRUCTION OF CP7C-1C, ENABLING WORKS FOR COMMERCIAL BOULEVARD

Client Lusail Real Estate Development Company W.L.L.

Value (USD $) 48,000,000

Project Scope The scope includes early enabling works project consisting of dewatering works, bulk excavation and temporary
support of excavation systems etc.

The major scope of works • Work site Clearance


• Temporary Fencing
• Temporary Access Roads
• Design, installation, operation and maintenance of temporary dewatering systems and handed over to the
permanent works contractor
• Excavation in the dry with mechanical means and the transport of excavated materials to an authorized
off-site landfill
The Excavation consists of:
- Car Park 2 141,587 m3
- Car Park 3 124,613 m3
- Car Park 4 105,576 m3
- Car Park 5 15,1622 m3
- Underpass Tunnel 996,973 m3
• Monitoring ground movements around and within the excavations
• Provision for the disposal of 3,000,000 m3 of excavated material from the stockpile generated by LREDC
• Lowering of Western Marina 386,000 m3
• Widening of Earth Bridge 2A 30,000 m3 (Filling with selected excavated material)

Completion Date February, 2015


RASGAS FLOW ASSURANCE PROJECT - SITE PREPARATION WORKS

Client RasGas Company Ltd.

Value (USD $) 2,000,000

Project Scope The project scope consists of site preparation and fencing works. The work site consists of two (2) parts OSPL area and
the Temporary Site Facilities (TSF) Area. The major works consists of:

For OSPL Area


Soil Cutting for Soil improvement 13,867 m3
Excavation inside pile area 1,027 m3
Soil Fill (Type A material) 39,179 m3

For TSF Area


Soil Fill (Type B material) 9,387 m3
Temporary Perimeter Fence 1,040 lm
Gates 4 sets
Temporary pipe culverts 57 lm
Concrete Pavement 670 m2

Completion Date May, 2014


ALJABER ENGINEERING | CORPORATE PROFILE 39

SITE PREPARATION WORKS FOR GASAL PROJECT

Client GASAL Q.S.C

Value (USD $) 8,000,000

Project Scope The project site is located within Lot W8 of Ras Laffan Industrial City and the scope consists of earthworks encompassing
excavation, dumping of unwanted soil to designated location within RLIC, backfill, grading, levelling, compaction to
arrive at the finished ground level as per project requirements as set out in Specifications for Site Preparation Works,
Concrete Works and Road Works.

The major quantities are:


• Soil Grubbing and Scrubbing 75,000 m2
• General Excavation 95,775 m3
• Surface Levelling 75,000 m2
• General fill and embankment (0 50 mm) 189,420 m3
• Surface Compaction 75,000 m2
• Galvanized Fence 1,100 m
• Vehicle Gates 2 Nos.
• Protection of Existing Pipe 50 m

Completion Date September, 2014


COAST GUARD BASE - EXPANSION OF THE MAIN NAVIGATIONAL CHANNEL & TURNING BASIN

Client UrbaCon General Contracting

Value (USD $) 20,000,000

Project Scope The scope of subcontract works shall be the excavation, bunds creation, bunds removal and disposal of all excavated
materials:

The major scope of works • Complete excavation of estimated quantity 1,055,000 m3


• Creation and complete removal of the bounds to seabed level or original grade level
• Supply, install and operate complete dewatering system ensuring working in dry ambient surface conditions
• Pre and post survey works
• Removal of excavated material from the excavated areas for drying purposes
• Dispose all excavated materials off site to an approved local authorities disposal location

Completion Date August, 2014


ALJABER ENGINEERING | CORPORATE PROFILE 41

THE BASE PROJECT IN NORTH LUSAIL - THE ISLAND BRIDGE WORKS

Client UrbaCon General Contracting

Value (USD $) 8,000,000

Project Scope The project involves the construction of a bridge to provide access to the private island(Private residence palace) from
mainland with an approximate length of 442 m with 20 m span between two piers.

The major scope of works • Bridge construction including foundations, piers, superstructure, arch towers, lighting podiums and decorations.
• Road pavement as well as all related drainage works for the road, sidewalks and utilities trenches.
• Bridge lighting and decorative lighting.

Completion Date January, 2014


THE BASE SECONDARY CHANNEL EXCAVATION AND DISPOSAL WORKS.

Client UrbaCon General Contracting

Value (USD $) 7,000,000

Project Scope • Pre & Post excavation bathymetric surveys


• Island channel excavation 537,000 m3
• Diposal of excavated material on land off-site 537,000 m3

Completion Date April, 2013


ALJABER ENGINEERING | CORPORATE PROFILE 43

EPIC FOR WET UTILITIES DISTRIBUTION NETWORK (POTABLE WATER SUPPLY, FIRE WATER AND SEWRAGE) FOR
SUPPORT SERVICES FOR AN AREA OF APPROXIMATELY 3000 HECTARES COMPLETE WITH AUXILIARY FACILITIES,
SUB-SYSTEMS AND MAINS NETWORK AT RAS LAFFAN INDUSTRIAL CITY.

Client Qatar Petroleum

Value (USD $) 151,000,000

Project Scope Engineering, procurement and construction of major Civil, Mechanical, Electrical, Instrumentation and SCADA control
works detailed as follows:
Various utility pipeline Networks 230 Km
Sewage pumping stations 29 Nos.
Civil Works:
• Excavation 873,300 m3
• Imported fill material 111,000 Ton
• Precast concrete paving 28,000 m2
• Major RCC/Steel structure works & Road crossing(Microtunneling)
Major Mechanical Works:
• Potable water/fire water pumping station
• Potable water and fire water tanks 9 Tanks
• Overhead cranes and manual hoist cranes 31 Cranes
Major Electrical Installations:
• Power network(Transformers with panels, ups, etc) 30 Km
Control System and Instrumentation:
• Telecommunication and SCADA control system
• Fire alarm system/Fiber optic network (25 km)

Completion Date December, 2014


RECONSTRUCTION OF EXISTING ROADS AND CONSTRUCTION OF NEW ROADS WITH ALL ASSOCIATED SERVICES AND
INFRASTRUCTURE INCLUDING UPGRADE OF EXISTING UTILITIES AND INSTALLATION OF NEW UTILITIES AT MESAIEED
COMMUNITY AREA.

Client Qatar Petroleum

Value (USD $) 190,000,000

Project Scope The project scope includes all associated Civil, Mechanical, Electrical, Instrumentation and telecommunication works.

