SECTION A

Raw Material Costs Qty Unit of Measure Aprox.Cost/Unit Total Cost


Bricks 25000 No 5.5 137500
Cement 300 Bags 300 90000
Iron 2 Tonnes 40000 80000
Sand 25 Trucks 700 17500
Concrete Mixture 3 Units 4000 12000

Doors 2 10000 20000

Darwajas 2 22500 45000


Slab 30000
Wiring 40000
White Wash 5000
SARUKU KARRALU 16000
Material Cost 493000
Kalasaalu TENTATIVE 10000

Cost of Material Includes temple construction, Basement,Slab & Mandapam


Total Cost = Section A+ SectionB = 11,1

TEMPLE CONSTRUCTION Inside 7 Feet 1 Inch


Outside 8 feet 9(1/2) inch
SECTION B
Labbour costs Qty Unit of Measure Aprox.Cost/Unit
Temple construction Labour Cost 2 Temple 150000
Basement Labour Cost

Prathishtalu expenses

(Homamu,Prathistha with Transfer of Vigrahas etc)

Yagasala
Bhojanala Expenses

Labour costs

Labour Cost
st = Section A+ SectionB = 11,14,000

Dhwajasthambalu INR 2Lakhs Commited Outside people


Total Cost
300000
21000

200000

30000
70000

621000

1114000

ted Outside people


TILL DATE AMOUNT REMI
Relation Ship with
S.No Family Person Name Payee Name Payee bank Family person
1 Gopal Gopal HDFC NA
2 Gopal Kiran Friend
3 Gopal Sirish Friend
4 Gopal Mohan Friend
5 Gopal Varaprasad Friend
6 Gopal Karthik Friend
7 Gopal Chetan Friend
8 Gopal Surya Prakash Friend
9
10
11
12
13
14
15
16
TILL DATE AMOUNT REMITTANCE
Date of Transfer Amount(INR) Reference No (If Applicable)

50000
5000
5000
2000
5000
3000
10000
10000
Name to display on the Temple Wall

Kruthiventi venkata subbayya & Lakshmikumari


Inside 7 Feet 1 Inch
Outside 8 feet 9(1/2) inch