Chimney - Heavy Lifting
1. GENERAL
1.1. PROJECT INFORMATION
Project Name :-
Description : This document covers structural check of concrete bucket
lifting.
2
Rev 0
Chimney - Heavy Lifting
B. Concrete Weight
Volume = 0.8 m3
Weight = 1840 kg
3
Rev 0
Chimney - Heavy Lifting
T
Hook diameter, d = 29 mm
Type = deform bar
Yield strength, fy = 400 MPa
Sectional area, As = 661 mm2
Tensile strength, Tn = 264 kN
Allowable tensile force, T_all = 174 kN
= 18.8 deg
T = 0.5*P / sin()
= 33 kN
weld
4
Rev 0
Chimney - Heavy Lifting
Fw >> 0.5P
30.6 >> 10.6 OK!
ratio = 0.35
B. Concrete Weight
Volume = 1.0 m3
Weight = 2300 kg
5
Rev 0
Chimney - Heavy Lifting
T
0.5*P = 13.5 kN
Hook diameter, d = 22 mm
Type = deform bar
Yield strength, fy = 400 MPa
Sectional area, As = 380 mm2
Tensile strength, Tn = 152 kN
Allowable tensile force, T_all = 100 kN
= 53.5 deg
T = 0.5*P / sin()
= 17 kN
6
Rev 0
Chimney - Heavy Lifting
weld
Bolt diameter db = 36 mm
Area Ab = 1017 mm
Bolt grade, fb = 825 MPa
7