Design Works:
- Coordination of existing and future utility services
- Traffic management strategy and traffic phasing
- Reinforced concrete protection slab and culverts
• Road Works and street lighting: 39 Km
• Conversion of existing Mesaieed main and Police roundabout to traffic signal junction
• Electricity and Power Network(LV/MV/HV/EHV) 187 Km
• Potable Water Network 9 Km
• Telecommunication Network 34 Km
• Utility Duct Network 29 Km
• Treated Sewer Effluent Network(TSE) 18 Km
• Surface Water Drainage Network 70 Km
• Foul Sewer Network 5 Km
• Landscaping Network & Irrigation Network 250 Km

Completion Date February, 2012


ALJABER ENGINEERING | CORPORATE PROFILE 45

EARLY SITE EARTH WORKS FOR BARZAN ONSHORE PROJECT AT RAS LAFFAN.

Client RasGas

Main Contractor CCC / Teyseer JV

Value (USD $) 36,000,000

Project Scope Earth works for Barzan onshore early site project total area of 1,560,000 m2 detailed as follows:

• Grubbing, removal and transport vegetation 1,560,000 m2


• Remove, transport and depose marine deposit 1,512,000 m3
• Remove, transport and stockpile dune sand 400,000 m3
• Excavation (suitable soil, soft rock and hard rock) 940,000 m3
• Fill material 698,600 m3
• Imported fill 1,521,000 m3

Completion Date July, 2011


CONSTRUCTION OF ROADS AND INFRASTRUCTURE SERVICES SUCH AS FOUL SEWAGE, SURFACE WATER, POTABLE
WATER, TSE LINES, PUMP STATIONS AND STORM WATER SYSTEM IN NEW DIPLOMATIC AREA.

Client Public Works Authority (ASHGHAL)

Value (USD $) 55,000,000

Project Scope • Electrical work, storm drainage, telecommunication services, service water, TSE lines, irrigation and landscape
works
• Security wall, CCTV cameras, gates, fiber optic cables, road blocks, security rooms, special signage and other
necessary security items.
• Hard and soft landscaping and irrigation system.
• Construction of roads (12.1 km)

Completion Date December, 2010


ALJABER ENGINEERING | CORPORATE PROFILE 47

EPIC FOR NEW SUPPORT SERVICES AND SITE DEVELOPMENT OF 3,000,000 M2 LAND AT RAS LAFFAN INDUSTRIAL
CITY.

Client Qatar Petroleum

Value (USD $) 82,000,000

Project Scope Design, procurement and construction of storm water drainage system, duct banks, road grading and sabkha treatment
and construction of internal and external roads detailed as follows:

• Excavation 435,000 m3
• Imported fill 2,060,000 m3
• Concrete 42,000 m3
• Concrete culverts (600 & 1000 mm diameter) 13 Km
• Construction of roads 145,000 m2

Completion Date November, 2010


CONSTRUCTION OF UNDERGROUND PIPING SYSTEMS CONSIST OF INSTALLATION OF GRP SEA WATER PIPELINES,
FIREWATER, PROCESS, POTABLE WATER LINES AND MAJOR INFRASTRUCTURE CIVIL WORKS AT ALUMINIUM SMELTER
IN MESAIEED.

Client Qatar Aluminium Company (Qatalum)

EPC Contractor SNC - Lavalin

Value (USD $) 96,000,000

Project Scope This project includes underground piping works and major Civil works for Qatar Aluminium plant detailed as follows:

• Total excavation 325,000 m3


• Dewatering 74,000 m3
• Sheet piling 38,500 m2
• Concrete works 15,500 m3
• Piping works 73 Km
• Ducting works 58 Km

Completion Date August, 2010


ALJABER ENGINEERING | CORPORATE PROFILE 49

SITE DEVELOPMENT OF SERVICE AREAS AND POTROOM BUILDING AREA INCLUDING EARTH WORKS, CONSTRUCTION
OF ROADS, SURFACE DRAINAGES SUPPLY AND INSTALLATION OF POTABLE WATER LINES FOR QATAR ALUMINIUM
SMELTER IN MESAIEED.
Client Qatar Aluminium Company (Qatalum)

EPC Contractor SNC - Lavalin

Value (USD $) 18,000,000


Project Scope Engineering and Technical Services:
• Engineering and details design
• Compaction test of the existing sub grade and newly constructed roads
• Survey of existing utility services
Earth Works:
• Grading and leveling 3,000 m3
• Sub grade of road system and the drainage ditches 25,000 m3
• Site filling of utility corridor and underground pipelines 10,000 m3
Construction of Road System and Surface Drainage
• Road base with well graded crushed stone (0-25 mm)
• Lining of the open ditches with well graded crushed stone 52,000 m3
• Surfacing of the road base with a layer of 70 mm of compacted asphalt for roads 9,000 m3
• Curbstone, temporary road signs chain-link fence 87,000 m3
Supply & Installation of Potable Water Line
• Permanent pipeline 300 Lm
• Temporary pipeline including fire hydrants 4,000 Lm
• Concrete works 1,100 m3

Completion Date October, 2009


SALWA INTERNATIONAL HIGHWAY INTERCHANGES AND INSTALLATION OF WATER PIPELINES AND STREET LIGHTING.

Client Public Works Authority (ASHGHAL)

Value (USD $) 86,000,000

Project Scope Water Pipes:

• Laying of D.I Pipes from 200 mm to 400 mm diameter 2300 LM


• Removal of existing water D.I pipes 400 mm & 500 mm diameter 15,000 LM

Street lighting columns foundation: 1200 sets


• Cable trenches 34,000 LM

Construction works for ten(10) interchanges:


• Site clearance, demolition and earthworks
• Sub-base and road base
• Flexible surfacing
• Road marking
• Bridge structure works

Completion Date January, 2009


ALJABER ENGINEERING | CORPORATE PROFILE 51

SITE PREPARATION, GROUND IMPROVEMENT BY DYNAMIC COMPACTION AND INSTALLATION OF 8000 LM NEW
SECURITY PALISIDE FENCE FOR QATAR ALUMINIUM SMELTER AND POWER PLANT IN MESAIEED.

Client Qatar Aluminium Company (Qatalum)

Value (USD $) 34,000,000

Project Scope • Site clearance (180 Hectares), scarification and compaction of existing ground (179 Hectares).
• Placing and compaction of fill materials for the platform construction of the aluminium and power plant
(4,540,000 m3).
• Ground improvement for the power plant area (25 Hectares) using wick drains and surcharge loading (placing
and relocating to power plant area) of (750,000 m3).
• Ground improvement for the carbon plant (12 Hectares), using dynamic compaction.
• Removal of existing security fence (3,000 M) and installation of new security palisade fence (8,000 M) to the
perimeter of the aluminium and power plant.

Completion Date December, 2008


UNDERPASS AND ACCESS ROADS FOR DOHA 2006 ASIAN GAMES VILLAGE AND HAMAD MEDICAL CITY.

Client Public Works Authority (ASHGHAL)

Value (USD $) 19,000,000

Project Scope • Transformation of the existing Al Razi roundabout into a large elliptical roundabout with two underpasses
including all associated road works, concrete works and diversion/replacement of existing underground utilities.

