DESIGN CALCULATIONS OF CHEMICAL HOUSE FOR PRE TREATMENT PLANT PAGE

OWNER: KARNATAKA POWER CORPORATION LIMITED


35
WATER AUGMENTATION FOR BELLARY
PROJECT:
TPS UNIT -3

6.2 DESIGN OF SUNSHADE (1000 mm wide)


6.2)

Concrete grade
Clear cover
fy  fckbd
Density of concrete =
Depth D =
Breadth B =
d =
Length of span. =

Loading on slab
Dead load
1) Self weight of slab
=
=
Partial safety factor for DL =
Partial safety factor for LL =

150
1000
116
3

OWNER:

PROJECT:

DESIGN OF SUNSHADE (1000mm wide)

mm
mm
mm
DESIGN CALCULATIONS OF CHEMICAL HOUSE FOR PRE TREATMENT PLANT

1m
25

2.5
Steel Grade = Fe
30 mm @ Top & bottom
1.5
1.5
T/m3

= 0.15 X
KARNATAKA POWER CORPORATION LIMITED

WATER AUGMENTATION FOR BELLARY

2.5
TPS UNIT -3

500

T/m^3 0.375 T/m²


PAGE

36

2) Finish = 0.125 T/m²


0.50 T/m²
Live load
3) Live load = 0.075 T/m²

Total D.L = 0.5 T/m² Total L..L = 0.075 T/m²

0.50 X 1 ^2 0.075 X 1 ^2
Moment for DL = = 0.250 Tm/m, Moment for LL= = 0.038 Tm/m
2 2
Total Moment = 0.25 + 0.038 = 0.288 Tm/m
Total factored moment ( Mu ) =( 0.250 X 1.5 ) + ( 0.0375 + 1.5 )
= 0.431 Tm/m
Mu / bd^2 = 0.320

Pt % = 0.075 %
Ast reqd. = 87 mm^2/m

Pt min = 0.12 %
Ast min = 0.12
X 1000 X 150 = 180 mm^2/m
100

SUMMARY :
PROVIDE D = 150 mm

Provide 8 tor @ 200 c/c at top in short direction.


(Provided Ast. = 251 mm^2/m)
Provide 8 tor @ 200 c/c at bottom & top in long direction & bottom short direction
(Provided Ast. = 251 mm^2/m)

Check for deflection :-

Ast req. = 180 mm^2/m


Ast prov. = 251 mm^2/m

Area of c/s of steel required


fs = 0.58 X fy
Area of c/s of steel provided
180
fs = 0.58 X 500 = 207.9681
251
Percentage tension reinfocement = 0.216 %
Percentage compression reinfocement = 0.216 %
Modification factor = 1.60 ( IS 456, fig - 4 )

Modification factor = 1.08 ( IS 456, fig - 5 )

Span 1000
= = 4.99 < 7
Effective depth X M.F. 116 1.6 X 1.08 ( Permissible values for cantilever slab as
Hence safe per IS 456, Clause no. 23.2.1 )
DESIGN CALCULATIONS OF CHEMICAL HOUSE FOR PRE TREATMENT PLANT PAGE

OWNER: KARNATAKA POWER CORPORATION LIMITED


37
WATER AUGMENTATION FOR BELLARY
PROJECT:
TPS UNIT -3

6.3 DESIGN OF SUNSHADE (600mm wide)


2
6.3)

Concrete grade
Clear cover
fy  fckbd
=
=
Partial safety factor for DL =
Partial safety factor for LL =
Density of concrete =
Depth D =
Breadth B =
d =
Length of span. =

Loading on slab
OWNER:

PROJECT:

DESIGN OF SUNSHADE (600mm wide)

125
1000
91
M

mm
mm
mm
DESIGN CALCULATIONS OF CHEMICAL HOUSE FOR PRE TREATMENT

0.6 m
25

1.5
1.5
2.5
Steel Grade = Fe
30 mm @ Top & bottom

T/m3
KARNATAKA POWER CORPORATION LIMITE

WATER AUGMENTATION FOR BELLARY


TPS UNIT -3

500

Dead load
1) Self weight of slab = 0.125 X 2.5 T/m^3 0.313
2) Finish = 0.125
0.44
Live load
3) Live load = 0.075

Total D.L = 0.4375 T/m² Total L..L = 0.075 T/m²

0.44 X 0.6 ^2 0.075


Moment for DL = = 0.079 Tm/m, Moment for LL=
2
Total Moment = 0.07875 + 0.014 = 0.092 Tm/m
Total factored moment ( Mu ) =( 0.079 X 1.5 ) + ( 0.0135 + 1.5
= 0.138 Tm/m
Mu / bd^2 = 0.167

Pt % = 0.039 %
Ast reqd. = 35 mm^2/m

Pt min = 0.12 %
Ast min = 0.12
X 1000 X 125 = 150 mm^2/m
100

SUMMARY :
PROVIDE D = 125 mm

Provide 8 tor @ 200 c/c at top in short direction.


