Bakhrabad Siddhirganj Pipeline Project

Inspection / Test Requirements_Civil

Sr.
Description of the Item Inspection / Test
No.

1 Fine Aggregate (Sand)

Sieve Analysis (Gradation/Fineness Modulus)

Moisture Content

Silt Content

Specific Gravity

Soundness

Alkaly Aggregate Reactivity

Deleterious Constituents

Petrogrphic Analysis

2 Course Aggregate (40, 20, 10 & 6mm Metal)

Sieve Analysis (Gradation)

Moisture Content

Silt Content

Specific Gravity

Crushing Value

Impact Value

Abrasion

Elongation & Flackiness Indices

Water Absorption

Soundness

Alkaly Aggregate Reactivity

Deleterious Constituents

Petrogrphic Analysis

3 Cement

Initial & Final Setting Time

Fineness

Soundness

Compressive Strength

Chemical Properties

4 Concrete-All Grades

Comresion Strength

Page 1 of 5
Bakhrabad Siddhirganj Pipeline Project
Inspection / Test Requirements_Civil

Sr.
Description of the Item Inspection / Test
No.

Concrete Permiability Test

Workability for Concrete

Core Test

NDT

Initial Setting time of Concrete

Accelerated Curing

5 Water

Chloride Content

Sulphur Content

pH Value

Organic & Inorganic Test

Total Dissolve Solids - Hardness Test

6 Reinforcement Steel

Weight pre Meter

Bend/ Rebend

Tensile Strength

Elongation

Yield Strength

Chemical Properties

Carbon Content

Sulphur Content

Phosphorous Content

7 Bricks

Dimension

Water Absorption

Compressive Strength

Efflorescense

Colour

8 Solid / Hollow Concrete Block

Density

Water Absorption

Page 2 of 5
Bakhrabad Siddhirganj Pipeline Project
Inspection / Test Requirements_Civil

Sr.
Description of the Item Inspection / Test
No.

Compressive Strength

Drying Shrinkage

Moisture Movement

9 Floor Tiles / Paver Tiles

Dimension

Water Absorption

Abrasion Resistance

Wet Transverse

Wearing Layer

Flexure Strength

10 Bitumen

Marshal Stability of Mix

Bitumen Percentage in Mix

Taking Hard Core

Grade of Bitumen

11 Soil

Field Density

Standard Compaction Test/ Standard Proctor

Specific Gravity

Field Moisture

Grain Size Analysis

Liquid Limit / Plastic Limit

Shear Parameters

CBR Test

12 Soling Stone Crushing Value

Water Absorption

Verification of Test Report for same batch & grade from


13 Water Proofing Chemical
Manufacturer

Verification of Test Reportfor same batch & grade from


14 Admixture for Concrete/Water Proofing
Manufacturer

1) Verification of Test report for same batch & grade from


Manufacturer
15 PVC Pipe
2) Internal Diameter
3) Wall Thickness

Page 3 of 5
Bakhrabad Siddhirganj Pipeline Project
Inspection / Test Requirements_Civil

Sr.
Description of the Item Inspection / Test
No.

1) Verification of Test report for same batch & grade from


Manufacturer
16 RCC Hume Pipes/Cllars
2) Internal Diameter
3) Wall Thickness.

1) Verification of Test report for same batch & grade from


Manufacturer
17 GI Pipe
2) Internal Diameter
3) Wall Thickness.
1) Verification of Test report for same batch & grade from
Manufacturer
18 DI Pipe
2) Internal Diameter
3) Wall Thickness.
1) Verification of Test report for same batch & grade from
Manufacturer
19 CI Pipe
2) Internal Diameter
3) Wall Thickness.

20 Structural Steel

Dimension

Chemical Properties

Acid Resistance

21 Stoneware Pipe

Alkali Resistance

Crushing Strength

Water absorption

22 Ceramic Tiles/Glazed Tiles/Vitrified Tiles

Crazing

Impact Resistance

Chemical resistance

Warpage

Dimension

Thickness

23 Plywood/Gypsum Board/Partical Board

Moisture Cotent

Water resistance

Glue Shear Strength

Knife Test

Micological Test

Moisture Cotent

24 Wood

Density

Page 4 of 5
Bakhrabad Siddhirganj Pipeline Project
Inspection / Test Requirements_Civil

Sr.
Description of the Item Inspection / Test
No.

Origin Certificate

Knots, Bends, Holes

Moisture Cotent

25 Flush Door

Immersion Test

Knife Test

Glue Adhesion Test

Physical dimension/thickness/colour

Verification of Test Report for same batch & grade from


26 Anti Termite Chemical
Manufacturer

Verification of Test Report for same batch & grade from


27 Paint & Paint materials
Manufacturer

Note: All routine tests shall be carried out as per applicable standards.