• upgrade of Ahamed Bin Ali Street (C Ring Road) between the existing Bin Omran roundabout and Rayyan street
including all associated diversions and replacement of existing underground utilities.

• Excavation works for the overall car park, situated within the boundaries of the large elliptical roundabout.

Completion Date October, 2005


ALJABER ENGINEERING | CORPORATE PROFILE 53

ENVIRONMENTAL CLEAN-UP FOR NEW DOHA INTERNATIONAL AIRPORT PROJECT SITE INCLUDING EXCAVATION
AND REMOVAL OF WASTE, TRANSPORTATION FROM NDIA SITE AND PLACEMENT AT ENGINEERED LANDFILL SITE AT
MESAIEED.

Client New Doha International Airport (NDIA)

Value (USD $) 38,000,000

Project Scope • Excavation and removal of 8,000,000 m3 waste from the NDIA site and placement at engineered landfill site at
Mesaieed.
• Demolition and removal of all direct structures.
• Removal of stagnant water from the northern lagoon and leachate from the made ground with all associated
environmental aspects.
• Stock piling of the waste removed to the new landfill site until the landfill is ready to receive waste materials.
• Fencing for stock piling areas and wheel washing systems for transporting trucks.

Completion Date October, 2005


(0.2) OIL & GAS, PETROCHEMICAL AND INDUSTRIAL PROJECTS
FABRICATION AND INSTALLATION OF ABOVE GROUND METAL PIPING, INSTALLATION OF WATER SUPPLY PUMPS,
EMERGENCY COOLING TOWERS, COMPRESSED AIR PIPING SYSTEM AND CLOSED COOLING MEDIUM SYSTEM AT QATAR
ALUMINIUM SMELTER IN MESAIEED.

Client Qatar Aluminium Company (Qatalum)

EPC Contractor SNC - Lavalin

Value (USD $) 20,000,000

Project Scope • Fabrication and erection of pipes and connection to potable, process and fire water tanks.
• In water supply area.
• Installation of water supply pumps.
• Installation of emergency cooling tower.
• Fabrication and erection of compressed air piping system.
• Fabrication and erection of closed cooling medium system.

Completion Date September, 2010


ALJABER ENGINEERING | CORPORATE PROFILE 55

MAJOR GROUND AND CIVIL WORKS FOR RECTIFIER STATIONS AT QATAR ALUMINIUM SMELTER IN MESAIEED.

Client Qatar Aluminium Company (Qatalum)

Value (USD $) 24,000,000

Project Scope • Excavation for foundations


• Filling to structures and embankment
• Fire rated concrete works and surface painting
• Water proofing, and fencing works
• miscellaneous metal works

Completion Date March, 2010


EPIC FOR TWO NEW KANGAROO CRANES AND UPGRADING OF EXISTING GABBRO BERTHS CRANE FACILITIES
INCLUDING ALL MECHANICAL AND ELECTRICAL WORKS AT MESAIEED PORT.

Client Qatar Petroleum

Value (USD $) 31,000,000

Project Scope The Scope includes engineering, procurement, construction and commissioning of two kangaroo cranes with a rated
capacity of 1,100 ton/hour each including all related electrical and mechanical works as follows:

• Two kangaroo crane with a rated capacity of 1,100 ton/hour


• HV electrical power supply for the new kangaroo cranes
• Four new grabs and ropes for the two existing kangaroo cranes
• Fresh-water based dust suppression systems for the two existing kangaroo cranes
• Video camera system

The scope also includes all related mechanical and electrical works to upgrade the following:

• A mobile harbour crane


• A hopper
• LV electrical power supply and sockets for mobile hopper

Completion Date March, 2009


ALJABER ENGINEERING | CORPORATE PROFILE 57

INSTALLATION OF CATHODE ROADING EQUIPMENT AND INDUCTION FURNACE INCLUDING SUPPLY AND ERECTION OF
ALL MECHANICAL, PIPING, ELECTRICAL AND INSTRUMENTATION WORKS AT QATAR ALUMINIUM SMELTER IN MESAIEED.

Client Qatar Aluminium Company (Qatalum)

EPC Contractor SNC - Lavalin

Value (USD $) 8,000,000

Project Scope All associated mechanical, piping, electrical and instrumentation works to install the following:

• Cathode roding equipment


• Induction furnace
• Overhead cranes
• Emergency water pumps

Completion Date January, 2009


CIVIL, INFRASTRUCTURE AND ELECTROMECHANICAL WORKS FOR CAMPS AND OTHER FACILITIES INCLUDING
UNDERGROUND PIPING NETWORKS, ROAD WORKS, INSTALLATION OF TREATED EFFLUENT TANKS, WASTE WATER
TREATMENT UNITS AND SLUDGE TREATMENT UNITS.

Client Chiyoda - Technip J.V.

Value (USD $) 33,000,000

Project Scope This project consists of the following:

Civil and Infrastructure works:

• Underground networks(HDPE 40 to 410 mm)


• GRP pipeline 10” diameter
• Foundations for the waste water treatment, potable water/ firewater and power generation units
• Road works and street lighting
• Sludge building
• Galvanized fence
• Construction of secondary substations and diesel generators buildings

Mechanical, Electrical and Instrumentation works:

• Installation of secondary package substations


• Cable laying
• Instrumentation works
• Diesel storage tanks
• Structural steel works
• Above ground galvanized steel piping
• Supply and installation of 2 Nos. vertical, GLS bolted potable water tanks (3200 m3) each, with aluminium
dome cover
• Supply and Installation of 4 Nos. vertical, GLS bolted treated effluent tanks (1600 m3) each, with aluminium
dome cover
• Installation of the waste water treatment units
• Installation of sludge treatment unit

Completion Date November, 2007


ALJABER ENGINEERING | CORPORATE PROFILE 59

ENGINEERING, PROCUREMENT, FABRICATION AND INSTALLATION OF DUST COLLECTION TOWERS AND SUNSHADES.

Client General Electric (GE)

Value (USD $) 2,000,000

Project Scope • Fabrication and erection of structural steel


• “Dust Collection Towers” 201 Ton
• Checkered plates 18 Ton
• Gratings 190 m2
• Supply and installation of H2 sunshade 28 Ton
• Aluminium sheeting 430 m2

Completion Date August, 2007


EPIC OF POTABLE WATER TRANSMISSION SYSTEM AND LANDSCAPING MAINS TO DISTRIBUTE WATER PRODUCED BY
RLPC TO VARIOUS FACILITIES WITHIN RAS LAFFAN.

Client Qatar Petroleum

Value (USD $) 14,000,000

Project Scope Detailed engineering, procurement, construction, installation, testing and commissioning of:

• Water potable (WP) transmission system (FRP) to distribute the water produced by Ras Laffan power company
to existing reservoirs in Ras Laffan City, with all associated control and monitoring systems.

