Professional Documents
Culture Documents
Pre-Feasibility Studies
(EDM) (SEC)
Architectural Research
(PRI & SEC)
Architectural
Programming (APSP)
(SPC)
Space management
studies (AoSR) (SP)
Value Management
(AUP@MC)
Manner of Payment
Owner's Responsibilities
Other conditions of
Per diem/honorarium
(personal time; plus out
of pocket expenses)
Mixed MoC
SPP 201
Owner's
responsibilities
Other conditions on
services
SPP 202
REGULAR DESIGN SERVIES
PDP,SDP,DDP,CDP,BNP,CP (6)
give oral or written advice Project Definition phase
(4)
attend conferences 1
3
Construction Phase (5)
Single Contract\
Separate Contract
Classified - Degree of
Complexity & creative skill
required
SMERMRHEAC
Group 1: Simple
Group 2: Moderate
Group 3: Exceptional
Character
Group 4: Residences
Group 5: Monumental
Group 6: Repetitive
Construction
Group 7: Housing Projects
Group 9: Alteration
(6) MoC
Per diem/honorarium
(personal time; plus out
of pocket expenses)
Mixed MoC
-18
Conditions for the Architect's
Fee
Other services
Work suspended or
Diferent Periods of
Construction
Charges of Specialist
Consultants
Separate Services
Estimates
Cost Records
Specialized Architectural
Services - deals with specific
expertise for further enhancement
of the archietctural interior and
exterior components of a project.
Architect's responsibility to
man and society - make sure
that both the building and its
physical environment enhances
the lives of people by strictly
adhering to national and
international standards with
regard to public health, safety and
welfare.
Consulting Architect - shall refer
only to a RLA who may also be a
separately RLP
PSDCBC
Owner Requirements &
Arch'l Program
consult and confirm
conceptual framework
and related reqts
Design Development
Documents
DD Docs - plans, elevs, sec,
and other
Outline specs: fix and
illustrate size and character
of entire project - type of
Matls and Engg system
Diagrammatic layout of
Construction Systems
Updated SPPCC
Contract Documents
(See General Ocnditions
UAP Doc 301)
prepares complete
Contract Docs
documents for
construction
forms for invitation
and instruction to
bidders, forms for
bidders' proposals
and general/specific
conditions of
contract,
assist owner listetc
of
prospective contractors
Competitive
Bids/Procurement
(many
contractors/long or
short listed)
furnishes
complete sets
of Bid Docs -
loaned to
Bidders at an
amount
sufficient to
cover direct
and indirect
costs (prep.
Packag,
reprod,
delivery)
intellectual
property of
the Ar (Sec 33
- Ar sole
ownership
help conduct
and organize
pre-bid
conferences
responds to
question
from
bidders (Bid
assist owner:
(1) obtaining
proposals
from
contractor,
(2) analyzes
bid results,
(3) prepares
Abstract of
Bids, (4)
notice of
award, (5)
Negotiated
Contracts one
contractor only
performs:
decisions on all claims of
the Owner and Contractor
prepares change orders,
gathers and turns over
written guarantees
periodic visits (general
progress and quality of
works and if in accordance
with Contract Docs) - shall
not be exhaustive; shall
condemn work
noncompliant; report to
owner defects and
deficiencies
determine amount owing
and due to contractor
issue:
Certificate of Payment
(based on observation and
Contractor's Application for
Payment)
Necessary inspection - to
conclude dates of
substantial and final
completion and issue final
Certificate of Payment to
contractor
Should more extensive Que
inspection or full time ry
(8hours) construction
supervision is reqd, a
separate full time
supervisor must be hired
(SPP 204 A)
DAEDS
DADS
* both cases - civil liabilities
remain saparate; RLA does
not assume civil liability of
the other RLP
other improvements as to
the availability of
utility/service lines both
public and private;
zoning compliances,
clearances, deed of
restrictions, encumbrances
and annotations to titles,
association guidelines and
standards, and soil
investigations, boring and
test pits necessary for
determining soil and sub
soil condition
Based on the PCC; When
the Ar. Has to render
additional services, addl
compenstaion is reqd
To be recommended by Ar
for Owner's Approval. To be
payed by owner: - other
service provider and Ar for
coordination fee
chargeablle to owner if Ar or
rep is reqd byond 50 km
from office (Ar. Letter head)
Owner shall pay addl sets
(4)
- Quality Control
- Evaluation of
Construction work
- Prep. Of Daily Inspection
Reports
- Filing of Docs
Dual Capacity (Ar and CA)
or as CSG
AoR is in better position to
interpret his drawings
(staf can be assigned to
full time supervision)
CA only or as CSG
Percentage of Project
Construction Cost
MDPE (7copies)
Professional Fee +
expenses
Lump sum/FF
Limitation of Authority
CSG or Ar, shall not
assume the responsibility
of the Contractor's
Projects superintendednt
CSG shall not make
decisions on matters that
are sole responsibility of
Aor
Legal responsibility
CSG
- admin matters to Owner
- technical matters to Aor
Article 1723 of Civil Code,
CSG may not havfe a legal
responsibility for plans
and construction
However, Service
Contract/Agreement bet.
