KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD. FORM NO.

F/TQM/04
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL REV. 03
Rev. No.:________
Project / Location: Name of Job: Prepared By: Reviewed By:
R4 / BBR111, Bandar Bukit Raja 2, 5. Temporary Wiring / Cable
Klang, Selangor. Date: Date:

5. Temporary Wiring / Cable


HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

Mechanical - Minor injury (5) Machine operated by competent operator.


Delivery of Material Struck by moving part of -Damage to property / 2 3 6 - Workers stay away from moving machine.
Loading and machine utilities (6) To provide appropriate PPE.
1
unloading material Physical (5) Machine operated by competent operator.
(Cable / Wire) -Serious injury
Falling object – during lifting 2 4 8 - Machine inspection before work commences. Project Manager
-Damage to property (6) To provide appropriate PPE.
of material Site Manager
Physical (5) Supervised by designated person during lifting of
material. Site Agent
Slip / fall / collapse of material
-Serious injury 2 4 8 - Routine checking to ensure stability of material. Site Engineer
due to poor material - To ensure material not obstruct any access way.
Stacking / Storing arrangement. (6) To provide appropriate PPE. Site Supervisor
2
material at site (5) Machine must operate by competent operator.
Physical SHO / SSS
- Workers stay away from moving machine.
Struck / hit by moving part of -Minor injury 2 3 6 - Designated person to supervise lifting activity. EO
material during lifting activity (6) To provide appropriate PPE. Scaffolder
(4) Safety guard are in good condition. Work Leader
Mechanical (5) Work carry out by skill workers.
-Serious injury 2 4 8 Machinery opr/
Hand cut by cutting equipment (6) To provide appropriate PPE.
- Workers to wear suitable clothes. Driver
-Minor injury Signalman
(5) Work carry out by skill workers.
Noise exposure (long term can impair 2 3 6 (6) To provide appropriate PPE. Banksman
Installation work workers hearing)
3 Rigger
(Cable / Wire) (5) Material handling should be carried out with correct.
Physical (Ergonomic) Welder
-Negligible injury 2 3 6 - Take a 2-3 minutes rest after every 2 ( two ) hours.
Improper method of handling (6) To provide appropriate PPE. Workers

-Heat stress (low (4) Good / open ventilation at working area.


Psychological - To provide shelter/ rest area & drinking facilities
productivity) 2 3 6
Hot weather (5) Take a 2-3 minutes rest after every 2 ( two ) hours.
- Skin burn (6) To provide appropriate PPE.

Legend:
(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)
KITACON SDN. BHD. & PEMBINAAN KITACON SDN. BHD.
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL

Temporary Wiring / Cable (Cont’d)


HAZARD IDENTIFICATION RISK ASSESSMENT
Current Control Measures /
Responsibility
No Job Sequence Hazard Potential Risk Probability Severity Risk Recommendation

Project Manager

Physical (4) Proper working platform for workers. Site Manager


-Serious injury 2 4 8
Workers slip and fall (6) To provide appropriate PPE. Site Agent
Site Engineer

Installation work Site Supervisor


3
(Cable / Wire) SHO / SSS
EO
Physical (4) To ensure hand-tool in good condition. Scaffolder
-Serious injury 2 4 8
Hit by hand-tool (6) To provide appropriate PPE. Work Leader
Machinery opr/
Driver
Signalman
Banksman
(4) To ensure wiring in good condition before used. Rigger
Physical
4 Using electrical -Serious injury/Fatality 2 5 10 - Electrical wire shall hang-up or not obstruct walkway.
Electrical shock (6) To provide appropriate PPE. Welder
Workers

Legend:

(1) Eliminate ; (2) Substitution; (3) Isolate; (4) Engineering Control; (5) Administrative Control; (6) Personal Protective Equipment (PPE)