• Water landscaping (WL) transmission system (FRP, UPVC & CS) to distribute water from Ras Laffan power
company, Oryx GTL plant, Ras Laffan City camp waste water treatment plant and the JGC waste water treatment
plant to various facilities.

Completion Date October, 2005


ALJABER ENGINEERING | CORPORATE PROFILE 61

(0.3) PIPELINE CONSTRUCTION


GTC/600/2013, Pipelines for Mega Reservoirs Corridor Main 1 Package C &
GTC/599/2013, Pipelines for Mega Reservoirs Corridor Main 2 Package A
Client Qatar General Electricity & Water Co. (KAHRAMAA)

Value (USD $) 437,000,000

Project Scope The scope of this Contract is to provide and complete the corridor pipelines (Corridor Mains) and fibre optic cable
ducts within the southern length of the Qatar Utility Corridor (QUC) between PRPS 3 (Rawdat Rashed) and PRPS 4
(Abu Nakhla), transmission mains and corridor main pipework and connections at both PRPS 3 and 4 for Package A
and northern length of the Qatar Utility Corridor (QUC) between the Dukhan Road and PRPS 3 (Rawdat Rashed) for
Package B
The Major Quantities:
Main Utility Corridor from Rawdat Rashed ( PRPS3) to Abu Nakhla ( PRPS4):
23.95km of twin 1600 mm diameter water corridor main | 10.40km of single 1200mm diameter transmission main
0.35km of twin 1600 mm diameter branches water corridor main
Northern length between the Dukhan Road and PRPS 3 (Rawdat Rashed):
1600 mm dia.: 22.9 km of twin pipeline from the Dukhan Road to PRPS 3.
1200 mm dia.: 10.7 km of pipeline from the Dukhan Road to PRPS 3
900 mm dia.: 1.5 km of pipeline from the QUC water corridor to the west edge of the QUC
Construction of all washout, air valve and other chambers
Design and construction of Trenchless road and utility crossings
Supply, installation & testing of the ducts in parallel with the pipelines for FOC.
The pipeline (DI) quantities are: 1600 mm dia Pipes - 94,292 m 1400 mm dia Pipes - 32,866m
1200 mm dia Pipes - 33,970 m 900 mm dia Pipes - 1,5361 m

Completion Date Ongoing


DESIGN AND CONSTRUCTION OF 1200 MM OF 30 KM TRANSMISSION MAIN FROM DOHA WEST STW TO AL RAKHIYA
FARM.

Client Public Works Authority (Ashghal)

Value (USD $) 44,000,000

Project Scope The project consists of design, procurement and construction of 1200 mm diameter GRP mains detailed as follows:

• 1200 mm diameter GRP main 30 Km


• 500 mm diameter GRP main 720 M
• Air valves, washout and connection chambers
• Flow control valves and flow meters.

Completion Date December, 2011


ALJABER ENGINEERING | CORPORATE PROFILE 63

UPGRADING OF NEW AND OLD SALWA DISTILLATE AND RISING MAINS (22 KM OF PIPES)

Client Qatar Electricity & Water Co. (KAHRAMAA)

Value (USD $) 32,000,000

Project Scope Replacement of 1200 mm, 900 mm rising mains and associated pipe works from Old Salwa reservoir station and
New Salwa reservoir station.

Replacement of existing 1200 and 1400 mm pipe works and construction of new 1400 mm distillate main segment
including all associated pipe works from New Salwa to immigration interchange.

Extension of new 600 mm rising main and associated pipe works along Waab Street, from Fourosiyah to Khalifa
Stadium.

Completion Date September, 2007


(0.4) POWER GENERATION, SUBSTATIONS AND DESALINATION PLANTS
UMM AL HOUL POWER PROJECT - PACKAGE A (CIVIL & BUILDING WORKS) & PACKAGE B (HVAC WORKS)

Client Hitachi Zosen Corporation

Value (USD $) 100,000,000

Project Scope The Major Scope of the Project consists of:


For Package A (Civil & Building Works)
MSF Plant Area
• MSF Switchgear Building – 3,540 m2
• Demister Acid Cleaning Unit
• MSF Unit – 1 Nos.
• Roads & Paving
PWT (Remine) Plant Area
• Remine Switchgear Building - 1,747 m2 Cable Trenches Equipment Foundations
• Generator System Building - 168 m2 Underground Pipelines
RO Plant Area
Civil Works
DAF - 7,648 m2 DAF Sunshades HVAC Works Cable
Trenches Underground Piping Roads & Paving
Building Works
UF Building – I & II - 3,837 m2 each RO Building - 9,264 m2 RO Electrical Building - 4,737 m2
Control Building - 305 m2 Chemical Building - 1,075 m2
Waste Water Treatment Building - 450 m2

Completion Date Ongoing
ALJABER ENGINEERING | CORPORATE PROFILE 65

MAJOR CIVIL WORKS RELATED TO THE CONSTRUCTION OF DISTILLERS AND BOILERS AREAS, INTAKE STRUCTURE
AND POTABLE WATER RESERVOIRS FOR 45 MILLION GALLONS PER DAY WATER DESALINATION PLANT AT RAS ABU
FONTAS.

Client Fisia Italimpianti

Value (USD $) 76,000,000

Project Scope Distillers area and intake structure


• Intake and outfall structures & Equipment and pipe rack foundations
• Road works / Pipe trenches
• Local control room, Chlorination building and C02 production building
• Water basins and pumps well
• Seawater screening and pumping station
Boilers area
• Storage tanks
• Local control rooms, switchgear and control room buildings
• Pipe rack and equipment foundations, boilers and stack foundations
Potable water reservoirs
• Potable water reservoirs 102,000 m2 (2 Nos.)
• Potable water pumping station
• Equipment foundations & Flow meters and valve pits

Completion Date March, 2010


CIVIL WORKS RELATED TO THE CONSTRUCTION OF 40 MILLION GALLONS PER DAY WATER DESALINATION PLANT AT
RAS LAFFAN.

Client Fisia Italimpianti and Enel Power

Value (USD $) 20,000,000

Project Scope All associated civil works to build 40 million gallons per day desalination, blending and demineralization plants.

• Installation of temporary facilities and lay down area for this project and future expansion
• Bulk earth works
• Concrete foundations for 4 main desalination units
• Supply and discharge stations including U.G. GRP pipe works
• Onsite GRP pipelines of various diameters
• Main pumps structure and chemical dosing units
• Re-mineralization structure including water tight structure
• Main switchgear and control buildings (3 Nos.)
• Electro - chlorination building (1 No.)
• New roads and walkways with all associated civil works
• Construction of cooling tower
• Construction of 220 KVA cable corridor involves 80,000 m3 of excavation

Completion Date May, 2003


ALJABER ENGINEERING | CORPORATE PROFILE 67

(0.5) SEWAGE TREATMENT PLANTS, DISTRICT COOLING PLANTS AND


PUMPING STATIONS
ENGINEERING, PROCUREMENT, CONSTRUCTION, TESTING & COMMISSIONING OF THE DISTRICT COOLING PLANT-3 IN
WEST BAY

Client Qatar District Cooling Q.C.S.