CSG and Owner may
stipulate such terms
particularly if party is to
review Contract Docs and
interpretation during
course of construction.
cross claims may be filed
if non-performance of
certain acts are traced to
the CSG
Qualification
BSA degree
Extensive experience in
design and construction
and must be very
knowledgeable in bldg
materials and
construction detailing
SPP 204 - B SPP 205
CONSTRUCTION POST CONSTRUCTION
MANAGEMENT SERVICES
SERVICES
Bldg Eqpt
Maintenance
Business Devt and
Management
Dual Capacity (Ar and CA)
or as CSG
CA only or
separate compensation % of Gross Rentals,
from AR maintenance and security
fees
Monthly salary/fee
Limitation of Authority Shall not
involve himself directly
with work of the
contractor (to not be
construed with
Contractor's
impose Civil liability)
methods, systems
or designs that will
substantially afect
construction schedule and
impair design concept of
Ar.
Legal responsibility
CM
- directly responsible to
owner: programming,
coordination, quality and
cost control and time
management
CM assumes no liability in
case quipment fail to
function or if a portion of
a bldg collapses:
- due to deficiencies in
plan, provided CM did not
participate in Plan review
- due to deficiencies in the
manner of construction,
provided CM faithfully
discharged his functions
during
construction/project
implementation
Qualification
Must be State-regulated
professional (RLP)
Ar who are cpontractors or
who have already been in
responsible charge of
construction - capable of
being CM
SPP 206
COMPREHENSIVE
ARCHL SERVICES
(1) comprehensive
Architectural Services, (2)
Project Management
Comprehensive Provide continuity of
Architectural Services services
involves management
activities
Project Management
Ar as PM performs Regular
Design Servise, shall be
paid separtely for such)
SPP 207 SPP 208
DESIGN-BUILD
SERVICES
(1) DB by Administration,
(2) DB with Guaranteed
Max. PCC
- best to achieve need on
balance of elements of
time, quality and cost (Ar
performing DBS)
- Ar -assumes profl
responsibility and civil
liability (for both Design
and construction)
DB Services by Admin
Procurement: materials,
plants, eqpts, licenses and
permits
Authorizing payment of
accounts
Keeping records of
accounts
himself a Stet-liocensed
Contractor
variation must adhere to - SPP 200 (CEC) and SPP
202
- owner shall pay all costs
of permits and licensesnd
other incidental works
- Ar may appoint
construction
superintendedt,
purchasing agent,
timekeeper (not
deductible toi Ar fee)
- may be modified based
on SPP 202 alternatives
SPP 209
Specialized Allied Services Architectural Interior
Services (Sec3 & 14)
final inspection
assist in bidding & nego with assist in bidding & nego with
contractor contractor
checks and approves samples of checks and approves samples of
materials and shop drawing materials and shop drawing
Multi-disciplinary team
Ordinarily: landscaping layout of studying its interrelationship with
small building projects could be other structures, the surrounding
done by the Ar as part of SDP environment, and their efect and
efort. However if its large in impact on the neighboring areas
scale, the Ar must hire a
qualified SC
When commissioned to do
physical planning for bldg sites:
confers project
examines laws, ordinances
FRDP, CMDP
PMDP/DMDP (18)
prepare SPPCC for the total
physical devt
undertakes modifications,
revisions and changes
reqd by owner
prepares finalized plans
prepare construction
prepares Project Cost
Estimates (PCE)
conceptualizes the entire SDP:
civil, hardscape, softscape
Multi-disciplinary team
CDP services may place heavy
emphasis on the non-
physical/non engg
componments of the devt plan
(i.e. financial, economic, market
demand, forecast,
administrative-political-insitl-
legal, socio-culturalo,
environmental and the like)
Comprehensivce
Development Planning (CDP)
- calls for the detailed study of
phsyical, social, economic and
administrative components; as
such requires the expertise and
knowledge of Special
Ocnsultants.
CA is commissioned to do CDP
efort, he performs the f:
How? Adding all costs fo technical services Fixed sum over and above the
(manhours x rate) and then multiplying reimbursment for the Ar's technical
by a multiplier (covering overhead and time and overhead
profit)
Formula
Direct Cost = AN + CN + TN
Fee = Direct Cost x M
Total Cost of Service charged to the
client = Fee + R
= (Direct Cost x M) + R
Lump Sum (Fixed Fee) Per Diem/Honorarium
May be applied to government for work which will require his personal
projects (since they entail more paper time, such as:
work and time consuming efforts) (1) attending project related meetings,
conferences, trips
(2) conducting ocular inspection of
possible project sites
(3) conferring with others regarding
prospective investements or ventures
No Yes