You are on page 1of 3

WABO® CRETE II

Elastomeric Concrete
DESCRIPTION PREPARATION
®
Wabo Crete II is two-component polyurethane with a The concrete substrate must be clean (free of dirt, dust,
specialty aggregate, 100% solids material for use in coatings, rust, grease, curing compounds, laitance, and
®
exterior construction environments. Wabo Crete II is a other contaminants), sound and durable. Wabo
unique mixture, which monolithically bonds the recommends a minimum of 14 days open cure time on
expansion joint to the deck, creating a waterproof normal Portland cement concrete prior to application of
® ®
system. Wabo Crete II absorbs traffic impact loads and Wabo Crete II. Horizontal and vertical surface
evenly disperses them into the deck, while allowing the preparation methods include grinding, chipping, and
system to flex with deck loads. It is resistant to ozone, scarification, but are highly dependent on proper field
deicing chemicals, and abrasives. The addition of heat techniques. Sandblasting is the most reliable, preferred,
is not required to increase flow or cure the material, and and recommended method. Acid etching is NOT
it will self-level in the block out. recommended.
RECOMMENDED FOR  Durable Concrete - Sound and durable concrete
® should have a minimum cap pull-off strength of 200
 Wabo Crete II Membrane Systems
psi per ACI 503R, Appendix A.
 Wabo®SiliconeSeal
 Unsound Concrete – Loose, weak, spall, deteriorated,
 Wabo®InverSeal and/or delaminated concrete should be removed to
® sound concrete and repaired prior to placement of
 Aladin Structural Sealing System this product.
 Wabo®StripSeal System  Cracks – prior to placement of Wabo®Crete II, repair
 Concrete Spall Repairs cracks with a structural epoxy injection adhesive.
 Void filler Material Proper substrate preparation is essential to achieving a
®
successful Wabo Crete II installation.
FEATURES AND BENEFITS
 Rapid Installation and Fast Curing INSTALLATION
Easily mixes and cures in less than 2 hours. Traffic can
be received depending on temperature, normally within  Apply Wabo Bonding Agent (primer) to the surface of
two hours of completion. properly prepared concrete prior to installation of
®
Wabo Crete II. There must be no visible moisture
ASTM TEST prior to the application of the primer. Primer can be
PHYSICAL PROPERTY REQUIREMENT brush applied. Do not allow primer to dry prior to
METHOD
®
5-hr.Compressive Strength., min, C579-01
placement of Wabo Crete II.
3.45
MPa (modified)
 Premix Part B separately for 30 seconds before
24-hr.Compressive Strength., min, C579-01
14
pouring entire content of Part A and Part B into a
MPa (modified) clean 25 litre container. Mix both components slowly
7-day Tensile Strength., min, MPa D638 1 with a power mixer equipped with a butterfly paddle
for approximately 30 seconds, or until well blended.
7-day Tear Strength., min, kN/m D624 7
 Roll Part C drum 2-3 turns on floor prior to opening.
Slowly add the aggregate component to the liquid
Resilience @ 5% deflection, min C579-01 70%
material and mix with a heavy-duty power mixer for 3
Slant Shear Bond Strength to D882 minutes or until all the aggregate is coated thoroughly.
1.72
Concrete, min, MPa (modified) This mix can be poured into the properly prepared
block out, in which the primer is still stiff / tacky. The
Impact Resistance (Ball Drop),14days
@ 0°C
No cracks material will flow and self-level. Use a margin trowel
D5628 No cracks to work material and finish surface.
@ -29°C
No cracks
@ 70°C
 Refer to detailed “Installation Guidelines” prior to
Gardco Gel 10 minutes @
installation.
Pot Life 24°C
Timer
Page 2 of 3
®
WABO CRETE II
TYPICAL APPLICATION
®
Wabo Crete II with Aladin:

®
Wabo Crete II with Membrane Seal:

®
Wabo Crete II with Wabo SMD StripSeal:

®
Wabo Crete II for Crack repair:

PACKAGING
Bonding Agent: Part A: 1.2 KG (1.04 liters)
Part B: 1.2 KG (0.85 liters)
®
Wabo Crete II: Part A: 2.2 KG (1.8 liters)
Part B: 4.3 KG (4.5 liters)
Part C: 32.6 KG (18.3 liters)

Coverage of One Kit of WaboCreteII = 19 Liters


WABO® CRETE II
STORAGE
 Store at temperatures above 5°C in tightly sealed
containers.
 Application temperatures <21°C will result in slower
cure times.
 Wabo®Crete II must be fully supported by a structural
member (steel or concrete), and there should be no
overhang.
 Always mix as a full unit.

The technical information and application advice given in this BASF Construction Chemicals publication are
STATEMENT OF based on the present state of our best scientific and practical knowledge. As the information herein is of a
general nature, no assumption can be made as to a product's suitability for a particular use or application and
RESPONSIBILITY no warranty as to its accuracy, reliability or completeness either expressed or implied is given other than
those required by law. The user is responsible for checking the suitability of products for their intended use.
NOTE Field service where provided does not constitute supervisory responsibility. Suggestions made by BASF
Construction Chemicals either orally or in writing may be followed, modified or rejected by the owner,
engineer or contractor since they, and not BASF Construction Chemicals, are responsible for carrying out
procedures appropriate to a specific application.

BASF (Thai) Ltd. Imported & Marketed in India by:


Construction Chemicals Division
rd
23 Fl,, Emporium Tower,
BASF Construction Chemicals (India) Pvt. Limited
622, Sukhumvit 24 Rd., C-68, MIDC Turbhe, Navi Mumbai – 400 613
Klongton Nua, Klongtoey, Phone: +91 22 4157 7777 Fax: 4157 7766
Bangkok 10110 Thailand
Tel :+66-2664 9428 e-mail: basfcc@vsnl.net www.basf-cc.co.in
Fax :+66-2664 9267