Value (USD $) 87,000,000

Project Scope The Works include the design, supply, delivery, erection and installation on site of a district cooling plant with a
guaranteed capacity of 35,000tons of mechanical refrigeration plus 5,000 tons thermal energy storage tank (TES)
capacity, serving the West Bay area including architectural and civil works and all necessary mechanical, electrical,
plumbing and fire (“MEPF”) equipment and installations, associated structures, and the civil works of Kahramaa
substation.
The major elements are:

• Construction of plant building including all civil and architectural works
• MEP services complying with the final plant capacity
• District Cooling Process work serving 35,000 RT plus 5,000 RT TES tank
• Construction of Primary Substation

Completion Date Ongoing


REFURBISHMENT AND UPGRADING WORKS FOR VARIOUS FOUL AND STORM WATER PUMPING STATIONS INCLUDING
CIVIL, MECHANICAL ELECTRICAL AND HVAC WORKS.

Client Public Works Authority (Ashghal)

Value (USD $) 53,000,000

Project Scope The refurbishment and upgrading of four (4) foul pumping stations and two (2) storm water pumping stations including:

• Civil works
• Temporary bypass works, wet and dry well works
• Rising main works and mechanical works

Completion Date February, 2016 (Ongoing)


ALJABER ENGINEERING | CORPORATE PROFILE 69

CONSTRUCTION OF TREATED SEWAGE EFFLUENT NETWORK (TSE) T6 TO T7 INCLUDING 48 KM OF TSE MAINS

Client Ministry of Municipal Affairs and Agriculture (MMAA)

Value (USD $) 13,000,000

Project Scope Construction of 48 Km of treated sewage effluent network to service the north of Doha area including:

• Various TSE mains HDPE pipes 300 - 600 (mm)


• D.I. pipes laid over the channel hung on the parapet of the bridge
• Air valves circular type
• Gate valves circular type
• Washouts circular type
• Distribution chambers rectangular type
• TSE pipes installed by non-disruptive method
• Partial TSE mains HDPE ducts installed by NDM
• Remote control irrigation systems for primary and secondary roads

Completion Date April, 2004


(0.6) LANDMARK BUILDINGS
QATAR PETROLEUM DISTRICT (A JOINT VENTURE WITH BOUYGUES AND MIDMAC CONTRACTING).

Client Barwa Real Estate Company

Value (USD $) 1,301,000,000

Project Scope The Barwa Financial District (BFD) is situated in Doha’s new business district in West Bay with approximately built-up
area of 700,000 m2 as detailed below:

• Elevated car parking


• 15 Podiums: Retail + Technical
• 10 Towers: Offices - Shell & Core
• Hotel & Convention Center
• Primary substation
• Energy Center

Completion Date December, 2016


ALJABER ENGINEERING | CORPORATE PROFILE 71

DUBAI TOWER IN DOHA

Client Meraas Development L.L.C

Value (USD $) 400,000,000

Project Scope Construction of a new mixed-use corporate tower in the West Bay district of Doha. It will contain world-class retail,
offices, hotel, serviced apartments and residential units. It has been envisioned that upon completion, the project will
be the tallest building in Doha housing both residential and commercial establishments.

The scope consists an 84-storey tower with total built-up area of 295,000 m2 detailed as below:

• Residential space 31 floors


• Office space 29 floors
• Five-star boutique hotel 13 floors
• Retail space 2 floors
• Ballroom
• Meeting facilities
• Business center
• Swimming pool and Spa
• Associated facilities

Completion Date On Hold - Design Changes


ALWAHA CLUB

Client RasGas

Value (USD $) 7,000,000

Project Scope Construction of one storey concrete structure building with a total buit up area of 7300 m2 includes a metal decking
roofing for the multipurpose hall with all associated MEP, telecommunications, HVAC and fire fighting system.

• Restaurant, snack bar and private dining room


• Lounge and meeting rooms
• Recreational rooms
• Multi- purpose hall that functions as a theatre
• Gymnasium
• Children’s nursery
• Administration offices
• External swimming pool
• Shaded paddling pools
• Play areas and mini golf course

Completion Date March, 2002


ALJABER ENGINEERING | CORPORATE PROFILE 73

ALJABER ENGINEERING HEADQUARTERS - FOX HILLS PLOT NO. MU-B04, LUSAIL-QATAR

Client AlJaber Holding

Value (USD $) 34,000,000

Project Scope The site situated at Fox-Hills District, Lusail, is being developed into an office building. The project
works comprises but is not limited to the following:

• Mobilization, Fencing, Excavation, Shoring and Dewatering.


• Construction, completion, handover and maintenance of an office building consisting of three
• basements, ground, mezzanine, five floors and roof to a total built-up area of 14,000-m2 with required
electro-mechanical services.
• Hard and soft landscaping including external services as indicated in the tender drawings.

Completion Date September, 2015


RESOURCES
ALJABER ENGINEERING | CORPORATE PROFILE 75

OFFICES
JEC’s head office is located Fox Hill, Lusail. Our offices are equipped with latest IT infrastructure to meet the international
standards and requirements in order to meet our local and international clients’ expectations.

FABRICATION WORKSHOP
JEC’s philosophy is to achieve maximum efficiency of fabrication productivity. JEC has established state of art
fabrication workshop facilities equipped with new machines, equipment and tools.

Our fabrication workshop is situated in Al Khor Industrial Area close to the Ras Laffan Industrial City where all the major
clients are located.

PMV FACILITIES
JEC has invested heavily in purchasing new equipment to be able to execute the upcoming mega projects. In addition,
JEC has established two central PMV workshops located in Salwa Industrial Area and Al Khor Industrial Area. Our
continuous preventative maintenance is carried out by a dedicated and trained team. JEC has the largest fleet count in
the State of Qatar exceeding 1,800 pieces of machinery.
ALJABER ENGINEERING | CORPORATE PROFILE 77

EQUIPMENT FLEET

Description No. Description No.


