HAZOP Worksheets ABC XYZ FIELD DEVELOPMENT PROJECT, Central Facilities Rev C 22 May 2010

Node Function: Describe its Function/Design Intent. Review in association with the layout or location of equipment Identify any novel or first of its kind or innovative solution.

PFD Nos: P&ID Nos:


Oper/ Design Press, barg / Oper/ Design Temp, ºC / Remarks:
Causes are within nodes; consequences can be elsewhere. For vessel outlet causes are pressure issues

Node: 1 Describe the Node

Deviation Possible Causes Potential Consequences Safeguards & Procedures Recommendations Rank

No / Less Flow

More Flow

Reverse Flow Fine Print


Educational/ Training Material
Mis-directed flow Issued as a service to the
industry
Where else it can flow for Free Distribution

Other flow issues

Contaminants Gas/
Liquid/ Solid

Compatibility

Toxic Components

REPORT NUMBER: REV: C 22 MAY 2010 PAGE 1 OF 6


HAZOP Worksheets XYZ BLOCK X-YZ FIELD DEVELOPMENT, Central Processing Platform Date:

Node: 1 Describe the Node


Deviation Possible Causes Potential Consequences Safeguards & Procedures Recommendations Rank
High Temperature

Low Temperature

Transient Temperature

High Pressure

Explosion

Less Pressure/
Vacuum

High Level

Uneven level

Low / No Level/ Empty

Chemical Reaction/ Injection/ Addition


Less Concentration

More Concentration

Incorrect Chemical

More/ Less/ Wrong/


As-Well-As Reaction
Stirrer/ Agitator Failure
More/ Less Mixing
Chem injn points are

REPORT NUMBER: REV: C 22 MAY 2010 PAGE 2 OF 6


HAZOP Worksheets XYZ BLOCK X-YZ FIELD DEVELOPMENT, Central Processing Platform Date:

Node: 1 Describe the Node


Deviation Possible Causes Potential Consequences Safeguards & Procedures Recommendations Rank
close together

Less Time

More Time

Sequence Step
Skipped

Wrong sequence

Extra Actions

Instruments – None /
too many/ insufficient
FO/ FC/ FL positions
Instrt Response Time
Interlocks
Piping Class Rating

Operable/ Maintainable

Overview
Deviation Possible Causes Potential Consequences Safeguards & Procedures Recommendations Rank
Product RVP not met
Product spec not met

Material Selection
Corrosion/ Erosion
Material Identification

REPORT NUMBER: REV: C 22 MAY 2010 PAGE 3 OF 6


HAZOP Worksheets XYZ BLOCK X-YZ FIELD DEVELOPMENT, Central Processing Platform Date:

Overview
Deviation Possible Causes Potential Consequences Safeguards & Procedures Recommendations Rank

LPG handling
Old style vent stack

Commissioning
how will it be done
Sequence

Start-up

Shutdown
Planned
Emergency

Vessel Entry

Entry into Gas Turbine


Enclosure

Testing/ calibration

Noise
Sources
Power Failure
Utility Failure - Inst Air,
Plant Air, Hydraulic

REPORT NUMBER: REV: C 22 MAY 2010 PAGE 4 OF 6


HAZOP Worksheets XYZ BLOCK X-YZ FIELD DEVELOPMENT, Central Processing Platform Date:

Overview
Deviation Possible Causes Potential Consequences Safeguards & Procedures Recommendations Rank
Fluid, Steam, Nitrogen,
Cooling Water,
Process Water, DM
Water, Hot Oil, Fuel
Oil, Fuel Gas, Vacuum
& Vents

DCS Failure

Telecommunication /
Telemetry Failure

Electrical–HAC/
isolation/ earth

Emissions

Open drain tank


overflows

Bunding

Materials handling

Handling Toxic Wastes

REPORT NUMBER: REV: C 22 MAY 2010 PAGE 5 OF 6


HAZOP Worksheets XYZ BLOCK X-YZ FIELD DEVELOPMENT, Central Processing Platform Date:

Overview
Deviation Possible Causes Potential Consequences Safeguards & Procedures Recommendations Rank

Earthquake, Flooding,
Bushfire

Fire & Explosion


Detection/ mitigation

Dropped Object,
Collision
Human Factors

Alarms

REPORT NUMBER: REV: C 22 MAY 2010 PAGE 6 OF 6