(Provided Ast. = 251 mm^2/m)
Provide 8 tor @ 200 c/c at bottom & top in long direction & b
(Provided Ast. = 251 mm^2/m)

Check for deflection :-


Ast req. =
Ast prov. =

fs =

fs =
0.58

0.58
fy  fckbd
X
150
251

500
Percentage tension reinfocement =
OWNER:

PROJECT:

mm^2/m
mm^2/m

150
251

Percentage compression reinfocement =


Modification factor =

Modification factor =
2.00
DESIGN CALCULATIONS OF CHEMICAL HOUSE FOR PRE TREATMENT

Area of c/s of steel required


X fy
Area of c/s of steel provided

1.10
= 173.3068
0.276
0.276
( IS 456, fig - 4 )
KARNATAKA POWER CORPORATION LIMITE

%
%

( IS 456, fig - 5 )
WATER AUGMENTATION FOR BELLARY
TPS UNIT -3

Span 600
= = 3
Effective depth X M.F. 91 2 X 1.1
Hence safe
F CHEMICAL HOUSE FOR PRE TREATMENT PLANT
PAGE

KARNATAKA POWER CORPORATION LIMITED


38
WATER AUGMENTATION FOR BELLARY
TPS UNIT -3

0.313 T/m²
0.125 T/m²
0.44 T/m²

0.075 T/m²

0.075 X 0.6 ^2
= 0.014 Tm/m
2

c/c at bottom & top in long direction & bottom short direction
F CHEMICAL HOUSE FOR PRE TREATMENT PLANT
PAGE

KARNATAKA POWER CORPORATION LIMITED


38
WATER AUGMENTATION FOR BELLARY
TPS UNIT -3

< 7
( Permissible values for cantilever slab as
Hence safe per IS 456, Clause no. 23.2.1 )
DESIGN OF CASCADE AERATOR, STILLING CHAMBER, PARSHAL
FLUME & FLASH MIXER FOR PT SYSTEM

KARNATAKA POWER CORPORATION


OWNER:
LIMITED
WATER AUGMENTATION FOR BELLARY
PROJECT:
TPS UNIT -3

11.3) DESIGN OF WALKWAY SUPPORTING BEAMS FOR WALKWAY OVER STC-1 & PF-1

INPUT DATA :
Concrete grade = M 30 Steel Grade = Fe 500
Clear cover = 30 mm Top
Clear cover = 30 mm Bottom
Breadth (b) = 300 mm
Depth (D) = 350 mm
Span (L) = 6m
Walkway load (W1) = 1 T/m (Refer Walkway design for DL+LL = 1 T/m2 x 1.0m (width) = 1 T/m
Selfweight (W2) 0.26 T/m
Total Load (W) 1.26 T/m (W1 + W2)
Mmax @ bottom = 5.68 T-m (W x L^2 / 8)
Mmax @ top = 3.79 T-m (W x L^2 / 12)

d req = Mumax x 10^7/( 0.138 xb x fck)

= Err:511 26.19 cm
= 261.94 mm

provided D = 350 mm, d = 310 mm

0 .5 f ck 4.6 M u
Ast = 1  1 2 bd
fy f ck bd

Reinforcement required

Ast required for bottom moment

= Err:511
 = 727 mm^2

Ast required for top moment

= Err:511
 = 459 mm^2
DESIGN OF CASCADE AERATOR, STILLING CHAMBER, PARSHAL
FLUME & FLASH MIXER FOR PT SYSTEM

KARNATAKA POWER CORPORATION


OWNER:
LIMITED
WATER AUGMENTATION FOR BELLARY
PROJECT:
TPS UNIT -3
SUMMARY :
Provide D = 350 mm, B= 300 mm

Provide 3 nos. 20 tor @ bottom


(Provided Ast. = 942 mm^2)
Provide 3 nos. 16 tor @ top
(Provided Ast. = 603 mm^2)
DESIGN OF CASCADE AERATOR, STILLING CHAMBER, PARSHAL
FLUME & FLASH MIXER FOR PT SYSTEM

KARNATAKA POWER CORPORATION


OWNER:
LIMITED
WATER AUGMENTATION FOR BELLARY
PROJECT:
TPS UNIT -3

SHEAR CHECK

Shear due to load (V) 7.58 T (W x L)