Lifting Equipment 77 Others 927
Mobile Crane 26 Generator 165
Tower Crane 4 Tower Lights 367
Man Lift 3 Concrete Mixer 15
Forklift &Tele Handler 22 Power Floats 9
Self-Loader 22 High Water Pressure Pump 20
Earth Works 775 Asphalt Cutters 3
Trencher / Surface Miner 7 Vibrators 52
Bulldozer 30 Hydro Testing Pump 22
Back Hoe (JCB) 31 Air Compressor 78
Excavator 169 Dewatering Pump (6” & 3”) 131
Wheel Loader 67 Welding Machine 65
Uni-Loader 33 Power Screen & Vibratory Screen 15
Water Tank Truck 3 Mobile Jaw Crusher & Impact Crushers 20
Roller 67 Sand Plant 1
Compactor 64 Kerb Casting Machine 1
Grader 25 Interlock Laying Machine 1
Tipper Truck & Trailer 247 Vehicles 596
Articulated Dump Truck 32 Buses 149
Transport Equipment 27 Pickups 283
Trailer with Low Bed & Flat Bed) 24 Cars 164
Recovery Truck & Pickup 3
Grand Total 2,402
ALJABER ENGINEERING | CORPORATE PROFILE 79

STAFF & MANPOWER

Description No
Management Staff 234
Top Management 8
Business Development 2
Estimation Department 33
Procurement Department 28
Commercial and Contract Department 41
Planning & Cost Control Department 28
Technical Department 3
Finance & Accounts Department 32
Information Technology 16
Human Resources Department 32

Projects Staff 9,494


Operation Civil 966
Operation MEP 857
Quality, Health, Safety & Environment 345
Project Technical Staff 43
HR Department Support Staff (Site Admin & Camps) 54
Project Workforce (Skilled & Unskilled Labor) 3,871
Drivers & Operators 2,119
PMV Department 1,028
Crusher Operations 73
Main Store Operations 50
Security Department 88
Grand Total 9,728
SUSTAINABILITY
INTEGRATED MANAGEMENT SYSTEM (IMS)

Quality, Health, Safety and Environment


JEC places emphasis on internally improving the physical and social environments in which employees operate in. We
constantly perform risk management techniques to identify the dangers employees can encounter in the workplace.
Preventing these problems are highly beneficial and results have shown that a safe and hygienic environment has
led to a higher productivity. Our standards of procedure and policies are implemented to ensure employee safety and
health is an action taken proactively and controlled by the top management.

In QHSE (Quality, Health, Safety and Environment), JEC continues to be one of the leading performers within our
industry sectors.

JEC is striving to continually improve the performance in QHSE management system and continually improving our
Quality, Health, Safety and Environment performance is one of our key strategic objectives. AlJaber Engineering’s
QHSE objectives are given equal value with other business objectives and being monitored by top management.

The quality of everything we make and do brings value to our customers and justifies their decision to do business
with us.

The protection of human health, personal safety and environmental rank at the highest level of importance to JEC.
We operate in a diligent and responsible manner consistent with other world-class corporations and aligned with our
stated QHSE business goals and policy.

JEC empowers and supports our associates in their ongoing efforts to prevent accidents of all kinds and to promote a
safe environment where-ever they go. We use comprehensive management systems to demonstrate our commitment
to Quality, Health, Safety and the protection of our Environment and to the principles of our QHSE Policy, bringing
value to our associates, customers and the community.

Responsibility for Quality, Health, Safety and Environment rests at the top management level of AlJaber Engineering
and is transferred to down the line for implementation. Everyone in our organization is accountable for QHSE
performance in their respective area. JEC embarked upon a number of behavioral safety initiatives to complement
our procedures and to seek to ensure that everyone engages fully in matters.
ALJABER ENGINEERING | CORPORATE PROFILE 81

CERTIFICATIONS
• ISO & OHSAS Certifications
• Quality & HSE Policies
• Safety Certifications & Achievements
• 2 Million Man Hours without a lost time incident. Presented By NDIA.
• 20,000,000 Man Hours with no lost time incidents. Presented by CTJV.
• 1,000,000 Man Hours without lost time accident at NDIA. Presented by NDIA.
• 5,000,000 Man Hours without LTI at Ras Abu Fontas - A1 Project.Presented by Fisia Italimpianti
• 1,000,000 Man Hours without LTI & with outstanding Safety Performance. Presented By LUSAIL.
• 250,000 Man-Hours without LTI under Onshore Flow Assurance Project Contract. Presented by RasGas.
• 6,200,000 Man-Hours without LTI. Presented by KAHRAMAA - Water Project Department.
• Appreciations
AFFILIATES

ARABIAN SPECIALIZED MATERIALS AL WATANIYA CONCRETE

Arabian Specialised Materials Company ASMA is part Al Wataniya Concrete is the first company in the market
of the AlJaber Group and specializes in trading, supply to receive certification from the National Ready Mix
and manufacture of a wide range of quality products and Concrete Association (NRMCA) and from Qatar General
services to a diverse sphere of sectors and industries. Organization for Standard and Metrology (QGSM).

ASMA has the ability to deliver the right product The Al Wataniya Concrete corporate strategy is to
from the right supplier. ASMA achieve this through integrate processes and services to ensure delivery of
many partnerships and associations with world-class high quality, customer-centric timely products.
companies in Europe, America, Canada and India.
Al Wataniya prides itself for being the first company in
ASMA has been serving the market since 1996. the market to acquire NRMCA and QGSM certifications.
ASMA provided construction materials and solutions Al Wataniya’s commitment to excellence and quality
to numerous clients in several industries including is sustained by the dedication of its team-oriented,
infrastructure, buildings, railway, water, electricity, Oil & highly qualified and experienced team of engineers and
Gas, and petrochemicals. professionals who utilize their know-how of the gulf
ASMA provides a wide range of products such as: market to deliver concrete efficiently and in a timely
• Formwork & Scaffolding manner.
• GRP & Steel Sectional Water Tanks
• Garbage & Linen Chute System To this effect, Al Wataniya Concrete, established in
• General Fabrication Works July 2005, has positioned itself as one of the leading
• HVAC Ducts producers and suppliers of ready-mix concrete in Qatar.
• Aluminum access covers Al Wataniya currently operates 13 plants that are spread
• Power Cables across the State of Qatar to fulfill the country’s escalating
• Street Lighting Poles, Fixtures, Luminaries construction and infrastructure needs.
• Granite curbs and pavers
• GRP access covers Contact Details:
• GRP pipes LOAI GHARAIBEH
• HDPE Lining General Manager
• Passive Fire Stopping system Mob. : +974 6685 7341
• Ironmongery & High security Locks Tel. : +974 4483 8751
Contact Details: Fax : +974 4483 2334
KHALIFA AL JAJA - General Manager Email : loai@watancon.com
Mob. : +974 5583 0496 Web. : www.watancon.com
Tel. : +974 4421 3636 Fax: +974 4421 3737
Email : khalifa.jaja@asmaqatar.com
Web. : www.asmaqatar.com
ALJABER ENGINEERING | CORPORATE PROFILE 83

