You are on page 1of 9

Chart No. 1.

Building Information

Sr.
No.
1 Project name
2 City
3 Contact Details Sr. No. Name Email ID Phone No.
1
2
3
4
4 Select the building Type that
most accurately describes
building
Day time occupied built up area
24x7 occupied commercial built
up area
Total built up area*
5 total plot/ site area
6 Building is operational since
date

*Total built up area must be more than 2500 sq. m to get eligible for GRIHA rating system for existing building
Chart No. 2. Contents

Section Name Criterion Number Criterion Name Maximum Point anticipated Points
Site Parameters Criterion 1 Accessibility to basic Services 2 2
Criterion 2 Microclimatic Impact 4 2
Maintenance & Criterion 3 Maintenance, Green Procurement & 7 3
Housekeeping Waste management
Criterion 4 Metering & Monitoring 10 6
Energy Criterion 5 Energy Efficiency 20 5
criterion 6 Renewable Energy Utilization 15 0
Water Criterion 7 Water Footprint 15 0
Criterion 8 Reduction in Cumulative water 10 0
Performance
Human health & Criterion 9 Achieving Indoor Comfort Requirements 8 8
comfort Criterion 10 Maintaining Good IAQ 4 4
Social Aspects Criterion 11 Universal Accessibility & Environmental 5 5
Awareness
Bonus Points Criterion 12 Bonus Points 4 4
Total (Excluding bonus points) 100 Not eligible for
rating
Anticipated rating
Chart No. 3. Criterion 1: Accessibility to basic Services

Appraisal 1.1.1 Answer


At least 5 services within campus or within 500 m Yes/ No
from the main entrance gate

Appraisal 1.1.2 Answer


Collective transport to provide connectivity to Yes/ No
nearest public transportation nodes
Chart No. 4 Criterion 2: Microclimatic Impact

Appraisal feasibility Check Answer Feasible Maximum


Points Points
2.1.1. Analyze total number of trees planted 1 Total site/plot area Sq. m. 2
on site and demonstrate compliance with 2 Building footprint area Sq. m.
GRIHA existing building threshold of 1 tree per 3 Total built-up area Sq. m.
80 sq. m. of plot area. Total number of trees 4 Number of trees Quantity
on site must meet/ exceed the GRIHA existing
building threshold Threshold value (Total plot Sq. m.
area/No of /tree
trees on site)

2.1.2. To reduce the urban heat island effect:

1. More than 25% of the site surface visible to 1 Total area visible to sky Sq. m.
sky (including building roofs) are either soft
paved/ covered with high SRI coating (SRI >
50)/ shaded by trees/ shaded by vegetated
pergolas/ shaded by solar panels or any
combination of these strategies
2. More than 50% of the site surface visible to 2 Area under
sky (including building roofs) are either soft a Soft Landscape area Sq. m.
paved/ covered with high SRI coating (SRI > b Hard paved area with Sq. m.
50)/ shaded by trees/ shaded by vegetated vegetation and/ green
pergolas/ shaded by solar panels or any roof and/ solar panels
combination of these strategies and / China Mosaic
c Hard paved area with SRI
> 50%
Total Treated area (a+b+c) Sq. m.
Percentage treated area (Total treated
(%) area/ area
visible to sky)
Chart No .5. Criterion 3: Maintenance, Green Procurement & Waste management