Vu = 11.36 T (= 1.5 x V )
t vu = Vu /bd = 1.222

Pt % provided = 1.013
tc = 0.659 N/mm^2

DESIGN SHEAR REINFORCEMENT


Sv = 0.87 x fy x Asv / ( b X ( tvu - tc ) )
= ( 0.87 X 415 X 2 X 50.27 ) / ( Err:511
= 215

MINIMUM SHEAR REINFORCEMENT

Sv = (0.87 X fy X Asv ) / ( 0.4 X b)


= 302 mm

SHEAR REINFORCEMENT

Provide 2 - Legged 8 tor @ 200 mm c/c Stirrups


0.5fk 46Muc 
A 1 bd
9/3/2016

er Walkway design for DL+LL = 1 T/m2 x 1.0m (width) = 1 T/m)


Ast0.5fk1 46Muc 2bd
Af1 bd
9/3/2016
st0.5fk 46Muc 2
fAy1 ckbd
9/3/2016
DESIGN OF CASCADE AERATOR, STILLING CHAMBER, PARSHAL
FLUME & FLASH MIXER FOR PT SYSTEM

KARNATAKA POWER CORPORATION


OWNER:
LIMITED
WATER AUGMENTATION FOR BELLARY
PROJECT:
TPS UNIT -3

11.4) DESIGN OF WALKWAY SUPPORTING BEAMS FOR WALKWAY OVER FM-1

INPUT DATA :
Concrete grade = M 30 Steel Grade = Fe 500
Clear cover = 30 mm Top
Clear cover = 30 mm Bottom
Breadth (b) = 300 mm
Depth (D) = 350 mm
Span (L) = 4.5 m
Walkway load (W1) = 0.75 T/m (Refer Walkway design for DL+LL = 1 T/m2 x 1.5m (width) / 2 = 0.75
Selfweight (W2) 0.26 T/m
Total Load (W) 1.01 T/m (W1 + W2)
Mmax @ bottom = 2.56 T-m (W x L^2 / 8)
Mmax @ top = 1.71 T-m (W x L^2 / 12)

d req = Mumax x 10^7/( 0.138 xb x fck)

= Err:511 17.59 cm
= 175.93 mm

provided D = 350 mm, d = 310 mm

0 .5 f ck 4.6 M u
Ast = 1  1 2 bd
fy f ck bd

Reinforcement required

Ast required for bottom moment

= Err:511
 = 302 mm^2

Ast required for top moment

= Err:511
 = 197 mm^2
DESIGN OF CASCADE AERATOR, STILLING CHAMBER, PARSHAL
FLUME & FLASH MIXER FOR PT SYSTEM

KARNATAKA POWER CORPORATION


OWNER:
LIMITED
WATER AUGMENTATION FOR BELLARY
PROJECT:
TPS UNIT -3
SUMMARY :
Provide D = 350 mm, B= 300 mm

Provide 3 nos. 20 tor @ bottom


(Provided Ast. = 942 mm^2)
Provide 3 nos. 16 tor @ top
(Provided Ast. = 603 mm^2)
DESIGN OF CASCADE AERATOR, STILLING CHAMBER, PARSHAL
FLUME & FLASH MIXER FOR PT SYSTEM

KARNATAKA POWER CORPORATION


OWNER:
LIMITED
WATER AUGMENTATION FOR BELLARY
PROJECT:
TPS UNIT -3

SHEAR CHECK

Shear due to load (V) 4.56 T (W x L)

Vu = 6.83 T (= 1.5 x V )
t vu = Vu /bd = 0.735

Pt % provided = 1.013
tc = 0.659 N/mm^2

DESIGN SHEAR REINFORCEMENT


Sv = 0.87 x fy x Asv / ( b X ( tvu - tc ) )
= ( 0.87 X 415 X 2 X 50.27 ) / ( Err:511
= Provide minimum shear reinforcement

MINIMUM SHEAR REINFORCEMENT

Sv = (0.87 X fy X Asv ) / ( 0.4 X b)


= 302 mm

SHEAR REINFORCEMENT

Provide 2 - Legged 8 tor @ 200 mm c/c Stirrups


0.5fk 46Muc 
A 1 bd
9/3/2016

er Walkway design for DL+LL = 1 T/m2 x 1.5m (width) / 2 = 0.75 T/m)


Ast0.5fk1 46Muc 2bd
Af1 bd
9/3/2016
st0.5fk 46Muc 2
fAy1 ckbd
9/3/2016