CONFIDENCE ARABIAN SUPPLY CENTER ALJABER & MAKHLOUF


EQUIPMENT & TRANSPORTATION CO W.L.L.
Established in 2008, Arabian Supply Center (ASC) AL JABER & MAKHLOUF W.L.L. is a Grade A Contractor
Confidence Equipment and Transportation (CET) offers supplies heavy equipment & quality spare parts to for Road Works and Infrastructure in Qatar.
solutions for water tankers, sewage removal, garbage the Qatari markets as well as accessories and related
material as well as the transportation of these activities. products for the construction industry. Initially providing The Company has a proven track record of executing
With more than 320 employees at their disposal, CET is only its affiliates with a limited range of spare parts large scale, multi-dimensional projects, of expressways,
one of the market leaders in catering to various sectors for trucks and trailers, it soon expanded as it obtained development of urban & rural infrastructure, road
and providing assistance for any rental of equipment that exclusive distributor rights for world-class brands and maintenance & safety improvements, infrastructure and
aid companies in their operations. equipment. road works for airports, educational institutions, real
By 2012, within only four years of its founding, ASC estate developments, industrial & petro-chemical plants,
CORE COMPETENCE: became the exclusive dealer for AKSA generators in sports stadium, commercial and residential communities.
Confidence Equipment and Transportation (CET) offers Qatar, followed by Sandvik rock tools (Rammer and
solutions for the supply of sweet water and Treated Bretec) in 2013. One year later ASC acquired exclusive Al Jaber & Makhlouf’s core business activities comprise
Water (TSE), tanker rentals, removal of Sewage water, dealership for its flagship product: Hitachi construction of earth works, Infrastructure works , road works , road
Garbage material, construction waste, Hazardous & non- equipment. This year, ASC’s success story continues with marking works , asphalt texturing and coating works and
hazardous waste as well as the transportation of these its appointment as the sole distributor of LUK lubricants landscaping works .
activities since its inception in 2002, operating 150 plus in Qatar.
vehicles in all corners of the State of Qatar with more The Company owns large fleet of the latest equipment
than 320 plus employees at their disposal, we are a ASC’s reputation is based on three principles: providing and qualified workforce to deliver the works to the highest
well known name in the waste management industry & quality products, at the right price, and following it with quality and safety standards.
equipment rental Business. excellent customer service.
Al Jaber & Makhlouf motto is satisfaction of its clients
NATURE OF SERVICES: Our team of experts has extensive experience with our while adopting safe working practices and protection of
• Rental of Treated water tankers (TSE) products and is fully prepared to meet all customer needs. environment.
• Rental of Sweet water tankers With continued investment in people, processes and
• Supply of Sweet water resources, ASC is well positioned to remain one of the Contact details:
• Removal of Sewage water leading suppliers of construction, industrial and transport ROGER MAKHLOUF
• Removal of Garbage Material, Construction waste, equipment, spare parts and related products in both the Managing Director
mixed waste and other wastes. Qatari market and throughout the region. Mob. : +974 5525 8558
• Supply of 7m3 Skip boxes Tel. : +974 4040 9600
Contact Details: Fax : +974 4040 9797
TAREK BARGHOUTHI - Manager Contact Details: Email : roger.makhlouf@jabmak.com
MIKE HAMZEH - Operation Manager HISHAM HADID - Chief Executive Officer Web. : www.jabmak.com
Mob. : +974 5503 8876 Tel. : +974 4458 0623, +974 4458 0635
Tel. : +974 4469 0714 Fax: +974 4469 0735 Fax : +974 4458 0562
Email : tabarghouthi@cetqatar.com Email : info@asc.qa
: mhamzeh@cetqatar.com Web. : www.asc.com.qa
DELMON SCAFFOLDING BIMTEC EMCON

Delmon Scaffolding & Formwork has been operating in Engineering Management is a specialized form of Emirates Concrete & Steel Coating Works (EMCON) was
the Gulf for more than 30 years. It manufactures, supplies management that is concerned with the application established in 1978 and started its Painting and Special
and hires various types of scaffolding and formwork of engineering principles to business practice. It is the Coating Division in 1987.
systems. Over the years Delmon has established a name ability to bring together in house engineering, value
in the market place for its technical expertise, quality engineering, information management, site construction EMCON has over 300 highly qualified employees with
products and ability to deliver. It has branches in the management and process management into a unified access to additional workforce in Qatar/UAE.
U.A.E, Oman, Qatar, and Saudi Arabia. BIM environment. This will yield the most efficient and
cost effective outcome that benefits the construction EMCON has a fleet of Airless Spray equipment, Injection
In addition to D-Lock systems for Scaffolding, Delmon is operations’ lifecycle. BIMTEC has shaped this platform Equipment, Floor Grinders, Shot Blasting Machines,
the exclusive distributor of ULMA products in Qatar, UAE, to cater to the local and international regions and has Water Jetting equipment, Compressors, Sand Blasting
Oman, Kuwait and Bahrain which can provide solutions excelled to become one of the most sought after EMO equipment, Guniting and Shotcreting equipment.
to client in order to achieve their targets in a timely companies in the region.
manner and within budget, for any type of structure, any EMCON is a leader in Qatar & UAE in the following fields:
geometry for any kind of construction project. Our offering range within the BIM/EMO Environments
from • Fireproofing
Delmon’s scaffolding & formwork system are • Protective Coating for Concrete & Steel
manufactured according to specifications of the • Virtual design Construction • Pipe Coating
International Construction Standards, Health & Safety in • Vertical Planning • GRP Lining
Workplace, Environment Management System and the • Project Management • Surface Preparation
Engineering Council. • Health and Safety Simulation • Epoxy & Traffic Floor Coating
• 3D Laser Scanning • Special Effect Paint, Calligraphy and Multicolor Paint
Delmon has a reputation for providing a reliable and • 3D Mobile Mapping • Tank Coating
dependable service backed up by its vast products range, • Data Management for Facilities Management • Concrete Repair
its management and sales teams, experienced design • Crack/Leakage Injection
engineers, supervisors and inspectors. Contact Details: • Structural Strengthening
Please contact us so we can become part of your team. RAMZI I ABU QAMAR • Guniting/Shotcrete
General Manager • Polyurea
Contact Details: Mob. : +974 5546 6669 • Liquid Applied Flooring Solutions
AMER ARAJI Email : rqamar@bimtec-eng.com
General Sales & Operations Manager Web. : www.bimtec-eng.com Contact Details:
Mob. : +974 5522 3747 MOHAMMED HAMZEH
Tel. : +974 4435 3131 General Manager
Fax : +974 4435 3232 Mob. : +974 5510 2006
Email : amer@delmongroup.net Tel. : +974 4476 1417
Fax : +974 4466 2170
Email : mhamzeh@sat.qa / info@emcongcc.com
ALJABER ENGINEERING | CORPORATE PROFILE 85

HYDROSERV VIJAY ARABIA FIRE & SECURITY URBAN CONCEPT W.L.L.