Appraisal Feasibility Check Answer


3.1.1. (Mandatory)- maintenance and Do maintenance protocols exist for the following systems?
housekeeping protocols of all installed 1 Electrical system
systems a Transformers Yes/ No/NA
b Diesel generator sets Yes/ No/NA
c HT, LT panels Yes/ No
d Motors Yes/ No
2 Mechanical system
a Window/ split AC units Yes/ No/NA
b AHU Yes/ No/NA
c Cooling tower Yes/ No/NA
d Chillers Yes/ No/NA
e Pumps Yes/ No
f VRF Yes/ No
g Ventilation fans Yes/ No
h ducting Yes/ No/NA
3 Plumbing system
a Piping Yes/ No
b Fixtures and fittings Yes/ No
c Fire safety pumps Yes/ No
d Sprinklers Yes/ No
4 Metering and Sensors
a Energy Meters Yes/ No
b Water Meters Yes/ No
c Air Quality Meters Yes/ No/NA
5 Renewable Energy Systems
a Solar PV Yes/ No/NA
b Solar water heaters Yes/ No/NA
c Wind Turbines Yes/ No/NA
d Bio-gasifiers Yes/ No/NA
e Any other RE system (defined as per Yes/ No/NA
MNRE guidelines)
6 Sewage Treatment plant Yes/ No/NA
7 Waste Treatment plant Yes/ No/NA
8 Storm water drainage system Yes/ No
9 Rain water harvesting system Yes/ No/NA
3.1.2. (Mandatory)- Ensure following
In case of conditioned spaces all HVAC Are refrigerants in all HVAC equipments are CFC Yes/ No/NA
equipment are CF free and all insulation free and all the insulation used in building should
used in building should be CFCs and be CFCs and HCFCs free of do you have a phase-out
HCFCs free or phase-out plan for HCFC/ plan for HCFC/ CFC using equipment?
CFC using equipment
Firefighting equipment are Halon free Are all firefighting equipment Halon free? Yes/ No
Eligibility
Appraisal Feasibility Check Answer Feasible Maximum
points Points
3.1.3. Maintain and follow a policy of Are these products categories a part of your green 1
purchasing housekeeping material with procurement policy?
low ODP 1 Low-VOC interior paints Yes/ No
2 Low-VOC adhesives Yes/ No
3 Low-VOC sealants Yes/ No
3.1.4. Maintain and follow a policy of Is a policy for purchasing at least the following BEE 1
purchasing appliances with at least BEE 3- star rated products in place?
star rating 1 Frost-free refrigerators Yes/ No
2 Direct cool refrigerators Yes/ No
3 Tubular fluorescent lights Yes/ No
4 Room air conditioners Yes/ No
5 Distribution transformers Yes/ No
6 Electric geysers Yes/ No/NA
7 Colour televisions Yes/ No
3.1.5. Provide provision for segregation of Is there a provision for segregation of waste at Yes/ No 1
waste at source source?
3.1.6. provide dedicated storage areas for Is there a provision for different storage areas for Yes/ No 1
different types of wastes different types of wastes?
3.1.7. provide details of contractual tie- Are there contractual tie-ups with authorized waste Yes/ No 1
ups with authorized waste recyclers for recyclers for recycling waste?
safe recycling
3.1.8
1.Implement strategies to treat all Is the amount of organic waste generated more Yes/ No/ NA 2
organic waste on-site than 100 kg/day?
2.Reuse the treated organic waste on-site Is this organic waste treated and reuse on-site? Yes/ No
Chart No. 6. Criterion 4: Metering & Monitoring

Appraisal Eligibility Check Answer


4.1.1. (Mandatory)- Basic Do meters exist at all of the following points
metering requirements 1 Utility grid Yes/ No/ NA
2 On-site renewable energy system Yes/ No/ NA
3 Gas generator sets Yes/ No/ NA
4 Diesel generators Yes/ No/ NA
Do meters exist at all of the following points?
1 Municipal supply Yes/ No/ NA
2 Bore well Yes/ No/ NA
3 STP Inlet Yes/ No/ NA
4 STP outlet Yes/ No/ NA
Eligibility
Appraisal Feasibility check Answer feasible Maximum
points points
4.1.2. Advance metering Do meters exist at all of the following points? 1
requirements 1 AHUs Yes/ No/ NA
2 cooling tower Yes/ No/ NA
3 Chillers (BTU meters) Yes/ No/ NA
4 Distributed units (split/ window ACs) Yes/ No/ NA
5 Indoor lighting Yes/ No/ NA
6 Outdoor lighting Yes/ No
7 Basement parking lighting Yes/ No
8 Community/ recreation center Yes/ No/ NA
9 Water pumping Yes/ No 1
10 Irrigation Yes/ No/ NA
11 Captured rain water Yes/ No/ NA
12 Fresh water and waste water consumption Yes/ No/ NA
at each building
Are sensors for air quality installed in following area?
1 Basement and/ or closed parking spaces Yes/ No/ NA 1
2 All regularly occupied spaces Yes/ No
4.1.3. one way communicable Are one way communicable smart meters installed for
smart meters and monitoring these categories of meters?
systems 1 Energy Yes/ No 3
2 Water Yes/ No
3 Air quality Yes/ No
4.1.4. Connect to GRIHA IT Are two way communicable smart energy meters installed? Yes/ No 4
platform
Total 10

You might also like