SYSTEMS W.L.L.
HYDROSERV is a leading name in dewatering and Urban Concept W.L.L. is a Design and Build Contractor of
specialized in ground water treatment, pumping services Vijay Arabia Fire & Security Systems WLL (VASS) is one Landscape and Urban Spaces.
for fluid handling applications. With vast knowledge and of the fastest growing integrated Fire & Security Specialist It has a long history in designing large scale landscape
experience of the complex hydrogeological conditions Companies. Established in Qatar in 2007, VASS and urban projects, such as the New Doha International
encountered, Hydroserv can engineer a solution to safely specializes in turnkey industrial and commercial projects. Airport, Barwa City, Oxyen Park Qatar Foundation, Ras
manage the risks associated for any dewatering project. From conceptualizing, design, supply, installation, Abou Abboud Interchange.
Hydroserv offers a complete line ground water treatment, testing, commissioning & maintenance – complete Presently we are building a horse race track and all the
water pumps and related equipment for a range of array of solutions are offered to the customers through a facilities around it for the Ministry of Youth and Sports in
applications, including diesel, hydraulic and electric professional team of more than 250 personnel. Qatar.
powered centrifugals, electric submersibles, light towers We have a plant nursery for outdoor plants.
and diesel generators. Solution Constellation offered by VASS includes:
The principle that we can support the growth of industry, Our primary activities are:
infrastructure and community while protecting the • Fire Detection System – Addressable, Conventional,
integrity of the natural environment is highly important to Enterprise Solutions • Landscape design and construction.
us. Our approach, our equipment and our services cater • Fire Protection System – Hydrant, Sprinkler, • Hardscape design and construction
to site specific environmental sensitivities. Foam, Gas Suppression (FM200, Novec), Pre-action • Irrigation Design and construction
Hydroserv is also providing the services below in Oman, & Deluge Systems • Garden lighting design and construction.
UAE, Kuwait as well as Qatar. • Passive Fire Protection Contractor & Supplier of Fire • Green roof gardening supply and construction
Services: Door, Sealant, Cable coating, Mortar. • Turf track specialist contractor
• Dewatering • Security Systems - Access Control, CCTV, Intruder • Supplier and installer of turf reinforcement products
• Over Pumping Works Alarm & AV systems.
• Sewage Works • Annual Maintenance for Fire Fighting and Fire Alarm Contact Details:
• Emergrncy Pumping Systems. FOUAD HANNA FRANGIEH
• Pipe Laying Managing Director
• Rental and Sales Contact Details: Mob. : +974 5556 6480
• Pressure Washers & Wheel Washers HEMAL SALOT Tel. : +974 4450 9815
• Ground Water Treatment General Manager Fax : +974 4450 9815
• Hydro-Dynamic Flushing or pipeline commissioning Mob. : +974 5521 5486 Email : frangieh@urbanconceptcontracting.com
Tel. : +974 4019 2900
Contact Details: Fax : +974 4019 2929
TOM DOYLE Email : hemal.salot@vijayarabia.com
General Manager Web. : www.vijayarabia.com
Mob. : +974 7442 2245
Tel. : +974 4421 1325, Fax : +974 4472 7315
Email : tom@hydroserv.qa
Web. : www.hydroserv.qa
STREAM ACOUSTIC & THERMAL MARKAZ

Stream Acoustic & Thermal (SAT) was established in 2005 as reliable providers of Markaz, at Fox Hills, in the heart of Lusail City, consists of fully Serviced Offices providing
acoustic and insulation solutions. By applying their vast experience and support of first an ideal solution for companies to start smooth operations instantly. Markaz, a state of
class manufacturers, SAT became one of the major solution providers in the state of the art Business Center, is located where the future of Doha will be built. With over 60
Qatar in no time. furnished and fully serviced units, our clients feel at home with their own personalized
office space, giving them the flexibility to operate their daily business, in their own way,
In 2013, SAT became a member of AlJaber Group of companies, one of the most instantaneously.
reputable business groups in Qatar, which helps strengthen our presence in the market.
Whether your partners and associates are in New York or Hong Kong, at Markaz your
SAT is a specialized solution provider of sound absorption, sound insulation, and isolation operations will carry on easily around the clock and throughout the week. Our luxurious
for both vibration and structural born noise. It is also specialized in thermal and Water conference and meeting rooms are internet-enabled, allowing your business partners
Proofing for International Contractors as well as grade A local contractors targeting high around the world to join you within minutes.
end / prestigious projects.
Markaz is based at AlJaber Engineering Head Office, where warm and professional
We offer our clients solutions empowered by the latest standards and technologies and environments encourage growth and prosperity.
in compliance with international standards and building codes.
Markaz offers a variety of services:
Our products and solutions cover:
• High Speed Internet Network
• Sound Absorption • 24/7 Office Access
• Sound & Impact Insulation • Daily Office Cleaning
• Thermal Insulation • High-tech Fully Equipped Conference/Meeting Rooms
• Vibration Isolation • Administrative Services
• Water Proofing Insulation • Printing & Scanning services
• Business Lounge
Contact Details: • On site IT support
MOHAMMED HAMZEH • CCTV
General Manager • Fitness Center
Mob. : +974 5510 2006 • Parking
Tel. : +974 4038 7201 Fax : +974 4038 6824 • Café Restaurant
Email : mhamzeh@sat.qa
Web. : www.sat.qa Contact Details:
Markaz Management
Mob. : +974 5082 1708
Tel. : +974 4040 9898 Fax : +974 4040 9899
Email : info@markaz.qa Web. : www.markaz.qa
ALJABER ENGINEERING | CORPORATE PROFILE 87

TMS FORMWORK

TMS Formwork Qatar is a complete provider of formwork, shoring and scaffolding


systems. We offer an advanced range of product lines, which is supported by a large
group of skilled engineers, who excel in the quality of service offered. This is what
underpins TMS’s standing in international markets.

TMS is aware of all the increasing challenges of the modern construction, which
continuously raise the bar in building higher, wider and faster. Thus our aim is to cope
with all these engineering & planning challenges to provide the best and most cost-
effective solutions through developing stronger, faster but even safer systems to our
valuable customers.

TMS was one of the main formwork technology exhibitors at Bauma 2016 – Munich,
Germany. Our ambitions and continuous efforts to excel have led us to success in
winning and delivering on signature Projects such as the Qatar Metro & Muscat Airport.

Since we position ourselves as an engineering company more than just a supplier, we


make use of all our engineering capabilities in order to sustain innovation in our products
and services. Hence, every new TMS product or service comes out with some innovative
detail. We believe this is our key differentiator in the market.

Contact Details:
KAAN ATIK
General Manager
Mob. : +974 6693 1923
Tel. : +974 4493 8940
Fax : +974 4493 8940
Email : katik@tmsformworkqatar.com
Web. : www.tms.tc
COMMITTED TO
EXCELLENCE
www.jec.qa

You might also like